You are on page 1of 1

A1 DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

GENERAL NOTES
100 9000 101 9000 102 9000 103 9000 104 9000 105 9000 106 9000 107
1. All Dimensions are in Millimetres (mm) and all levels are in Meters unless otherwise
1/ 09-L2-017 1/ 09-L2-020 1/ 09-L2-021 mentioned specifically.
2. Written dimensions shall be read and drawings shall not be scaled.
1/ 09-L2-026 1/ 09-L2-027 3. These drawings shall be read in conjunction with GA Architectural Drawings and
MEPF/ IT drawings.
NORTH 4. All locations of respective Doors & Windows shall be verified at site before
installation.
5. Sub-contractor to coordinate and verify dimensions of all the openings for doors,
HVAC
windows and louvers by taking field measurements before fabrication and indicate
them in shop drawings.
6. Any deviation in approved Shop drawings and Site shall be brought to Client’s notice
immediately before further proceeding with the works.
7. Contractor to coordinate all the Masonary anchorage devices for securing Door
Frames in concrete or masonary walls. Contractor also need to provide necessary
structural arrangement for dry wall to support Door Frames.
8. Contractor shall check and ensure the Plumb and Squareness of all the structural
openings for Door & Window frames in the walls.
9. Contractor to ensure proper grouting of the frames.
10. Contractor to coordinate and incorporate all the necessary Ironmongery provisions
as per the approved door schedule.
11. Sub-contractor to ensure that the selection of materials complies with performance
requirement as per specification.
12. Paint Colour, Appearance and Pattern (for cladded door) of Doors as visible to Public
PASSPORT as well as for BOH Areas shall be subject to sample review and approval by Architect
CONTROL and Client before physical works at site. Sub-contractor shall provide uniformly high-
OFFICE quality appearance of the final visible elements.
L2-F2-01 13. Sub-contractor to ensure that the glass in vision panel and also for Glass Doors will
be free from any impurity & waviness.
14. Sub-contractor to ensure that all the Metal Doors & Frames doesn’t contain any
sharp edges & welding outgrown and shall be properly grinded. For Glass doors the
edges of the glass shall be properly chamfered.
15. Details indicated are illustrating the Design Intent. The Sub-Contractor shall submit
Shop drawings for Review and Approval of Architect and Client.
16. All the Doors shall comply with Fire and Smoke Compartmentation requirements and
PTB-L2-F2-01-A shall be as per the approved Fire Strategy requirements.
17. Sub-contractor to produce full scale mock-up of each type of door for review and
approval by Main Contractor, Client and Architect prior to commencement of work.
18. Subcontractor to protect completed works as per Client and Main Contractor
requirements and ensure no damage /deterioration at the time of handover to Client.
19. Clear opening and width mentioned here are min. required and could vary slightly
based on door profiles. Contractor to highlight any deviation in this regard to main
contractor/ Architect for approval.
20. Kick plate shall be provided on both side of door panel unless mentioned in door
schedule.
M 21. Facade door are not included in door package and needs to be procurred by facade
contractor.
22. Retail doors not included in the package.

INTERNATIONAL
9000

SECURITY
SCREENING
AREA
L2-F2-02

PTB-L2-F2-02-A

N 0 11-01-2021 GOOD FOR CONSTRUCTION


REV DATE DESCRIPTION
FHC

DSGN CB

DRWN AG

CHKD CB

APPD CCS

NAME SIGN DATE


9000

KEY PLAN:

NORTH

ST-18
L2-ST-18

PROJECT:
GREENFIELD INTERNATIONAL
AIRPORT AT MOPA, GOA
CLIENT:
GMR GOA INTERNATIONAL
AIRPORT LIMITED
9000

EPC CONTRACTOR:
MEGAWIDE CONSTRUCTION
DMCC
ARCHITECTURAL CONSULTANT:

INTEGRATED DESIGN
ASSOCIATES LTD.
Unit 603, Block A, Shatin Industrial Centre.
5-7 Yuen Shun Circuit,
Shatin, New Territories, Hong Kong
t: +(852) 2863 0778 | f: +(852) 2528 2226
Q STRUCTURAL CONSULTANT:

SY^2 + ASSOCIATES, Inc.


9801 Kamagong Street
Makati Philippines.

MEP CONSULTANT:

ESKAYEM
CONSULTANTS PVT. LTD.

301, 3RD FLOOR, SWASTIK CHAMBERS,


9000

C.S.T. ROAD, CHEMBUR, MUMBAI-400071


ESKAYEM TEL 022-25282645/46/47

FACADE CONSULTANT:

w ww . en ve l op et ec h n ik. com

PACKAGE:
GOA INTERNATIONAL AIRPORT - PTB

R TITLE:

L2 Second Floor Plan -


Zone F3

DRAWING NO.:
GGIAL-MW-PTB-AR-21-L2-025

FILE REF.: DATE:


11-01-2021
0 1 2 3 4 5

RELEASED FOR: SCALE: SIZE: REV:


SCALE 1 : 100 1 : 100
1/ 09-L2-025 1/ 09-L2-028 GFC A1 0

You might also like