Inspection & Testing Requirements Scope:: Test and Inspection Per
Inspection & Testing Requirements Scope:: Test and Inspection Per
0020 R X Raw Material Verification including coils As per API 5L. The steel coils for ERW pipes (HIC/Non HIC
resistance, as applicable) shall be procured from Saudi Aramco
latest approved steel mills list.
0050 R X NDE procedures and Personnel Verify valid personnel qualification and approved procedure.
0020
0010
***
W X
In process inspection & test requirement
ERW parameter control
Specification Details / Notes:
Per pre-qualified MPQ, (Conform ERW parameters to be within
MPQ)
0020 W R X Mechanical Tests; Tensile, Fracture Toughness, Hardness, Per 01-SAMSS-333 and API Spec 5L, as applicable.
Guided Bends, Flattening, Microstructure
0040 W X Hydrogen Induced Cracking Test Per 01-SAMSS-333 Annex H for Sour Service.
0070 W R X a)Ultrasonic examination(UT)of Weld UT to be carried out after hydrostatic testing Per
01-SAMSS-333
IR010300 Continued...
INSPECTION & TESTING REQUIREMENTS REVISION: 12/31/2017 CODE NUMBER: PAGE:
SAUDI ARAMCO FORM-175 REPLACES: 04/27/2017 IR010300 2 of 2
(1).VISUAL INSPECTION BY BUYER INSPECTION REPRESENTATIVE
(2) REVIEW AND VERIFICATION OF MATERIAL CERTIFICATES AND INSPECTION RECORDS
(3) SUBMISSION OF MANUFACTURING, INSPECTION AND QUALITY RECORDS
0080 W R X b)Ultrasonic examination(UT) of pipe ends 01-SAMSS-333: Full circumference of the pipe ends shall be
UT inspected.
0090 R X c)Supplementary NDT Requirements Per 01-SAMSS-333 Annex E and Annex K for Sour and/or
Offshore service
0030
0012
***
H X
Final inspection & test requirements
Visual and Dimensional Inspection
Specification Details / Notes:
Per 01-SAMSS-333 and API 5L
0014 W X Coating, Marking, and shipment Per 01-SAMSS-333, API 5L and P.O requirement.
Notes:
(1) Refer detailed instruction sheet SA175 form IR000003 of inspection requirement for ideal use of this form.
End of IR010300