You are on page 1of 2

.

RAM TECHNOLOGY SERVICES


Lab. GR-83A, Ganpati Dham Industrial Area,
Delhi-Rohatk Road, Opp. Omex City ..… Your Quality Partner …..
Bahadurgarh-124507(H.R) Rgd.Office: Ekta Vihar Colony, Ujha
Ph. No. 8059940480-81-82-83-84 Road, Near Indane Gas Godown, Behind Sec. 24
Email:- advance321@gmail.com Panipat-132103 Haryana (INDIA)
rtspanipat@gmail.com, Land line:-01276-298823
www.acsgroups.net
CALIBRATION CERTIFICATE

Customer Name & Address Form No. F01(5.10/01) Page No.1 of 2


M/s: MASU BRAKE PADS PVT. LTD. (UNIT-II) Certificate No. RTS/ACS/2021/455
Formerly BIC Auto Pvt. Ltd. Service Request Date 06/11/2021
Plot No. CH7 to CH10A, Govt. Industrial Area, Date of Calibration 09/11/2021
Bahadurgarh.Distt.Jhajjar-124507 (Haryana) Calibration Due Date 08/11/2022

Instrument Details
Instrument name Powder Coating Oven Model No. -----
Make ----- Location Production
Ramp. Temperature Ambient to 300 ºC Accuracy ------
Socking Temperature ------ Visual Inspection OK
I.D. No. Powder Coating Oven Type k type
Mapping Time 13.13 to 14.05 hr. Calibration Performed At Site
Detail of reference standards & Major equipments used
Sr. No. Equipment Name Make Model / SR No Certificate No. Calibration Calibration
Validity by
1 Universal calibrator Masibus 10030656 CC325721000000114F 04/08/2022 KL Tech.
2 Universal Data Logger ------ DL 35 W CC320821000004362F 01/10/2022 RTS

Environmental Ambient Temp. 25 ºC Calibration Reference ITS-90


Condition Relative Humidity 50±20% Calibration Procedure WI-01ET
CALIBRATION RESULTS
Sr.No. Date Time TC.01 TC.02 TC.03
01 09/11/2021 13:13:00 44 42 43
02 13:15:00 45 42 43
03 13:17:00 46 43 44
04 13:19:00 48 44 46
05 13:21:00 48 45 46
06 13:26:00 63 46 46
07 13:28:00 46 46 44
08 13:30:00 51 52 48
09 13:32:00 56 59 53
10 13:34:00 58 60 55
Remark:
*UUC: Unit under Calibration
Calibration Interval has given as required by Customer.
(The reported Uncertainty is at coverage factor k=2, which correspond to coverage possibility of approximately 95% of a
normal distribution)

01. This result of calibration refers to only to the particular item submitted for calibration.
02. The above results are valid at the time of and under the stated conditions measurement.
03. This certificate shall not be reproduced, except in full unless written permission for the publication of an approved
abstract has been obtained from the Executive Director, Ram Technology Services.

Calibrated By Approved By
(Calibration Engg.) Technical Manager
R.P. Singh Vikas Malik

Regd. Office: GR-83A, Ganpati Dham Industrial Area, Delhi-Rohtak Road, Bahadurgarh-124507(Haryana)
.
RAM TECHNOLOGY SERVICES
Lab. GR-83A, Ganpati Dham Industrial Area,
Delhi-Rohatk Road, Opp. Omex City ..… Your Quality Partner …..
Bahadurgarh-124507(H.R) Rgd.Office: Ekta Vihar Colony, Ujha
Ph. No. 8059940480-81-82-83-84 Road, Near Indane Gas Godown, Behind Sec. 24
Email:- advance321@gmail.com Panipat-132103 Haryana (INDIA)
rtspanipat@gmail.com, Land line:-01276-298823
www.acsgroups.net
CALIBRATION CERTIFICATE
Customer Name & Address Form No. F01(5.10/01) Page No.2 of 2
M/s: MASU BRAKE PADS PVT. LTD. (UNIT-II) Certificate No. RTS/ACS/2021/455
Formerly BIC Auto Pvt. Ltd. Service Request Date 06/11/2021
Plot No. CH7 to CH10A, Govt. Industrial Area, Date of Calibration 09/11/2021
Bahadurgarh.Distt.Jhajjar-124507 (Haryana) Calibration Due Date 08/11/2022

CALIBRATION RESULTS

Sr.No. Date Time TC.01 TC.02 TC.03


11 09/11/2021 13:36:00 71 77 72
12 13:40:00 134 136 138
13 13:42:00 203 207 202
14 13:44:00 236 240 242
15 13:46:00 279 275 274
16 13:48:00 288 292 294
17 13:50:00 299 302 299
18 13:52:00 302 299 304
19 13:54:00 301 301 299
20 13:56:00 299 303 304
21 13:58:00 189 192 191
22 14:00:00 162 160 167
23 14:02:00 144 155 157
24 14:04:00 71 77 52

Remark:

*UUC: Unit under Calibration


Calibration Interval has given as required by Customer.
(The reported Uncertainty is at coverage factor k=2, which correspond to coverage possibility of approximately 95% of a
normal distribution)

01. This result of calibration refers to only to the particular item submitted for calibration.
02. The above results are valid at the time of and under the stated conditions measurement.
03. This certificate shall not be reproduced, except in full unless written permission for the publication of an approved
abstract has been obtained from the Executive Director, Ram Technology Services.

Calibrated By Approved By
(Calibration Engg.) Technical Manager
R.P. Singh Vikas Malik

Regd. Office: GR-83A, Ganpati Dham Industrial Area, Delhi-Rohtak Road, Bahadurgarh-124507(Haryana)

You might also like