You are on page 1of 2

19 January 2022 14:59

ATTEMPERATOR. 1.1 TEMP HIGH

ALARM : 412 °C 08002


TRIP : 475 °C FOR 2 SEC. Document Number: BOILER03-AC
Alarm Procedure: 15OPAR U/B-002AR

POSSIBLE CAUSE IMMEDIATE ACTION FOLLOW UP ACTION

 Over firing in the evaporator section  Warn SOR of possible unit trip and announce an emergency  With permission, return lost unit
due to firing disturbances namely: over the PA system. to service, using procedure
- Mill start-up  Switch NNC and frequency correction off. U/U/OPER-009.
- Mill shutdown.  Reduce firing and increase feed flow according to rate of  C&I to rectify faulty control.
- Mill running empty. temperature rise.  Tripped plant to be returned to
- Mill losses.  If temperature rate not too fast, the feedwater master, boiler service with great care.
- Draught start-ups. demand, master fuel and enthalpy controls are to be left on  With load loss in force, it should
- Too high excess air values. auto with close observation. be kept as short as possible.
 Feed flow less than steam flow for  Manual intervention to be kept to a minimum. UC/USS to use
extended period during: their own discretion.
- Loss of EFP’s.  Enthalpy control to be selected to manual above 412°C. See
- Feed control manual. OPS/UNT-035.
- Faulty enthalpy control.  Ensure following valves are correct according to existing load:
- Main steam pressure.
- Total fuel flow.
- Feed water flow.
- Steam flow.
- Total air flow. (O2 values).

Note:
- Over reaction should be avoided.
- Wait at least 10 minutes for unit to stablise.
- Boiler load signal (black needle) and capability signal (red
needle) to be balanced before trip plant is re-started.

PTO

CP 8/12/2014
PUBLIC DOMAIN
19 January 2022 14:59

POSSIBLE CAUSE IMMEDIATE ACTION FOLLOW UP ACTION

 Start-up of mills, E pumps and draught groups should be done


as per procedures.
 If unit tripped.
 Safeguard boiler.
 Safeguard turbine.
 Call investigation team for investigation.

PUBLIC DOMAIN