You are on page 1of 1

Certificate AREA CHART :

(1) The mulba during the construction will be removed on weekly


TOTAL AREA OF PLOT = 1.35 ACRE = 5463.256 SQM
basis.If the same is not done, in that case the local body shall
remove the mulba and the cost shall be borne by
TOTAL COVD. AREA OF PETROL PUMP = 2401.519 SQM
the owner of the plot.
(2) During construction it is mandatory on the part of the owner to TOTAL COVD. AREA OF HOTEL = 1776.069 SQM
properly screen the construction site off the main road by means
of erecting a screen wall not less than 8 ft. in height from ground PARKING AREA PROVIDED IN PETROL PUMP = 117.288 SQM
level which is to be painted to avoid unpleasant look from road
side .In addition to this, a net or some other protective material AREA OF THE BUILDING IN PETROL PUMP = 74.23 SQM
shall be hoisted at the facades of the building to ensure that any
ENTRY ENTRY
falling material remains within the protected area. AREA PROVIDED FOR PARK IN HOTEL = 130.89 SQM
EXIT EXIT

(3) Noise related activities will not be taken up for construction at night after 10pm
AREA PROVIDED FOR PARKING FACILITY IN HOTEL = 166.88 SQM

PROPOSED HOTEL AREA = 667.2 SQM


Water Harvesting Certificate PROPOSED ROAD AREA FOR HOTEL = 129.18 SQM
(1) Certified that the building plans submitted for approval satisfy the water
harvesting requirements as well as minimum anticipated discharge of waste
water as stipulated under clause 22.4.1,22.4.2 and the information given therein
is factually correct to the best of our knowledge and understanding.
(2) waste water recycling system shall be incorporated at site .
The recycled Water shall be used for horticulture purposes
SITE DETAILS :

SURVEY NUMBER = 14*


V F Structural stability Certificate
D S (1) Certified that the building plans submitted for approval satisfy the safety
HISSA = B3
requirements as stipulated under clause 18 of building bye-law, 1983 and
the information given therein is factually correct to the best of our KHATA NUMBER = 1598
knowledge and understanding.
PARAPET (2) It is also Certified that the structural design including safety from natural OWNER NAME = P SASIKANTA bin PATAGI VENKATESH
ROOF SLAB hazards based on soil.conditions has been duly incorporated in the
design of the building and these provision shall be adhered to during
the construction.

CHAKKUBANDI
6.09 RCC LINTEL
NORTH = SURVEY NO 14/B3
27.62
0.23mThk
SOUTH = MUJAVAR REHEMAN SAB'S LAND
12.19
137.05
BBM WALL
EAST = 12M WIDE ROAD
WEST = KOTRAPPA'S LAND

16.00
SCALE
18.49
FOR LAYOUT PLAN = 1:1
SSM IN CM FOR ELEVATIONS AND SECTIONS = 2:1(DOUBLE)

SAND & BOULDERS


FILLING
22.24 NOTE
DISPENSER
ALL DIMENSIONS ARE IN METERS UNLESS SPECIFIED
1 1 2
HP
30.00

OWNER'S SIGNATURE/SEAL

4.00 4.00
1 1
3.88

30.48 1 2
SAND

FUEL DISPENSER FRONT VIEW FUEL DISPENSER SIDE VIEW

ENGINEER'S SIGNATURE/SEAL

M P
M P

HP TOP VIEW OF FUEL DISPENSER

PARAPET
ROOF SLAB

RCC LINTEL

0.23mThk
BBM WALL TITLE :
SUBMISSION DRAWING
SSM IN CM

FIRE EXTINGUISHER
DATE : E
SAND & BOULDERS
FILLING
SCALE :1:1 N S

ARCHITECTS : W
KS CONSTRUCTIONS
Kotturu-Hospet Bypass Road
HARAPANAHALLI (T)
VIJAYANAGARA (D)
Ph no. 9740910241
7760204907
9538697473

You might also like