CONFIRMATION/ THƯ XÁC NHẬN

To: Coteccons Construction Joint Stock Company.


Project: NORTH STAR / 29 Lieu Giai, Ba Dinh, Ha Noi.

Project: NORTH STAR


Ref: Quantity of Construction waste disposed at NORTH STAR Project by Urban Environment
Co., in June 2020
V/v: Xử lý rác thải xây dựng ở công trường NORTH STAR trong tháng 6/2020
We hereby confirm the quantity of construction waste removed and processed from NORTH
STAR Project in June 2020 by our company as follows/ Chúng tôi xác nhận khối lượng rác thải
xây dựng đã thu gom và xử lý trong tháng 6/2020 từ công trường NORTH STAR như sau:

• Domestic waste/Rác thải sinh hoạt: 3.6 m3


• Rubble/Xà bần: 41.0 m3
• Wood/ Ván gỗ vụn: 57.2 m3
• Ferrous Metal Scraps/ Sắt vụn: 1,700 kg
• Non-ferrous Metal scrap: 100 kg
• Plastics/ Nhựa: 2.2 kg
Tp. HÀ NỘI ngày 25/06/2020
Regards/Trân trọng
Project: NORTH STAR
Location: 29 LIEU GIAI, DISTRICT BA DINH, HA NOI
Contractor: Coteccons Construction Joint Stock Company.
LORRY LOG

MAY 2020

Date Vehicle No Time in Time out Purpose of Entry

06/06/2020 29C-880.94 10am 11am

08/06/2020 29C-889.03 2pm 3pm

09/06/2020 29C-549.66 2pm 3:15pm


Removal of waste
12/06/2020 29C-815.63 3pm 4pm

13/06/2020 29C-820.93 10am 2pm

25/06/2020 29C-820.72 2pm 3pm

On behalf of Contractor

Trần Văn Chung


MONTHLY PHOTO REPORT
JUNE 2020
1. PROJECT INFORMATION
PROJECT NAME: NORTH STAR
LOCATION: 29 LIEU GIAI, DISTRICT BA DINH, HA NOI
CONTRACTORS: Coteccons
Waste Management Goals: This project will recycle or salvage for reuse AT LEAST 97.5% by weight
of construction waste generated on-site
2. EVIDENCE OF WASTE COLLECTION ONSITE

Waste collection on site


3. EVIDENCE OF SALVAGE

Rubble retained for backfilling off-site


a. Segregation onsite: Paper, cardboard, plastic, steel scraps ... and other recyclable waste are collected,
segregated and will be sold to a third party for recycle.
- Rubble: During construction work and casting concrete, a little amount of rubble has been generated
and retained for backfilling at other sites.
Recycling: More improvement has been made in further segregation of domestic waste to sort out
recyclable materials (plastic bottles, plastic containers, packaging, cardboard, metal scr

Recycling waste material


b. Segregation off-site: Co-mingled construction waste is removed out of site to Waste
Storage Area of Urban Environment Company where it spends final segregation for possible
recyclables. Finally, rubble is sorted out and transported to other sites for backfilling.

Segregation off-site
4. EVIDENCE OF IAQ MANAGEMENT AND SUSTAINABLE SITES.

Gather and separate the garbage to Gather and separate the garbage to
handover project to PrM team handover project to PrM team

Clean the basement to handover to PrM Clean the Landscape to handover to


team PrM team