This document provides tables and guidelines for assessing risks at a power and water utility company. Table e defines an impact scale for occupational health and safety from minor to severe. Table f defines an impact scale for property damage from minor to severe. Table g defines a likelihood scale from remote to expected. The document explains how to calculate initial and residual risk priority numbers by cross-referencing the impact and likelihood ratings on a 5x5 risk heat map. It notes the risk assessment is proprietary information of the power company.
This document provides tables and guidelines for assessing risks at a power and water utility company. Table e defines an impact scale for occupational health and safety from minor to severe. Table f defines an impact scale for property damage from minor to severe. Table g defines a likelihood scale from remote to expected. The document explains how to calculate initial and residual risk priority numbers by cross-referencing the impact and likelihood ratings on a 5x5 risk heat map. It notes the risk assessment is proprietary information of the power company.
This document provides tables and guidelines for assessing risks at a power and water utility company. Table e defines an impact scale for occupational health and safety from minor to severe. Table f defines an impact scale for property damage from minor to severe. Table g defines a likelihood scale from remote to expected. The document explains how to calculate initial and residual risk priority numbers by cross-referencing the impact and likelihood ratings on a 5x5 risk heat map. It notes the risk assessment is proprietary information of the power company.
Score Description Health & Safety Score Description Financial – Site (SAR) 5 Severe >40 million · One or more fatality of employee, contractor staff or 4 Material >4 million to 40 million 5 Severe public 3 Important >400,000 to 4 million · Permanent total disability of one or more employees, 2 Moderate >100,000 to 400,000 4 Material contractor staff or public 1 Minor 40,000 to 100,000 · Lost time injury 3 Important · In-patient medical care required for employee, Table- g: Likelihood of consequence contractor staff or public Score Description · Minor injury or illness with reversible health effect 5 Expected 2 Moderate · Restricted work case 4 Highly Likely 3 Likely · Slight injury or health effect 2 Less Likely 1 Minor · Out-patient medical treatment to employee, contractor 1 Remote staff or public
Calculation of Initial & Residual Risk:
The Initial and Residual risks shall be calculated as per the rating criteria detailed in tables d, e, f & g above to decide on at Risk Priority Number (RPN) from the table b. RPN is calculated as ‘RPN=Impact X Likelihood’. Use table ‘a’, the 5x5 Risk Heat Map to identify the rate for the Impact and likelihood.