You are on page 1of 65

STRUCTURAL DRAWINGS

DESIGN OF G+5 MIXED-USE BUILDING OF RICBL AT DEKI LANE,


PHUENTSHOLING.

PLOT NO. PGT-2405


THRAM NO. 2035
LIST OF STRUCTURAL DRAWINGS FOR THE PROPOSED CONSTRUCTION OF MIXED-USE BUILIDING AT
DEKILANE, PHUENTSHOLING

DRG. NO. DRAWING TITLE DATE OF ISSUE STR/47 Fifth/Roof Floor Slab Layout plan. DECEMBER, 2017
STR/48 Fifth/Roof Floor Slab Bottom Reinforcement plan. DECEMBER, 2017
List of Structural Drawings for Basement G+4 Office Building for Bhutan Post, Gelephu DECEMBER, 2017
STR/49 Typical opening details in slab/near beams. DECEMBER, 2017
STR/00 General Notes on Structural Drawings DECEMBER, 2017 DECEMBER, 2017
STR/50 Staircase Plan
STR/00 General Notes on Structural Drawings DECEMBER, 2017
STR/51 Staircase Details DECEMBER, 2017
STR/01 Footing Layout Plan DECEMBER, 2017
STR/52 Main Roof Truss layout plan DECEMBER, 2017
STR/02 Column Layout Plan DECEMBER, 2017
STR/53 Main Roof Truss Purlin layout plan DECEMBER, 2017
STR/03 Footing Details DECEMBER, 2017
STR/54 Jamthog Roof Truss layout plan DECEMBER, 2017
STR/04 Lift Layout plan & its reinforcement plan DECEMBER, 2017
STR/55 Jamthog Roof Truss Purlin layout plan DECEMBER, 2017
STR/05 Lift Section Details DECEMBER, 2017
STR/56 Roof Truss Elevation DECEMBER, 2017
STR/06 Column Details DECEMBER, 2017
STR/57 Roof Truss member schedule (Main Roof) DECEMBER, 2017
STR/07 Kachen Details DECEMBER, 2017
STR/58 Roof Truss member schedule (Jamthog Roof) DECEMBER, 2017
STR/08 Typical Splice location and details in column DECEMBER, 2017
STR/59 Roof Truss connection details (a) DECEMBER, 2017
STR/09 Typical Splice location and splices in beam DECEMBER, 2017
STR/60 Roof Truss connection details (b) DECEMBER, 2017
STR/10 Beam - Column Junction Details DECEMBER, 2017
STR/61 Roof Truss Prop Details DECEMBER, 2017
STR/11 Ground Floor Beam Layout Plan DECEMBER, 2017
STR/12 Ground Floor Beam Details (a) DECEMBER, 2017
STR/13 Ground Floor Beam Details (b) DECEMBER, 2017
STR/14 First Floor Beam layout plan. DECEMBER, 2017
STR/15 First Floor Beam Details (a) DECEMBER, 2017
STR/16 First Floor Beam Details (b) DECEMBER, 2017
STR/17 Second Floor Beam Layout Plan DECEMBER, 2017
STR/18 SecondFloor Beam Details (a) DECEMBER, 2017
STR/19 SecondFloor Beam Details (b) DECEMBER, 2017
STR/20 Third Floor Beam Layout Plan DECEMBER, 2017
STR/21 ThirdFloor Beam Details (a) DECEMBER, 2017
STR/22 ThirdFloor Beam Details (b) DECEMBER, 2017
STR/23 Fourth Floor Beam Layout Plan DECEMBER, 2017
STR/24 FourthFloor Beam Details (a) DECEMBER, 2017
STR/25 FourthFloor Beam Details (b) DECEMBER, 2017
STR/26 Fifth Floor Beam Layout Plan DECEMBER, 2017
STR/27 FifthFloor Beam Details (a) DECEMBER, 2017
STR/28 FifthFloor Beam Details (b) DECEMBER, 2017
STR/29 Roof Beam Layout Plan DECEMBER, 2017
STR/30 RoofFloor Beam Details (a) DECEMBER, 2017
STR/31 RoofFloor Beam Details (b) DECEMBER, 2017
STR/32 Jamthog Beam Layout Plan DECEMBER, 2017
STR/33 Jamthog Beam Details DECEMBER, 2017
STR/34 Lintel Band Details. DECEMBER, 2017
STR/35 Vertical reinforcement in project wall and lintel anchorage. DECEMBER, 2017
STR/36 Cornice Details. DECEMBER, 2017
STR/37 First/Second/Third Floor Slab Layout plan. DECEMBER, 2017
STR/38 First/Second/Third Floor Slab Bottom Reinforcement plan. DECEMBER, 2017
STR/39 First/Second/Third Floor Slab Top Reinforcement plan. DECEMBER, 2017
STR/40 First/Second/Third Floor Slab Section Details DECEMBER, 2017
STR/41 Fourth Floor Slab Layout plan. DECEMBER, 2017
STR/42 Fourth Floor Slab Bottom Reinforcement plan. DECEMBER, 2017
STR/43 Fourth Floor Slab Top Reinforcement plan. DECEMBER, 2017
STR/44 Fourth Floor Slab Section Details DECEMBER, 2017
STR/45 Fifth/Roof Floor Slab Layout plan. DECEMBER, 2017
STR/46 Fifth/Roof Floor Slab Bottom Reinforcement plan. DECEMBER, 2017

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/00
TASHI NAMGYAL CEO (NHDCL) RICBL
A. GENERAL C. LOADING

1. READ THIS DRAWINGS IN CONJUNCTION WITH ARCHITECTS' AND OTHER ENGINEERS' DRAWINGS AND SPECIFICATIONS, AND SUCH OTHER WRITTEN 1. THIS STRUCTURE HAS BEEN DESIGNED FOR THE FOLLOWING NOMINAL LOADS:
INSTRUCTIONS AS MAY BE ISSUED.
1.1 DEAD LOADS:
2. ALL DIMENSIONS ARE IN MILIMETRE UNLESS STATED OTHERWISE. UNIT WEIGHT OF WALL 23 KN/M3 (CEMENT CONCRETE BLOCK)
UNIT WEIGHT OF RCC 25 KN/M3
3. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWINGS. UNIT WEIGHT OF PCC 24 KN/M3

4. DESIGN CONFORMS TO: 1.2 SUPERIMPOSED LOADS(LIVE LOADS):


IS456:2000 CODE OF PRACTICE FOR PLAIN AND REINFORCED CONCRETE LIVE LOAD FOR FLOORS 3 N/MM2 (Load on commercial building)
IS4326:1993 EARTHQUAKE RESISTANT DESIGN AND CONSTRUCTION OF BUILDINGS LIVE LOAD FOR STAIRCASE 3.5 N/MM2
IS13920:1993 DUCTILE DETAILING OF REINFORCED CONCRETE STRUCTURES SUBJECTED TO SEISMIC FORCES LIVE LOAD FOR ROOF 0.75 N/MM2 (not accessible)
IS 875 : 1987( Part 1 to 3) CODE OF PRACTICE FOR DESIGN LOADS( OTHER THAN EARTHQUAKE) FOR BUILDINGS AND STRUCTURES.
IS 120353 (Part 1) : 2002 CRITERIA FOR EARTHQUAKE RESISTANT DESIGN OF STRUCTURES. 1.3 WIND LOAD:
BASIC WIND SPEED (ASSUMED) 47 M/S
5. VERIFY ALL SETTING OUT DIMENSIONS WITH THE ENGINEER/ARCHITECT. VERIFY LOCATION AND DIMENSIONS OF CHASES, INSERTS, BUILDING CLASS A
OPENINGS, WASHES, DRIPS, DEPRESSIONS, AND OTHER PROJECT REQUIREMENTS NOT SHOWN ON THE STRUCTURAL DRAWINGS. TERRAIN CATEGORY III

6. IF IN DOUBT, ASK. 1.4 EARTHQUAKE DESIGN DATA


SEISMIC ZONE V
7. REFER ANY DISCREPANCY TO ENGINEER/ARCHITECT BEFORE PROCEEDING WITH THE WORK. BASIC SEISMIC FORCE RESISTING
SYSTEM SPECIAL MOMENT RESISTING FRAME
8. ALL CONSTRUCTION MATERIALS AND WORKMANSHIP SHALL COMPLY WITH THE SPECIFICATIONS FOR BUILDING AND ROAD WORKS TOGETHER WITH THE ANALYSIS PROCEDURE EQUVALENT LATERAL FORCE PROCEDURE
REQUIREMENTS OF ALL RELEVANT CODES OF PRACTICE REFERRED TO HEREIN AND THE REQUIREMENTS OF ALL STATUTORY AUTHORITIES.
2. MAINTAIN STRUCTURE IN STABLE CONDITION DURING CONSTRUCTION.
9. CHECK ALL DIMENSIONS BEFORE STARTING WORK.
3. DO NOT PLACE OR STORE BUILDING MATERIALS ON CONCRETE MEMBERS WITHOUT ENGINEER'S APPROVAL.
10. ALWAYS REFER ADDITIONAL NOTES PROVIDED IN THE DRAWINGS.

11. UNLESS OTHERWISE INDICATED, DETAILS SHOWN ARE TO BE CONSIDERED TYPICAL FOR SIMILAR CONDITIONS. D. CONCRETE
12. NO FRAMING OR STRUCTURAL MEMBERS ARE TO BE MODIFIED, NOTCHED, OR CUT WITHOUT THE APPROVAL OF THE ENGINEER.
1. CONCRETE QUALITY SHALL COMPLY WITH IS456:2000
13. THE OWNNER SHALL FAMILIARIZE THEMSELVES WITH THE DRAWINGS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
2. PROJECT ASSESSMENT OF CONCRETE STRENGTH IS REQUIRED.
ENGINEER BEFORE PROCEEDING WITH THE AFFECTED WORK. ANY VARIATIONS OR SUBSTITUTIONS OF MATERIALS OR DETAILS FROM THOSE
INDICATED ON THE DRAWINGS MAY ONLY BE MADE WiTH PRIOR APPROVAL OF THE ENGINEER.
3. GRADE OF CONCRETE IS M20(1:1.5:3) FOR ALL RCC WORKS.

4. FOR THE ABOVE GRADE TO BE ACHIEVED, MAXIMUM FREE WATER-CEMENT RATIO SHALL BE 0.55, MINIMUM CEMENT CONTENT
B. FOUNDATION SHALL BE 300KG/M3 AND MAXIMUM AMOUNT OF WATER SHALL BE 165L FOR 300KG/M3 OF CEMENT.

1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 150KPA. VERIFY THE SOIL STRENGTH AND OBTAIN APPROVAL 5. ONLY POTABLE WATER SHALL BE USED FOR MIXING AND CURING, AND SHALL COMPLY TO THE REQUIREMENTS OF IS456:2000.
FROM THE ENGINEER BEFORE PLACING CONCRETE.
6. MECHANICALLY VIBRATE CONCRETE IN THE FORM TO GIVE MAXIMUM COMPACTION WITHOUT SEGREGATION OF THE CONCRETE.
2. FOUNDATION SHALL BEAR ON UNDISTURBED NATURAL MATERIAL OR PROPERLY PLACED AND COMPACTED CONTROLLED STRUCTURAL
FILL HAVING A MINIMUM BEARING CAPACITY OF 150 KPA. 7. CURE CONCRETE AS REQUIRED BY THE CLASUE 13.5 OF IS456:2000 AND WORK SPECIFICATIONS.

3. CONTROLLED STRUCTURAL FILL SHALL CONSIST OF CLEAN GRANULAR MATERIAL FREE OF ORGANIC OR OTHER DELETERIOUS MATTER 8. IN THE DRAWINGS THE BEAM SIZES ARE DESIGNATED WIDTH X DEPTH (INCLUDES SLAB THICKNESS IF ANY).
AND CONFORM TO THE REQUIREMENTS OF STANDARDS AND QUALITY CONTROL AUTHORITY.
9. CONCRETE SIZES AS DRAWN ARE MINIMUM AND DO NOT INCLUDE APPLIED FINISHES.
4. MASONRY WALLS IN THE FORM OF RANDOM RUBBLE MASONRY SHALL BE PROVIDED BELOW THE EXTERIOR AS WELL AS INTERIOR PLINTH BEAM.
10. DO NOT MAKE UNSPECIFIED HOLES OR CHASES WITHOUT ENGINEER'S PRIOR APPROVAL.
5. FOOTINGS ARE DESIGNED CONSIDERING THE MINIMUM DEPTH OF 2000MM BELOW THE ORIGINAL GROUND LEVEL. NOTIFY ENGINEER IF
THE DEPTH OF FOOTINGS REQUIRED TO BE PROVIDED VARIES FROM THE DEPTH SPECIFIED ABOVE. 11. DO NOT PLACE CONDUITS, PIPES AND THE LIKE WITHIN COVER CONCRETE.

6. ALL EXCAVATION SHALL BE DRY BEFORE PLACING ANY CONCRETE. 12. AGGREGATES SHALL COMPLY WITH CLAUSE 5.3 OF IS456:2000. NOMINAL SIZE OF COARSE AGGREGATES SHALL BE 20MM.

7. IF SEEPAGE IS ENCOUNTERED DURING FOUNDATION EXCAVATION, PUMP OUT WATER BEFORE PLACING CONCRETE. 13. THE CHARACTERISTIC STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 20MPA. THE CONCRETE SHALL BE ASSESSED AS PER THE
ACCEPTANCE CRITERIA OUTLINED IN CLAUSE 16 OF IS456:2000 OR ANY OTHER STATUTORY AUTHORITIES.
8. THE FOUNDATIONS UNDER THE CONCRETE BASE SLAB SHALL BE COMPACTED THROUGHLY AND A MINIMUM 200MM LAYER OF
COURSE AGGREGATE SHALL BE PLACED OVER THE COMPACTED EARTH AND SEALED WITH 75MM THICK LAYER OF BLINDING CONCRETE. 14. ALL FORMWORKS FOR BEAMS AND SLABS ARE TO BE REMOVED BEFORE CONSTRUCTION OF WALLS OR OTHER
PERMANENT LOADINGS. ALL FORMWORK AND ITS REMOVAL MUST BE IN ACCORDANCE TO IS456:2000.
9. BACKFILLING AGAINST BUILDING FOUNDATION WALLS SHALL BE DONE ONLY AFTER WALLS ARE BRACED TO PREVENT MOVEMENT.
15. ALL FLOOR SLABS ARE REINFORCED CONCRETE SLABS.
10. CARE SHALL BE TAKEN NOT TO OVERSTRESS ANY ADJACENT RETAINING WALLS AND STRUCTURES DURING BACKFILLING AROUND FOUNDATIONS.

11. COMPACTION OF FOUNDATION SHALL BE APPROVED BY ENGINEER PRIOR TO PLACEMENT OF CONCRETE.

12. NECESSARY PRECAUTION SHALL BE TAKEN WHILE EXCAVATING THE FOUNDATION NEAR BY THE DRAIN.

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/00
TASHI NAMGYAL CEO (NHDCL) RICBL
E. REINFORCEMENT

1. GRADE OF STEEL USED FOR RCC WORKS SHALL BE FE500(TMT).

2. BAR NOTATION GIVES THE FOLLOWING INFORMATION IN THIS ORDER:NUMBER OF BARS; BAR SIZE(MM); SPACING (MM, IF REQUIRED).

3. REINFORCEMENT IS REPRESENTED DIAGRAMATICALLY AND NOT NECESSARILY IN TRUE PROJECTION.

4. LAP REINFORCEMENT ONLY AT LOCATIONS SHOWN IN THE DRAWINGS. LAP LENGTH SHALL COMPLY WITH IS456:2000. LAP SPLICES
SHALL NOT BE LESS THAN THE DEVELOPMENT LENGTH IN TENSION( GENERALLY 57X Ø).

5. REINFORCEMENT SHALL NOT BE CUT, BENT OR HEATED ON SITE WITHOUT ENGINEER'S PRIOR APPROVAL.

6. THE DEVIATION OF REINFORCEMENT FROM ITS SPECIFIED POSITION SHALL NOT EXCEED THE FOLLOWING(MM):

6.1) TOLERENCE FOR COVER -0,+10 MM. WHERE A NEGATIVE VALUE INDICATES A DECREASE IN SPECIFIED COVER, AND POSITIVE
VALUE INDICATES AN INCREASE IN COVER.

6.2) TOLERENCES ON PLACING OF REINFORCEMENT:


I) FOR SLABS AND STAIRCASE -10,+10MM.
II) FOR BEAMS COLUMNS AND FOUNDATION -15,+15 MM.

7. SPACERS AND SUPPORTS SHALL BE LOCATED AT CENTRES CLOSE ENOUGH(PREFERABLY NOT EXCEEDING 750MM C/C FOR COLUMN
AND BEAM REINFORCEMENT, AND 450MM FOR SLAB REINFORCEMENT) TO PREVENT DISPLACEMENT OF REINFORCEMENT BY
WORKMEN OR EQUIPMENT DURING FIXING AND SUBSEQUENT CONCRETE PLACEMENT WITHIN THE TOLERENCE GIVEN IN 6 ABOVE.

8. THE COVER TO THE REINFORCEMENT NEAREST TO THE CONCRETE SURFACE SHALL NOT BE LESS THAN THE FOLLOWING EXCEPT
WHERE SPECIFIED OTHERWISE:
BEAMS 30 MM
COLUMNS 40 MM
FLOOR SLABS AND STAIRCASE 20 MM
FOUNDATION 50 MM

9. BENDING OF REINFORCEMENT IN BEAMS AND COLUMNS SHALL COMPLY WITH THE REQUIREMENTS OF IS456:2000.

10. REINFORCEMENT SHALL BE SUBJECT TO LABORATORY TEST TO DETERMINE DUCTILE PROPERTY.

11. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24 HOURS PRIOR TO SCHEDULED CONCRETE PLACEMENT. NOTIFY
ENGINEER AT LEAST 48 HOURS PRIOR TO SCHEDULED CONRETE PLACEMENT, TO ALLOW TIME FOR INSPECTION.

F. TIMBER
1. ALL STRUCTURAL TIMBER SHALL CONFORM TO THE IS883.( If available use the Bhutanese Timber Code)

2. MOISTURE CONTENT OF THE STRUCTURAL TIMBER SHALL NOT EXCEED 12%.

3. ALL STRUCTURAL TIMBER SHALL HAVE A MINIMUM ALLOWABLE BENDING STRESS, Fb, OF 7MPA,
A MINIMUM ALLOWABLE HORIZONTAL SHEAR STRESS, Fv, OF 0.6MPA, A MINIMUM MODULUS OF
ELASTICITY, E, OF 9800MPA, AND MAXIMUM UNIT WEIGHT OF 5.75 KN/M3.

G. FORMWORK
1. PROPERLY BRACE AND SHORE FORMWORK TO MAINTAIN ALIGNMENT AND TOLERANCE IN ACCORDANCE WITH IS456:2000.

2. FORMWORK SHALL COMPLY WITH CLAUSE 11 OF IS456:2000.

3. STRIPPING OF FORMWORK SHALL COMPLY WITH CLAUSE 11.3 OF IS456:2000.

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/00
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G

5525 5125 650 3250 5525 5525

3300 7050
3000

F1 F2 CF1 F4 F3

3000

3300

3200
1
C1 C2 C1 C3 C4 C4 C3
3750

3500 3300

F2 F2 CF2 F6 F4

3400

3500

3300
2
C2 C2 C4 C6 C6 C4

7400
3750

F1 F2 CF1 F5 F3

3400

3000
3
C1 C2 C1 C3 C5 C5 C3

3000
3400

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

FOOTING LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/01
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

1
C1 C2 C1 C3 C4 C4 C3
3750
7500

2
C2 C2 C2 C4 C6 C6 C4
3750

3
C1 C2 C1 C3 C5 C5 C3

NOTES: REFERENCE:

1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/01 FOR FOOTING LAYOUT PLAN
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. DETAILS.
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 3. REFER DRG. NO. STR/04 & 05 FOR SHEAR WALL DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 4. REFER DRG. NO. STR/08 FOR COLUMN DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 5. REFER DRG. NO. STR/09 FOR COLUMN SPLICE DETAILS.
6. REFER DRG. NO. STR/10 FOR BEAM SPLICE DETAILS
7. REFER DRG. NO. STR/11 FOR BEAM- COLUMN JUNCTION
DETAILS.
COLUMN LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/02
TASHI NAMGYAL CEO (NHDCL) RICBL
PLINTH BEAM
L 100 PCC SLAB(1:2:4)
BEAM IN THE ORTHOGONAL COLUMN BARS (REFER DETAILS) BRICK WALL 50 MM THICK PCC (1:3:6)
DIRECTION 150 MM THICK STONE SOLING
GROUND FLOOR BEAM (Refer RL +0.45 M WELL-COMPACTED EARTH
Details)
GROUND FLOOR LEVEL

RL ± 0.000 M
50MM THK PCC PAD

2000
A A 50 PROVIDE EXTRA COVER TO RRM IN CM (1:4)
C
L OF COLUMN/
B
FOOTING COLUMN BELOW GROUND 450
100 MM THICK PCC(1:3:6)
75mm side cover TOP REBAR (SEE TABLE 150 MM THICK STONE
2000 MIN BELOW) 600 SOLING
800

RL -2.000 M FOUNDATION FOR INTERNAL WALL BELOW


La = L + 10Ø

D
d 7 5MM PROJECTION
50mm MIN BASEMENT/PLINTH BEAM AND PARTITION
WALL
C
L OF COLUMN/FOOTING 100 MM CONCRETE(1:2:4),
20mm agg. NOTES:
TYPICAL FOOTING PLAN 200 MM STONE SOLING SAME WALL FOUNDATION DETAILS SHALL BE ADOPTED FOR ALL WALLS..
TYPICAL FOOTING ELEVATION BOTTOM REBAR
(SECTION A-A) (SEE TABLE BELOW)

REBAR DEVELOPMENT
BRICK WALL SIZE LENGTH, Ldt
PLINTH BEAM RL +0.45 M 100 PCC SLAB(1:2:4)
50 MM THICK PCC (1:3:6) 12Ø 700
150 MM THICK STONE SOLING 16Ø 950
FOOTING SCHEDULE RL ± 0.000 M WELL-COMPACTED EARTH
20Ø 1150
FOOTING FOOTING SIZE BOTTOM REBAR BOTTOM REBAR TOP REBAR IN
MARK L B D IN L-DIRECTION IN B-DIRECTION BOTH DIRECTION 50MM THK PCC PAD 25Ø 1450
600

2000
F1 3000 3000 650 12Ø@150 c/c 12Ø@150 c/c 12Ø@180 c/c
RRM IN CM (1:4)
F2 3300 3300 750 12Ø@120 c/c 12Ø@120c/c 12Ø@180 c/c
100 MM THICK PCC(1:3:6)
F3 3000 3000 700 12Ø@140 c/c 12Ø@140c/c 12Ø@180 c/c 150 MM THICK STONE NOTES:
700 SOLING
F4 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@170 c/c 800 1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER
HAVING REMOVED ALL THE TOP ORGANIC SOIL.
F5 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@160 c/c FOUNDATION FOR EXTERNAL WALL 2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM
BELOW BASEMENT/PLINTH BEAM FROM THE GROUND LEVEL
F6 3500 3500 800 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 3. BACK FILL SHALL BE FULLY COMPACTED BEFORE
PLACING GROUND FLOOR CONCRETE.
CF1 7050 3200 650 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR
COLUMN SHALL BE PROVIDED AS DETAILED IN
DRAWING NO. STR/08
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM
BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR
COLUMN SHALL BE CAST ONLY UP TO 3/4 OF THEIR
HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN
UPPER FLOOR.
FOOTING SCHEDULE

FOOTING FOOTING SIZE BOTTOM REBAR TOP REBAR IN


BOTTOM REBAR
MARK IN L-DIRECTION BOTH DIRECTION
L B D IN B-DIRECTION
RHS LHS
CF1 7050 3200 650 12Ø@140 c/c 16Ø@140 c/c 12Ø@120c/c 12Ø@180 c/c
CF2 7050 3200 650 12Ø@140 c/c 16Ø@140 c/c 12Ø@120c/c 12Ø@180 c/c

FOOTING & WALL FOUNDATION DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/03
TASHI NAMGYAL CEO (NHDCL) RICBL
PLINTH BEAM
L 100 PCC SLAB(1:2:4)
BEAM IN THE ORTHOGONAL COLUMN BARS (REFER DETAILS) BRICK WALL 50 MM THICK PCC (1:3:6)
DIRECTION 150 MM THICK STONE SOLING
GROUND FLOOR BEAM (Refer RL +0.45 M WELL-COMPACTED EARTH
Details)
GROUND FLOOR LEVEL

RL ± 0.000 M
50MM THK PCC PAD

2000
A A 50 PROVIDE EXTRA COVER TO RRM IN CM (1:4)
C
L OF COLUMN/
B

FOOTING COLUMN BELOW GROUND 450


100 MM THICK PCC(1:3:6)
75mm side cover TOP REBAR (SEE TABLE 150 MM THICK STONE
2000 MIN BELOW) 600 SOLING
800

RL -2.000 M FOUNDATION FOR INTERNAL WALL BELOW


La = L + 10Ø

D
d 7 5MM PROJECTION
50mm MIN BASEMENT/PLINTH BEAM AND PARTITION
WALL
C
L OF COLUMN/FOOTING 100 MM CONCRETE(1:2:4),
20mm agg. NOTES:
TYPICAL FOOTING PLAN 200 MM STONE SOLING SAME WALL FOUNDATION DETAILS SHALL BE ADOPTED FOR ALL WALLS..
TYPICAL FOOTING ELEVATION BOTTOM REBAR
(SECTION A-A) (SEE TABLE BELOW)

REBAR DEVELOPMENT
BRICK WALL SIZE LENGTH, Ldt
PLINTH BEAM RL +0.45 M 100 PCC SLAB(1:2:4)
50 MM THICK PCC (1:3:6) 12Ø 700
150 MM THICK STONE SOLING 16Ø 950
FOOTING SCHEDULE RL ± 0.000 M WELL-COMPACTED EARTH
20Ø 1150
FOOTING FOOTING SIZE BOTTOM REBAR BOTTOM REBAR TOP REBAR IN
MARK L B D IN L-DIRECTION IN B-DIRECTION BOTH DIRECTION 50MM THK PCC PAD 25Ø 1450
600

2000
F1 3000 3000 650 12Ø@150 c/c 12Ø@150 c/c 12Ø@180 c/c
RRM IN CM (1:4)
F2 3300 3300 750 12Ø@120 c/c 12Ø@120c/c 12Ø@180 c/c
100 MM THICK PCC(1:3:6)
F3 3000 3000 700 12Ø@140 c/c 12Ø@140c/c 12Ø@180 c/c 150 MM THICK STONE NOTES:
700 SOLING
F4 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@170 c/c 800 1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER
HAVING REMOVED ALL THE TOP ORGANIC SOIL.
F5 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@160 c/c FOUNDATION FOR EXTERNAL WALL 2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM
BELOW BASEMENT/PLINTH BEAM FROM THE GROUND LEVEL
F6 3500 3500 800 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 3. BACK FILL SHALL BE FULLY COMPACTED BEFORE
PLACING GROUND FLOOR CONCRETE.
CF1 7050 3200 650 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR
COLUMN SHALL BE PROVIDED AS DETAILED IN
DRAWING NO. STR/08
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM
BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR
COLUMN SHALL BE CAST ONLY UP TO 3/4 OF THEIR
HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN
UPPER FLOOR.
FOOTING SCHEDULE

FOOTING FOOTING SIZE BOTTOM REBAR TOP REBAR IN


BOTTOM REBAR
MARK IN L-DIRECTION
L B D IN B-DIRECTION BOTH DIRECTION
RHS LHS
CF1 7050 3200 650 12Ø@140 c/c 16Ø@140 c/c 12Ø@120c/c 12Ø@180 c/c
CF2 7050 3200 650 12Ø@140 c/c 16Ø@140 c/c 12Ø@120c/c 12Ø@180 c/c

FOOTING & WALL FOUNDATION DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/04
TASHI NAMGYAL CEO (NHDCL) RICBL
E F
5525 MACHINE ROOM
FIXING DETAILS TO BE
FOLLOWED FROM LIFT SUPPLIER/
MANUFACTURER'S DRAWINGS
2 MACHINE DRIVE

1700

A A

1400
LIFT

1900
3750

250

2200

CL OF CAR GUIDE
Landing Door

3 TOP FLOOR

12Ø@150c/c (Bothways)
12Ø@120c/c (Vertical bars)
500 500

Landing Door
A A 500 C C

500
ELEVATOR CAR

1400
1700
10Ø@ 150 c/c
500

250

10Ø@150c/c (B/F)
500 500
LIFT FOOTING REINFORCEMENT PLAN
12Ø@120c/c (B/F)
SECTION B-B

12Ø@120c/c (Vertical bars)


500 Landing Door

GROUND FLOOR
1700

Car Guide Rail


1400

10Ø@ 150 c/c B B


GL GL
500

250

Car Buffer 1800

Counter Weight Buffer


8Ø@ 100 c/c 200 mm Slab

100 mm PCC 40mm 1:2:4


SECTION C-C
150 mm stone soling 12Ø@150c/c (Bothways)

LIFT LAYOUT PLAN SECTION A-A


THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/05
TASHI NAMGYAL CEO (NHDCL) RICBL
ROOF LEVEL

COLUMN SCHEDULE

S1
TYPE SIZE MAIN BAR TIES AT S1, SPLICES TIES AT S2
BELOW PLINTH LEVEL
C1

S2
500x500 4-25Ø+4-20Ø 10Ø @ 75C/C 10Ø @ 150C/C

C2 500x500 4-25Ø+8-20Ø 10Ø @ 75C/C 10Ø @ 150C/C

500x500 4-25Ø+4-20Ø 10Ø @ 75C/C

650

650
C3 10Ø @ 150C/C
SECOND FLOOR LEVEL

57Ø
C4 500x500 8-25Ø+4-16Ø 10Ø @ 75C/C 10Ø @ 150C/C

S1
Special
confining zone

650
C5

650
500x500 8-25Ø+4-20Ø 10Ø @ 75C/C 10Ø @ 150C/C

900

900
Special confining
C6 550x550 12-25Ø 10Ø @ 75C/C 10Ø @ 150C/C zone
Splicng

3500
Non splicing zone
Special

S2
S1

S1
Ld
confining zone Special confining
500 500 500 zone

900

900
4-25Ø 4-25Ø

650
4-25Ø

650
FIRST FLOOR LEVEL

57Ø
4-20Ø

S1
S1
4-20Ø 4-20Ø

650

650
500 500 4-20Ø 500 Special confining

900

900
ties 10Ø ties 10Ø zone
ties 10Ø
Splicng

3500
Non splicing zone

S2
S1

S1
C1 C2 C3

Ld
Special
Special confining zone
500 500 550

900

900
confining zone

650
650
GROUND FLOOR LEVEL
4-25Ø 4-25Ø 4-25Ø

57Ø

S1
4-25Ø 4-20Ø 4-25Ø

650
650
500 500 550

900

900
4-16Ø 4-25Ø 4-25Ø Special confining
zone

3500
ties 10Ø ties 10Ø ties 10Ø

S2
C4 C5 C6 Special confining
zone

900

900
NOTES:

650

650
REFERENCES: BASEMENT LEVEL
1. ALL SPLICES TO BE PROVIDED NEAR THE MIDDLE OF COLUMN.

57Ø
2. NOT MORE THAN 50% OF COLUMN BARS SHALL BE SPLICED AT ONE 1. REFER DRG. NO. STR/01 FOR FOOTING LAYOUT GL GL
SECTION. PLAN.
3. SPLICING OF COLUMN BARS AT GROUND FLOOR IS NOT PERMITTED. 3. REFER DRG. NO. STR/10 FOR BEAM- COLUMN
4. COLUMN DETAILS IS SAME UP TO ROOF LEVEL. JUNCTION DETAILS.
5. ***CLOSER TIE SPACING OF 75 MM C/C SHALL BE PROVIDED THROUGHOUT 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.

S1
Special confining Special confining
FOR COLUMNS SUPPORTING STAIRCASE. 5. REFER DRG. NO. STR/70 TO 74 FOR STAIRCASE DETAILS. zone zone

2000
6. ***TIE SPACING OF 75 MM C/C SHALL BE PROVIDED UP TO GROUND FLOOR
LEVEL IN ALL COLUMNS.
7. COLUMN C7 & C8 WILL TERMINATE A LOWER GROUND FLOOR LEVEL.
8. COLUMN C9 WILL TERMINATE AT FIRST FLOOR LEVEL. FOUNDATION TIE LEVEL
9. COLUMN SHALL CONTINUE AS PROP WHERE NECESSARY.
10. ALL THE COLUMN TIES SHALL BE 10Ø UNLESS STATED OTHERWISE.
11. SAME TIE AND SPLICING DETAILS SHALL BE ADOPTED IN ALL COLUMNS.
12. Ld (57Ø)
16Ø =950 MM
20Ø =1150 MM
25Ø =1450 MM

COLUMN SCHEDULE & DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/06
TASHI NAMGYAL CEO (NHDCL) RICBL
2-LEGGED 8Ø@150c/c.
2-LEGGED 8Ø@150c/c. 2-LEGGED 8Ø@150c/c.

BEAM BEAM
A
A
A 800 800 800

3-12Ø

3-12Ø
ZHU
A A ZHU FACED SHALL BE
800

800
A Zhu Shall be as per
3-12Ø Architectural Drawings 3-12Ø 3-12Ø AS PER ARCHITECTURAL

DRAWING

10@75c/c Throughout the Kachen Height (Refer Str/06)


8Ø@75c/c THROUGHOUT KACHEN HEIGHT
BEAM REINFORCEMENT
(Refer beam details)

3-12Ø
SECTION A-A

DETAILS IN END KACHEN


DETAILS IN MIDDLE KACHEN.

DETAILS OF KACHEN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/07
TASHI NAMGYAL CEO (NHDCL) RICBL
ROOF LEVEL

S1
S2
INTERIOR
BEAM-COLUMN
CONNECTION 100
EXTERIOR (REFER
BEAM-COLUMN DETAILS >300

650

650
CONNECTION
r
IN STR/13)
(REFER DETAIL ON
SECOND FLOOR LEVEL 135°
DWG NO. STR/13)

57Ø

S1
COLUMN FACE
Special
confining zone >47xØ COVER 40MM COVER(MIN.)

650

650
100

900

900
Special confining
zone
Splicng

3500
Non splicing zone BEND RADIUS, 4Ø
Special

S2
S1

S1
SPLICES WITH OFFSET
CRANKED BARS IN COLUMN
TYPICAL COLUMN DETAIL
Ld
confining zone Special confining
zone

900

900
650
650
FIRST FLOOR LEVEL
57Ø

S1
S1 Rebar size
Development Anchoragement
Bend Radius, r 4Ø
length,Ld length,La
650

650
Special confining
900

900
10Ø 570 670 40
zone
12Ø 700 850 48
Splicng 3500 Non splicing zone
16Ø 950 1100 64

S2
S1

S1
Ld

20Ø 1150 1350 80


Special
Special confining zone 1450 1700 100
900

900
25Ø
confining zone

650
650

GROUND FLOOR LEVEL


57Ø

S1
650
650
900

900
Special confining
NOTES:
zone
3500

1. ALL SPLICES TO BE PROVIDED NEAR THE MIDDLE OF COLUMN.

S2
S1

S1

2. NOT MORE THAN 50% OF COLUMN BARS SHALL BE SPLICED AT ONE SECTION.
Special confining 3. SPLICING OF COLUMN BARS AT BASEMENT AND GROUND FLOOR IS
zone NOT PERMITTED.
900

900
650

650

BASEMENT LEVEL 4. COLUMN DETAILS IS SAME UP TO ROOF LEVEL.


57Ø

5. CLOSER SPACING OF TIES OF 75 MM C/C SHOULD BE PROVIDED THROUGH OUT


GL GL THE COLUMN SUPPORTING STAIRCASE.

6. TIES SPACING OF 75 MM C/C SHOULD BE PROVIDED IN ALL COLUMNS


UP TO GROUND FLOOR.
S1

Special confining Special confining 7. COLUMN SHOULD CONTINUE TILL TIE BEAM SUPPORTING TRUSSES AND BEAMS.
zone zone
2000

8. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR


COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST ONLY UP TO 3/4 OF THEIR
HEIGHT BEFORE LAYOUT BEAM REINFORCEMENT IN UPPER FLOORS.

FOUNDATION TIE LEVEL

COLUMN SPLICE DETAILS


THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/08
TASHI NAMGYAL CEO (NHDCL) RICBL
L
L/2
2D Ld Top rebar Hoops with
135° 135° bend
D
2D Ld 2D 2D 10Ø
D
Bottom rebar Where,Ø=stirrup
diameter

b
C/S, DETAILS AT END

L/2 BEAM STIRRUP DETAILS

Ld Where S is the spacing of


Top rebar
slab rebar
D S/2 Top splice zone near or
at mid span of member
Top reba
Top splice, Ld
2D 2D
D
Bottom rebar Bottom splice, Ld Bottom reba
Bottom splice zone not within
distance of 2d from joint face
& quater length of beam member.
b
BEAM SPLICING DETAIL
C/S, DETAILS AT MID

Ld NOTES :

D 1. SPLICING OF BOTTOM BEAM BARS SHAL BE


PROVIDED 2D AWAY FROM THE FACE OF THE COLUMN
2. SPLICING OF OF TOP BEAM BARS SHALL BE AT MID SPAN ( L/2)
2D 2D 2D 3. NOT MORE THAN 50% OF BEAM BARS SHALL BE SPLICED AT ONE SECTION
4. STIRRUPS SPACING AT SPLICES SHALL BE 8Ø @ 75C/C
5. SPLICING LENGTH SHALL NOT BE LESS THAN DEVELOPMENT LENGTH, Ld

TYPICAL ARRANGEMENT OF STIRRUPS & SPLICES IN BEAMS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/09
TASHI NAMGYAL CEO (NHDCL) RICBL
EXTERIOR COLUMN COLUMN

COLUMN REINFORCEMENTS

SECONDARY BEAM
BEAM REINFORCEMENTS
BEAM
50MM (MAX)
BEAM
50 MM (MAX)

PRIMARY BEAM
57Ø

PRIMARY-SECONDARY
Ld = 1150 MM FOR 20Ø COLUMN TIES WITHIN THE JOINT BEAM JUNCTION DETAILS
= 1450 MM FOR 25Ø
= 950 MM FOR 16 Ø
= 700 MM FOR 12Ø

INTERIOR BEAM - COLUMN


CONNECTION DETAIL (SIDE VIEW)
TYPICAL EXTERIOR BEAM - COLUMN

CONNECTION DETAIL ( SIDE VIEW)


BEAM

BEAM
BEAM
BEAM COLUMN
REINFORCEMENT
COLUMN PCC

COLUMN
50 MM (MAX)
50 MM (MAX)

COLUMN
PCC REINFORCEMENT
COLUMN TIE COLUMN
COLUMN
COLUMN TIE REINFORCEMENT COLUMN TIE REINFORCEMENT

BEAM BAR BENT BEAM BAR BENT


FOR ANCHORAGE FOR ANCHORAGE
BEAM STIRRUPS

TYPICAL EXTERIOR BEAM - COLUMN TYPICAL INTERIOR BEAM - COLUMN

CONNECTION DETAIL (PLAN VIEW) CONNECTION DETAIL (PLAN VIEW)

BEAM -COLUMN JUNCTION DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/10
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)
3750
7500

UP

(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
2
(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)
3750

(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

PLINTH BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/11
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2 3 4
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 1000 S2 1000 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
100
5525 5125 3250 5525 5525
1 2 3 4

L-SECTION OF PLINTH BEAM ALONG GRID 1 (300x400) L-SECTION OF PLINTH BEAM ALONG GRID 1 (300x450)

5 6 3 4
A B C D E F G
4-20Ø 4-20Ø 4-20Ø 4-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-20Ø 2-20Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 900 S2 900 900 S2 900 900 S2 900
4-20Ø 4-20Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
100
5525 5125 3250 5525 5525
5 6 3 4

L-SECTION OF PLINTH BEAM ALONG GRID 2 (300x400) L-SECTION OF PLINTH BEAM ALONG GRID 2 (300x450)
1 2 3 4
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 900 S2 900 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
100
5525 5125 3250 5525 5525
1 2 3 4

L-SECTION OF PLINTH BEAM ALONG GRID 3 (300x400) L-SECTION OF PLINTH BEAM ALONG GRID 3 (300x450)

Stirrups Details
PCC 2-20Ø PCC PCC 2-20Ø PCC
2-25Ø 2-25Ø 2-25Ø 2-25Ø REFERENCES: S1 = 8Ø @100c/c
S2 = 8Ø @150c/c
1. REFER DRG. NO. STR/11 FOR PLINTH BEAM LAYOUT PLAN.
2. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
400 400 450 450 3. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS.
2-16Ø 2-16Ø 2-16Ø 2-16Ø 4. REFER DRG. NO. STR/67 TO 70 FOR STAIRCASE DETAILS.
2-20Ø 2-25Ø 2-25Ø 2-25Ø
300 300 300 300 NOTES
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4
1. LOWER THE BEAM IN GRID 3, 300MM LOWER THAN THE OTHER

PLINTH BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/12
TASHI NAMGYAL CEO (NHDCL) RICBL
7 8 7 8 7 8
1 2 3 1 2 3 1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
7 8 7 8 7 8
L-SECTION OF PLINTH BEAM ALONG GRID A (300x400) L-SECTION OF PLINTH BEAM ALONG GRID B (300x400) L-SECTION OF PLINTH BEAM ALONG GRID C (300x400)

9 10 5 6 11 12
1 2 3 1 2 3 1 2 3
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-20Ø+2-16Ø 2-20Ø+2-16Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
9 10 5 6 11 12
L-SECTION OF PLINTH BEAM ALONG GRID D (300x450) L-SECTION OF PLINTH BEAM ALONG GRID E (300x450) L-SECTION OF PLINTH BEAM ALONG GRID F (300x450)

11 12
1 2 3
2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-20Ø PCC
PCC PCC PCC PCC PCC
2-25Ø 2-25Ø 2-25Ø 2-25Ø 4-20Ø 2-20Ø
1250 1250 1250 1250 4-20Ø 2-20Ø

400 400 400 400 450 2-16Ø 450 2-16Ø


S1 S1 S1 S1
800 S2 800 800 S2 800 4-20Ø 4-20Ø 4-20Ø 4-20Ø 2-20Ø 2-20Ø
4-20Ø 4-20Ø
3750 3750 300 300 300 300 300 300
SECTION 5-5 SECTION 6-6 SECTION 7-7 SECTION 8-8 SECTION 9-9 SECTION 10-10
11 12
L-SECTION OF PLINTH BEAM ALONG GRID G (300x450)

PCC 2-16Ø PCC


REFERENCES:
2-25Ø 2-25Ø
1. REFER DRG. NO. STR/11 FOR PLINTH BEAM LAYOUT PLAN.
2. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
3. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS.
4. REFER DRG. NO. STR/67 TO 70 FOR STAIRCASE DETAILS. 450 450
4-20Ø 4-20Ø
NOTES
300 300
1. LOWER THE BEAM IN GRID 3, 300MM LOWER THAN THE OTHER SECTION 11-11 SECTION 12-12

PLINTH BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/13
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)
3750
7500

UP

(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
2
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)
3750

(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

FIRST FLOOR BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/14
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2 3 4
A B C D E F G
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
1 2 3 4
L-SECTION OF FIRST FLOOR BEAM ALONG GRID 1 (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID 1 (300 X 550)

5 6 7 8 9 10
A B C D E F G
2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-12Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
5 6 7 8 9 10

L-SECTION OF FIRST FLOOR BEAM ALONG GRID 2 (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID 2 (300 X 550)
1 2 3 4
A B C D E F G
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
1 2 3 4
L-SECTION OF FIRST FLOOR BEAM ALONG GRID 3 (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID 3 (300 X 550)

2-20Ø PCC Stirrups Details


PCC PCC PCC
4-25Ø 2-25Ø 2-25Ø 2-25Ø S1 = 8Ø @100c/c
S2 = 8Ø @150c/c
2-12Ø 2-20Ø
550 2-20Ø 550 2-20Ø 550 550
2-25Ø 2-25Ø 4-25Ø 4-25Ø
300 300 300 300
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4

PCC 2-20Ø PCC PCC PCC PCC PCC


2-25Ø 2-25Ø 4-25Ø 2-25Ø 4-25Ø 2-25Ø
2-20Ø 2-20Ø 2-20Ø
550 550 550 2-12Ø 550 2-12Ø 550 550
2-20Ø 2-20Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø
300 300 300 300 300 300
SECTION 5-5 SECTION 6-6 SECTION 7-7 SECTION 8-8 SECTION 9-9 SECTION 10-10

FIRST FLOOR BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/15
TASHI NAMGYAL CEO (NHDCL) RICBL
11 12 11 12 11 12 11 12
1 2 3 1 2 3 1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
11 12 11 12 11 12 11 12

L-SECTION OF FIRST FLOOR BEAM ALONG GRID A (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID B (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID C (300 X 550)

13 14
11 12 11 12 11 12 1 2 3
1 2 3 1 2 3
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 1250 1250 1250 1250
1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1
S1 S1 S1 S1 S1 S1 S1 S1 1100 S2 1100 1100 S2 1100
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 4-25Ø 4-25Ø
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750
3750 3750 3750 3750
13 14
11 12 11 12 11 12
L-SECTION OF FIRST FLOOR BEAM ALONG GRID D (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID E (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID F (300 X 550)

11 12
1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø PCC PCC
2-25Ø 2-25Ø PCC PCC
4-25Ø 2-25Ø 4-25Ø 2-25Ø
1250 1250 1250 1250
2-12Ø

550 550 550 550


S1 S1 S1 S1
2-20Ø 2-20Ø
2-25Ø 2-25Ø 4-25Ø 4-25Ø
1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 300 300
3750 3750 300 300
SECTION 11-11 SECTION 12-12 SECTION 13-13 SECTION 14-14
11 12

L-SECTION OF FIRST FLOOR BEAM ALONG GRID G (300 X 550)

FIRST FLOOR BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/16
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)
3750
7500

UP

(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
2
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)

(300 X 550)
3750

(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

SECONDFLOOR BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/17
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2 3 4
A B C D E F G
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 100 2-25Ø+2-20Ø 2-25Ø+2-20Ø
5525 5125 3250 5525 5525
3 4
1 2
L-SECTION OF SECONDFLOOR BEAM ALONG GRID 1 (300 X 550) L-SECTION OF SECONDFLOOR BEAM ALONG GRID 1 (300 X 550)

3 4 5 6 7 8
A B C D E F G
2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-12Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
3 4 5 6 7 8

L-SECTION OF SECONDFLOOR BEAM ALONG GRID 2 (300 X 550) L-SECTION OF SECONDFLOOR BEAM ALONG GRID 2 (300 X 550)
1 2 9 10 3 4
A B C D E F G
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
100
5525 5125 3250 5525 5525
9 10
1 2 3 4
L-SECTION OF SECONDFLOOR BEAM ALONG GRID 3 (300 X 550) L-SECTION OF SECONDFLOOR BEAM ALONG GRID 3 (300 X 550)

PCC PCC PCC 2-20Ø PCC PCC 2-20Ø PCC PCC 2-20Ø PCC
4-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
2-12Ø 2-20Ø 2-20Ø 2-20Ø

550 550 550 550 550 550 550 550


2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-12Ø 2-12Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø

300 300 300 300 300 300 300 300


SECTION 3-3 SECTION 4-4 SECTION 5-5 SECTION 6-6 SECTION 7-7 SECTION 8-8
SECTION 1-1 SECTION 2-2

PCC 2-20Ø PCC


2-25Ø 2-25Ø
2-20Ø
550 2-20Ø 550 2-20Ø Stirrups Details
2-20Ø 2-20Ø S1 = 8Ø @100c/c
2-25Ø 2-25Ø
S2 = 8Ø @150c/c
300 300
SECTION 9-9 SECTION 10-10

SECONDFLOOR BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/18
TASHI NAMGYAL CEO (NHDCL) RICBL
11 12 11 12 11 12 11 12
1 2 3 1 2 3 1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
11 12 11 12 11 12 11 12

L-SECTION OF FIRST FLOOR BEAM ALONG GRID A (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID B (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID C (300 X 550)

13 14
11 12 11 12 11 12 1 2 3
1 2 3 1 2 3
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 1250 1250 1250 1250
1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1
S1 S1 S1 S1 S1 S1 S1 S1 1100 S2 1100 1100 S2 1100
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 4-25Ø 4-25Ø
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750
3750 3750 3750 3750
13 14
11 12 11 12 11 12
L-SECTION OF FIRST FLOOR BEAM ALONG GRID D (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID E (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID F (300 X 550)

11 12
1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø PCC PCC
2-25Ø 2-25Ø PCC PCC
4-25Ø 2-25Ø 4-25Ø 2-25Ø
1250 1250 1250 1250
2-12Ø

550 550 550 550


S1 S1 S1 S1
2-20Ø 2-20Ø
2-25Ø 2-25Ø 4-25Ø 4-25Ø
1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 300 300
3750 3750 300 300
SECTION 11-11 SECTION 12-12 SECTION 13-13 SECTION 14-14
11 12

L-SECTION OF FIRST FLOOR BEAM ALONG GRID G (300 X 550)

SECONDFLOOR BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/19
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)
3750
7500

UP

(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
2
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)
3750

(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

THIRDFLOOR BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/20
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2 3 4
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 2-25Ø+2-20Ø 100 2-25Ø+2-20Ø 2-25Ø+2-20Ø
5525 5125 3250 5525 5525
3 4
1 2
L-SECTION OF THIRDFLOOR BEAM ALONG GRID 1 (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID 1 (300 X 500)

3 4 5 6
A B C D E F G
4-25Ø+2-12Ø
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
3 4 5 6

L-SECTION OF THIRDFLOOR BEAM ALONG GRID 2 (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID 2 (300 X 500)
1 2 7 8
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 100 4-25Ø 4-25Ø 4-25Ø
5525 5125 3250 5525 5525
7 8
1 2
L-SECTION OF THIRDFLOOR BEAM ALONG GRID 3 (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID 3 (300 X 500)

PCC PCC PCC PCC PCC 2-20Ø PCC PCC PCC


4-25Ø 2-25Ø 4-25Ø 2-25Ø 2-25Ø 2-25Ø 4-25Ø 2-25Ø
2-12Ø 2-20Ø 2-12Ø
500 500 500 500 500 500 500 500
2-20Ø 2-20Ø 2-20Ø 2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
300 300 300 300 300 300 300 300
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4 SECTION 5-5 SECTION 6-6 SECTION 7-7 SECTION 8-8

Stirrups Details
S1 = 8Ø @100c/c
S2 = 8Ø @150c/c

THIRDFLOOR BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/21
TASHI NAMGYAL CEO (NHDCL) RICBL
9 10 9 10 9 10
1 2 3 1 2 3 1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
9 10 9 10 9 10

L-SECTION OF THIRDFLOOR BEAM ALONG GRID A (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID B (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID C (300 X 500)

11 12 9 10 9 10
1 2 3 1 2 3 1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
11 12 9 10 9 10

L-SECTION OF THIRDFLOOR BEAM ALONG GRID D (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID E (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID F (300 X 500)

9 10
1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø 2-20Ø
PCC PCC PCC PCC
2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 4-25Ø 2-25Ø

500 500 500 500


S1 S1 S1 S1 2-20Ø 2-20Ø
1000 S2 1000 1000 S2 1000 2-25Ø 2-25Ø 4-20Ø 4-20Ø
2-25Ø+2-20Ø 2-25Ø+2-20Ø 300 300
3750 3750 300 300
SECTION 9-9 SECTION 10-10 SECTION 11-11 SECTION 12-12
9 10

L-SECTION OF THIRDFLOOR BEAM ALONG GRID G (300 X 500)

THIRDFLOOR BEAM DETAILS


THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/22
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)
3750
7500

UP

(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
2
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)

(300 X 500)
3750

(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

FOURTHFLOOR BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/23
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2 1 2
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 100 4-20Ø 4-20Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 1 (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 1 (300 X 500)

1 2 1 2
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 100 4-20Ø 4-20Ø 4-20Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 2 (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 2 (300 X 500)
1 2 1 2
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 100 4-20Ø 4-20Ø 4-20Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 3 (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 3 (300 X 500)

PCC PCC
4-25Ø 2-25Ø

500 500
Stirrups Details
4-20Ø 4-20Ø
S1 = 8Ø @100c/c
300 300 S2 = 8Ø @150c/c
SECTION 1-1 SECTION 2-2

FOURTHFLOOR BEAM DETAILS


THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/24
TASHI NAMGYAL CEO (NHDCL) RICBL
3 4 3 4 3 4
1 2 3 1 2 3 1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4

L-SECTION OF FOURTHFLOOR BEAM ALONG GRID A (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID B (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID C (300 X 500)

3 4 3 4 3 4
1 2 3 1 2 3 1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4

L-SECTION OF FOURTHFLOOR BEAM ALONG GRID D (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID E (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID F (300 X 500)

3 4
1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø PCC 2-20Ø PCC
1250 1250 1250 1250 2-25Ø 2-25Ø

500 500
S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 4-20Ø 4-20Ø
4-20Ø 4-20Ø
3750 3750 300 300
SECTION 3-3 SECTION 4-4
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID G (300 X 500)

FOURTHFLOOR BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/25
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)
3750
7500

UP

(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
2
(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)

(300 X 450)
3750

(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

FIFTHFLOOR BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/26
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2 1 2
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900
4-20Ø+2-16Ø 4-20Ø+2-16Ø 100 4-20Ø+2-16Ø 4-20Ø+2-16Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 1 (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 1 (300 X 450)

1 2 1 2
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
4-20Ø+2-16Ø 4-20Ø+2-16Ø 100 4-20Ø+2-16Ø 4-20Ø+2-16Ø 4-20Ø+2-16Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 2 (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 2 (300 X 450)
1 2 1 2
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
4-20Ø+2-16Ø 4-20Ø+2-16Ø 100 4-20Ø+2-16Ø 4-20Ø+2-16Ø 4-20Ø+2-16Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 3 (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 3 (300 X 450)

PCC 2-20Ø PCC


2-25Ø 2-25Ø

450 450
2-16Ø 2-16Ø Stirrups Details
2-20Ø 2-20Ø
S1 = 8Ø @100c/c
300 300 S2 = 8Ø @150c/c
SECTION 1-1 SECTION 2-2

FIFTHFLOOR BEAM DETAILS


THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/27
TASHI NAMGYAL CEO (NHDCL) RICBL
3 4 3 4 3 4
1 2 3 1 2 3 1 2 3
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4

L-SECTION OF FIFTHFLOOR BEAM ALONG GRID A (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID B (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID C (300 X 450)

3 4 3 4 3 4
1 2 3 1 2 3 1 2 3
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4

L-SECTION OF FIFTHFLOOR BEAM ALONG GRID D (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID E (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID F (300 X 450)

3 4
1 2 3
4-20Ø 4-20Ø 4-20Ø 4-20Ø
2-20Ø 2-20Ø PCC PCC
1250 1250 1250 1250 4-20Ø 2-20Ø

S1 S1 S1 S1 450 450
2-16Ø 2-16Ø
900 S2 900 900 S2 900 2-20Ø 2-20Ø
2-20Ø+2-16Ø 2-20Ø+2-16Ø
3750 3750 300 300
3 4 SECTION 3-3 SECTION 4-4
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID G (300 X 450)

FIFTHFLOOR BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/28
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)
3750
7500

UP

(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
2
(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)

(300 X 400)
3750

(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

ROOF BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/29
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2 1 2
A B C D E F G
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-25Ø
2-20Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 100 2-16Ø+2-12Ø 2-16Ø+2-12Ø 2-16Ø+2-12Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 1 (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID 1 (300 X 400)

1 2 3 4
A B C D E F G
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
2-20Ø 2-20Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 100 4-16Ø 4-16Ø 4-16Ø
5525 5125 3250 5525 5525
3 4
1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 2 (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID 2 (300 X 400)
1 2 1 2
A B C D E F G
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-25Ø
2-20Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 100 2-16Ø+2-12Ø 2-16Ø+2-12Ø 2-16Ø+2-12Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 3 (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID 3 (300 X 400)

PCC 2-16Ø PCC PCC PCC 2-16Ø PCC


2-20Ø 2-20Ø 2-25Ø 2-25Ø

400 400 400 400


2-12Ø 2-12Ø Stirrups Details
2-16Ø 2-16Ø 4-16Ø 4-16Ø
S1 = 8Ø @100c/c
300 300 300 300 S2 = 8Ø @150c/c
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4

ROOF BEAM DETAILS


THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/30
TASHI NAMGYAL CEO (NHDCL) RICBL
5 6 7 8 5 6
1 2 3 1 2 3 1 2 3
4-16Ø 4-16Ø 4-16Ø 4-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø
2-16Ø 2-16Ø 2-20Ø 2-20Ø 2-16Ø 2-16Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 4-16Ø 4-16Ø 2-16Ø+2-12Ø 2-16Ø+2-12Ø
3750 3750 3750 3750 3750 3750
5 6 7 8 5 6

L-SECTION OF ROOFFLOOR BEAM ALONG GRID A (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID B (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID C (300 X 400)

5 6 7 8 7 8
1 2 3 1 2 3 1 2 3
4-16Ø 4-16Ø 4-16Ø 4-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
2-16Ø 2-16Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250

S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø
3750 3750 3750 3750 3750 3750
5 6 7 8 7 8

L-SECTION OF ROOFFLOOR BEAM ALONG GRID D (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID E (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID F (300 X 400)

5 6
1 2 3
4-16Ø 4-16Ø 4-16Ø 4-16Ø
2-16Ø 2-16Ø PCC PCC PCC 2-16Ø PCC
1250 1250 1250 1250 4-16Ø 2-16Ø 2-20Ø 2-20Ø

S1 S1 S1 S1 400 400 400 400


2-12Ø 2-12Ø
800 S2 800 800 S2 800 2-16Ø 2-16Ø 4-16Ø 4-16Ø
2-16Ø+2-12Ø 2-16Ø+2-12Ø
3750 3750 300 300 300 300
5 6 SECTION 5-5 SECTION 6-6 SECTION 7-7 SECTION 8-8
L-SECTION OF ROOFFLOOR BEAM ALONG GRID G (300 X 400)

ROOF BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/31
TASHI NAMGYAL CEO (NHDCL) RICBL
A B' B C D E F F' G
25600

5525 5125 650 3250 5525 5525

Extra PCC

1
(300 X 400)

1'
3750

(250 X 350) (250 X 350) (250 X 350)


7500

(250 X 350)

(250 X 350)
2
3750

(250 X 350) (250 X 350) (250 X 350)


2'

(300 X 400)
3

NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.

JAMTHOG BEAM LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/32
TASHI NAMGYAL CEO (NHDCL) RICBL
1 2
B' C D E F'
2-16Ø+1-12Ø 2-16Ø+1-12Ø 2-16Ø+1-12Ø 2-16Ø+1-12Ø 2-16Ø+1-12Ø 2-16Ø+1-12Ø
2-16Ø 2-16Ø 2-16Ø
1550 1550 1000 1000 1670 1670

S1 S1 S1 S1 S1 S1
700 S2 700 700 S2 700 700 S2 700
100
4-12Ø 4-12Ø 4-12Ø
5250 3250 5650

1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 1 (250X350)

3 4
1' 2 2'
2-16Ø+2-12Ø 2-16Ø+2-12Ø PCC 1-12Ø PCC PCC 2-12Ø PCC
2-16Ø 2-16Ø 2-16Ø 2-16Ø

350 350 350 350

4-12Ø 4-12Ø 4-12Ø 4-12Ø


4-12Ø 4-12Ø 250 250 250 250
2025 2025
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4
3 4

L-SECTION OF ROOFFLOOR BEAM ALONG GRID 1 (250X350)


Stirrups Details
S1 = 8Ø @100c/c
S2 = 8Ø @150c/c

JAMTHOG BEAM DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/33
TASHI NAMGYAL CEO (NHDCL) RICBL
A B

300 300
DOOR / WINDOW OPENING
A B

LINTEL BAND OVER OPENINGS

Masonry Wall

B
c
1-8Ø per boh
2-12Ø 8Ø@150c/c
150 2-12Ø 150 2-12Ø 2-12Ø
B
c
8Ø@150c/c150 2-12Ø 2-12Ø
DOOR / WINDOW OPENING
75
250 2-12Ø 125 250
LINTEL BAND OVER OPENINGS
SECTION A-A 250 SECTION C-C
SECTION B-B INTERNAL

NOTES :

1. LINTEL BAND SHALL BE PROVIDED FOR THE FULL LENGTH OF WALLS.

2. LAP LENGTH OF LINTEL BAND REINFORCEMENT SHALL NOT BE LESS THAN 47XØ OF BAR.

3. LINTEL BAND SHALL EXTEND FROM COLUMN TO COLUMN ENCLOSING PROJECTED WALLS

4. LINTEL BAND REINFORCEMENT SHALL BE PROPERLY ANCHORED TO COLUMNS.

LINTEL BAND DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/34
TASHI NAMGYAL CEO (NHDCL) RICBL
10Ø AS VERTICAL REINFORCEMENT
1-10Ø AS VERTICAL REINFORCEMENT

DETAIL A
MASONRY WALL
BAND REINFORCEMENT
RCC COLUMN
2-12Ø ( BOTH DIRECTIONS) 10Ø VERTICAL
10Ø AS VERTICAL REINFORCEMENT
REINFORCEMENT 2-12Ø

DETAIL C RCC COLUMN LINTEL BAND


DETAIL B
450 450
X X VERTICAL REINFORCEMENT

MASONRY

DETAIL B
TYPICAL LAYOUT OF VERTICAL REINFORCEMENT THROUGH PROJECTED WALLS SECTION X-X
TYPICAL LINTEL BAND DETAIL AT CORNER
OVER PROJECTED EXTERNAL WALL

10Ø VERTICAL
REINFORCEMENT
2-12Ø RCC COLUMN
VERTICAL REINFORCEMENT X
MASONRY WALL LINTEL BAND
MASONRY WALL
REINFORCEMENT
RCC COLUMN RCC COLUMN
LINTEL BAND
LINTEL BAND LINTEL BAND REINFORCEMENT
REINFORCEMENT REINFORCEMENT DETAIL A
X
DETAIL C
TYPICAL LINTEL BAND DETAIL AT CORNER TYPICAL LINTEL BAND DETAIL AT MIDDLE TYPICAL LINTEL BAND DETAIL AT MIDDLE
OVER NON PROJECTED EXTERNAL WALL OVER NON PROJECTED EXTERNAL WALL OVER PROJECTED EXTERNAL WALL

NOTES :

1. VERTICAL REINFORCEMENT SHALL BE PROVIDED WITHIN WALLS WHERE WALL ARE PROJECTED OUTWARD FROM THE MAIN BUILDING LINE.
2. VERTICAL REINFORCEMENT SHALL EXTEND FROM SECOND FLOOR SLAB/BEAM TO ROOF SLAB/BEAM.
3. VERTICAL REINFORCEMENT SHALL BE PROPERLY ANCHORED TO FLOOR SLAB/BEAM AND EMBEDMENT LENGTH SHALL BE NOT LESS THAN 47Ø OF BAR.
4. LINTEL BAND SHALL CONTINUE THROUGHOUT THE LENGTH OF WALL.

VERTICAL REINFORCEMENT FOR PROJECTED WALL AND LINTAL ANCHORAGE

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/35
TASHI NAMGYAL CEO (NHDCL) RICBL
1000 SLAB 2-12Ø (Per Boh,
REINFORCEMENT additional)
12Ø SLAB
12Ø RCC CORNICE REINFORCEMENT
per (REFER ARCH.
Boh DRAWINGS FOR 3-12Ø
DETAILS)
3-12Ø

C OF BRICK WALL
COLUMN C
1000 L OF COLUMN
622

ROOF LEVEL CORNICE


FIFTH FLOOR LEVEL CORNICE

Slab Reinforcement

WALL 2-12Ø
Slab
Reinforcement
800

BEAM
12Ø per
800
cornice (Refer beam details)
2-LEGGED 8Ø@100c/c
12Ø
2-12Ø
8Ø@100c/c 2-LEGGED 8Ø@100c/c
2-12Ø
CL OF
8Ø@100c/c COLUMN

CL OF
4-12Ø COLUMN

FIRST FLOOR LEVEL CORNICE


FOURTH FLOOR LEVEL CORNICE

CORNICE DETAILS DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/36
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 600 3250 5525 5525

Extra PCC

1
3750
7500

UP

LIFT
3750

3 750

REFERENCE:

1. REFER DRG. NO. STR/38 FOR GROUND FLOOR SLAB BOTTOM NOTES:
REINFORCEMENT PLAN.
2. REFER DRG. NO. STR/39 FOR LOWER GROUND FLOOR SLAB TOP 1. FLOOR SLAB THICKNESS IS 160 MM
REINFORCEMENT PLAN 2. ROOF SLAB THICKNESS IS 150 MM
3. REFER DRG. NO. STR/40 FOR SLAB SECTION 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS
DETAILS. 4. ADOPT DIFFERENT DETAILS FOR ROOF
4. REFER DRG. NO. STR/36 FOR CORNICE DETAILS SLAB.

FIRST/SECOND & THIRD FLOOR SLAB LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/37
TASHI NAMGYAL CEO (NHDCL) RICBL
X
A B C D E F G
25600

5525 5125 600 3250 5525 5525

10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

Extra PCC

1
10Ø@150 C/C

10Ø@150 C/C
3750
7500

UP

Y LIFT
Y
10Ø@150 C/C

10Ø@150 C/C
3750

X
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

FIRST/SECOND & THIRD FLOOR SLAB BOTTOM REINFORCEMENT

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/38
TASHI NAMGYAL CEO (NHDCL) RICBL
X
A B C D E F G
25600

5525 5125 650 3250 5525 5525

Extra PCC 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

1
10Ø@150 C/C

10Ø@150 C/C
3750
7500

UP

Y LIFT
Y
10Ø@150 C/C

10Ø@150 C/C
3750

3
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
X

FIRST/SECOND & THIRD FLOOR SLAB TOP REINFORCEMENT

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/39
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
5525 5125 3250 5525 5525
1650 1875 1650 1550 1675 1550 1000 900 1000 1650 1875 1650 1650 1875 1650

10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C


10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

SECTION Y-Y

1 2 3 NOTES:
3750 3750 1. FLOOR SLAB THICKNESS IS 160 MM
1150 1100 1150 1150 1100 1150
2. ROOF SLAB THICKNESS IS 150 MM

3. ADOPT SAME SECTION DETAILS FOR ALL SLABS


10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
4. ADOPT DIFFERENT DETAILS FOR ROOF
SLAB.

10Ø@150 C/C 10Ø@150 C/C


10Ø@150 C/C 10Ø@150 C/C

SECTION X-X

SLAB SECTION DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/40
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 600 3250 5525 5525

Extra PCC

1
3750
7500

UP

LIFT
3750

3 750

REFERENCE:

1. REFER DRG. NO. STR/38 FOR GROUND FLOOR SLAB BOTTOM NOTES:
REINFORCEMENT PLAN.
2. REFER DRG. NO. STR/39 FOR LOWER GROUND FLOOR SLAB TOP 1. FLOOR SLAB THICKNESS IS 160 MM
REINFORCEMENT PLAN 2. ROOF SLAB THICKNESS IS 150 MM
3. REFER DRG. NO. STR/40 FOR SLAB SECTION 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS
DETAILS. 4. ADOPT DIFFERENT DETAILS FOR ROOF
4. REFER DRG. NO. STR/36 FOR CORNICE DETAILS SLAB.

FOURTH FLOOR SLAB LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/41
TASHI NAMGYAL CEO (NHDCL) RICBL
X
A B C D E F G
25600

5525 5125 600 3250 5525 5525

10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C


Extra PCC

1
10Ø@150 C/C

10Ø@150 C/C
3750
7500

UP

2
10Ø@150 C/C

10Ø@150 C/C
Y LIFT
Y
3750

10Ø@150 C/C X C/C


10Ø@150 10Ø@150 C/C 10Ø@150 C/C

FOURTH FLOOR SLAB BOTTOM REINFORCEMENT

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/42
TASHI NAMGYAL CEO (NHDCL) RICBL
X
A B C D E F G
25600
12Ø@150 C/C
5525 5125 650 3250 5525 5525

Extra PCC 10Ø@150 C/C 10Ø@150 C/C

1
12Ø@150 C/C

12Ø@150 C/C
3750
7500

UP

2
12Ø@150 C/C

12Ø@150 C/C
Y LIFT
Y
3750

10Ø@150 C/C 10Ø@150 C/C


12Ø@150 C/C
X
12Ø@150 C/C

FOURTH FLOOR SLAB TOP REINFORCEMENT

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/43
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
5525 5125 3250 5525 5525

1650 1875 1650 1550 1675 1550 1000 900 1000 1650 1875 1650 1650 1875 1650

10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C


10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

SECTION Y-Y

1 2 3
NOTES:
3750 3750

1. FLOOR SLAB THICKNESS IS 160 MM


1150 1100 1150 1150 1100 1150

2. ROOF SLAB THICKNESS IS 150 MM


10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS

4. ADOPT DIFFERENT DETAILS FOR ROOF


10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C
SLAB.

SECTION X-X

SLAB SECTION DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/44
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 600 3250 5525 5525

Extra PCC

1
3750
7500

LIFT
3750

3 750

REFERENCE:

1. REFER DRG. NO. STR/38 FOR GROUND FLOOR SLAB BOTTOM NOTES:
REINFORCEMENT PLAN.
2. REFER DRG. NO. STR/39 FOR LOWER GROUND FLOOR SLAB TOP 1. FLOOR SLAB THICKNESS IS 160 MM
REINFORCEMENT PLAN 2. ROOF SLAB THICKNESS IS 150 MM
3. REFER DRG. NO. STR/40 FOR SLAB SECTION 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS
DETAILS. 4. ADOPT DIFFERENT DETAILS FOR ROOF
4. REFER DRG. NO. STR/36 FOR CORNICE DETAILS SLAB.

FIFTH/ROOF FLOOR SLAB LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/45
TASHI NAMGYAL CEO (NHDCL) RICBL
X
A B C D E F G
25600

5525 5125 600 3250 5525 5525


10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
Extra PCC

1
10Ø@150 C/C

10Ø@150 C/C
3750
7500

2
10Ø@150 C/C

10Ø@150 C/C
Y LIFT
Y
3750

10Ø@150 C/C X C/C


10Ø@150 10Ø@150 C/C
10Ø@150 C/C

FIFTH/ROOF FLOOR SLAB BOTTOM REINFORCEMENT

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/46
TASHI NAMGYAL CEO (NHDCL) RICBL
X
A B C D E F G
25600
12Ø@150 C/C 12Ø@150 C/C
5525 5125 650 3250 5525 5525
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

1
12Ø@150 C/C

12Ø@150 C/C
3750
7500

2
12Ø@150 C/C

12Ø@150 C/C
Y LIFT
Y
4750

10Ø@150 C/C 10Ø@150 C/C


12Ø@150 C/C
X
12Ø@150 C/C

FIFTH/ROOF FLOOR SLAB TOP REINFORCEMENT

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/47
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
5525 5125 3250 5525 5525

1650 1875 1650 1550 1675 1550 1000 900 1000 1650 1875 1650 1650 1875 1650

12Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 12Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 12Ø@150 C/C

10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C


10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C

SECTION Y-Y

1 2 3
NOTES:
3750 3750

1. FLOOR SLAB THICKNESS IS 160 MM


1150 1100 1150 1150 1100 1150

2. ROOF SLAB THICKNESS IS 150 MM


10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS

4. ADOPT DIFFERENT DETAILS FOR ROOF


10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C
SLAB.
5. ALL THE SLAB TOP REINFORCEMENT IN THE PROJECTED AREAS SHALL BE OF 12Ø

SECTION X-X

SLAB SECTION DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/48
TASHI NAMGYAL CEO (NHDCL) RICBL
2NOS-10Ø 2NOS-10Ø
(BOTH TOP AND BOTTOM) (BOTH TOP AND BOTTOM)

2NOS-10Ø 600 2NOS-10Ø


600
(BOTH TOP AND BOTTOM)
800
(BOTH TOP AND BOTTOM)
800

2NOS-10Ø BARS TO BE FULLY

BEAM UNDER
(BOTH TOP AND BOTTOM) ANCHORED TO BEAM
2NOS-10Ø
(BOTH TOP AND BOTTOM)

2NOS-10Ø
(BOTH TOP AND BOTTOM)
600
600

TYPICAL DETAIL FOR OPENING NEAR


TYPICAL DETAIL FOR OPENING IN THE BEAM
MIDDLE OF SLAB
OPENING DETAILS

8Ø@150c/c
OPENING
A A 2-12Ø
150
2-12Ø
200
SECTION A-A
REINFORCEMENT AT OPENINGS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/49
TASHI NAMGYAL CEO (NHDCL) RICBL
D A B E 1 2
5 6
1000 1000
INTERMEDIATE
LANDING 4-25Ø 4-25Ø
1250
2-25Ø

1
2-16Ø S1 S1
1000 S2 1000
4-25Ø
3250
2950
1 2

L-SECTION OF LANDING BEAM

UP
4-25Ø 2-25Ø

800

2-16Ø
2 500 500
A B 4-25Ø
3250
4-25Ø
350 350

SECTION 1-1 SECTION 2-2

STAIRCASE LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/50
TASHI NAMGYAL CEO (NHDCL) RICBL
1
2

LANDING
12Ø@150c/c 10Ø@150c/c

950
12Ø@150c/c 600

10Ø@150c/c
12Ø@150c/c 1750
950
600 X

12Ø@150c/c 12Ø@150c/c
1500
10Ø@150c/c

LANDING BEAM
12Ø@150c/c 10Ø@170c/c
SECTION B-B
1-10Ø 300

150
RISER =175 10Ø300C/C 175
TREAD =300
WAIST SLAB THICKNESS =160
NUMBER OF STEPS= 20 10Ø@150 c/c
LANDING
10Ø@150c/c 12Ø@150c/c 12Ø@150 c/c
1150 DETAIL X
950
600 12Ø@150c/c
LANDING BEAM

10Ø@150c/c
1750 12Ø@150c/c
950
X 600

12Ø@150c/c 12Ø@150c/c
1500
10Ø@150c/c

10Ø@170c/c
SECTION A-A

STAIRCASE SECTION

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/51
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600
5525 5125 600 3250 5525 5525

2100 1842 1842 1842 1708 1708 1708 600 1563 1687 1842 1842 1842 1842 1842 1842 2100

T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1

SLOPE
SLOPE
1

SLOPE

SLOPE

SLOPE
3750
7500

2
3750

SLOPE
SLOPE

SLOPE

SLOPE

SLOPE
3

ROOF TRUSS LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/52
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 600 3250 5525 5525

T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1

957
958
SLOPE
SLOPE
1

SLOPE

SLOPE

SLOPE

958
958
3750

958
7500

958
150
2

958
958
3750

958
SLOPE
SLOPE

SLOPE

SLOPE

SLOPE

958
3

958
958
PURLIN LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/53
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 600 3250 5525 5525


1708 1708 1708 600 1563 1687 1842 1842 1842 1842

T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1

T3 T3 T3 T3 T3 T3 T3 T3 T3
3750

SLOPE

SLOPE
7500

SLOPE

SLOPE
3750

JAMTHOG ROOF TRUSS LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/54
TASHI NAMGYAL CEO (NHDCL) RICBL
A B C D E F G
25600

5525 5125 600 3250 5525 5525

T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1

T3 T3 T3 T3 T3 T3 T3 T3 T3

933
3750

SLOPE

SLOPE

933
7500

933
150
2

933
SLOPE

SLOPE

933
3750

933
3

JAMTHOG PURLIN LAYOUT PLAN

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/55
TASHI NAMGYAL CEO (NHDCL) RICBL
5981 5981
1587 1243 1587
1439 978 978 1439
1327 712 712 1327
446 446
12°

2100 1250 1250 1250 1250 1250 1250 2100

T1

944 778 778 944


965 628 628 965
446 446

2100 855 705 4382 705 855 2100

3014 3014 T2
1110 616 1110
1052 396 396 1052
175 175

825 1038 1038 1038 1038 825


2904 2904

T3

TRUSS ELEVATION

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/56
TASHI NAMGYAL CEO (NHDCL) RICBL
Top Chord
A
B strut(Inclined)

D
C E F
Prop Prop
Bottom Chord Strut(Vertical)

TRUSS MEMBER SCHEDULE (MAIN TRUSS)

MEMBER STEEL TUBES SIZE SECTION THICKNESS, (mm)

TOP & BOTTOM CHORD 60.3 ODM, 5.03 Kg/m 3.60


STRUT (INCLINED) 48.3 ODM, 3.56 Kg/m 3.20
STRUT (VERTICAL) 48.3 ODM, 3.56 Kg/m 3.20
PURLIN 88.90 ODM, 8.430 Kg/m 4.00
OD- Outer Diamter, M- medium
NOTES:
1. ALL WELDING SHOULD BE FILLET WELD OF MINIMUN 4 MM THICK
2. SIZE OF COMPLETE PENETRATION BUTT WELD GREATER THAN
EQUAL TO MEMBER THICKNESS
3. STEEL GRADE ST35 (Yst 22 GRADE)

TRUSS MEMBER SCHEDULE (MAIN TRUSS)

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/57
TASHI NAMGYAL CEO (NHDCL) RICBL
Top Chord
A
B strut(Inclined)

D
C E F
Prop Prop
Bottom Chord Strut(Vertical)

TRUSS MEMBER SCHEDULE (JAMTHO TRUSS)

MEMBER STEEL TUBES SIZE SECTION THICKNESS, (mm)

TOP & BOTTOM CHORD 60.3 ODM, 5.070 Kg/m 3.60


STRUT (INCLINED) 48.30 ODM, 3.590 Kg/m 3.20
STRUT (VERTICAL) 48.30 ODM, 3.590 Kg/m 3.20
PURLIN 60.3 ODM, 5.070 Kg/m 3.60
OD- Outer Diamter, M- medium
NOTES:
1. ALL WELDING SHOULD BE FILLET WELD OF MINIMUN 6 MM THICK
2. SIZE OF COMPLETE PENETRATION BUTT WELD GREATER THAN
EQUAL TO MEMBER THICKNESS
3. STEEL GRADE ST35 (Yst 22 GRADE)

TRUSS MEMBER SCHEDULE (JAMTHO TRUSS)

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/58
TASHI NAMGYAL CEO (NHDCL) RICBL
120 X 80 X 5 MM PURLIN
CLEAT
PURLINS

4 MM WELD
PRINCIPAL STRUTS
RAFTER RAFTER
RAFTER
BOTTOM WASHER 4 MM THICK
TIE

STRUT (INCLINED) STRUT (INCLINED)

VERTICAL STRUT WELD


INCLINED TIE DETAIL C
STRUTS
DETAIL - A
DETAIL B
STRUTS
BOTTOM
TIE

STRUTS
120 x80x 5 mm
PURLIN CLEAT PRINCIPAL RAFTER BOTTOM WASHER 3 MM THICK
TIE
PURLIN
BOTTOM TIE

MS Flat 8mm size=150X150mm


MS Flat 8mm welded to bottom chord
MS Flat 8mm size=150X150mm
MS Flat 8 mm size=150mmx150mm
size=150mmx150mm
MS Flat
MS Flat 25x25x4mm
20mm nuts, 250
DETAIL D 20mm nuts, 250 25x25x4mm
mm long and bolts
mm long and bolts (4 Nos)
(4 Nos) RCC PROP
RCC PROP

DETAIL F
DETAIL E
4nos. 20 mm nut and bolts

150

150 TRUSS CONNECTION DETAILS


TOP VIEW OF JOINT B& C & ANCHORAGE JOINTS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/59
TASHI NAMGYAL CEO (NHDCL) RICBL
PURLIN

PURLIN 4 MM Weld RAFTER


Bottom Chord
120 x80x 5 mm 5 mm MS steel plate
PURLIN welded to steel tubular rafter
VERTICAL STRUT CLEAT

TIE/ BOTTOM CHORD


5 MM WELD
RAFTER PURLIN-RAFTER
CONNECTION DETAILS
VERTICAL STRUT (TOP VIEW)
150x150x8MM BASE PLATE

4-20Ø, 250MM LONG


HIGH DENSITY PURLIN-RAFTER 150
8Ø@75c/c CONNECTION DETAILS
NUTS & BOLTS (SIDE VIEW)
30
4 MM WELD
RCC PROP
90 150
PURLIN
4-20Ø, 75MM LONG
30 HIGH DENSITY
NUTS & BOLTS
35 80 35
4 MM Weld
120 x80x 5 mm
PURLIN CLEAT
TOP CHORD TRUSS HOLDING
BASE PLATE
PURLIN-RAFTER
CONNECTION DETAILS NOTES:
(END VIEW) 1. SAME TRUSS CONNECTION DETAILS SHALL BE
ADOPTED IN ALL CONNECTIONS.
TRUSS HOLDING DETAILS

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/60
TASHI NAMGYAL CEO (NHDCL) RICBL
STRUTS
250
BOTTOM Washer 4 mm thick
TIE
MS Flat 8mm size=150X150mm
welded to bottom chord

4-16Ø
250
MS Flat 8mm size=150X150mm
MS Flat 8mm size=150mmx150mm
placed on a RCC prop
on top of tie beam

MS Flat
20mm nuts, 250 25x25x4mm
SECTION A-A mm long and bolts NOTES:
(4 Nos)
RCC PROP 1. FOR A FLEXIBLE SUPPORT, HOLDING DOWN BOLTS
TO BE TIGHT 75 %
2. OVAL SHAPED SOLE PLATE HOLE FOR FLEXIBLE
SUPPORT
FLEXIBLE SUPPORT DETAIL 3. SAME SUPPORT DETAILS TO PROVIDED AS SHOWN IN
ROOF TRUSS LAYOUT PLAN.

SOLE PLATE 4nos. 20 mm nut and bolts


Oval shaped sole plate

A A BASE PLATE
150
8Ø@75c/c
H
8 mm Sole Plate
RCC PROP
RCC PROP
SOLE PLATE FOR
BASE/SOLE PLATE FLEXIBLE SUPPORT
SECTION

4nos. 20 mm nut and bolts


Circular shaped sole plate
Circular shaped
Hole in Base Plate

150 150

8 mm Thick Base Plate 8 mm Thick Sole Plate


PROP DETAILS
150 150

BASE PLATE FOR BOTH SOLE PLATE FOR


NOTE: FIXED/FLEXIBLE SUPPORT FIXED SUPPORT
H= HEIGTH OF PROP (REFER ARCHITECTURAL DRAWING FOR
PROP HEIGHT

THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:

NAME OF THE DRAWING:- AS MENTIONED 2035


G.M ( D&PS)
PLOT NO. National Housing Development Corporation Ltd.
SCALE:- NTS DRAWING NO: Design & Planning Services
PO Box 1439
PGT-2405 Thimphu
DATE:- DEC, 2017 STR/61
TASHI NAMGYAL CEO (NHDCL) RICBL

You might also like