SHEAR WALL NOTES:

1. 1/2" CDX SHEATHING ON EXTERIOR SIDE OF WALL.

2. 6D NAILS @ 4" O.C. AT ALL PANEL EDGES.

3. 6D NAILS @ 6" O.C. AT ALL PANEL INTERMEDIATE MEMBERS.


DOUBLE UNDERLAYMENT ON ROOF
FIBERGLASS SHINGLES OVER 30# FELT PITCHES OF 2:12 TO 5:12 APPLIED IN 4. 1/2" GYPSUM BOARD AT INTERIOR SIDE OF WALL.
ACCORDANCE WITH FBC 1507.2.8
5/8" CDX PLYWOOD SHEATHING. REFER TO
s0.1 FOR NAILING DIAGRAM

BAFFLE (TYPICAL)

SIMPSON H10 AT EACH TRUSS OR


EQUAL FROM TRUSS TO TOP
SEE
12 PRE-ENGINEERED WD. TRUSSES @
24" O.C. MANUF. TO SUBMIT SHOP
TERMITE PROTECTION
PLATE.
AC PAD MUST (ALLOWABLE UPLIFT = 905) PLAN DWG.'S & UPLIFT CALC'S
NOTES:
MEET MINIMUM ALUMINUM DRIP EDGE
TRUSS BEARING . (PER FBC
DESIGN FLOOD 1. APPROVED TERMITE PROTECTIVE TREATMENT SHALL BE USED AND PROVIDED

a3.1
1
ELEV. 17'-4" RESIDENTIAL SIXTH EDITION (2017), SECTION R318.1)
ELEVATION IN
OR
26'-3" FLOOD ZONE 2. PERMANENT SIGNAGE FOR TREATMENT SHALL BE POSTED NEAR WATER HEATER
LOCATIONS R-38 INSULATION ELECTRICAL PANEL. (PER FBC RESIDENTIAL SIXTH EDITION (2017), SECTION R318.1)
GRADE
2x8 P.T. WOOD FASCIA 1/2" CEILING BOARD 3. A 6" MINIMUM CLEARANCE SHALL BE PROVIDED BETWEEN EXTERIOR WALLS AND
WINDOW 1'-0" 3'-0" FOR TERMITE INSPECTION (4" MINIMUM FOR GARAGE/PATIO SLABS). (PER FBC RESIDENTIAL
3'-0"
SIXTH EDITION (2017), SECTION R318.1)
DOUBLE 2X4 TOP PLATE

4'-5"
SIDEWALLS
VENTED VINYL SOFFIT 4. A 1'-0" MINIMUM CLEARANCE SHALL BE PROVIDED BETWEEN THE STRUCTURE'S
AND CONDENSATE LINES, ROOF DOWNSPOUTS, SPRINKLER SYSTEMS AND RISERS FOR SPRAY

3'-0"
W.H. SIMPSON SP2 AT EACH STUD OR

WALL
CL OF
MESH USE 6 MIL VAPOR BARRIER HEADS. (PER FBC RESIDENTIAL SIXTH EDITION (2017), R318.1.6)
EQUAL FROM STUD TO TOP
OF 6X6 1.4X1.4 W.W.M. OR FIBER 5'-2" PLATE. 5. APPROVED TERMITE PROTECTION SHOULD BE PLACED/PROTECTED W/ 6MIL VAPOR
ANY SOIL
(ALLOWABLE UPLIFT = 890) BARRIER. IT SHALL BE DONE AFTER EXCAVATION, BACKFILLING AND COMPACTION.
FILL REINFORCED W/ 1 LAYER DISTURBANCE AFTER TREATMENT SHALL BE PROTECTED BY PERMANENT PLASTIC OR METAL
COMPACTED TERMITE TREATED

3'-7"
FORMS IN CONCRETE FLOORS BOXED OUT OR CONSTRUCTED FOR THE INSTALLATION OF
BE
3 1/2" CONC. SLAB OVER @ WELL PLUMBING LINES AND THE LIKE. IF SOIL IF DISTURBED AFTER TREATMENT, SOIL SHOULD
RETREATED. (PER FBC RESIDENTIAL SIXTH EDITION (2017), SECTIONS R318.1.1, R318.1.2, R318.1.3,

WALL
CL OF
SLIDING DOOR

2 LAYERS VAPOR
0'-0" A.F.F.
FIN. FLR.

2,500 PSI MINIMUM BARRIER OR EQUAL R318.1.4)


N
SIDING 6. ELIMINATE OVERPOUR OR MORTAR ACCUMULATION ALONG THE EXTERIOR FOUNDATIO
PERIMETER BEFORE TREATMENT TO ENHANCE VERTICAL PENETRATION OF CHEMICALS. (PER FBC
1/2" GYPSUM BOARD RESIDENTIAL SIXTH EDITION (2017), SECTION R318.1.5)
REFER TO FOUNDATION NOTE REFER TO FOUNDATION NOTE FIRE STOP BLOCKING @
1'-0" OF
NO.6 BELOW FOR WALLS NO.1 BELOW FOR SLAB MIDSPAN OF STUDS 7. TREATMENT SHALL BE APPLIED TO ALL EXTERIOR CONCRETE OR GRADE WITHIN
STAGGERED. 2 X 4 BOTTOM PLATE SIDEWALLS (W/ 6MIL. VAPOR BARRIER AFTER CONSTRUCTION) (PER FBC RESIDENTIAL SIXTH

24'-0"
PROVIDE 1/2" EXPANSION REFER TO FOUNDATION NOTE EDITION (2017), SECTION R318.1.6)

DOOR
MATERIAL BETWEEN NO.4 BELOW FOR SLAB SLEEVES
HOUSE/PORCH SLAB 8. NON-CELLULOSE MATERIAL W/ TERMITICIDE SHALL BE USED FOR PROTECTIVE
AROUND METAL PIPINGS PENETRATING ON SLAB-ON- GRADE FLOORS. (PER FBC RESIDENTIAL
SIXTH EDITION (2017), SECTION R318.2)
9. POST CONSTRUCTION, ALL LOOSE WOOD AND DEBRIS SHALL BE COMPLETELY REMOVED
FROM UNDER THE BUILDING WITHIN 1'-0" EXCEPT FOR NATURALLY DURABLE OR P.T. WOOD
FOR GROUND CONTACT AND INSTALLED 6" MIN. FROM THE STRUCTURE FOR TERMITE
2 X 4 WOOD STUDS AT 16" O.C. INSPECTION. (PER FBC RESIDENTIAL SIXTH EDITION (2017), SECTION R318.3)
WINDOW

MAX.
35'-0"

FIN. FLR.
SLOPE DOWN

(-) 0'-8" B.F.F.


DOOR "SYSTEM 42" 16" DEEP FLOOR

a3.1
TRUSS. REFER TO STRUCTURAL

2
R-13 BATT INSULATION
REFER TO FOUNDATION NOTE DRAWINGS
NO.4 BELOW FOR SLAB

0'-0" A.F.F.
FIN. FLR.
REFER TO FOUNDATION NOTE 2 X 4 RIBBON BOARD
NO.6 BELOW FOR WALLS

PROVIDE 1/2" EXPANSION FINISH FLOOR


MATERIAL BETWEEN
HOUSE/PORCH SLAB ELEV. 9'-4"

MESH USE 6 MIL VAPOR BARRIER


CONC. STEPS
SIMPSON MSTAM36 STRAP TIE AT
32" O.C.WITH (13)-10d NAILS TO STUD
AND (8) 1/4"X2 1/4"-TITEN FASTENERS
FOUNDATION NOTES:
VARY PER GRADE TO CMU
OF 6X6 1.4X1.4 W.W.M. OR FIBER 1. SLAB-ON-GRADE TO BE 3 1/2" THICK
W/ FIBER MESH ON 6 MIL
FILL REINFORCED W/ 1 LAYER VAPOR BARRIER (LAPPED AND TAPED)
COMPACTED TERMITE TREATED
2. TOP OF SLAB ELEV. + 0'-0"
3 1/2" CONC. SLAB OVER @ WELL
11'-0"

EXCEPT WHERE NOTED.


2,500 PSI MINIMUM 1/2" CEILING BOARD
3. CJ = 3/16" W. x 1" DP SAW CUT CONTROL
15# MIN. FELT BETWEEN CMU JOINT. CUT SAME DAY AS POUR.
AND TRUSS 4. PROVIDE TERMITE TREATED CLEAN WELL
WELL COMPACTED FILL UNDER FLOOR SLAB.
(2) KNOCK OUT BLOCK WITH
#5 POURED SOLID IN EACH 5. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE
CONTINUOUS WITH APPLICABLE CODES AND ORDINANCES

RECESS SLAB 1" @ DOOR 6. REINFORCE ALL MASONRY WALLS


W/ #5V. @ 48" OC MAX. & ALL CORNERS + JAMBS

1/2" GYP. BD. ON 1X


WOOD FURRING ON 3/4"
a3.1 RIGID INSULATION

FOUNDATION PLAN
SIDING ON 8" C.M.U.

#5 VERT. AT 48" O.C., CORNERS, ENDS


AND OPENINGS (FILL CELLS CONTAINING
REBAR WITH GROUT)

GARAGE
25" MIN. OVERLAP
#5 DOWEL

FOUNDATION PLAN
3 1/2" CONC. SLAB WITH FIBER MESH
TOP OF SLAB TO BE 12" MIN. OVER 6 MIL. VAPOR BARRIER
SCALE: 3/8" = 1'-0"

Project No.
ABOVE GRADE

GARAGE FF SLAB
ELEV. (-)0'-8" B.F.F.
24"

WELL COMPACTED TERMITE


GRADE TREATED FILL
8" MIN.
ELEV. (-) 0'-12" B.F.F.
(2) #5 REBAR
3" MIN

TYPICAL WALL SECTION


SCALE: 3/4" = 1'-0"
ARCHITECT CERTIFIES, TO THE BEST OF HIS KNOWLEDGE, THAT ALL
PLANS AND SPECIFICATIONS COMPLY WITH THE MINIMUM BUILDING
G1.2
CODES.