You are on page 1of 3

Project PROPOSED PUMP ROOM

Location
Client
Subject Design of Rectangular Beams GB1
Calculated by Checked by Date Ref. No. No. of Page(s)
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 3

1.0 Beam Properties


Total Beam Depth h = 300 mm
Beam Width b = 250 mm
Diameter of Flexure Reinforcement db = 16 mm
Diameter of Shear Reinforcement dv = 10 mm
Concrete Clear Cover cc = 40 mm
Concrete Strength f' c = 21 MPa
Flexural Reinforcement Minimum Yield Strength fy = 275.79 MPa
Assumed No. of Flexural Bar Layers (maximum of 3 layers) n = 1
Approximate Effective Depth, d = 242 mm
d=h-c c -d v -0.5d b -(n-1)[(12.5 or 0.5d b )+0.5d b ]
2.0 Flexural Capacity
Reduction Factor for Flexure φ = 0.9
β 1 , (0.85 for f' c 17MPa to 28MPa). For f' c greater than β1 = 0.85 > 0.65; OK!
28 MPa, β 1 = 0.85-(0.05/7)(f'c-28) > 0.65.
ρ min = 1.4/f y ρ min = 0.005076
1/2
As min = (f' c ) (bd)/(4f y ) > (1.4/fy)(bd) As min = 307.1177 mm 2 Value from ρmin!
Minimum No. of Flexure Reinforcement N min = 1.527 - 16 mm dia. Rebars
ρ bal = (0.85f' c β 1 600)/[f y (600+f y )] ρ bal = 0.03769
ρ max = 0.75ρ bal ρ max = 0.028268
As max = ρ max bd As max = 1710.2 mm 2
Maximum No. of Flexure Reinforcement N max = 8.506 - 16 mm dia. Rebars
ω max = ρ max f y /f' c ω max = 0.371
2
M u max = φf' c ωbd (1-0.59ω) M u max = 80.226 kN-m
2.1 Program Calculated Flexure Reinforcement
Reference Beam: Element B4
Rebar Required
Location
I Middle J
2
Top (mm ) 635.328 197.069 585.639
Top (pcs) 3.160 0.980 2.913
2
Bottom (mm ) 302.254 411.555 279.819
Bottom (pcs) 1.503 2.047 1.392
Combo DCON76 DCON76/79 DCON75
Note: N prov > N min > 2 Bars < N max (for Singly Reinforced Beam). > N max , Doubly Reinforced.
Rebar Quantity Provided, Nprov (pcs)
Location
I Middle J
Top 4 2 3
Status OK! OK! OK!
Check Layer 1 1 1
Bottom 2 3 2

1/3
Project PROPOSED PUMP ROOM
Location
Client
Subject Design of Rectangular Beams GB1
Calculated by Checked by Date Ref. No. No. of Page(s)
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 3

Status OK! OK! OK!


Check Layer 1 1 1
3.0 Shear Capacity
Reduction Factor for Shear φ = 0.75
Shear Reinforcement Minimum Yield Strength f yv = 275.79 MPa
Concrete Material Modification Factor, λ = 1
1 for normal weight concrete, 0.75 for all-lightweight
concrete & 0.85 for sand-lightweight concrete.
Shear Strength Provided by Concrete, Vc = 47.132 kN
1/2
V c = 0.17λ(f' c ) bd
1/2
φV c = 0.17λ(f' c ) bd φV c = 35.349 kN
Ultimate Shear, value from structural analysis program. Vu = 61.703 kN > φVc; Shear reinf. required!
If V u > φV c , stirrups required
If φV c > V u > 0.5φV c , minimum stirrups required
If V u < 0.5φV c , no stirrups required
Controlling Load Combination Combo = DCON78
Shear strength to be provided by the stirrups, Vs = 35.139 kN
V s = V n -V c = (V u /φ)-V c
Area of Shear Reinforcement per Leg A bv = 78.540 mm 2
Number of Legs Provided leg = 2
1/2
Minimum Area of Stirrups, A vmin = 0.062(f' c ) bS/f yv , A vmin = 38.390 mm 2
> 0.35bS/f yv, where S = d/2 or 600mm
Cross Section of Each Stirrup Crossing the Crack Av = 157.0796 mm 2 > Avmin; OK!
1/2
If V s < 0.66(f' c ) bd, stirrups spacing, S = A v f yv d/V s, S = 298.35 mm > Smax; Use Sprov < or = Smax!
If V s > 0.66(f' c ) 1/2 bd , increase beam size
If S < 25mm , increase the value of A v (legs &(or) diam.)
If V s < 0.33(f' c ) 1/2 bd, S max = d/2 or 600 S max = 121.00 mm < S; Use Sprov < or = Smax!
1/2
If V s > 0.33(f' c ) bd, S max = d/4 or 300
Provided Spacing Near The Supports S prov = 120.000 mm
Shear Strength Provided V sprov = 87.36 kN
Total Shear Capacity, V t = (φA v F yv d/S prov )+(φV c ) Vt = 100.87 kN > Vu; OK!
3.1 Program Calculated Shear Reinforcement
Program Calculated Value, (A v /S) prog (A v /S) prog = 0.657 mm 2 /mm
A v /S prov > (A v /S) prog A v /S prov = 1.31 mm 2 /mm > (Av/S)prog;OK!
Note: To increase A v , increase stirrup diameter, &(or) increase number of legs.
4.0 Beam Schedule
Beam Section (mm) Bottom Bars* Top Bars** Stirrups
Label h b Cont. Addt'l. Bar Ø Cont. Addt'l. Bar Ø Pcs./m Bar Ø
GB1 300 250 2 1 16 mm 2 2 16 mm 9 10 mm
*Bottom bars additional at midspan.**Top bars additional same quantity at each support.

2/3
Project PROPOSED PUMP ROOM
Location
Client
Subject Design of Rectangular Beams GB1
Calculated by Checked by Date Ref. No. No. of Page(s)
13017-311317-2140 ME MTA 13-Nov-13 002-11-2013 3

3/3

You might also like