Professional Documents
Culture Documents
Single Cylinder Balance Beam Steam Engine Dsigned by Gerry Dykstra General Arrangement
Single Cylinder Balance Beam Steam Engine Dsigned by Gerry Dykstra General Arrangement
DE WAAL,12 BRIGHTWELL STREET PAPAKURA 2110 NEW ZEALAND (09)2988815 IF IN DOUBT ASK
147
76
EEN CILINDER BALANS STOOM MACHINE ONTWORPEN DOOR GERRY DYKSTRA ALGEMENE OVERZICHT FOUND THIS PROJECT ON THE FOLLOWING WEB SITE: http://www.john-tom.com/html/SteamPlans2.html
TITLE JDW DRAUGHTING SERVICES DRAWN BY PROJECTION DRAWING NUMBER SHEET
4
6
6
26
24.5
1 24 1 24
BOTH ENDS
MAT: MILD STEEL EQUAL 13
31
00
26
45°
03 26
10
2.5 4PLACES
45°
5.5
17 PCD
20
13 04
7
MAT: TIMBER (PINE) SCALE 1:2 6
10
16
1.5
4
1.5
8
1.5
6 6
26
12
2.5 4 PLACES
2.5 4 PLACES
2
8
6
13
4.75 4.75
10
19
5.5
6
8.5
R0 7 12
.7
5
5
.7
R0.75
R0
M2.5 M2.5
2 4 M2.5x10mm DEEP
1.5
8 PLACES 06
OPPOSITE FACE EQUAL
M2x6 DEEP
A 45°
DETAIL B 3.5 19
SCALE 4:1 05 9.5
3.3 8 MAT: BRASS
6
17 PCD
1.5
MAT: BRASS
2
1.5
0.8
16
10
2
24 2 12
2
18.5
18.5
3.5
M4x6 DEEP
1.5
5.5
R6. 4.75 4.75
45°
6
1.5
5
3
R6.5
3
12
19
1.5
07
2 2 PLACES
18.5
6 6 4
2 4 PLACES 09
5.5 1.5
13
SECTION A-A OPPOSITE FACE EQUAL
MAT: BRASS MAT: BRASS
45°
A 6
MAT: BRASS
EEN CILINDER BALANS STOOM MACHINE ONTWORPEN DOOR GERRY DYKSTRA ONDERDELEN FOUND THIS PROJECT ON THE FOLLOWING WEB SITE: http://www.john-tom.com/html/SteamPlans2.html
TITLE JDW DRAUGHTING SERVICES DRAWN BY PROJECTION DRAWING NUMBER SHEET
3.5 3.5
18 9 9 11
3
THRU THRU THRU
9.5
2.5
5 11 DEEP 11 DEEP
M4
3 M3 M3 M3 M3 M3 M3 3
19
12
3
2.5
3.5 3.5
6
5
5
8
R0
R1
.8 6 C
08
.8
01 MAT: BRASS
R0
R3
R3
R3
01 M4.5
6
R3
R3
5.5
R2 R2 2.5
3
6.5
R3
R2
R2
2.5
116.5
R2
45.1
R2
106
R2 6
102.5
R3
2.5
6.5
89
3
86
1.5
R2
SECTION C-C
1.5 10
3 1.5
R3 19
R2
1.5
5.5 1.5
R2
R3
16.5
51.7
45°
6
13
M4.5
11
M2.5
23
M3
41
R3 MAT: BRASS
R3
R3
R3
7.5
2
12
10 2.5
R3
2.5 MAT: STEEL
17
15
2.5
2.5
12
12
12
R10
9
5
5
8 11
20 27 30 30 19 11
33.5 34.7
M3
6
4
34.7 41.5 3.5
64
6
84 76 R3
56
MATERIAL:PAINTED MILD STEEL OR ALUMINIUM SCALE 1.5:1 12 SCALE 1:1 MAT: STEEL
EEN CILINDER BALANS STOOM MACHINE ONTWORPEN DOOR GERRY DYKSTRA ONDERDELEN FOUND THIS PROJECT ON THE FOLLOWING WEB SITE: http://www.john-tom.com/html/SteamPlans2.html
TITLE JDW DRAUGHTING SERVICES DRAWN BY PROJECTION DRAWING NUMBER SHEET
2.5
13.1 16
3
R10
2.5
11
2.5
5
6 8 14 4.5 3 R0.
5
5
7
4
5
1.5
3 1.5 3
8 3 1.5 3 DRILL OIL HOLE 8
14 2 15 4 DRILL THRU AFTER ASSEMBLY
4 AFTER ASSEMBLY 6
13 MAT: STEEL
2.25
2 2 R5
.5
D D
R4
17
R2
R2
R2
R2
15
4.5
8
2
2
MAT:TEFLON OR NYLON
4.5
9
5
2.75
4
SECTION D-D MAT: BRASS
1.5
5.5 5.5 13 13 22
5.5 13 13
17 MAT: BRASS MAT: STEEL
18 PRESS FIT BRONZE BEARING
20 3 3 21
2.5
1.5
5
5
3 3
2.5
M4
1.5
4
4
6
M2
8 0.5
R3
12
30 3.5
2.5 31 75
MAT: BRASS & COPPER R1.
1.5
1.5
2
.5
4
R2
25.25
R2
3.5
.5
26 3.5
27 MAT: 1.5mm THICK STEEL PLATE
1.5
24 R3 3.5 8 3.5 R2.5
R3
5
R2.
4
25 25.5
8 29 1.5 MAT: 1.5mm THICK STEEL PLATE
19.5
3.5
4
2
MAT: 1.5mm THICK STEEL PLATE
3.4 23
22.2 3.5
3.5
3.5
5
8 8
M2
MAT: BRASS 31
19 MAT: BRASS
2 51 51
28
DRILL & C'SINK AFTER ASSEMBLY
3
3
12.2 3
20
23 5
3.5
51
M2
51
MAT: BRASS 9
26 41 6 6 15 17
1.5 1.5 3.5
3.5 3.5
5
E
.5
2
R2
LR R3.5
AL
1
1
20
1
.5
R3
MAT: STEEL 9
MAT: TIMBER SLATS 24 MAT: BRASS 13
EEN CILINDER BALANS STOOM MACHINE ONTWORPEN DOOR GERRY DYKSTRA ONDERDELEN FOUND THIS PROJECT ON THE FOLLOWING WEB SITE: http://www.john-tom.com/html/SteamPlans2.html
TITLE JDW DRAUGHTING SERVICES DRAWN BY PROJECTION DRAWING NUMBER SHEET
6
M5
M5
R2
R2
34 MAT: MILD STEEL
6
16
DRILLOIL
6 32 1 1 10 12 HOLES AFTER
1 1 8 ASSEMBLY
M5
°
100
H
100
J
R2 R2
0.68
°
1
35
40
5
R2
R2
2
26 26
10
8
45°
13
8
4.5
8
SECURE BEARINGS 2 DRILL 1mm
5mm DEEP ONE H
F MATERIAL: MILD STEEL SECTION J-J WITH 1mm PINS 2
18 PRESS FIT PINS J SIDE ONLY
MAT: MILD STEEL & BRONZE DRILL & TAP M2.5
4.5 4.5 23 WELD OR
5
R0.
4
4
2 U 2 5 5 L SOLDER
5
L 4.5
1.5
A
1.5
37
PRESS FIT 2.5 2
4
2.5 4.5
4
4.5
4.5
8
2.5
2.5 2.5
32 M2.5 38 11
U
13 SECTION U-U SECTION H-H
MAT: BRASS 35
13
MAT: 0.5mm BRASS PLATE
SECTION F-F 2 DRILL OIL HOLE
C'SINK AFTER ASSEMBLY
3
G 6
1.5 1.5 3.5
33 5
6 R3. 41 2 19 3
1.5
42
2
4
R2
6
5
8.5
39
2.5
R3
1.5
6 4.5
R2.
5 R2
25
3
18
21
9.5
WELD OR
6
SOLDER
10
M2
7
5
M3x6 DEEP
R3
R2
WELD OR
.5
G M5 SOLDER 6
R2
.5
1 GBE-09-STEAM CHEST COVER
R2
1 GBE-10-VALVE ROD PACKING GLAND
3 2 GBE-16-MAIN PIVOT SHAFT SUPPORT
R2.5 2 GBE-17-MAIN CRANK BEARING
2 GBE-18-GROUNDING LINK MOUNTING BLOCK
1 GBE-19-CYLINDER MANTEL
3 GBE-20-IN-OUTLET PIPE
1 GBE-21-MAIN PIVOT SHAFT
2 GBE-22-MAIN PIVOT SHAFT LOCKING PIN
2 GBE-29-GROUNDING LINK SPACER
R34
1 GBE-45-BELLCRANK POST
1 GBE-M2 NUT
3 GBE-M2 WASHER
16 GBE-M2.5 WASHER
R2.
R2
R2
16 GBE-M2.5x12 CHEESEHEAD SCREW
5
2 2 4 GBE-M2.5x8 CHEESEHEAD SCREW
5 4 GBE-M2x12 CHEESEHEAD SCREW
4 GBE-M2x8 CHEESEHEAD SCREW
12 GBE-M3 WASHER
8 GBE-M3x10 CHEESEHEAD SCREW
4 GBE-M3x8 CHEESEHEAD SCREW
12
6
4 GBE-WOOD SCREW
M2 M2
K 8 8
MATERIAL:PAINTED MILD STEEL OR ALUMINIUM SECTION K-K
70 9
M2
M3
40
1.5 1.8
M2
2.5
46
44 38 45
M2 43 5 32 5
2.5
4
M2
3
3
M2
4
3 6
MAT: BRASS
2 M2 MAT: 1.5mm MILD STEEL PLATE 2.5 5 6 2.5 ASSEMBLY 100
MAT: BRASS
EEN CILINDER BALANS STOOM MACHINE ONTWORPEN DOOR GERRY DYKSTRA ONDERDELEN & SAMENSTELLINGEN FOUND THIS PROJECT ON THE FOLLOWING WEB SITE: http://www.john-tom.com/html/SteamPlans2.html
TITLE JDW DRAUGHTING SERVICES DRAWN BY PROJECTION DRAWING NUMBER SHEET
61
ASSEMBLY 102
ASSEMBLY 105
96.5
18.5
QTY. ASSEMBLY 109
1 GBE-39-ECCENTRIC HOUSING
1 GBE-40-ECCENTRIC CONNETING ROD
1 GBE-41-ECCENTRIC CONNETING ROD YOKE
ASSEMBLY 103
QTY.
1
ASSEMBLY 103
GBE-15-VALVE
ASSEMBLY 109
1 GBE-14-VALVE ROD
1 GBE-43-VALVE STEM OFFSET POST
1 GBE-M2 NUT
ASSEMBLY 108
ASSEMBLY 101
63.5
QTY. ASSEMBLY 101
1 GBE-03-CYLINDER BOTTOM LID RESTING BLOCK
1 GBE-04-CYLINDER BOTTOM LID
1 GBE-05-CYLINDER BLOCK
1 GBE-06-CYLINDER TOP LID
1 GBE-07-CYLINDER ROD PACKING GLAND
ASSEMBLY 104
1 GBE-08-STEAM CHEST QTY. ASSEMBLY 107
1 GBE-09-STEAM CHEST COVER 1 GBE-34-MAIN CONNECTION ROD
1 GBE-10-VALVE ROD PACKING GLAND QTY. ASSEMBLY 104 1 GBE-33-MAIN CONNECTION ROD YOKE
4 GBE-M2.5 WASHER 1 GBE-24-MAIN BEAM END BUSHING 1 GBE-24-MAIN BEAM END BUSHING
4 GBE-M2.5x12 CHEESEHEAD SCREW
4 GBE-M2.5x8 CHEESEHEAD SCREW
2 GBE-25-BEAM PARALLEL LINKS
1 GBE-26-BEAM PARALLEL LINK BELOW BUSHING-1
ASSEMBLY 107 2 GBE-M2 WASHER
2 GBE-M2x4 CHEESEHEAD SCREW
4 GBE-M2x12 CHEESEHEAD SCREW 4 GBE-M2 WASHER 1 GBE-35-CONNECTION ROD CRANK BEARING
2 GBE-M2x8 CHEESEHEAD SCREW 4 GBE-M2x4 CHEESEHEAD SCREW 2 GBE-M2.5x12 CHEESEHEAD SCREW
EEN CILINDER BALANS STOOM MACHINE ONTWORPEN DOOR GERRY DYKSTRA SAMENSTELLINGEN FOUND THIS PROJECT ON THE FOLLOWING WEB SITE: http://www.john-tom.com/html/SteamPlans2.html
TITLE JDW DRAUGHTING SERVICES DRAWN BY PROJECTION DRAWING NUMBER SHEET
ASSEMBLY 105
ASSEMBLY 107 ASSEMBLY 104
ASSEMBLY 106
ASSEMBLY 109
ASSEMBLY 103
ASSEMBLY 101
ASSEMBLY 100
EEN CILINDER BALANS STOOM MACHINE ONTWORPEN DOOR GERRY DYKSTRA SAMENSTELLING FOUND THIS PROJECT ON THE FOLLOWING WEB SITE: http://www.john-tom.com/html/SteamPlans2.html
TITLE JDW DRAUGHTING SERVICES DRAWN BY PROJECTION DRAWING NUMBER SHEET