You are on page 1of 31

Didipio Mine

Week 05 Plan
(Jan 27 – Feb 02, 2023)
Physicals 2
3
Maintenance 4
Maintenance 5
UG Fixed Plant - Mechanical 6
UG Fixed Plant – Electrical/ Comms 7
UG Fixed Plant – Electrical/ Comms 8
Stope Schedule 9
Stope Schedule 10
Stope Schedule 11
Stope Schedule 12
Infra Schedule 13
14
15
16
CABLEBOLTING
Friday 20 - Jan to 26 - Jan

STOPES
Hole Remaining No.
Priority Description Planned Comments
Length of Holes

Brow Cables 2280_410_F 6 30 180m Mark up done for drilling and cable installation
Brow Cables 2280_450_E 6 16 96m for mark up
Stopes TOTAL (m): 46 276m

DEVELOPMENT
Hole Planned No. of
Priority Description Planned Comments
Length Holes

2190 _SS_ACC_2 6 9 54m Standard 3- Way Intersection

2250 RAD_2_E 6 9 36m Standard 3- Way Intersection

2160_SP 6 6 36m Standard 2- Way Intersection

2370_290 6 9 54m Intersection Cables

Development TOTAL (m): 33 180m

OSRO STRAPS INSTALLATION


Hole Planned No. of
Priority Description Planned Comments
Length Holes
For the first and second brow, 6pcs to be installed. 6m length osro
2310_250_H and 3 pieces 3m length
For the third and final brow, fabricated mesh arch will be used
17
18
GROUTING
Friday 20 - Jan to 26 - Jan

Week 04 Week 05
GROUTING SCHEDULE
Priority Location
Week 04 - Week 05
Jan-20 Remarks
Jan-21 Jan-22 Jan-23 Jan-24 Jan-25 Jan-26 Actions
Jan-27Jan-28 Jan-29 Jan-30 Jan-31 Days
Feb-01 Feb-02
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
Headings Status Remaining
to commence grouting once inflatable
2190_FWD_E1 waiting2190_FWD_E
for packer delivery 1 ADwaiting
hole for inflatable packers 2
2160_SUB/ACC for cover drilling first 7 Cover Holes packers arrive on site
2190_350 recent QED drilling 4 ResDef Holes
2250_FWD_E 6-8 m3 per hole 7.5 ResDef Holes to commence grouting on Week 04 if
2250_350 for2190_350
curtain grouting 4 ResDef
26 cover holes (not drilled)holes 4
inflatable packers are still not on site

to grout if significant water inflow is


2 2160_SUB/ACC for cover drilling 2
intersected

2250_FWD_E 8 holes left (6-8 m3 per hole) backup grouting area 5

2250_350 for curtain grouting; BT of 2280_350 holes need to drill pre-grouting holes first (26)
19

Planned
Priority Drive Name Material
Cuts Meters
2430_OD_230_XCUT_2 ORE 5 14.0
20

2400 290 I
Tightfilling
21

Priority Drive Name Material Planned


Cuts Meters
2370_OD_390 ORE 3 12.9
22

Stope Bogging
23
24

Planned
Priority Drive Name Material
Cuts Meters
2280_OD_370 ORE 3 9.6
25

Planned
Priority Drive Name Material
Cuts Meters
2250_RAD_2_E WASTE 3 10.0
2250_OD_350 ORE 1 4.3
26
27

Planned
Priority Drive Name Material
Cuts Meters
2190_RAD_2_N WASTE
2190_FWD_W WASTE 2 8.6
2190_SS_ACC_2 WASTE 1 2.8
2190_SS_ACC_2 WASTE 1 2.8
28
29
Risks to Weekly Plan
Risks / Opportunity Mitigation Actions Person
responsible
Interaction between activities (production drilling) at 2370 290 Revise teleremote plan to incorporate additional barrier and refuge chamber Operations
I and bogging at 2370 310 K near OD 290
2340 310 J Stope Performance Regular CMS and Inspections Operations, Geotech

Key personnel availability To continue hot seat and prioritize manning of loaders and trucks Operations
(loader, solo, jumbo and truck operators)
30
Critical Path and Milestones
Critical Tasks Reason
Pastefilling of 2340 350 H Finish bogging Jan 27 and start pastefilling of stope

2370 310 K Stope Bogging to Plan Reduce 2370 290 I stope interaction

Rhino and Production Drilling of 2310 250 H and 2370 290 I Next drilling areas of Rhino and Solo drills
Corporate Headquarters Americas Corporate Office
Level 14, 357 Collins Street Suite 350
4725 South Monaco Street
Melbourne, Victoria, 3000
Denver, Colorado, 80237
Australia United States of America
T: +61 3 9656 5300
F: +61 3 9656 5333
info@oceanagold.com

oceanagold.com @OceanaGold

You might also like