ES - As Planned Schedule + Causes 1 CCEP 12-Jun-15
Activity ID Activity Name Start Finish Total 2015 2016 May Float Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr MayJun Work done by WNG A1000 Approved start date by AAA 12-Jun-15 0 Approved start date by AAA A1020 Install Cabinets 12-Jun-15 25-Jun-15 67 Install Cabinets A1010 Install pathways for all systems 13-Jun-15 22-Jul-15 0 Install pathways for all systems A1030 Pull Copper Cables 23-Jul-15 31-Aug-15 0 Pull Copper Cables A1040 Pull Fiber 01-Sep-15 03-Sep-15 4 Pull Fiber A1060 Terminate Copper 01-Sep-15 11-Sep-15 0 Terminate Copper A1050 Terminate Fiber 04-Sep-15 07-Sep-15 4 Terminate Fiber A1070 Labeling 12-Sep-15 16-Sep-15 0 Labeling A1080 Testing by WNG 17-Sep-15 21-Sep-15 0 Testing by WNG A1090 Install Finish Equipment 22-Sep-15 26-Sep-15 0 Install Finish Equipment A1100 Provide Final Test Report 22-Sep-15 22-Sep-15 4 Provide Final Test Report A1110 WNG Scope Complete 26-Sep-15 0 WNG Scope Complete Work to be done by AAA A1130 Provide Back Boxes 12-Jun-15 12-Jun-15 0 Provide Back Boxes Impacting work by AAA A1140 Provide WAP's Design 12-Jun-15 18-Sep-15 8 Provide WAP's Design A1150 WAP's MDF Cabinets 12-Jun-15 15-Dec-15 -80 WAP's MDF Cabinets A1160 Clocks Provide Design and Back Boxes 12-Jun-15 28-Jul-15 60 Clocks Provide Design and Back Boxes A1170 Provide Clocks 12-Jun-15 06-Nov-15 -41 Provide Clocks A1180 Speakers - Provide Boxes 12-Jun-15 28-Jul-15 60 Speakers - Provide Boxes A1190 Speakers - Provide Speakers 12-Jun-15 20-Nov-15 -55 Speakers - Provide Speakers A1200 Details horns and cages 12-Jun-15 28-Jul-15 60 Details horns and cages A1210 Phones - Provide Design 12-Jun-15 15-Jul-15 73 Phones - Provide Design A1220 Provide Phones 12-Jun-15 06-Nov-15 -41 Provide Phones A1230 Flex Horns - Provide Design, back boxes, mounting 12-Jun-15 details06-Nov-15 -41 Flex Horns - Provide Design, back boxes, mounting details A1240 Flex Horns - Provide Flex Horns 12-Jun-15 06-Nov-15 -41 Flex Horns - Provide Flex Horns A1270 Test and Acceptance 12-Jun-15 05-May-16 -222 Test and
Actual Work Critical Remaining Work Page 1 of 1 TASK filter: All Activities