Professional Documents
Culture Documents
Instrument Details
Instrument name Powder Coating Oven Model No. -----
Make ----- Location Production
Ramp. Temperature Ambient to 300 ºC Accuracy ------
Socking Temperature ------ Visual Inspection OK
I.D. No. Powder Coating Oven Type k type
Mapping Time 13.13 to 14.05 hr. Calibration Performed At Site
Detail of reference standards & Major equipments used
Sr. No. Equipment Name Make Model / SR No Certificate No. Calibration Calibration
Validity by
1 Universal calibrator Masibus 10030656 CC325721000000114F 04/08/2022 KL Tech.
2 Universal Data Logger ------ DL 35 W CC320821000004362F 01/10/2022 RTS
01. This result of calibration refers to only to the particular item submitted for calibration.
02. The above results are valid at the time of and under the stated conditions measurement.
03. This certificate shall not be reproduced, except in full unless written permission for the publication of an approved
abstract has been obtained from the Executive Director, Ram Technology Services.
Calibrated By Approved By
(Calibration Engg.) Technical Manager
R.P. Singh Vikas Malik
Regd. Office: GR-83A, Ganpati Dham Industrial Area, Delhi-Rohtak Road, Bahadurgarh-124507(Haryana)
.
RAM TECHNOLOGY SERVICES
Lab. GR-83A, Ganpati Dham Industrial Area,
Delhi-Rohatk Road, Opp. Omex City ..… Your Quality Partner …..
Bahadurgarh-124507(H.R) Rgd.Office: Ekta Vihar Colony, Ujha
Ph. No. 8059940480-81-82-83-84 Road, Near Indane Gas Godown, Behind Sec. 24
Email:- advance321@gmail.com Panipat-132103 Haryana (INDIA)
rtspanipat@gmail.com, Land line:-01276-298823
www.acsgroups.net
CALIBRATION CERTIFICATE
Customer Name & Address Form No. F01(5.10/01) Page No.2 of 2
M/s: MASU BRAKE PADS PVT. LTD. (UNIT-II) Certificate No. RTS/ACS/2021/455
Formerly BIC Auto Pvt. Ltd. Service Request Date 06/11/2021
Plot No. CH7 to CH10A, Govt. Industrial Area, Date of Calibration 09/11/2021
Bahadurgarh.Distt.Jhajjar-124507 (Haryana) Calibration Due Date 08/11/2022
CALIBRATION RESULTS
Remark:
01. This result of calibration refers to only to the particular item submitted for calibration.
02. The above results are valid at the time of and under the stated conditions measurement.
03. This certificate shall not be reproduced, except in full unless written permission for the publication of an approved
abstract has been obtained from the Executive Director, Ram Technology Services.
Calibrated By Approved By
(Calibration Engg.) Technical Manager
R.P. Singh Vikas Malik
Regd. Office: GR-83A, Ganpati Dham Industrial Area, Delhi-Rohtak Road, Bahadurgarh-124507(Haryana)