CONSTRUCTION OF

First Month
No. Descriptions Section Days
1 2 3 4 5 6 7 1 2 3 4 5 6 7 1

POULTRY
1 Repositioning of I beams
2 Leveling and alignment of I beams
3 Grouting between foundation & I beam
4 Curing of Grouting
5 Plastering of grouting/pedestal
6 Installation Rafters
7 Installation of Purlis
8 Installation of sag rod
9 Installation of cross braces w/ buckles
10 Installation of roofing materials
11 Installation of walling ( long span)
Building
12 Installation of walling (short span)

13 Installation of polyurethane foam sheet panel


14 Installation of ceiling and supports
15 Installation of electrical wiring &fittings
16 Installation of lighting fixtures
17 Installation of plumbing system
18 Installation of blowers
19 Installation of door
20 Installation of gutters
21 Installation of downspouts
1 Dismantling old roofing structure
2 Leveling ground surface
3 Backfilling of sand for flooring
4 Installation of additional post
5 Installation of additional rafter
6 Installation of additional purlins
Staff Barracks
7 Installation of additional roofing materials

8 Installation of studs for walling & partition


9 Fixing plywood for walling & partition
10 Fabrication of single and double beds
Construction of concrete counter top for
11 kitchen sink & cooking burner
1 Lay-out
2 Excavation of foundations
3 Excavation for tie beams
4 Fabrication and installation formworks
5 Concreting of foundations and tie beams

Control septic
6 Instalaltion of formworks & steel for floor slab
7 Conctreting of floor slab

8 Installation of formworks for column& beams


9 Concreting of colums & beams Control septic
Room &
10 Concreting of roof slab Septic Tank
11 Laying of CHB
12 Plastering of walls
13 Instalaltion of doors & window
14 Installation of plumbing system
15 Installation of Electrical system
16 Excavation of septic tank
17 Concreting of Floor slab of Septic tank
18 Laying of CHB of Septic tank
19 Concreting of Septic tank top slab
20 Plastering of Septic tank walls

1 Cleaning and Clearing

Note:
a) Redline means completed
TRUCTION OF POULTRY IN CARBOMERE FARM IN MACALELON
First Month Second Month Third Month
2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7
ON
Third Month Fourth Month
1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7