Professional Documents
Culture Documents
Radiation Work (SPM 7.4) Power/Hand Tools (SPM 8.4) Pr epare JSA Prepare JSA
Is JSA
R equir ed
Ignition Source (SPM 5.3) Fire/Explosion (SPM 5.0 & 9.0)
Pressure (use permit to work system) Slips/Trips/Falls (SPM 8.1) Yes
Lifting Plan Required (SOP-406 & -504) Pinch Points (SPM 8.2 & 8.4) R eview JSA w ith
Manual Handling (SPM4 4.8, 8.2 & 8.4) Hot Surfaces (SPM 8.4) PIC
D iscuss w ith W R P
Additional Workers (SOP-401) Adequate Lighting (SID 12.4)
Over-the-side work (SOP-506) Excavations (SOP-405)
Bees/Snake Attack (SPM 7,6)
R eview JSA
Hazard Controls Safety Equipment Required
PPE (SPM 4.1) Face Shield/Goggles (SPM 4.7) Effect C hanges Effect C hanges Yes No
Physical Barriers (SPM 4.10) Hand Protection (SPM 4.8) C hanges
Safety Equipment (SPM 4.0) Chemical Gloves (read MSDS) required
Ignition Source Controls (SOP-402) Chemical Apron (read MSDS)
Lockout-Tagout (SOP 403) Work Vest/Life Jacket (SPM 16) R eview JSA at R eview final JSA
Required Work Permits (SPM 9.0) Full Body Harness (SPM 4.10) T ool box talk w ith W ork crew
Spill Control Plan (discuss with HES) Life Line (SPM 4.10) Accept JSA
Lifting and installation of crawler Heavy object, avoid line of fire Work Supervisor, Foreman
suspended load do not work under suspended load Operator and Rigger
line of fire ensure that tag lines are used to direct
damaged slings and lifting gears and position the crawler.
Struck by the Swinging boom ensure lifting plan is discussed and
followed.
Only qualified and certified riggers to be
used during lifting and positioning .
inspect all rigging equipment.
use signal man with reflector jacket.
adequate and smooth communication
between rigger, signal man and crane
operator mst be ensured throughout the
operation
Tightening,grinding and fixing of Pinch Point, Heavy object, Airborn Use proper hand gloves, faceshield. clean Work Supervisor, Foreman
plates. particles, slip,trip and fall. Electrical the work area if there any oil spill or
shock grease to avoid slipping and tripping
hazard.
Check all the hand and power tools
before use.
Working on Noisy and heat stress Heat stress, Noise Drink enough cold water, use hearing Work Supervisor, Foreman
area protection all the time while on noisy zone
Working on height to assemble the Fall from height, dropping object, Entangle Full body harness to be used while Work Supervisor, Foreman
booms. between the mechanical structure. working above 1.8 m from the groung and
100% tie off procedure to be followed.
Secure the area where the chance of
falling objects are high.
Always position your body in safe
distance to avoid entanglement between
the mechnical structure.
Arranging of materials Trip and fall All unnecessary materials should be Work Supervisor, Foreman
removed.
Do good housekeeping
Is everyone aware of what is being done at the work-site? Yes/No Does everyone know that anyone new to the job should be given this JSA for review and Yes/No
any questions answered prior to joining in on the work