Professional Documents
Culture Documents
For LPH-2:
LS-HD1102 ,LICHD1102
ARP RESPONSE PROCEDURE
Gland Steam Pressure abnormal Check for setting and pressure transmitter abnormal reading.
Call I&C Team for rectification of transmitters
Insufficient Cooling water supply to Check the condenser inlet and outlet pressure. If not enough
condenser (Sea Water) pressure, check the status of the seawater line for possibles leaks.
Run the other seawater if deemed necessary.
ARP RESPONSE PROCEDURE
Passing control or motorized valves Check the activity prior to worsening of vacuum.
connected to flash chamber (heater Double check at local and provide checklist (extraction, pressure
drains, extraction line, drain pots) heaters and drains connected to flash chamber)
Check the temperature of flash chamber if it increases versus
previous readings. Call attention of NDT for verification of valves
for possible passing
Air leaks ( LP Exhaust Hood , Vacuum Check the activity prior to the worsening of vacuum. Double check
Breaker, CEP Canister pinhole or sealing the sealing of vacuum related valves and equipment
problems) Check the U-seals at gland steam condenser, fill if necessary
Main air ejector auxiliary steam Y-strainer Check the pressure of auxiliary steam at inter condenser and after
clogged or stem trap passing condenser if it is in range. If not, check the valves at local and
reliability of pressure gauge.
Call attention of NDT for verification of clogged up and passing
steam trap
Condenser Hotwell Level High Open the condenser to ditch drain valve
BFP STOPPED See “BFP STOPPED Possible Cause and Remedial Action”
Hunting Of Desuperheater Valves During Check Desuperheater valves at DCS and at local if hunting is
Load Up/Down observed. If found erratic, Call attention of I&C for troubleshooting
Faulty Transmitter Check the reliability of transmitter/s. If found erratic, call attention
of I&C for troubleshooting
HP Bypass/Reheater Desuperheater Verify at DCS through parameter trending. Check locally the
Check Valve Passing valve. Call assistance of NDT for the passing valves verification.
Sudden opening/closing of Valves or For Control valves sudden opening, check the DCS through
passing valves on Boiler Steam, Main parameter trending, Check the actual status of the valve locally
Steam System (Main FCV, MBD, CBD, and troubleshoot (communicate with CRO). If still exist, Call
Blow off, Bypass system) attention of maintenance for rectification