You are on page 1of 1

Classified as MARAFIQ Internal Use

Document ID No : MEHF-1-SF- 018


Power and Water Utility Company for Jubail and Yanbu
Page 3 to 17

RISK ASSESSMENT Rev. No.: 1

Date: 09 01 2019

Table – e: OHS Impact Scale Table – f: Property Damage Impact Scale


Score Description Health & Safety Score Description Financial – Site (SAR)
5 Severe >40 million
· One or more fatality of employee, contractor staff or 4 Material >4 million to 40 million
5 Severe
public 3 Important >400,000 to 4 million
· Permanent total disability of one or more employees, 2 Moderate >100,000 to 400,000
4 Material
contractor staff or public 1 Minor 40,000 to 100,000
· Lost time injury
3 Important · In-patient medical care required for employee, Table- g: Likelihood of consequence
contractor staff or public Score Description
· Minor injury or illness with reversible health effect 5 Expected
2 Moderate
· Restricted work case 4 Highly Likely
3 Likely
· Slight injury or health effect 2 Less Likely
1 Minor · Out-patient medical treatment to employee, contractor 1 Remote
staff or public

Calculation of Initial & Residual Risk:


The Initial and Residual risks shall be calculated as per the rating criteria detailed in tables d, e, f & g above to decide on at Risk Priority Number (RPN)
from the table b.
RPN is calculated as ‘RPN=Impact X Likelihood’. Use table ‘a’, the 5x5 Risk
Heat Map to identify the rate for the Impact and likelihood.

PROPRIETARY NOTICE Reviewed By DC: Stamp Control


THIS DOCUMENT CONTAINS INFORMATION PROPRIETARY TO MARAFIQ. ANY DISCLOSURE OR USE THEREOF IS
EXPRESSLY PROHIBITED EXCEPT UPON THE WRITTEN PERMISSION OF MARAFIQ.

IMPORTANT
Only documents with stamps are considered official.