You are on page 1of 1

SCHEDULE OF TOTAL LOAD M.S.

B
TOTAL
BUILDING REF DB REF A/C W/H COOKER G.LOAD OTHERS
LOAD
IN SHOWROOM GROUND FLOOR DB2 7.50 1.50 0.00 2.50 0.00 11.50
IN STORE GROUND &
DB3 0.00 0.00 0.00 4.75 0.00 4.75
MEZZANINE FLOOR
LOCATION PLAN IN GUARD ROOM G. FLOOR DB4 2.08 2.00 0.00 1.05 0.00 5.13

SCALE 1:1000 IN ACCOMMODATION F. FLOOR DB5 6.24 1.50 0.00 2.35 0.00 10.09

IN OFFICE F. FLOOR DB6 5.00 1.50 0.00 2.15 0.00 8.65

IN ACCOMMODATION S. FLOOR DB7 6.24 1.50 0.00 2.35 0.00 10.09

CONTROL PANEL PORTABLE


PUMP (DUTY & STAND-BY)
30A TPN ISOL 0.00 0.00 0.00 0.00 20.00 20.00

CRANE 150A TPN ISOL 0.00 0.00 0.00 0.00 50.00 50.00

CRANE 150A TPN ISOL 0.00 0.00 0.00 0.00 50.00 50.00

TOTAL LOAD 27.06 8.00 0.00 15.15 120.00 170.21

MAX DEMAND LOAD 24.35 2.40 0.00 9.09 60.00 95.84

TOTAL CONNECTED LOAD 170.21 K.W.

MAX DEMAND LOAD 95.84 K.W.

150mmØ PVC DUCT AT 600mm BELOW GL


Guard Room THR OU GH 100mm PVC SLEEVE C OVER BY
IN CONCRETE SURROUND
DESCRIPTION
CON CRETE ACR OSS ROADS

17.00 Sqm
REV. DATE BY
FS
14.824 U.D.D STAMP MUNICIPALITY STAMP

IV

KAHRAMAA ELECTRIC SUPPLY


INCOMER
CONSULTANT'S SIGNATURE NABIL DASSOUKI

UPDA Reg. No./Grade : 1823 Qatar ID No.: 26281803023

Validity : 04 10 2021

CONSULTANT STAMP & SIGNATURE :

NOTE FOR INTERNAL ELECTRICAL WIRING SPECIFICATIONS TECHNIQAL MANAGER : D.NABIL


ALL INTERNAL WIRING FOR THE BUILDING WILL FOLLOW
REGISTRATION No. : 1823
KM INTERNAL WIRING SPECIFICATIONS UPDATED ON
1/7/2021 WITH OUR FULL RESPONSIBILITY.

Note for AMI provisioning : THE EXTERNAL PLUMBING OF ALL TYPS ,PREMITTED
BY KAHRAMAA ,SHALL BE PROTECTED AND ISOLATED
All required provisioning for AMI shall be implemented as per Kahramaa Regulations titled : Low FROM THE SUN ,AS WELL AS GROUND TANKS AND
Voltage Electricity& Water Installations Regulations - ADVANCED METERING INFRASTRUCTURE UBBER TANKS
CODE 2016
WATER CLOSETS FLUSH RATE FOR THE FLUSHER
CISTERN SHALL NOT EXCEED 4.8LITERS /FLUSH THERMAL INSULATION 87807 91011834SPECIFICATION
*Note For Water ARE AS PER MINISTERIAL DECREE NO 108 .OF THE
UPDA Reg. No. : 336 Company Reg. Grade : C

Validity : 24 09 2022 Qatar ID No. :


YEAR 2015
ALL PLUMPING MATERIALS SHOULD BE COMPLIES WITH KAHRAMA THIS WATER TANK PROJECT
SHOULD BE UNDER SHADE OR SHELTER FORM DIRECT SUN RADIATION FOR
CONSERVATION REASONS ALL ROOF PLUMPING :ALL TUBES /PIPES (COOPER /PPR / ASHGHAL
.1 ALL WORKS PERTAINING TO POTABLE WATER CONSULT AND CO -ORDINATE WITH HOUSE
MDPE )SHOULD BE HEAT INSULATED BY INSULATING MATERIALS ,THAT SHOULD BE BAD SUPPLY WITHIN CONSUMER PREMISES MUST BE
CONDUCTOR OF HEAT (FIBROUS MATERIAL OR CELLULAR MATERIAL WITH ALUMINUM CARRIED OUT IN LINE WITH KAHRAMAA PLUMBING
CONNECTION UNIT /DRAINAGE PROJECTS LOCATION:
BARAKAT AL AWAMER
CLADDING .THAT PROTECT AND THERMAL BLOCK TUBES FROM DIRECT SUN RADIATION . BYE-LAWS DEPARTMENT THREE )3(MONTHS PRIOR TO
CLIENT:
.2 KAHRAMAA APPROVED MATERIALS SHALL BE USED THE CONSTRUCTION OF THE MANHOLES
FOR MAINLAYING ,SERVICES PIPE EXTENSION , AL TARBAT COMPANY
AND INTERNAL DRAINAGE NETWORK FOR
**Water Consrevation-special Notes STORAGE TANKS,PLUMBING AND ASSOCIATED
FITTINGS
YOUR PROJECT DATE:
JULY/2021 JOB NO.:
DZ-47-2021
.3 GROUND/ROOF TANKS SHALL BE OF SUITABLE
ALL THE PLUMBING FIXTURES SHALL COMPLY WITH APPLICABLE WATER VOLUMES TO PROVIDE ADEQUATE SUPPLY AGAINST TITLE:
CONSERVATION MEASURES AS STIPULATED UNDER SECTION 7.0OF REGULATIONS OF LEVEL OF CONSUMPTION. SERVICE SITE PLAN
INTERNAL WATER INSTALLATIONS &CONNECTION WORKS MAY .2009 .4 ALL PLUMBING WORKS SHALL BE HANDELED BY
KAHRA MAA APPROVED PLUMPING OR PLUMPING
CONTRACTORS
DRAWING NO.: SCALE:
SSP 1:100
NOTES FOR AMI PROVISIONING : .5 THE DISTRIBUTION NETWORK FOR LARGE COMPLEX
COMPRISING OF SEVERAL VILLAS OR DWELLING
DRAWN BY: DESIGNED BY: CHECKED BY:
UNITS ,SHALL BE LAID IN ACCORDANCE TO KAHRA
ALL REQUIRED PROVISIONING FOR AMI SHALL BE IMPLEMENTED AS PER AMENDMENT MAA SPECIFICATION FOR MAINLAYING MATERIALS SAMEH. SAMEH.
TO THE REGULATIONS TITLED : AND MAINLAYING CONTRACTS -JANUARY 1993OR CAD FILE: REGISTRATION No. : REGISTRATION No. :
[AMENDMENT TO THE REGULATION FOR THE INSTALLATION OF ELECTRICAL ADVANCED ANY UPDATE 14092 14092
METERING INFRA STRUCTURE CODE 2016ADDITONAL FIELD REQUIREMENT FOR AMI ] .6 ALL WATER METERS SHALL BE SECURELY REVISION SIGNATURE SIGNATURE
ACCOMMODATED INSIDE METER CABINETS .