Professional Documents
Culture Documents
Scope of Work/Brief Description of The Project: A. General Requirements
Scope of Work/Brief Description of The Project: A. General Requirements
a. General Requirements
1. Project Billboard
b. Earthworks
1. Structural Excavation
1. Reinforced Concrete
3. Masonry Works
4. Metal Deck
d. Building Finishes
1. Plumbing/Roughing-in-Works
e. Electrical
Attested by:
ADRIENNE BOSTON
Authorized Managing Office
2.
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
PROCEDURING:
I. Implementation of the PPE to the workers such as wearing safety helmets, safety
shoes, gloves and eye protection to prevent diet contact of the sunlight.
II. Unsafe Act and unsafe condition in the working place shall be emphasized to the
workers to prevent unforeseeable accident.
III. Encourage the workers to be aware on good sanitation and housing to prevent
Health problems such as diarrhea, vomiting and etc.
IV. Emphasizing the importance and hazards in the use of Temporary Structure such as
improper installation of guardrail in the excavated area.
V. Safekeeping of the Heavy Equipment.
They’re being no other matters to be discussed the meeting was adjourned at 11:00
o’clock in the morning the next meeting is scheduled on August 30, 2018.
I hereby certify to the correctness of the foregoing minutes.
1 - Project Manager
1 - Project Engineer
1 - Materials Engineer
1 - Master Plumber
1 - Architect
1 - Safety Officer
1 - Construction Foreman
1 - Glass Installer
1 - Electrician
1 - First Aider
1 - Carpenter
2 - Welder
2 - Marson
1 - Steelman
4 - Laborer/Helper
Total 20 - Workers
Date Filled :
Reg’l Labor Office No. :
File Number :
C. Technical Information :
Brief Description of process operation and number and kind of equipment:
The work description of this project is Building Construction, with the use of light
equipment and tools
Submitted by:
ADRIENNE BOSTON
Authorized Managing Officer
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
ADRIENNE BOSTON
Authorized Managing Officer
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
I. ADRIENNE BOSTON, of legal age, married, Filipino, residing at Villa Kananga, Butuan City,
after having been duly sworn to in accordance with law, hereby depose and say:
IN FAITH WHEREOF, I hereunto affixed my signature this 3rd day of December 2018 at
Butuan City, Philippines.
SUBSCRIBED AND SWORN to before me this 3rd day of December 2018 in Butuan City,
Philippines . Affiant exhibiting to me his Community Tax Certificate No. 0849546 issued on
January 16, 2018.
Doc. No. ;
Page No. ;
Book No. ;
Series of 2018
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
I. ADRIENNE BOSTON, of legal age, married, Filipino, residing at Villa Kananga, Butuan City,
under oath, hereby depose and say:
I. I am ADRIENNE BOSTON, Authorized Managing Officer and am duly authorized to
make this statement in behalf of SAVER’S BUILDERS CORPORATION;
II. With regard to the bidding for the abovementioned contract of the BJMP ROXIII-
Butuan City , in accordance with the provisions of Section 17.7.1 of the implementing
Rules and Regulations Part A ( IRRA-A ) , R.A. 9184 , SAVER’S BUILDERS CORPORAION
is attesting that is responsible for :
a. having taken steps to carefully examine all of the Bidding Documents ;
b. having acknowledged all conditions, local or otherwise , affecting the
implementation of the contract ;
c. having made estimate of the facilities available and needed for the contract to be
bid, if any; and
d. having complied with its responsibility on Bid Bulletins ( Addenda ) as provided for
under IRR-A Section 22.5.1 ;
III. That I am making this statement as part of the bidding requirement for the
abovementioned contract.
IN FAITH WHEREOF, I hereby affix my signature this 3rd day of December 2018 at Butuan
City, Philippines.
SUBSCRIBED AND SWORN to before me this 3rd day of December 2018 in Butuan City,
Philippines . Affiant exhibiting to me his Community Tax Certificate No. 0849546 issued on
January 16, 2018.
Doc. No. ;
Page No. ;
Book No. ;
Series of 2018
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
I. ADRIENNE BOSTON, of legal age, married, Filipino and residing at Villa Kananga, Butuan
City, after having been duly sworn in accordance with law, do hereby depose and state that:
51-53, 61
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
NFCC COMPUTATION
December 3, 2018
Summary of the Bidder's assets and liabilities on the basis of the attached Income
Tax Return and Audited Financial Statement, stamped "Received" by Bureau of Internal
Revenue or BIR authorized collecting agent, for the immediately preceding year and a certified
copy of Schedule of Fixed Assets particular the list construction equipment.
1. Total Assets P
17,279,651.00
2. Current Assets P 13,940,908.00
3. Total Liabilities P 11,885,714.00
4. Current Liabilities P 504,071.00
5. Net worth (1-3) P 5,393,937.00
6. Net Working Capital (2-4) P 13,436,837.00
Herewith attached are certified true copies of the Income Tax Return and Audited
Financial Statement: Stamp "RECEIVED" by the BIR or BIR authorized collecting agent for
the immediately preceding year.
Submitted by:
ADRIENNE BOSTON
Authorized Managing Officer
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
Construction SAFETY
Proposed Construction of
Information Communication
Technology ( ICT ) Center ,
Caraga State University, Main
Campus, Ampayon, Butuan City
Prepared by:
TABLE OF CONTENTS
Preface 1
Vision / Mission 2
Company Safety Policy 3
Functions and Responsibilities 4
First Aid and Medical Services 5
Emergency Transportation of Injured Workers 6
Safety Philosophy 7
Safety Orientation 8
Safety Meeting 9
Safety Measures 10
Housekeeping 11
Documents / Records and Reports 12
Practice for General Safety 13
Fire Safety Practices and Emergency Procedures 14
Fire Prevention Requirement 15
Construction Safety 16
Equipment Safety 17
Excavation Safety 18
Scaffolding 19
Violations and Penalties 20
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
WORKING HOURS
Morning
Afternoon
FINANCIAL
COMPONENTS
"ORIGINAL"
PLEASE DO NOT OPEN BEFORE 2:00PM ON DECEMBER 3, 2018
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
TABLE OF CONTENT
FINANCIAL REQUIREMENTS
1. Financial Bid Form
2. Detailed Estimates
3. Cash Flow
ADRIENNE BOSTON
Authorized Managing Officer
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
` Jhunrey Ygot
Project Manager
UNSKILLED/COMMON
December 3, 2018
ADRIENNE BOSTON
Authorized Managing Officer
SAVER’S BUILDERS
CORPORATION P-7 JP. RIZAL, BUTUAN CITY, AGUSAN DEL NORTE
CONTACT NO. 095123456789 / 092701234567 EMAIL ADDRESS: SBC@gmail.com
PCAB LICENSE NO.36647 ISO CERTIFIED 9001:2015
I, ADRIENNE BOSTON, of legal age, Single, Filipino and residing at Bonbon, Butuan
City. Under oath, hereby depose and say:
That I have inspected the site for Extension of Quality Assurance and Hydrology
Division, Doongan, Butuan City.
That I am making this statement as part of requirement for the technical proposal of
the Saver’s Builders Corporation for Extension of Quality Assurance and Hydrology
Division, Doongan, Butuan City.
IN FAITH WHEREOF. I hereby affix my signature this 3rd day of December 2018 at
Butuan City, Philippines.
ADRIENNE BOSTON
Affiant
SUBSCRIBE AND SWORN TO before me this 3rd day of December 2018, affiant exhibiting to
may his Community Tax Certificate No. 00025432 issued on January 16, 2018 at Butuan
City, Philippines.
Doc No.
Page No.
Book No.
Series of 2018: