Professional Documents
Culture Documents
2.structural Drawing Deki Lane
2.structural Drawing Deki Lane
DRG. NO. DRAWING TITLE DATE OF ISSUE STR/47 Fifth/Roof Floor Slab Layout plan. DECEMBER, 2017
STR/48 Fifth/Roof Floor Slab Bottom Reinforcement plan. DECEMBER, 2017
List of Structural Drawings for Basement G+4 Office Building for Bhutan Post, Gelephu DECEMBER, 2017
STR/49 Typical opening details in slab/near beams. DECEMBER, 2017
STR/00 General Notes on Structural Drawings DECEMBER, 2017 DECEMBER, 2017
STR/50 Staircase Plan
STR/00 General Notes on Structural Drawings DECEMBER, 2017
STR/51 Staircase Details DECEMBER, 2017
STR/01 Footing Layout Plan DECEMBER, 2017
STR/52 Main Roof Truss layout plan DECEMBER, 2017
STR/02 Column Layout Plan DECEMBER, 2017
STR/53 Main Roof Truss Purlin layout plan DECEMBER, 2017
STR/03 Footing Details DECEMBER, 2017
STR/54 Jamthog Roof Truss layout plan DECEMBER, 2017
STR/04 Lift Layout plan & its reinforcement plan DECEMBER, 2017
STR/55 Jamthog Roof Truss Purlin layout plan DECEMBER, 2017
STR/05 Lift Section Details DECEMBER, 2017
STR/56 Roof Truss Elevation DECEMBER, 2017
STR/06 Column Details DECEMBER, 2017
STR/57 Roof Truss member schedule (Main Roof) DECEMBER, 2017
STR/07 Kachen Details DECEMBER, 2017
STR/58 Roof Truss member schedule (Jamthog Roof) DECEMBER, 2017
STR/08 Typical Splice location and details in column DECEMBER, 2017
STR/59 Roof Truss connection details (a) DECEMBER, 2017
STR/09 Typical Splice location and splices in beam DECEMBER, 2017
STR/60 Roof Truss connection details (b) DECEMBER, 2017
STR/10 Beam - Column Junction Details DECEMBER, 2017
STR/61 Roof Truss Prop Details DECEMBER, 2017
STR/11 Ground Floor Beam Layout Plan DECEMBER, 2017
STR/12 Ground Floor Beam Details (a) DECEMBER, 2017
STR/13 Ground Floor Beam Details (b) DECEMBER, 2017
STR/14 First Floor Beam layout plan. DECEMBER, 2017
STR/15 First Floor Beam Details (a) DECEMBER, 2017
STR/16 First Floor Beam Details (b) DECEMBER, 2017
STR/17 Second Floor Beam Layout Plan DECEMBER, 2017
STR/18 SecondFloor Beam Details (a) DECEMBER, 2017
STR/19 SecondFloor Beam Details (b) DECEMBER, 2017
STR/20 Third Floor Beam Layout Plan DECEMBER, 2017
STR/21 ThirdFloor Beam Details (a) DECEMBER, 2017
STR/22 ThirdFloor Beam Details (b) DECEMBER, 2017
STR/23 Fourth Floor Beam Layout Plan DECEMBER, 2017
STR/24 FourthFloor Beam Details (a) DECEMBER, 2017
STR/25 FourthFloor Beam Details (b) DECEMBER, 2017
STR/26 Fifth Floor Beam Layout Plan DECEMBER, 2017
STR/27 FifthFloor Beam Details (a) DECEMBER, 2017
STR/28 FifthFloor Beam Details (b) DECEMBER, 2017
STR/29 Roof Beam Layout Plan DECEMBER, 2017
STR/30 RoofFloor Beam Details (a) DECEMBER, 2017
STR/31 RoofFloor Beam Details (b) DECEMBER, 2017
STR/32 Jamthog Beam Layout Plan DECEMBER, 2017
STR/33 Jamthog Beam Details DECEMBER, 2017
STR/34 Lintel Band Details. DECEMBER, 2017
STR/35 Vertical reinforcement in project wall and lintel anchorage. DECEMBER, 2017
STR/36 Cornice Details. DECEMBER, 2017
STR/37 First/Second/Third Floor Slab Layout plan. DECEMBER, 2017
STR/38 First/Second/Third Floor Slab Bottom Reinforcement plan. DECEMBER, 2017
STR/39 First/Second/Third Floor Slab Top Reinforcement plan. DECEMBER, 2017
STR/40 First/Second/Third Floor Slab Section Details DECEMBER, 2017
STR/41 Fourth Floor Slab Layout plan. DECEMBER, 2017
STR/42 Fourth Floor Slab Bottom Reinforcement plan. DECEMBER, 2017
STR/43 Fourth Floor Slab Top Reinforcement plan. DECEMBER, 2017
STR/44 Fourth Floor Slab Section Details DECEMBER, 2017
STR/45 Fifth/Roof Floor Slab Layout plan. DECEMBER, 2017
STR/46 Fifth/Roof Floor Slab Bottom Reinforcement plan. DECEMBER, 2017
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1. READ THIS DRAWINGS IN CONJUNCTION WITH ARCHITECTS' AND OTHER ENGINEERS' DRAWINGS AND SPECIFICATIONS, AND SUCH OTHER WRITTEN 1. THIS STRUCTURE HAS BEEN DESIGNED FOR THE FOLLOWING NOMINAL LOADS:
INSTRUCTIONS AS MAY BE ISSUED.
1.1 DEAD LOADS:
2. ALL DIMENSIONS ARE IN MILIMETRE UNLESS STATED OTHERWISE. UNIT WEIGHT OF WALL 23 KN/M3 (CEMENT CONCRETE BLOCK)
UNIT WEIGHT OF RCC 25 KN/M3
3. DIMENSIONS SHALL NOT BE SCALED FROM THE DRAWINGS. UNIT WEIGHT OF PCC 24 KN/M3
11. UNLESS OTHERWISE INDICATED, DETAILS SHOWN ARE TO BE CONSIDERED TYPICAL FOR SIMILAR CONDITIONS. D. CONCRETE
12. NO FRAMING OR STRUCTURAL MEMBERS ARE TO BE MODIFIED, NOTCHED, OR CUT WITHOUT THE APPROVAL OF THE ENGINEER.
1. CONCRETE QUALITY SHALL COMPLY WITH IS456:2000
13. THE OWNNER SHALL FAMILIARIZE THEMSELVES WITH THE DRAWINGS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE
2. PROJECT ASSESSMENT OF CONCRETE STRENGTH IS REQUIRED.
ENGINEER BEFORE PROCEEDING WITH THE AFFECTED WORK. ANY VARIATIONS OR SUBSTITUTIONS OF MATERIALS OR DETAILS FROM THOSE
INDICATED ON THE DRAWINGS MAY ONLY BE MADE WiTH PRIOR APPROVAL OF THE ENGINEER.
3. GRADE OF CONCRETE IS M20(1:1.5:3) FOR ALL RCC WORKS.
4. FOR THE ABOVE GRADE TO BE ACHIEVED, MAXIMUM FREE WATER-CEMENT RATIO SHALL BE 0.55, MINIMUM CEMENT CONTENT
B. FOUNDATION SHALL BE 300KG/M3 AND MAXIMUM AMOUNT OF WATER SHALL BE 165L FOR 300KG/M3 OF CEMENT.
1. FOOTINGS ARE DESIGNED FOR AN ALLOWABLE BEARING CAPACITY OF 150KPA. VERIFY THE SOIL STRENGTH AND OBTAIN APPROVAL 5. ONLY POTABLE WATER SHALL BE USED FOR MIXING AND CURING, AND SHALL COMPLY TO THE REQUIREMENTS OF IS456:2000.
FROM THE ENGINEER BEFORE PLACING CONCRETE.
6. MECHANICALLY VIBRATE CONCRETE IN THE FORM TO GIVE MAXIMUM COMPACTION WITHOUT SEGREGATION OF THE CONCRETE.
2. FOUNDATION SHALL BEAR ON UNDISTURBED NATURAL MATERIAL OR PROPERLY PLACED AND COMPACTED CONTROLLED STRUCTURAL
FILL HAVING A MINIMUM BEARING CAPACITY OF 150 KPA. 7. CURE CONCRETE AS REQUIRED BY THE CLASUE 13.5 OF IS456:2000 AND WORK SPECIFICATIONS.
3. CONTROLLED STRUCTURAL FILL SHALL CONSIST OF CLEAN GRANULAR MATERIAL FREE OF ORGANIC OR OTHER DELETERIOUS MATTER 8. IN THE DRAWINGS THE BEAM SIZES ARE DESIGNATED WIDTH X DEPTH (INCLUDES SLAB THICKNESS IF ANY).
AND CONFORM TO THE REQUIREMENTS OF STANDARDS AND QUALITY CONTROL AUTHORITY.
9. CONCRETE SIZES AS DRAWN ARE MINIMUM AND DO NOT INCLUDE APPLIED FINISHES.
4. MASONRY WALLS IN THE FORM OF RANDOM RUBBLE MASONRY SHALL BE PROVIDED BELOW THE EXTERIOR AS WELL AS INTERIOR PLINTH BEAM.
10. DO NOT MAKE UNSPECIFIED HOLES OR CHASES WITHOUT ENGINEER'S PRIOR APPROVAL.
5. FOOTINGS ARE DESIGNED CONSIDERING THE MINIMUM DEPTH OF 2000MM BELOW THE ORIGINAL GROUND LEVEL. NOTIFY ENGINEER IF
THE DEPTH OF FOOTINGS REQUIRED TO BE PROVIDED VARIES FROM THE DEPTH SPECIFIED ABOVE. 11. DO NOT PLACE CONDUITS, PIPES AND THE LIKE WITHIN COVER CONCRETE.
6. ALL EXCAVATION SHALL BE DRY BEFORE PLACING ANY CONCRETE. 12. AGGREGATES SHALL COMPLY WITH CLAUSE 5.3 OF IS456:2000. NOMINAL SIZE OF COARSE AGGREGATES SHALL BE 20MM.
7. IF SEEPAGE IS ENCOUNTERED DURING FOUNDATION EXCAVATION, PUMP OUT WATER BEFORE PLACING CONCRETE. 13. THE CHARACTERISTIC STRENGTH OF CONCRETE AT 28 DAYS SHALL BE 20MPA. THE CONCRETE SHALL BE ASSESSED AS PER THE
ACCEPTANCE CRITERIA OUTLINED IN CLAUSE 16 OF IS456:2000 OR ANY OTHER STATUTORY AUTHORITIES.
8. THE FOUNDATIONS UNDER THE CONCRETE BASE SLAB SHALL BE COMPACTED THROUGHLY AND A MINIMUM 200MM LAYER OF
COURSE AGGREGATE SHALL BE PLACED OVER THE COMPACTED EARTH AND SEALED WITH 75MM THICK LAYER OF BLINDING CONCRETE. 14. ALL FORMWORKS FOR BEAMS AND SLABS ARE TO BE REMOVED BEFORE CONSTRUCTION OF WALLS OR OTHER
PERMANENT LOADINGS. ALL FORMWORK AND ITS REMOVAL MUST BE IN ACCORDANCE TO IS456:2000.
9. BACKFILLING AGAINST BUILDING FOUNDATION WALLS SHALL BE DONE ONLY AFTER WALLS ARE BRACED TO PREVENT MOVEMENT.
15. ALL FLOOR SLABS ARE REINFORCED CONCRETE SLABS.
10. CARE SHALL BE TAKEN NOT TO OVERSTRESS ANY ADJACENT RETAINING WALLS AND STRUCTURES DURING BACKFILLING AROUND FOUNDATIONS.
12. NECESSARY PRECAUTION SHALL BE TAKEN WHILE EXCAVATING THE FOUNDATION NEAR BY THE DRAIN.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
2. BAR NOTATION GIVES THE FOLLOWING INFORMATION IN THIS ORDER:NUMBER OF BARS; BAR SIZE(MM); SPACING (MM, IF REQUIRED).
4. LAP REINFORCEMENT ONLY AT LOCATIONS SHOWN IN THE DRAWINGS. LAP LENGTH SHALL COMPLY WITH IS456:2000. LAP SPLICES
SHALL NOT BE LESS THAN THE DEVELOPMENT LENGTH IN TENSION( GENERALLY 57X Ø).
5. REINFORCEMENT SHALL NOT BE CUT, BENT OR HEATED ON SITE WITHOUT ENGINEER'S PRIOR APPROVAL.
6. THE DEVIATION OF REINFORCEMENT FROM ITS SPECIFIED POSITION SHALL NOT EXCEED THE FOLLOWING(MM):
6.1) TOLERENCE FOR COVER -0,+10 MM. WHERE A NEGATIVE VALUE INDICATES A DECREASE IN SPECIFIED COVER, AND POSITIVE
VALUE INDICATES AN INCREASE IN COVER.
7. SPACERS AND SUPPORTS SHALL BE LOCATED AT CENTRES CLOSE ENOUGH(PREFERABLY NOT EXCEEDING 750MM C/C FOR COLUMN
AND BEAM REINFORCEMENT, AND 450MM FOR SLAB REINFORCEMENT) TO PREVENT DISPLACEMENT OF REINFORCEMENT BY
WORKMEN OR EQUIPMENT DURING FIXING AND SUBSEQUENT CONCRETE PLACEMENT WITHIN THE TOLERENCE GIVEN IN 6 ABOVE.
8. THE COVER TO THE REINFORCEMENT NEAREST TO THE CONCRETE SURFACE SHALL NOT BE LESS THAN THE FOLLOWING EXCEPT
WHERE SPECIFIED OTHERWISE:
BEAMS 30 MM
COLUMNS 40 MM
FLOOR SLABS AND STAIRCASE 20 MM
FOUNDATION 50 MM
9. BENDING OF REINFORCEMENT IN BEAMS AND COLUMNS SHALL COMPLY WITH THE REQUIREMENTS OF IS456:2000.
11. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24 HOURS PRIOR TO SCHEDULED CONCRETE PLACEMENT. NOTIFY
ENGINEER AT LEAST 48 HOURS PRIOR TO SCHEDULED CONRETE PLACEMENT, TO ALLOW TIME FOR INSPECTION.
F. TIMBER
1. ALL STRUCTURAL TIMBER SHALL CONFORM TO THE IS883.( If available use the Bhutanese Timber Code)
3. ALL STRUCTURAL TIMBER SHALL HAVE A MINIMUM ALLOWABLE BENDING STRESS, Fb, OF 7MPA,
A MINIMUM ALLOWABLE HORIZONTAL SHEAR STRESS, Fv, OF 0.6MPA, A MINIMUM MODULUS OF
ELASTICITY, E, OF 9800MPA, AND MAXIMUM UNIT WEIGHT OF 5.75 KN/M3.
G. FORMWORK
1. PROPERLY BRACE AND SHORE FORMWORK TO MAINTAIN ALIGNMENT AND TOLERANCE IN ACCORDANCE WITH IS456:2000.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
3300 7050
3000
F1 F2 CF1 F4 F3
3000
3300
3200
1
C1 C2 C1 C3 C4 C4 C3
3750
3500 3300
F2 F2 CF2 F6 F4
3400
3500
3300
2
C2 C2 C4 C6 C6 C4
7400
3750
F1 F2 CF1 F5 F3
3400
3000
3
C1 C2 C1 C3 C5 C5 C3
3000
3400
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1
C1 C2 C1 C3 C4 C4 C3
3750
7500
2
C2 C2 C2 C4 C6 C6 C4
3750
3
C1 C2 C1 C3 C5 C5 C3
NOTES: REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/01 FOR FOOTING LAYOUT PLAN
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. DETAILS.
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 3. REFER DRG. NO. STR/04 & 05 FOR SHEAR WALL DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 4. REFER DRG. NO. STR/08 FOR COLUMN DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 5. REFER DRG. NO. STR/09 FOR COLUMN SPLICE DETAILS.
6. REFER DRG. NO. STR/10 FOR BEAM SPLICE DETAILS
7. REFER DRG. NO. STR/11 FOR BEAM- COLUMN JUNCTION
DETAILS.
COLUMN LAYOUT PLAN
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
RL ± 0.000 M
50MM THK PCC PAD
2000
A A 50 PROVIDE EXTRA COVER TO RRM IN CM (1:4)
C
L OF COLUMN/
B
FOOTING COLUMN BELOW GROUND 450
100 MM THICK PCC(1:3:6)
75mm side cover TOP REBAR (SEE TABLE 150 MM THICK STONE
2000 MIN BELOW) 600 SOLING
800
D
d 7 5MM PROJECTION
50mm MIN BASEMENT/PLINTH BEAM AND PARTITION
WALL
C
L OF COLUMN/FOOTING 100 MM CONCRETE(1:2:4),
20mm agg. NOTES:
TYPICAL FOOTING PLAN 200 MM STONE SOLING SAME WALL FOUNDATION DETAILS SHALL BE ADOPTED FOR ALL WALLS..
TYPICAL FOOTING ELEVATION BOTTOM REBAR
(SECTION A-A) (SEE TABLE BELOW)
REBAR DEVELOPMENT
BRICK WALL SIZE LENGTH, Ldt
PLINTH BEAM RL +0.45 M 100 PCC SLAB(1:2:4)
50 MM THICK PCC (1:3:6) 12Ø 700
150 MM THICK STONE SOLING 16Ø 950
FOOTING SCHEDULE RL ± 0.000 M WELL-COMPACTED EARTH
20Ø 1150
FOOTING FOOTING SIZE BOTTOM REBAR BOTTOM REBAR TOP REBAR IN
MARK L B D IN L-DIRECTION IN B-DIRECTION BOTH DIRECTION 50MM THK PCC PAD 25Ø 1450
600
2000
F1 3000 3000 650 12Ø@150 c/c 12Ø@150 c/c 12Ø@180 c/c
RRM IN CM (1:4)
F2 3300 3300 750 12Ø@120 c/c 12Ø@120c/c 12Ø@180 c/c
100 MM THICK PCC(1:3:6)
F3 3000 3000 700 12Ø@140 c/c 12Ø@140c/c 12Ø@180 c/c 150 MM THICK STONE NOTES:
700 SOLING
F4 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@170 c/c 800 1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER
HAVING REMOVED ALL THE TOP ORGANIC SOIL.
F5 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@160 c/c FOUNDATION FOR EXTERNAL WALL 2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM
BELOW BASEMENT/PLINTH BEAM FROM THE GROUND LEVEL
F6 3500 3500 800 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 3. BACK FILL SHALL BE FULLY COMPACTED BEFORE
PLACING GROUND FLOOR CONCRETE.
CF1 7050 3200 650 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR
COLUMN SHALL BE PROVIDED AS DETAILED IN
DRAWING NO. STR/08
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM
BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR
COLUMN SHALL BE CAST ONLY UP TO 3/4 OF THEIR
HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN
UPPER FLOOR.
FOOTING SCHEDULE
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
RL ± 0.000 M
50MM THK PCC PAD
2000
A A 50 PROVIDE EXTRA COVER TO RRM IN CM (1:4)
C
L OF COLUMN/
B
D
d 7 5MM PROJECTION
50mm MIN BASEMENT/PLINTH BEAM AND PARTITION
WALL
C
L OF COLUMN/FOOTING 100 MM CONCRETE(1:2:4),
20mm agg. NOTES:
TYPICAL FOOTING PLAN 200 MM STONE SOLING SAME WALL FOUNDATION DETAILS SHALL BE ADOPTED FOR ALL WALLS..
TYPICAL FOOTING ELEVATION BOTTOM REBAR
(SECTION A-A) (SEE TABLE BELOW)
REBAR DEVELOPMENT
BRICK WALL SIZE LENGTH, Ldt
PLINTH BEAM RL +0.45 M 100 PCC SLAB(1:2:4)
50 MM THICK PCC (1:3:6) 12Ø 700
150 MM THICK STONE SOLING 16Ø 950
FOOTING SCHEDULE RL ± 0.000 M WELL-COMPACTED EARTH
20Ø 1150
FOOTING FOOTING SIZE BOTTOM REBAR BOTTOM REBAR TOP REBAR IN
MARK L B D IN L-DIRECTION IN B-DIRECTION BOTH DIRECTION 50MM THK PCC PAD 25Ø 1450
600
2000
F1 3000 3000 650 12Ø@150 c/c 12Ø@150 c/c 12Ø@180 c/c
RRM IN CM (1:4)
F2 3300 3300 750 12Ø@120 c/c 12Ø@120c/c 12Ø@180 c/c
100 MM THICK PCC(1:3:6)
F3 3000 3000 700 12Ø@140 c/c 12Ø@140c/c 12Ø@180 c/c 150 MM THICK STONE NOTES:
700 SOLING
F4 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@170 c/c 800 1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER
HAVING REMOVED ALL THE TOP ORGANIC SOIL.
F5 3400 3400 800 12Ø@120 c/c 12Ø@120c/c 12Ø@160 c/c FOUNDATION FOR EXTERNAL WALL 2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM
BELOW BASEMENT/PLINTH BEAM FROM THE GROUND LEVEL
F6 3500 3500 800 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 3. BACK FILL SHALL BE FULLY COMPACTED BEFORE
PLACING GROUND FLOOR CONCRETE.
CF1 7050 3200 650 12Ø@100 c/c 12Ø@100c/c 12Ø@160 c/c 4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR
COLUMN SHALL BE PROVIDED AS DETAILED IN
DRAWING NO. STR/08
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM
BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR
COLUMN SHALL BE CAST ONLY UP TO 3/4 OF THEIR
HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN
UPPER FLOOR.
FOOTING SCHEDULE
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1700
A A
1400
LIFT
1900
3750
250
2200
CL OF CAR GUIDE
Landing Door
3 TOP FLOOR
12Ø@150c/c (Bothways)
12Ø@120c/c (Vertical bars)
500 500
Landing Door
A A 500 C C
500
ELEVATOR CAR
1400
1700
10Ø@ 150 c/c
500
250
10Ø@150c/c (B/F)
500 500
LIFT FOOTING REINFORCEMENT PLAN
12Ø@120c/c (B/F)
SECTION B-B
GROUND FLOOR
1700
250
COLUMN SCHEDULE
S1
TYPE SIZE MAIN BAR TIES AT S1, SPLICES TIES AT S2
BELOW PLINTH LEVEL
C1
S2
500x500 4-25Ø+4-20Ø 10Ø @ 75C/C 10Ø @ 150C/C
650
650
C3 10Ø @ 150C/C
SECOND FLOOR LEVEL
57Ø
C4 500x500 8-25Ø+4-16Ø 10Ø @ 75C/C 10Ø @ 150C/C
S1
Special
confining zone
650
C5
650
500x500 8-25Ø+4-20Ø 10Ø @ 75C/C 10Ø @ 150C/C
900
900
Special confining
C6 550x550 12-25Ø 10Ø @ 75C/C 10Ø @ 150C/C zone
Splicng
3500
Non splicing zone
Special
S2
S1
S1
Ld
confining zone Special confining
500 500 500 zone
900
900
4-25Ø 4-25Ø
650
4-25Ø
650
FIRST FLOOR LEVEL
57Ø
4-20Ø
S1
S1
4-20Ø 4-20Ø
650
650
500 500 4-20Ø 500 Special confining
900
900
ties 10Ø ties 10Ø zone
ties 10Ø
Splicng
3500
Non splicing zone
S2
S1
S1
C1 C2 C3
Ld
Special
Special confining zone
500 500 550
900
900
confining zone
650
650
GROUND FLOOR LEVEL
4-25Ø 4-25Ø 4-25Ø
57Ø
S1
4-25Ø 4-20Ø 4-25Ø
650
650
500 500 550
900
900
4-16Ø 4-25Ø 4-25Ø Special confining
zone
3500
ties 10Ø ties 10Ø ties 10Ø
S2
C4 C5 C6 Special confining
zone
900
900
NOTES:
650
650
REFERENCES: BASEMENT LEVEL
1. ALL SPLICES TO BE PROVIDED NEAR THE MIDDLE OF COLUMN.
57Ø
2. NOT MORE THAN 50% OF COLUMN BARS SHALL BE SPLICED AT ONE 1. REFER DRG. NO. STR/01 FOR FOOTING LAYOUT GL GL
SECTION. PLAN.
3. SPLICING OF COLUMN BARS AT GROUND FLOOR IS NOT PERMITTED. 3. REFER DRG. NO. STR/10 FOR BEAM- COLUMN
4. COLUMN DETAILS IS SAME UP TO ROOF LEVEL. JUNCTION DETAILS.
5. ***CLOSER TIE SPACING OF 75 MM C/C SHALL BE PROVIDED THROUGHOUT 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
S1
Special confining Special confining
FOR COLUMNS SUPPORTING STAIRCASE. 5. REFER DRG. NO. STR/70 TO 74 FOR STAIRCASE DETAILS. zone zone
2000
6. ***TIE SPACING OF 75 MM C/C SHALL BE PROVIDED UP TO GROUND FLOOR
LEVEL IN ALL COLUMNS.
7. COLUMN C7 & C8 WILL TERMINATE A LOWER GROUND FLOOR LEVEL.
8. COLUMN C9 WILL TERMINATE AT FIRST FLOOR LEVEL. FOUNDATION TIE LEVEL
9. COLUMN SHALL CONTINUE AS PROP WHERE NECESSARY.
10. ALL THE COLUMN TIES SHALL BE 10Ø UNLESS STATED OTHERWISE.
11. SAME TIE AND SPLICING DETAILS SHALL BE ADOPTED IN ALL COLUMNS.
12. Ld (57Ø)
16Ø =950 MM
20Ø =1150 MM
25Ø =1450 MM
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
BEAM BEAM
A
A
A 800 800 800
3-12Ø
3-12Ø
ZHU
A A ZHU FACED SHALL BE
800
800
A Zhu Shall be as per
3-12Ø Architectural Drawings 3-12Ø 3-12Ø AS PER ARCHITECTURAL
DRAWING
3-12Ø
SECTION A-A
DETAILS OF KACHEN
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1
S2
INTERIOR
BEAM-COLUMN
CONNECTION 100
EXTERIOR (REFER
BEAM-COLUMN DETAILS >300
650
650
CONNECTION
r
IN STR/13)
(REFER DETAIL ON
SECOND FLOOR LEVEL 135°
DWG NO. STR/13)
57Ø
S1
COLUMN FACE
Special
confining zone >47xØ COVER 40MM COVER(MIN.)
650
650
100
900
900
Special confining
zone
Splicng
3500
Non splicing zone BEND RADIUS, 4Ø
Special
S2
S1
S1
SPLICES WITH OFFSET
CRANKED BARS IN COLUMN
TYPICAL COLUMN DETAIL
Ld
confining zone Special confining
zone
900
900
650
650
FIRST FLOOR LEVEL
57Ø
S1
S1 Rebar size
Development Anchoragement
Bend Radius, r 4Ø
length,Ld length,La
650
650
Special confining
900
900
10Ø 570 670 40
zone
12Ø 700 850 48
Splicng 3500 Non splicing zone
16Ø 950 1100 64
S2
S1
S1
Ld
900
25Ø
confining zone
650
650
S1
650
650
900
900
Special confining
NOTES:
zone
3500
S2
S1
S1
2. NOT MORE THAN 50% OF COLUMN BARS SHALL BE SPLICED AT ONE SECTION.
Special confining 3. SPLICING OF COLUMN BARS AT BASEMENT AND GROUND FLOOR IS
zone NOT PERMITTED.
900
900
650
650
Special confining Special confining 7. COLUMN SHOULD CONTINUE TILL TIE BEAM SUPPORTING TRUSSES AND BEAMS.
zone zone
2000
b
C/S, DETAILS AT END
Ld NOTES :
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
COLUMN REINFORCEMENTS
SECONDARY BEAM
BEAM REINFORCEMENTS
BEAM
50MM (MAX)
BEAM
50 MM (MAX)
PRIMARY BEAM
57Ø
PRIMARY-SECONDARY
Ld = 1150 MM FOR 20Ø COLUMN TIES WITHIN THE JOINT BEAM JUNCTION DETAILS
= 1450 MM FOR 25Ø
= 950 MM FOR 16 Ø
= 700 MM FOR 12Ø
BEAM
BEAM
BEAM COLUMN
REINFORCEMENT
COLUMN PCC
COLUMN
50 MM (MAX)
50 MM (MAX)
COLUMN
PCC REINFORCEMENT
COLUMN TIE COLUMN
COLUMN
COLUMN TIE REINFORCEMENT COLUMN TIE REINFORCEMENT
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
3750
7500
UP
(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
2
(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
3750
(300 X 400) (300 X 400) (300 X 450) (300 X 450) (300 X 450)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 1000 S2 1000 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
100
5525 5125 3250 5525 5525
1 2 3 4
L-SECTION OF PLINTH BEAM ALONG GRID 1 (300x400) L-SECTION OF PLINTH BEAM ALONG GRID 1 (300x450)
5 6 3 4
A B C D E F G
4-20Ø 4-20Ø 4-20Ø 4-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-20Ø 2-20Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 900 S2 900 900 S2 900 900 S2 900
4-20Ø 4-20Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
100
5525 5125 3250 5525 5525
5 6 3 4
L-SECTION OF PLINTH BEAM ALONG GRID 2 (300x400) L-SECTION OF PLINTH BEAM ALONG GRID 2 (300x450)
1 2 3 4
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 900 S2 900 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
100
5525 5125 3250 5525 5525
1 2 3 4
L-SECTION OF PLINTH BEAM ALONG GRID 3 (300x400) L-SECTION OF PLINTH BEAM ALONG GRID 3 (300x450)
Stirrups Details
PCC 2-20Ø PCC PCC 2-20Ø PCC
2-25Ø 2-25Ø 2-25Ø 2-25Ø REFERENCES: S1 = 8Ø @100c/c
S2 = 8Ø @150c/c
1. REFER DRG. NO. STR/11 FOR PLINTH BEAM LAYOUT PLAN.
2. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
400 400 450 450 3. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS.
2-16Ø 2-16Ø 2-16Ø 2-16Ø 4. REFER DRG. NO. STR/67 TO 70 FOR STAIRCASE DETAILS.
2-20Ø 2-25Ø 2-25Ø 2-25Ø
300 300 300 300 NOTES
SECTION 1-1 SECTION 2-2 SECTION 3-3 SECTION 4-4
1. LOWER THE BEAM IN GRID 3, 300MM LOWER THAN THE OTHER
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
7 8 7 8 7 8
L-SECTION OF PLINTH BEAM ALONG GRID A (300x400) L-SECTION OF PLINTH BEAM ALONG GRID B (300x400) L-SECTION OF PLINTH BEAM ALONG GRID C (300x400)
9 10 5 6 11 12
1 2 3 1 2 3 1 2 3
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-20Ø+2-16Ø 2-20Ø+2-16Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
9 10 5 6 11 12
L-SECTION OF PLINTH BEAM ALONG GRID D (300x450) L-SECTION OF PLINTH BEAM ALONG GRID E (300x450) L-SECTION OF PLINTH BEAM ALONG GRID F (300x450)
11 12
1 2 3
2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-20Ø PCC
PCC PCC PCC PCC PCC
2-25Ø 2-25Ø 2-25Ø 2-25Ø 4-20Ø 2-20Ø
1250 1250 1250 1250 4-20Ø 2-20Ø
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
3750
7500
UP
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
2
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
3750
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
1 2 3 4
L-SECTION OF FIRST FLOOR BEAM ALONG GRID 1 (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID 1 (300 X 550)
5 6 7 8 9 10
A B C D E F G
2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-12Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
5 6 7 8 9 10
L-SECTION OF FIRST FLOOR BEAM ALONG GRID 2 (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID 2 (300 X 550)
1 2 3 4
A B C D E F G
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
1 2 3 4
L-SECTION OF FIRST FLOOR BEAM ALONG GRID 3 (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID 3 (300 X 550)
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
11 12 11 12 11 12 11 12
L-SECTION OF FIRST FLOOR BEAM ALONG GRID A (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID B (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID C (300 X 550)
13 14
11 12 11 12 11 12 1 2 3
1 2 3 1 2 3
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 1250 1250 1250 1250
1250 1250 1250 1250 1250 1250 1250 1250
S1 S1 S1 S1
S1 S1 S1 S1 S1 S1 S1 S1 1100 S2 1100 1100 S2 1100
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 4-25Ø 4-25Ø
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750
3750 3750 3750 3750
13 14
11 12 11 12 11 12
L-SECTION OF FIRST FLOOR BEAM ALONG GRID D (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID E (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID F (300 X 550)
11 12
1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø PCC PCC
2-25Ø 2-25Ø PCC PCC
4-25Ø 2-25Ø 4-25Ø 2-25Ø
1250 1250 1250 1250
2-12Ø
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
3750
7500
UP
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
2
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
(300 X 550)
3750
(300 X 550) (300 X 550) (300 X 550) (300 X 550) (300 X 550)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 100 2-25Ø+2-20Ø 2-25Ø+2-20Ø
5525 5125 3250 5525 5525
3 4
1 2
L-SECTION OF SECONDFLOOR BEAM ALONG GRID 1 (300 X 550) L-SECTION OF SECONDFLOOR BEAM ALONG GRID 1 (300 X 550)
3 4 5 6 7 8
A B C D E F G
2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 2-25Ø+4-20Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø 4-25Ø+2-16Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-12Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
3 4 5 6 7 8
L-SECTION OF SECONDFLOOR BEAM ALONG GRID 2 (300 X 550) L-SECTION OF SECONDFLOOR BEAM ALONG GRID 2 (300 X 550)
1 2 9 10 3 4
A B C D E F G
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
100
5525 5125 3250 5525 5525
9 10
1 2 3 4
L-SECTION OF SECONDFLOOR BEAM ALONG GRID 3 (300 X 550) L-SECTION OF SECONDFLOOR BEAM ALONG GRID 3 (300 X 550)
PCC PCC PCC 2-20Ø PCC PCC 2-20Ø PCC PCC 2-20Ø PCC
4-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
2-12Ø 2-20Ø 2-20Ø 2-20Ø
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
11 12 11 12 11 12 11 12
L-SECTION OF FIRST FLOOR BEAM ALONG GRID A (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID B (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID C (300 X 550)
13 14
11 12 11 12 11 12 1 2 3
1 2 3 1 2 3
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 1250 1250 1250 1250
1250 1250 1250 1250 1250 1250 1250 1250
S1 S1 S1 S1
S1 S1 S1 S1 S1 S1 S1 S1 1100 S2 1100 1100 S2 1100
1100 S2 1100 1100 S2 1100 1100 S2 1100 1100 S2 1100 4-25Ø 4-25Ø
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750
3750 3750 3750 3750
13 14
11 12 11 12 11 12
L-SECTION OF FIRST FLOOR BEAM ALONG GRID D (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID E (300 X 550) L-SECTION OF FIRST FLOOR BEAM ALONG GRID F (300 X 550)
11 12
1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø PCC PCC
2-25Ø 2-25Ø PCC PCC
4-25Ø 2-25Ø 4-25Ø 2-25Ø
1250 1250 1250 1250
2-12Ø
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
3750
7500
UP
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
2
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
3750
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 2-25Ø+2-20Ø 100 2-25Ø+2-20Ø 2-25Ø+2-20Ø
5525 5125 3250 5525 5525
3 4
1 2
L-SECTION OF THIRDFLOOR BEAM ALONG GRID 1 (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID 1 (300 X 500)
3 4 5 6
A B C D E F G
4-25Ø+2-12Ø
4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø 4-20Ø+2-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
100
5525 5125 3250 5525 5525
3 4 5 6
L-SECTION OF THIRDFLOOR BEAM ALONG GRID 2 (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID 2 (300 X 500)
1 2 7 8
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø 4-25Ø+2-12Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 100 4-25Ø 4-25Ø 4-25Ø
5525 5125 3250 5525 5525
7 8
1 2
L-SECTION OF THIRDFLOOR BEAM ALONG GRID 3 (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID 3 (300 X 500)
Stirrups Details
S1 = 8Ø @100c/c
S2 = 8Ø @150c/c
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
9 10 9 10 9 10
L-SECTION OF THIRDFLOOR BEAM ALONG GRID A (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID B (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID C (300 X 500)
11 12 9 10 9 10
1 2 3 1 2 3 1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
3750 3750 3750 3750 3750 3750
11 12 9 10 9 10
L-SECTION OF THIRDFLOOR BEAM ALONG GRID D (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID E (300 X 500) L-SECTION OF THIRDFLOOR BEAM ALONG GRID F (300 X 500)
9 10
1 2 3
4-25Ø 4-25Ø 4-25Ø 4-25Ø 2-20Ø
PCC PCC PCC PCC
2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 4-25Ø 2-25Ø
Extra PCC
1
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
3750
7500
UP
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
2
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
(300 X 500)
3750
(300 X 500) (300 X 500) (300 X 500) (300 X 500) (300 X 500)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 100 4-20Ø 4-20Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 1 (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 1 (300 X 500)
1 2 1 2
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 100 4-20Ø 4-20Ø 4-20Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 2 (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 2 (300 X 500)
1 2 1 2
A B C D E F G
4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø 4-25Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 100 4-20Ø 4-20Ø 4-20Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 3 (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID 3 (300 X 500)
PCC PCC
4-25Ø 2-25Ø
500 500
Stirrups Details
4-20Ø 4-20Ø
S1 = 8Ø @100c/c
300 300 S2 = 8Ø @150c/c
SECTION 1-1 SECTION 2-2
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID A (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID B (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID C (300 X 500)
3 4 3 4 3 4
1 2 3 1 2 3 1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000 1000 S2 1000
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID D (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID E (300 X 500) L-SECTION OF FOURTHFLOOR BEAM ALONG GRID F (300 X 500)
3 4
1 2 3
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø PCC 2-20Ø PCC
1250 1250 1250 1250 2-25Ø 2-25Ø
500 500
S1 S1 S1 S1
1000 S2 1000 1000 S2 1000 4-20Ø 4-20Ø
4-20Ø 4-20Ø
3750 3750 300 300
SECTION 3-3 SECTION 4-4
L-SECTION OF FOURTHFLOOR BEAM ALONG GRID G (300 X 500)
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
3750
7500
UP
(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
2
(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
(300 X 450)
3750
(300 X 450) (300 X 450) (300 X 450) (300 X 450) (300 X 450)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900
4-20Ø+2-16Ø 4-20Ø+2-16Ø 100 4-20Ø+2-16Ø 4-20Ø+2-16Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 1 (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 1 (300 X 450)
1 2 1 2
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
4-20Ø+2-16Ø 4-20Ø+2-16Ø 100 4-20Ø+2-16Ø 4-20Ø+2-16Ø 4-20Ø+2-16Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 2 (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 2 (300 X 450)
1 2 1 2
A B C D E F G
2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø 2-25Ø+2-20Ø
2-25Ø 2-25Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
4-20Ø+2-16Ø 4-20Ø+2-16Ø 100 4-20Ø+2-16Ø 4-20Ø+2-16Ø 4-20Ø+2-16Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 3 (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID 3 (300 X 450)
450 450
2-16Ø 2-16Ø Stirrups Details
2-20Ø 2-20Ø
S1 = 8Ø @100c/c
300 300 S2 = 8Ø @150c/c
SECTION 1-1 SECTION 2-2
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID A (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID B (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID C (300 X 450)
3 4 3 4 3 4
1 2 3 1 2 3 1 2 3
4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø 4-20Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900 900 S2 900
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
3750 3750 3750 3750 3750 3750
3 4 3 4 3 4
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID D (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID E (300 X 450) L-SECTION OF FIFTHFLOOR BEAM ALONG GRID F (300 X 450)
3 4
1 2 3
4-20Ø 4-20Ø 4-20Ø 4-20Ø
2-20Ø 2-20Ø PCC PCC
1250 1250 1250 1250 4-20Ø 2-20Ø
S1 S1 S1 S1 450 450
2-16Ø 2-16Ø
900 S2 900 900 S2 900 2-20Ø 2-20Ø
2-20Ø+2-16Ø 2-20Ø+2-16Ø
3750 3750 300 300
3 4 SECTION 3-3 SECTION 4-4
L-SECTION OF FIFTHFLOOR BEAM ALONG GRID G (300 X 450)
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
3750
7500
UP
(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
2
(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
(300 X 400)
3750
(300 X 400) (300 X 400) (300 X 400) (300 X 400) (300 X 400)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 100 2-16Ø+2-12Ø 2-16Ø+2-12Ø 2-16Ø+2-12Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 1 (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID 1 (300 X 400)
1 2 3 4
A B C D E F G
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø 2-25Ø+2-16Ø
2-20Ø 2-20Ø 2-25Ø 2-25Ø 2-25Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 100 4-16Ø 4-16Ø 4-16Ø
5525 5125 3250 5525 5525
3 4
1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 2 (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID 2 (300 X 400)
1 2 1 2
A B C D E F G
2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
2-20Ø 2-20Ø 2-20Ø 2-20Ø 2-25Ø
2-20Ø
1670 1670 1550 1550 1000 1000 1670 1670 1670 1670
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 100 2-16Ø+2-12Ø 2-16Ø+2-12Ø 2-16Ø+2-12Ø
5525 5125 3250 5525 5525
1 2 1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 3 (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID 3 (300 X 400)
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 4-16Ø 4-16Ø 2-16Ø+2-12Ø 2-16Ø+2-12Ø
3750 3750 3750 3750 3750 3750
5 6 7 8 5 6
L-SECTION OF ROOFFLOOR BEAM ALONG GRID A (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID B (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID C (300 X 400)
5 6 7 8 7 8
1 2 3 1 2 3 1 2 3
4-16Ø 4-16Ø 4-16Ø 4-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø 2-20Ø+2-16Ø
2-16Ø 2-16Ø 2-20Ø 2-20Ø 2-20Ø 2-20Ø
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250
S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1 S1
800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800 800 S2 800
2-16Ø+2-12Ø 2-16Ø+2-12Ø 4-16Ø 4-16Ø 4-16Ø 4-16Ø
3750 3750 3750 3750 3750 3750
5 6 7 8 7 8
L-SECTION OF ROOFFLOOR BEAM ALONG GRID D (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID E (300 X 400) L-SECTION OF ROOFFLOOR BEAM ALONG GRID F (300 X 400)
5 6
1 2 3
4-16Ø 4-16Ø 4-16Ø 4-16Ø
2-16Ø 2-16Ø PCC PCC PCC 2-16Ø PCC
1250 1250 1250 1250 4-16Ø 2-16Ø 2-20Ø 2-20Ø
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
(300 X 400)
1'
3750
(250 X 350)
(250 X 350)
2
3750
(300 X 400)
3
NOTES:
REFERENCE:
1. GROUND LEVEL REFERS TO THE LEVELLED GROUND AFTER HAVING REMOVED ALL THE TOP ORGANIC SOIL. 1. REFER DRG. NO. STR/02 FOR COLUMN LAYOUT PLAN.
2. THE MINIMUM DEPTH OF FOUNDATION SHALL BE 2000MM FROM THE GROUND LEVEL. 2. REFER DRG. NO. STR/03 FOR FOOTING & WALL FOUNDATION DETAILS.
3. BACK FILL SHALL BE FULLY COMPACTED BEFORE PLACING GROUND FLOOR CONCRETE. 3. REFER DRG. NO. STR/06 FOR COLUMN DETAILS
4. PROPER ANCHORAGE OF BEAM BARS IN EXTERIOR COLUMN SHALL BE PROVIDED AS DETAILED IN DRAWING NO. STR/15. 4. REFER DRG. NO. STR/08 FOR COLUMN SPLICE DETAILS.
5. IN ORDER TO ACHIEVE PROPER ANCHORAGE OF BEAM BARS INTO EXTERIOR COLUMNS, ALL EXTERIOR COLUMN SHALL BE CAST 5. REFER DRG. NO. STR/09 FOR BEAM SPLICE DETAILS
ONLY UP TO 3/4 OF THEIR HEIGHT BEFORE LAYING BEAM REINFORCEMENT IN UPPER FLOOR. 6. REFER DRG. NO. STR/10 FOR BEAM- COLUMN JUNCTION DETAILS.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
S1 S1 S1 S1 S1 S1
700 S2 700 700 S2 700 700 S2 700
100
4-12Ø 4-12Ø 4-12Ø
5250 3250 5650
1 2
L-SECTION OF ROOFFLOOR BEAM ALONG GRID 1 (250X350)
3 4
1' 2 2'
2-16Ø+2-12Ø 2-16Ø+2-12Ø PCC 1-12Ø PCC PCC 2-12Ø PCC
2-16Ø 2-16Ø 2-16Ø 2-16Ø
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
300 300
DOOR / WINDOW OPENING
A B
Masonry Wall
B
c
1-8Ø per boh
2-12Ø 8Ø@150c/c
150 2-12Ø 150 2-12Ø 2-12Ø
B
c
8Ø@150c/c150 2-12Ø 2-12Ø
DOOR / WINDOW OPENING
75
250 2-12Ø 125 250
LINTEL BAND OVER OPENINGS
SECTION A-A 250 SECTION C-C
SECTION B-B INTERNAL
NOTES :
2. LAP LENGTH OF LINTEL BAND REINFORCEMENT SHALL NOT BE LESS THAN 47XØ OF BAR.
3. LINTEL BAND SHALL EXTEND FROM COLUMN TO COLUMN ENCLOSING PROJECTED WALLS
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
DETAIL A
MASONRY WALL
BAND REINFORCEMENT
RCC COLUMN
2-12Ø ( BOTH DIRECTIONS) 10Ø VERTICAL
10Ø AS VERTICAL REINFORCEMENT
REINFORCEMENT 2-12Ø
MASONRY
DETAIL B
TYPICAL LAYOUT OF VERTICAL REINFORCEMENT THROUGH PROJECTED WALLS SECTION X-X
TYPICAL LINTEL BAND DETAIL AT CORNER
OVER PROJECTED EXTERNAL WALL
10Ø VERTICAL
REINFORCEMENT
2-12Ø RCC COLUMN
VERTICAL REINFORCEMENT X
MASONRY WALL LINTEL BAND
MASONRY WALL
REINFORCEMENT
RCC COLUMN RCC COLUMN
LINTEL BAND
LINTEL BAND LINTEL BAND REINFORCEMENT
REINFORCEMENT REINFORCEMENT DETAIL A
X
DETAIL C
TYPICAL LINTEL BAND DETAIL AT CORNER TYPICAL LINTEL BAND DETAIL AT MIDDLE TYPICAL LINTEL BAND DETAIL AT MIDDLE
OVER NON PROJECTED EXTERNAL WALL OVER NON PROJECTED EXTERNAL WALL OVER PROJECTED EXTERNAL WALL
NOTES :
1. VERTICAL REINFORCEMENT SHALL BE PROVIDED WITHIN WALLS WHERE WALL ARE PROJECTED OUTWARD FROM THE MAIN BUILDING LINE.
2. VERTICAL REINFORCEMENT SHALL EXTEND FROM SECOND FLOOR SLAB/BEAM TO ROOF SLAB/BEAM.
3. VERTICAL REINFORCEMENT SHALL BE PROPERLY ANCHORED TO FLOOR SLAB/BEAM AND EMBEDMENT LENGTH SHALL BE NOT LESS THAN 47Ø OF BAR.
4. LINTEL BAND SHALL CONTINUE THROUGHOUT THE LENGTH OF WALL.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
C OF BRICK WALL
COLUMN C
1000 L OF COLUMN
622
Slab Reinforcement
WALL 2-12Ø
Slab
Reinforcement
800
BEAM
12Ø per
800
cornice (Refer beam details)
2-LEGGED 8Ø@100c/c
12Ø
2-12Ø
8Ø@100c/c 2-LEGGED 8Ø@100c/c
2-12Ø
CL OF
8Ø@100c/c COLUMN
CL OF
4-12Ø COLUMN
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
3750
7500
UP
LIFT
3750
3 750
REFERENCE:
1. REFER DRG. NO. STR/38 FOR GROUND FLOOR SLAB BOTTOM NOTES:
REINFORCEMENT PLAN.
2. REFER DRG. NO. STR/39 FOR LOWER GROUND FLOOR SLAB TOP 1. FLOOR SLAB THICKNESS IS 160 MM
REINFORCEMENT PLAN 2. ROOF SLAB THICKNESS IS 150 MM
3. REFER DRG. NO. STR/40 FOR SLAB SECTION 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS
DETAILS. 4. ADOPT DIFFERENT DETAILS FOR ROOF
4. REFER DRG. NO. STR/36 FOR CORNICE DETAILS SLAB.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
10Ø@150 C/C
10Ø@150 C/C
3750
7500
UP
Y LIFT
Y
10Ø@150 C/C
10Ø@150 C/C
3750
X
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
1
10Ø@150 C/C
10Ø@150 C/C
3750
7500
UP
Y LIFT
Y
10Ø@150 C/C
10Ø@150 C/C
3750
3
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
X
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
SECTION Y-Y
1 2 3 NOTES:
3750 3750 1. FLOOR SLAB THICKNESS IS 160 MM
1150 1100 1150 1150 1100 1150
2. ROOF SLAB THICKNESS IS 150 MM
SECTION X-X
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
3750
7500
UP
LIFT
3750
3 750
REFERENCE:
1. REFER DRG. NO. STR/38 FOR GROUND FLOOR SLAB BOTTOM NOTES:
REINFORCEMENT PLAN.
2. REFER DRG. NO. STR/39 FOR LOWER GROUND FLOOR SLAB TOP 1. FLOOR SLAB THICKNESS IS 160 MM
REINFORCEMENT PLAN 2. ROOF SLAB THICKNESS IS 150 MM
3. REFER DRG. NO. STR/40 FOR SLAB SECTION 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS
DETAILS. 4. ADOPT DIFFERENT DETAILS FOR ROOF
4. REFER DRG. NO. STR/36 FOR CORNICE DETAILS SLAB.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1
10Ø@150 C/C
10Ø@150 C/C
3750
7500
UP
2
10Ø@150 C/C
10Ø@150 C/C
Y LIFT
Y
3750
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1
12Ø@150 C/C
12Ø@150 C/C
3750
7500
UP
2
12Ø@150 C/C
12Ø@150 C/C
Y LIFT
Y
3750
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1650 1875 1650 1550 1675 1550 1000 900 1000 1650 1875 1650 1650 1875 1650
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C
SECTION Y-Y
1 2 3
NOTES:
3750 3750
SECTION X-X
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
Extra PCC
1
3750
7500
LIFT
3750
3 750
REFERENCE:
1. REFER DRG. NO. STR/38 FOR GROUND FLOOR SLAB BOTTOM NOTES:
REINFORCEMENT PLAN.
2. REFER DRG. NO. STR/39 FOR LOWER GROUND FLOOR SLAB TOP 1. FLOOR SLAB THICKNESS IS 160 MM
REINFORCEMENT PLAN 2. ROOF SLAB THICKNESS IS 150 MM
3. REFER DRG. NO. STR/40 FOR SLAB SECTION 3. ADOPT SAME SECTION DETAILS FOR ALL SLABS
DETAILS. 4. ADOPT DIFFERENT DETAILS FOR ROOF
4. REFER DRG. NO. STR/36 FOR CORNICE DETAILS SLAB.
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1
10Ø@150 C/C
10Ø@150 C/C
3750
7500
2
10Ø@150 C/C
10Ø@150 C/C
Y LIFT
Y
3750
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1
12Ø@150 C/C
12Ø@150 C/C
3750
7500
2
12Ø@150 C/C
12Ø@150 C/C
Y LIFT
Y
4750
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1650 1875 1650 1550 1675 1550 1000 900 1000 1650 1875 1650 1650 1875 1650
12Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 12Ø@150 C/C
10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 10Ø@150 C/C 12Ø@150 C/C
SECTION Y-Y
1 2 3
NOTES:
3750 3750
SECTION X-X
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
BEAM UNDER
(BOTH TOP AND BOTTOM) ANCHORED TO BEAM
2NOS-10Ø
(BOTH TOP AND BOTTOM)
2NOS-10Ø
(BOTH TOP AND BOTTOM)
600
600
8Ø@150c/c
OPENING
A A 2-12Ø
150
2-12Ø
200
SECTION A-A
REINFORCEMENT AT OPENINGS
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
1
2-16Ø S1 S1
1000 S2 1000
4-25Ø
3250
2950
1 2
UP
4-25Ø 2-25Ø
800
2-16Ø
2 500 500
A B 4-25Ø
3250
4-25Ø
350 350
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
LANDING
12Ø@150c/c 10Ø@150c/c
950
12Ø@150c/c 600
10Ø@150c/c
12Ø@150c/c 1750
950
600 X
12Ø@150c/c 12Ø@150c/c
1500
10Ø@150c/c
LANDING BEAM
12Ø@150c/c 10Ø@170c/c
SECTION B-B
1-10Ø 300
150
RISER =175 10Ø300C/C 175
TREAD =300
WAIST SLAB THICKNESS =160
NUMBER OF STEPS= 20 10Ø@150 c/c
LANDING
10Ø@150c/c 12Ø@150c/c 12Ø@150 c/c
1150 DETAIL X
950
600 12Ø@150c/c
LANDING BEAM
10Ø@150c/c
1750 12Ø@150c/c
950
X 600
12Ø@150c/c 12Ø@150c/c
1500
10Ø@150c/c
10Ø@170c/c
SECTION A-A
STAIRCASE SECTION
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
2100 1842 1842 1842 1708 1708 1708 600 1563 1687 1842 1842 1842 1842 1842 1842 2100
T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1
SLOPE
SLOPE
1
SLOPE
SLOPE
SLOPE
3750
7500
2
3750
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
3
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1
957
958
SLOPE
SLOPE
1
SLOPE
SLOPE
SLOPE
958
958
3750
958
7500
958
150
2
958
958
3750
958
SLOPE
SLOPE
SLOPE
SLOPE
SLOPE
958
3
958
958
PURLIN LAYOUT PLAN
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1
T3 T3 T3 T3 T3 T3 T3 T3 T3
3750
SLOPE
SLOPE
7500
SLOPE
SLOPE
3750
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
T1 T1 T1 T2 T2 T2 T2 T2 T2 T2 T2 T2 T2 T1 T1 T1
T3 T3 T3 T3 T3 T3 T3 T3 T3
933
3750
SLOPE
SLOPE
933
7500
933
150
2
933
SLOPE
SLOPE
933
3750
933
3
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
T1
3014 3014 T2
1110 616 1110
1052 396 396 1052
175 175
T3
TRUSS ELEVATION
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
D
C E F
Prop Prop
Bottom Chord Strut(Vertical)
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
D
C E F
Prop Prop
Bottom Chord Strut(Vertical)
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
4 MM WELD
PRINCIPAL STRUTS
RAFTER RAFTER
RAFTER
BOTTOM WASHER 4 MM THICK
TIE
STRUTS
120 x80x 5 mm
PURLIN CLEAT PRINCIPAL RAFTER BOTTOM WASHER 3 MM THICK
TIE
PURLIN
BOTTOM TIE
DETAIL F
DETAIL E
4nos. 20 mm nut and bolts
150
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT:
4-16Ø
250
MS Flat 8mm size=150X150mm
MS Flat 8mm size=150mmx150mm
placed on a RCC prop
on top of tie beam
MS Flat
20mm nuts, 250 25x25x4mm
SECTION A-A mm long and bolts NOTES:
(4 Nos)
RCC PROP 1. FOR A FLEXIBLE SUPPORT, HOLDING DOWN BOLTS
TO BE TIGHT 75 %
2. OVAL SHAPED SOLE PLATE HOLE FOR FLEXIBLE
SUPPORT
FLEXIBLE SUPPORT DETAIL 3. SAME SUPPORT DETAILS TO PROVIDED AS SHOWN IN
ROOF TRUSS LAYOUT PLAN.
A A BASE PLATE
150
8Ø@75c/c
H
8 mm Sole Plate
RCC PROP
RCC PROP
SOLE PLATE FOR
BASE/SOLE PLATE FLEXIBLE SUPPORT
SECTION
150 150
THRAM NO.
G+5 RICBL COMMERCIAL BUILDING,DEKILANE, PHUENSTHOLING DESIGNED & DRAWN BY:- NOTE:- REVISION DATE:- CONTENT:- CLIENT: