You are on page 1of 9

M/s Gabriel India Ltd.

Dewas
D2 Project
Fabrication Progress

S.No Description Total Qty Unit Cutting

1 Column 32 Nos 23
20 Nos 10
2 Rafter
3 Jack beam 3 Nos
4 Tie beam
5 Purlin - Roof RM
6 Purlin - Wall RM
7 Monitor - Post 16 Nos
8 Monitor - Rafter 8 Nos
9 Bracing - Roof 3 Sets
10 Bracing - Wall 6 Sets
11 Gutter RM
Surface
Tack Welding Full welding Primer 1 coat 2 Coat
preparation

23 10
6
Remarks

Rcc Plaform required for


layouts & rafter assembly.
M/s Gabriel India Ltd. Dewas
D2 Project
Fabrication Progress

Descritption Column Rafter Jack beam Tie beam


Date
Total Qty 32 20 3
Unit Nos Nos Nos
Cutting
Tack Welding
Full welding
2-Jul Surface preparation
Primer
1 coat
2 Coat
Cutting 2
Tack Welding 2 1
Full welding 9
3-Jul Surface preparation
Primer
1 coat
2 Coat
Cutting 2 4
Tack Welding 2 2
Full welding 9
4-Jul Surface preparation
Primer
1 coat
2 Coat
Cutting 4
Tack Welding 4 6
Full welding 9
5-Jul Surface preparation
Primer
1 coat
2 Coat

Cutting 23 10
Tack Welding 23 6
Full welding 10
6-Jul Surface preparation
Primer
1 coat
2 Coat
Cutting 23 10
Tack Welding 23 6
Full welding 10
6-Jul Surface preparation
Primer
1 coat
2 Coat
Monitor - Monitor -
Purlin - Roof Purlin - Wall Bracing - Roof Bracing - Wall Gutter
Post Rafter
16 8 3 6
RM RM Nos Nos Sets Sets RM
Remarks