Project ZINC FACTORY (54 M X 21 M ELECTROW

Client CORNERSTONE CO;LTD. Design by Date


Location base point 1364 ZWT 3/27/2022
PAD FOUNDATION DESIGN to ACI-318 Checked Revision
XXX -

INPUT
OUTPUT
CHECK
MATERIAL f'c 2900 psi cover 3
fy 50000 psi Assume average unit weight of soil& concrete 125
service surcharge 100 lb-cf Bearing Pressure 1.2
p (rho) 0.004 allowable soil pressure 0.625
Net allowable soil pressure at bottom( qe) 2.063

DIMENSION -
BASE COLUMN
L= (ft) 4.0 h(c1)= 12
B=(ft) 4.0 b(c2)= 12
Depth H=(ft) 5

COLUMN REACTION-kip(From ETABS)


DEAD LIVE
Axial(kip) 23.68 10

1 .Required footing area


Required Base Area of Footing
Af = Unfactored Load/qe = 16.33 ft²

USE 4 X 4 (ft) Square Footing

2 . Factored load and soil reaction


Pu = 1.4D.L=1.7L.L = 50.15 kips

qu = Pu/Af = 3.13 ksf

3 . Check one way shear (Wide Beam Action)


f'c = 2900 psi Footing Cover = 3.5 in
pu = 50.152 kips
qu = 3.1 ksf
Assumed Footing thickness = 8 in d= 4.5 in
Vu = qu x tributary area (for wide beam)

Tributary area = B {[(L-c1)/2]-d} = 4.5 ft²


Vu =qux tributary area = 14.11 kips
ɸVn = ɸ(2√ f'c bw d = 19.77 kips > 14.11

3 . Check Two Way Shear(Purching Shear)

Vu = qu x tributary area (for punching)


Punching Area= (c1+d)x(c2+d)= 272.25 in2 = 1.89 sqft
Tributary area = Footing Area - Punching Area= 14.109375 ft²

Vu = qu x tributary area = 44.23 kips


bo = 2(c1+d) + 2(c2+d) 66 in

ɸVc = 4 x .85 √ f'c bo d 54.38 kips > 44.23 kips OK


So, USE h= 8 d = 4.5
4.To Find Min; Reinforcing Steel

As(min) = pbd = 0.22 in² (B-c1)/2 = 1

Mu =qu L {(B-c1)/2}² /2 = 6.27 kip-ft quLb2/2 6.269

Assume (a) = 1 in d-a/2 = 4 in

As =Mu/{0.9 x fy x (d-a/2)} = 0.42 in²

check to a ,
a= As fy/ (0.85f'c bw) 0.18

Reassume (a) = 0.18 in d-a/2 = 4.41 in

As =Mu/{0.9 x fy x (d-a/2)} = 0.38 in² > As(min) = 0.22

check to a ,
a= As fy/ (0.85f'c bw) 0.16 in
USE As = 0.38 in²

SIZE AREA NOS SPACING=b*As/Ab b = 12 in


12mm 0.175 8.66 5.54
13mm 0.196 7.73 6.21
16mm 0.312 4.86 9.88
18mm 0.395 3.84 12.51
20mm 0.487 3.11 15.42
Page

Job No
S-1291

in
pcf
t/sqft

ksf

FOR PUNCHING SHEAR


FOR PUNCHING SHEAR

OK L

d
2 c1

B
ft

USE As
HING SHEAR FOR WIDE BEAM ACT
HING SHEAR FOR WIDE BEAM ACT

L Tributary Area
L

d d d d
2 c1 2
Punching Area
2 2 c
d
2
c2

B
Tributary Area
d
2

(L-c1)
2 -
AM ACTION
AM ACTION

d
c1 2
d
2 c2
d
2

-c1)
2 -d