EQUIPMENT INTERNAL INSTALLTION WORK Date- 4-Sep-21

BALURAM & BROS.


Sender- AMRAT

10-Sep-21
11-Sep-21
12-Sep-21
13-Sep-21
14-Sep-21

15-Sep-21
16-Sep-21
17-Sep-21
18-Sep-21
19-Sep-21
20-Sep-21
21-Sep-21
22-Sep-21
23-Sep-21
24-Sep-21
25-Sep-21
26-Sep-21
27-Sep-21
28-Sep-21
29-Sep-21
30-Sep-21

10-Oct-21
11-Oct-21
12-Oct-21
13-Oct-21
14-Oct-21
15-Oct-21
16-Oct-21
17-Oct-21
18-Oct-21
19-Oct-21
20-Oct-21
21-Oct-21
22-Oct-21
23-Oct-21
8-Sep-21
9-Sep-21

1-Oct-21
2-Oct-21
3-Oct-21
4-Oct-21
5-Oct-21
6-Oct-21
7-Oct-21
8-Oct-21
9-Oct-21
Activity Equipment Activity Unit Qty. Duration Start date Finish date Remarks
No. No. (Days)

1. DHDT 13-C-001N
Mobilization of agency with supervisor for gatepass
1.1 1 8/Sep/21 8/Sep/21
formalities of worker & tools tackles
1.2 Gatepass process 5 9/Sep/21 13/Sep/21
Manhole opening and inspection with HSE team for
1.3 1 9/Sep/13 9/Sep/13
oxygen level and confined space requirement
Installation of exhaust fan and lightening
1.4 1 10/Sep/21 10/Sep/21
arrangement
Scaffolding arrangement as per requirement (Inside
1.5 4 11/Sep/21 14/Sep/21
& Outsite of vessel)
13-C-001N Identification of internal material & baricading of KG 3790
1.6 1 11/Sep/21 11/Sep/21
storage location
1.7 Preparation of MIV 1 12/Sep/21 12/Sep/21
1.8 Material shifting from from tkIS store to site 1 13/Sep/21 13/Sep/21
Installation of PP rope with trolly in vessel for lifting
1.9 1 14/Sep/21 14/Sep/21
of internals
1.10 Fixing of Internal Trays 34 15/Sep/21 18/Oct/21
1.11 Final inspection by tkIS & Sulzer 2 19/Oct/21 20/Oct/21
1.12 Scaffolding dismantling and manhole closing 3 21/Oct/21 23/Oct/21
Note:.
1. This schedule is prepared without considering delay due to natural calamities.
2. Availiblity of M/s. Sulzer is required during internals installation.