Professional Documents
Culture Documents
Specs Nuat Thai
Specs Nuat Thai
LOCATION : Primark Town Center Atherton, Novaliches, Quezon City, Metro Manila
OWNER : NUAT THAI ATHERTON - FAIRVIEW
TECHNICAL SPECIFICATIONS
GENERAL CONDITION
The Drawing and Specifications are complimentary and supplementary to each other.
Anything mentioned in the specifications but not shown in the drawings or vice-versa shall
be of effect as if mentioned in both.
All drawings are done according to scale. Numerical values are indicated in drawings. But if
there are indicated numerical values drawings shall be measured by the scale, But if there is
a discrepancy, the numerical value indicated are to be followed instead of the scale.
All works mentioned herein shall be final. Any revisions to be done shall be settled between
the owner and the Engineer in charge of the construction.
INTERIOR FINISH
ELECTRICAL WORKS
PLUMBING WORKS
Sanitary Vent Pipe, sewer & storm embedded at ground - PVC pipes, series 1000 only
Miscellaneous -
Floor Drains - heavy-duty stainless strainer, with flapper only. Those at shower area, provide
basket strainer.
Clean Out Cover – must be of brass material except for ceiling-mounted clean-out, wherein PVC
shall be used. For septic tank, use countersunk CO. (brass).
Air Chamber (300 mm. long) shall be provided for all waterline outlets; all necessary fittings shall
be provided.
1.) Unless specified all brand of paint shall be Boysen or Dutch Boy.
2.) All exposed wood work shall be applied first with wood stain.
Sanding is an essential part of painting works. Therefore, all cracks joints and nails shall be
glued and concealed first with wood filler.
Prepared By:
Arch. Jan Nikolai D. Gongora, rmp
AR-0040782 PTR NO. - 9071303
ISSUED ON: JAN 12, 2018/TAYTAY RIZAL