APPENDIX 02 LOAD CHASE DOWN

COLUMN LOAD CHASE DOWN


COLUMN C7, 8-C

Distribution load area from L7 to L1

Distribution load area from B1 to B2

COLUMN NAME COLUMN C7 , GRID 8-C


LEVE
L LOADED AREA LL SDL SDL + LL Axial load (kN)

| REPORT | CARDNO PROJECT WICKHAM TERRACE COMMERCIAL TOWER |1


B2 15 5 1 6 90
B1 15 5 1 6 90
L1 48 3 1 4 192
L2 48 3 1 4 192
L3 48 3 1 4 192
L4 48 3 1 4 192
L5 48 3 1 4 192
L6 48 3 1 4 192
L7 48 4 1 5 240

SUM 1572

CORE WALL

| REPORT | CARDNO PROJECT WICKHAM TERRACE COMMERCIAL TOWER |2


Distribution load area on B2

Distribution load area on B1

Distribution load area on L1

| REPORT | CARDNO PROJECT WICKHAM TERRACE COMMERCIAL TOWER |3


Distributed load area L2

Distributed load area L3 TO L7

COLUMN NAME COLUMN C7 , GRID 8-C


LEVE
L LOADED AREA LL SDL SDL + LL Axial load (kN)
B2 63.2 5 1 6 379.2
B1 63.2 5 1 6 379.2
L1 30.6 3 1 4 122.4

| REPORT | CARDNO PROJECT WICKHAM TERRACE COMMERCIAL TOWER |4


L2 33.4 3 1 4 133.6
L3 76 3 1 4 304
L4 76 3 1 4 304
L5 76 3 1 4 304
L6 76 3 1 4 304
L7 76 4 1 5 380

SUM 2610.4

| REPORT | CARDNO PROJECT WICKHAM TERRACE COMMERCIAL TOWER |5