DGR#14 K-461 (KDS-28) Wi-07
DGR#14 K-461 (KDS-28) Wi-07
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT DAILY GEOLOGY REPORT (DGR)
WATER INJECTION
ENTRY DATA
References RTKB 331 GL 325 Rig JZ(40)
Well KDS-28(K-461) Date 8-Jan-22 Day spud 8-Jan-22 Report No 1
Depth (mMD) 38 Depth (mTVD RT) 38 Progress 16 ROP m/h 1.7
Current Formation Upper Fars Formation
TOTCO
GEOLOGICAL SUMMARY
Interval m. MD Lithology Descriptions
Sand: Vary colored, translucent, medium hard to hard, fine to medium grains, rounded to sub rounded, loose, moderately sorted, no visible porosity.
Claystone: (Mud stone) Light brown, yellowish brown, greyish brown, soft, blocky to subblocky, sticky, silty, amorphous in part, calcareous.
(22-38) Silty Clay: Grey, brownish grey, soft to moderatley firm, blocky to subblocky, slightly
calcareous.
Shows
GAS DATA
Gas Type Interval Total C1 C2 C3 iC4 nC4
(m) (%) ppm ppm ppm ppm ppm
Background Gas
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure to Min.(ppge ) Max PP in open hole (ppge)
iC5 nC5
ppm ppm
Basis of Pick
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 91
Current Formation Upper Fars Formation
depth
TOTCO
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Sand: Vary colored, translucent, medium hard to har
Claystone: (Mud stone) Light brown, yellowish brow
(38-91)
calcareous.
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig JZ(40)
Date 9-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 91 Progress 53 ROP m/h
Formation
Inc Azi
GEOLOGICAL SUMMARY
Lithology Descriptions
cent, medium hard to hard, fine to medium grains, rounded to sub rounded, loose, moderately sorte
ght brown, yellowish brown, greyish brown, soft, blocky to subblocky, sticky, silty, amorphous in part,
Silty Clay: Grey, brownish grey, soft to moderatley firm, blocky to s
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
112 Current Activity Drilling 17.5" hole section
Basis of Pick
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 177
Current Formation Upper Fars Formation
depth
50
TOTCO
147
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Sand: Vary colored, translucent, medium hard to har
Claystone: (Mud stone) Light brown, yellowish brow
(177-202)
calcareous.
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig JZ(40)
Date 10-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 177 Progress 86 ROP m/h
Formation
Inc Azi
0
0.2
GEOLOGICAL SUMMARY
Lithology Descriptions
cent, medium hard to hard, fine to medium grains, rounded to sub rounded, loose, moderately sorte
ght brown, yellowish brown, greyish brown, soft, blocky to subblocky, sticky, silty, amorphous in part,
Silty Clay: Grey, brownish grey, soft to moderatley firm, blocky to s
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
202 Current Activity Drilling 17.5" hole section
Basis of Pick
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 270
Current Formation Upper Fars Formation
GEOLO
Interval m. MD
Sand: Vary colored, translucent, medium hard to har
Claystone: (Mud stone) Light brown, yellowish brow
(202-270)
calcareous.
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig JZ(40)
Date 11-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 270 Progress 93 ROP m/h
Formation
GEOLOGICAL SUMMARY
Lithology Descriptions
cent, medium hard to hard, fine to medium grains, rounded to sub rounded, loose, moderately sorte
ght brown, yellowish brown, greyish brown, soft, blocky to subblocky, sticky, silty, amorphous in part,
Silty Clay: Grey, brownish grey, soft to moderatley firm, blocky to s
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
288 Current Activity Drilling 17.5" hole section
5" hole section F/ 270 m T/ 280 m, Circulate , clean the well, Drilling 17.5" hole section F/ 280 m T/ 288 m
Basis of Pick
F/ 280 m T/ 288 m
Days Off
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 350
Current Formation Upper Fars Formation
GEOLO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig JZ(40)
Date 12-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 350 Progress 80 ROP m/h
Formation
GEOLOGICAL SUMMARY
Lithology Descriptions
cent, medium hard to hard, fine to medium grains, rounded to sub rounded, loose, moderately sorte
ght brown, yellowish brown, greyish brown, soft, blocky to subblocky, sticky, silty, amorphous in part,
grey, soft to moderatley firm, blocky to subblocky, slightly calcareous.
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
350 Current Activity Circulate, clean the well for TOTCO survey, POOH and run 13 3
lean the well for TOTCO survey and POOH - as per KAR request, POOH T/ 22 m - conductor shoe - as per KAR req
0 m - OK, Circulate, clean the well for TOTCO survey, POOH and run 13 3/8" csg
Cementing
Team Crew
Days on Ranjdar Ahmed
Days on Twana Alyas
Days on Rebwar Noury
5
3.30
Basis of Pick
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 350
Current Formation Upper Fars Formation
Circulate, clean the well
Current Operation at 24:00:
Circulate, clean the well,POOH F/ 350 m T/ 2
csg,Performed inclination survey, run TOTCO
Operations last 24 hours(00:00 to 24:00) 3/8" K-55 54.5 ppf casing as per tally T/ 277
At 127 m brake circulation for 10 min - OK.
depth
52
TOTCO 147
240
344
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig JZ(40)
Date 13-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 350 Progress 0 ROP m/h
Formation
lean the well
ean the well,POOH F/ 350 m T/ 22 m - conductor shoe - as per KAR request - OK, no overpull,RIH F/ 22 m T/ 350 m - OK,TOT
ed inclination survey, run TOTCO by slick line at 344 m, record: 0.3 deg,Prepare for RIH 13 3/8" csg,PJSM, P/U shoe, 2 x jts cs
.5 ppf casing as per tally T/ 277 m. Fill up every 2 joints NL/NG
ake circulation for 10 min - OK.
Inc Azi
0
0.2
0.3
0.3
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
B Casing point
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
350 Current Activity Circulate w/ Rig pump w/ 165 gpm, 180 psi, R/U cementing unit
IH 13 3/8" K-55 54.5 ppf casing as per tally F/ 277 m T/ 348 m. Fill up every 2 joints NL/NG ,Circulate w/ Rig pump w
unit and lines
b, WOC
Team Crew
Days on Ranjdar Ahmed
Days on Twana Alyas
Days on Rebwar Noury
6
-
Basis of Pick
Days Off
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 350
Current Formation Upper Fars Formation
WOC, dump mud and clean mud tanks. G
Current Operation at 24:00:
Continue RIH 13 3/8" K-55 54.5 ppf casing a
lines, Wait on chemicals, Reciprocate string
each 1 hour, R/U cmt head, cmt lines, Circula
water ) w/ 8 bpm, 300 psi, Drop btm plug, sta
Operations last 24 hours(00:00 to 24:00) dump mud and clean mud tanks. General ho
depth
52
TOTCO 147
240
344
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig JZ(40)
Date 14-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 350 Progress 0 ROP m/h
Formation
p mud and clean mud tanks. General house keeping, maintenance and rig service.
H 13 3/8" K-55 54.5 ppf casing as per tally F/ 277 m T/ 348 m. Fill up every 2 joints NL/NG , Circulate w/ Rig pump w/ 165 gpm,
n chemicals, Reciprocate string each 1 hour, Circulate w/ Rig pump w/ 300 gpm, 240 psi, conditioning mud, Mixing chemicals fo
R/U cmt head, cmt lines, Circulate w/ Rig pump w/ 320 gpm, 220 psi, PJSM, P/T cmt lines at 500/3000 psi 5/10 min, Pump by
bpm, 300 psi, Drop btm plug, start pumping slurry 282 bbl, 15.8 ppg Flymix, pumping pressure 500 psi, drop top plug and displa
nd clean mud tanks. General house keeping, maintenance and rig service.
Inc Azi
0
0.2
0.3
0.3
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
B Casing point
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
WOC, continue dump mud and clean mud tanks. General house
350 Current Activity
service.
nue dump mud and clean mud tanks. General house keeping, maintenance and rig service.
Team Crew
Days on Ranjdar Ahmed
Days on Twana Alyas
Days on Rebwar Noury
7
-
culate w/ Rig pump w/ 165 gpm, 180 psi, R/U cementing unit and
ioning mud, Mixing chemicals for cementing job Reciprocate string
00/3000 psi 5/10 min, Pump by Rig pump100 bbl spacer ( fresh
500 psi, drop top plug and displaced with 170 bbl, 5-6 BPM, WOC,
Basis of Pick
vice.
Days Off
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 350
Current Formation Upper Fars Formation
Rough cut 13 3/8" csg, remove the 13 3/8
Current Operation at 24:00:
WOC, continue dump mud and clean mud ta
15:00 - 17:00: Cut flow line and conductor fro
13 3/8" csg, remove the 13 3/8 csg, final cut,
Operations last 24 hours(00:00 to 24:00)
depth
52
TOTCO 147
240
344
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig JZ(40)
Date 15-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 350 Progress 0 ROP m/h
Formation
13 3/8" csg, remove the 13 3/8 csg, final cut, prepare csg for welding, PJSM. N/U CH, start welding to 13 3/8" Casing
nue dump mud and clean mud tanks. General house keeping, maintenance and rig service.
0: Cut flow line and conductor from bottom of cellar,Slack-off - csg no moved down; Removed conductor, 13 3/8" csg - is movin
remove the 13 3/8 csg, final cut, prepare csg for welding, PJSM. N/U CH, start welding to 13 3/8" Casing.
Inc Azi
0
0.2
0.3
0.3
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
B Casing point
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
350 Current Activity Waiting for Coolong
Team Crew
Days on Ranjdar Ahmed
Days on Twana Alyas
Days on Rebwar Noury
8
-
Basis of Pick
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 350
Current Formation Upper Fars Formation
Continue N/U BOP stack: 4 x drilling spoo
Current Operation at 24:00:
Continued welding CH on 13 3/8" casing. Wa
Redress inside welding, PJSM. Perform pres
Continued manufacture and install support fo
N/U BOP stack: 4 x drilling spools ( 2 as spa
Operations last 24 hours(00:00 to 24:00)
depth
52
TOTCO 147
240
344
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig ZJ (40)
Date 16-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 350 Progress 0 ROP m/h
Formation
/U BOP stack: 4 x drilling spools ( 2 as spacers ), doube ram, annular, chocke and kill lines - in progress
elding CH on 13 3/8" casing. Wait for cooling, Started to manufacture support for csg.
de welding, PJSM. Perform pressure test for welding at 500/2000 psi, 5/10 min - OK.
manufacture and install support for csg
ack: 4 x drilling spools ( 2 as spacers ), doube ram, annular, chocke and kill lines - in progress
Inc Azi
0
0.2
0.3
0.3
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
B Casing point
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
to Min.(ppge ) Max PP in open hole (ppge)
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
350 Current Activity Test BOP
N/U BOP stack: 4 x drilling spools ( 2 as spacers ), doube ram, annular, chocke and kill lines.
or Pressure test: P/U & M/U test plug w/ 5" DP, run and set in CH
ack - in progress
ple, RIH 12 1/4" bit, Drill out cement.
Team Crew
Days on Ranjdar Ahmed
Days on Kovan Waleed
Days on Ahmed Adnan
9
-
nes - in progress
Basis of Pick
Days Off
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 350
Current Formation Upper Fars Formation
Current Operation at 24:00: Drill out cement
Finalized N/U BOP stack: 4 x drilling spools (
Prepared for P/T: P/U & M/U test plug w/ 5" D
P/T BOP stack by test plug at 500/2000 psi,
- Pipe rams and 3 valves of chocke manifold
- Pipe rams and next 3 valves of chocke man
- HCR - pass
- Annular and manual valve of chocke line, fl
POOH test plug, break-off, run and set test p
- Tried to P/T blind rams, observed that the t
Operations last 24 hours(00:00 to 24:00) Run and set wear bushings by 5" DP and tes
N/U and weld bell nipple, connect to flow line
P/U & M/U 12 1/4" PDC bit, 2 jts x 8 1/4" DC
Circulate, Petroservice calibrate drawwork se
Replaced shale shakers screens from 100 m
Wash down F/313 m T/ 321.3 m - plugs
Drill out plugs, float collar, F/ 321.3 m T/ 321
depth
52
TOTCO 147
240
344
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Stop Drilling At 350m RTKB Casing point
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig ZJ (40)
Date 17-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 350 Progress 0 ROP m/h
Formation
ment
U BOP stack: 4 x drilling spools ( 2 as spacers ), doube ram, annular, chocke and kill lines
P/T: P/U & M/U test plug w/ 5" DP, run and set in CH
ck by test plug at 500/2000 psi, 5/15 min:
and 3 valves of chocke manifold, chocke and Kill lines, all flanged connections from CH to pipe ram - fixed leakage - pass
and next 3 valves of chocke manifold - pass
s
d manual valve of chocke line, flanged connections between pipe ram and annular - fixed leakage - pass
plug, break-off, run and set test plug on CH, POOH DP
T blind rams, observed that the test plug no keep pressure, pull out, found seal broken
wear bushings by 5" DP and test plug, tight locking screws
d bell nipple, connect to flow line, aligned and anchored BOPs
2 1/4" PDC bit, 2 jts x 8 1/4" DCs, RIH w/ BHA # 2 T/ 313 m
etroservice calibrate drawwork sensor
ale shakers screens from 100 mesh to 70 mesh - by Mud Engineer request
F/313 m T/ 321.3 m - plugs
s, float collar, F/ 321.3 m T/ 321,8 m
Inc Azi
0
0.2
0.3
0.3
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
B Casing point
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
350 Current Activity Drill out cement
rill out cement, Drill new 12 1/4" hole, POOH, M/U stabilizers, RIH, Drill new 12 1/4" hole
Team Crew
Days on Ranjdar Ahmed
Days on Kovan Waleed
Days on Ahmed Adnan
10
-
ge - pass
nC4 iC5 nC5
ppm ppm ppm
Basis of Pick
Days Off
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 364
Current Formation Upper/Middle Fars Formation
Current Operation at 24:00: Drilling 12.25" hole
Drill out plugs, float collar, cement, shoe, rat
Drill new 12 1/4" hole F/ 350 m T/ 363 m
Circulate, clean the well for POOH
POOH F/ 363 m T/ surface; reciprocate strin
P/U & M/U 2 x stabilizers, RIH w/ BHA # 3 T/
Circulate dumping old mud, replace old mud
Operations last 24 hours(00:00 to 24:00)
Clean mud system
Circulate and condition mud
Drill new 12 1/4" hole F/ 363 m T/ 364 m
depth
52
TOTCO 147
240
344
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig ZJ (40)
Date 18-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 364 Progress 14 m ROP m/h
le Fars Formation
25" hole
s, float collar, cement, shoe, rat hole F/ 321.8 m T/ 350 m
1/4" hole F/ 350 m T/ 363 m
ean the well for POOH
3 m T/ surface; reciprocate string on shoe and float collar interval
x stabilizers, RIH w/ BHA # 3 T/ 363 m, filling string each 7 stands
mping old mud, replace old mud with new mud
ystem
d condition mud
1/4" hole F/ 363 m T/ 364 m
Inc Azi
0
0.2
0.3
0.3
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
tion
enerally light brown, greyish brown, traces grey, soft and sticky, blocky to subblocky, smoothy, amor
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
384 Current Activity Drilling 12.25" hole
Team Crew
Days on Ranjdar Ahmed
Days on Kovan Waleed
Days on Ahmed Adnan
11
-
Basis of Pick
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 468
Current Formation Upper/Middle Fars Formation
Current Operation at 24:00: Continue Drilling 12.25" hole
Drill new 12 1/4" hole F/ 364 m T/ 439 m
Circulate w/ low flow rate, reciprocate string,
Resume drilling 12 1/4" hole F/ 439 m T/ 467
Operations last 24 hours(00:00 to 24:00) Circulate, clean the well for TOTCO survey
Performed inclination survey, run TOTCO by
Resume drilling 12 1/4" hole F/ 467 m T/ 468
depth
52
147
TOTCO
240
344
452
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig ZJ (40)
Date 19-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 467.98 Progress 104 m ROP m/h
le Fars Formation
rilling 12.25" hole
1/4" hole F/ 364 m T/ 439 m
low flow rate, reciprocate string, replaced one bolt from motor of shale shaker # 2
ing 12 1/4" hole F/ 439 m T/ 467 m
ean the well for TOTCO survey
nclination survey, run TOTCO by slick line at 452 m, record: 0.5 deg.
ing 12 1/4" hole F/ 467 m T/ 468 m
Inc Azi
0
0.2
0.3
0.3
0.5
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
tion
ght brown, greyish brown, traces grey, very soft to soft, sticky, blocky to subblocky, silty and sandy i
ous.
ranslucent, friable, very fine to medium grains, rounded to sub rounded, sub angular in part, modera
rix, calcareous cement, no visible porosity.
ight grey, soft to moderately firm, blocky to subblocky, slightly calcareous.
ff white in part, traces grey, soft to moderately firm, blocky to sub blocky, amorphous in part, slightly
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
504 Current Activity Drilling 12.25" hole
Team Crew
Days on Ranjdar Ahmed
Days on Kovan Waleed
Days on Ahmed Adnan
12
-
Basis of Pick
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 608
Current Formation Upper/Middle Fars Formation
Current Operation at 24:00: Wiper trip: POOH F/ 593 m T/ 548 m
Drill new 12 1/4" hole F/ 468 m T/ 608 m
Circulate, pump HiVis pill, clean the well for T
Performed inclination survey, run TOTCO by
Operations last 24 hours(00:00 to 24:00) Wiper trip: POOH F/ 593 m T/ 548 m
depth
52
147
TOTCO 240
344
452
593
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Upper/Middle Fars Formation
Claystone: (Mud stone) Reddish brown, light brown
calcareous.
Siltstone: Grey, light grey, greenish grey, greyish wh
465 - 605
part, slightly calcareous to calcareous.
Sandstone: Vary colored, translucent, loose and fria
moderately sorted, trace glauconitic, argillaceous ma
Gas Type Interval
(m)
Background Gas
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig ZJ (40)
Date 20-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 607.99 Progress 140 m ROP m/h
le Fars Formation
POOH F/ 593 m T/ 548 m
1/4" hole F/ 468 m T/ 608 m
mp HiVis pill, clean the well for TOTCO survey
nclination survey, run TOTCO by slick line at 593 m, record: 0.1 deg. Flow check - OK
OOH F/ 593 m T/ 548 m
Inc Azi
0
0.2
0.3
0.3
0.5
0.1
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
tion
eddish brown, light brown, yellowish brown, soft to moderately firm, blocky to sub blocky, amorphou
greenish grey, greyish white, occasionally greyish brown, soft to moderately firm in part, blocky to su
calcareous.
ranslucent, loose and friable, fine to medium grains, occasionally coarse grain, rounded to sub roun
auconitic, argillaceous matrix, calcareous cement, no visible porosity.
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
626.02 Current Activity Drilling 12.25" hole
POOH F/ 548m T/ 345m - No overpull. RIH F/ 345m T/ 608m, filling string each 5 stands
lling 12 1/4" hole F/ 608 m T/ 626 m
Team Crew
Days on Ranjdar Ahmed
Days on Kovan Waleed
Days on Ahmed Adnan
13
-
Basis of Pick
Days Off
Days Off
Days Off
,
KAR OIL & GAS CO.
KOF
FIELD DEPARTMENT
DRILLING WATER WELL INJECTION PROJECT
WATER INJECTION
E
References RTKB
Well KDS-28(K-461)
Depth (mMD) 718
Current Formation Upper/Middle Fars Formation
Current Operation at 24:00: Resume drilling 12 1/4" hole F/ 712 m T/
Wiper trip: POOH F/ 548m T/ 345m - No ov
Resume drilling 12 1/4" hole F/ 608 m T/ 712
Circulate, pump HiVis pill, clean the well for T
Operations last 24 hours(00:00 to 24:00) Performed inclination survey, run TOTCO by
Resume drilling 12 1/4" hole F/ 712 m T/ 718
depth
52
147
240
TOTCO
344
452
593
697
MW(kg/l)
MW(kg/l)
GEOLO
Interval m. MD
Upper/Middle Fars Formation
Claystone: (Mud stone) Reddish brown, light brown
calcareous.
Siltstone: Grey, light grey, greenish grey, greyish wh
608-718
part, slightly calcareous to calcareous.
Sandstone: Vary colored, translucent, loose and fria
moderately sorted, trace glauconitic, argillaceous ma
Gas Type Interval
(m)
Background Gas
Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Pore Presure
ENTRY DATA
331 GL 325 Rig ZJ (40)
Date 21-Jan-22 Day spud 8-Jan-22 Report No
Depth (mTVD RT) 718 Progress 110 m ROP m/h
le Fars Formation
lling 12 1/4" hole F/ 712 m T/ 718 m, FR: 488 gpm, 100 RPM, SPP: 610 psi, WOB: 2-3 ton, ROP: 4 m/hr.
OOH F/ 548m T/ 345m - No overpull. RIH F/ 345m T/ 608m, filling string each 5 stands
ing 12 1/4" hole F/ 608 m T/ 712 m
mp HiVis pill, clean the well for TOTCO survey
nclination survey, run TOTCO by slick line at 697 m, record: 1.0 deg. Flow check - OK
ing 12 1/4" hole F/ 712 m T/ 718 m, FR: 488 gpm, 100 RPM, SPP: 610 psi, WOB: 2-3 ton, ROP: 4 m/hr.
Inc Azi
0
0.2
0.3
0.3
0.5
0.1
0.1
Csg Size (inch) 13.375'' Csg Depth (m) 348
Csg Size (inch) Csg Depth (m)
GEOLOGICAL SUMMARY
Lithology Descriptions
tion
eddish brown, light brown, yellowish brown, soft to moderately firm, blocky to sub blocky, amorphou
greenish grey, greyish white, occasionally greyish brown, soft to moderately firm in part, blocky to su
calcareous.
ranslucent, loose and friable, fine to medium grains, occasionally coarse grain, rounded to sub roun
auconitic, argillaceous matrix, calcareous cement, no visible porosity.
Shows
GAS DATA
Total C1 C2 C3 iC4
(%) ppm ppm ppm ppm
Actual Difference
Well site Top MD Actual Depth
Thickness Basis of
Depth TVDss
M m +/-
in part in part BY ROP, CUTTING SAMPLE (LITHOLOGY
06:00 UPDATE
744 Current Activity Drilling 12.25" hole
Team Crew
Days on Ranjdar Ahmed
Days on Kovan Waleed
Days on Ahmed Adnan
14
7.00
P: 4 m/hr.
Basis of Pick