SN Cost Factors Document Reference Section Page Remarks

1 System Completion Database (SCDB) Plan- Cloud Based ILOBP JS Section F - Joint Execution Procedure Rev 0 7.2 27 Planned to use SCDB from COMPANY
2 Engaging Services for Specialized Agencies (including supply of temporary Lab set up, supply Pigs and other temporary arrangements)
6, Engineering Team to estimate BOQ based
2.1 Specialised Oil Cleaning of Pipes and Tanks/Vessels ILOBP Cleanliness procedure 5, 6, 7 10-15, on guidelines given in this procedure
20-25
6,
Engineering Team to estimate BOQ based
2.2 Lines Pigging ILOBP Cleanliness procedure 5, 6, 7 10-15,
on TQ# 59 response from COMPANY
20-25

Can be included in Lump-Sum Cost for


2.3 Handling and Disposal of Water and Oil Effluent ILOBP Cleanliness procedure 5b 6
Effluent Disposal during Construction stage

3 Optional Prices for Start up services


ILOBP JS Section D Attachment F PC and TCS
3.1 Start up Support Equipment support requirements 5.1 18 Details given in the referred section

ILOBP JS Section D Attachment F PC and TCS


3.2 Start Up Support – Personnel support requirements 5.2 19 Details given in the referred section

Rental Portable Air Compressor (Diesel for


Diesel driven) with Air Dryer and hoses,
Temporary valves, Measuring Equipments &
Tools, Tools for E&I, Piping & Mechanical
works, Portable Emergency Lamps, Exhaust
for Precommissioning and Commissioning
4 Tools and Tackles requirements - - Fans (Confined space entry & inspection),
Scaffolding Materials, Construction
equipments, Portable Radio, Safety
Equipments, Non-Asbestos Sheets for
Temporary Gaskets, CS Piping and Plates for
Temporary arrangement.

ILOBP JS Section D Attachment F PC and TCS COMPANY advices to use Nitrogen as per
5 Equipment and Piping Preservation Post Hydrotest 6.1 21 TQ#60. Engineering Team to estimate BOQ
support requirements
for N2 requirement.

6 Training Requirement ILOBP JS Section D Attachment F PC and TCS 3 14 Details given in the referred section
support requirements
BOQ can be estimated based on
Corrosion Inhibitor for System with wet service especially with ILOBP JS Section D Attachment F PC and TCS
7 water support requirements 6.1 21 Construction Plan to hold water during
storage and Tanks hydrotesting.
Lubricants and Consumables for Pumps and Vendor Package for Precommissioning and Commissioning Can be included in Lump-Sum Cost for
8 - -
items requirements respective Vendors
for Precommissioning and Commissioning Can be included in Lump-Sum Cost for
9 Vendor Mobilisation for Precommissioning and Commissioning requirements - - respective Vendors
Laboratory Instruments, Consumables (Gas & Glass),
10 Chemicals, etc. EM TOTAL LAB BOQ UNPRICED in Lab India Package - - Details given in the referred Document

Consider cost of one Bluebeam License for


11 Bluebeam software Home Office use - - P&ID Mark up
Manpower for SCDB Management and Precommissioning and for Precommissioning and Commissioning
12 - - Mr. Alok Chaubey will provide the details.
Commissioning execution requirements
Can be included in Lump-Sum Cost for
13 Commissioning Spares for Precommissioning and Commissioning - - respective Vendors.
requirements Commissioning Spares Gaskets can be
considered as 100% of MTO.
for Precommissioning and Commissioning Can be included in Lump-Sum Cost during
14 Cost of Utilities (Water, Power) - -
requirements Construction stage
TCP DOSSIER
Bulk Additive Mini-bulk Truck weigh
 A PROCESS SYSTEM Base Oil Pumps
Pumps Additive Pumps scales

Finished
HYDROCARBONS Finished Filling Line -
 B Pulsair package product
(OIL System) product pump Drum Lines
manifold

 C SAFETY SYSTEM F&G SENSORS FACP CLEAN AGENT FIRE WATER

EMERGENCY compressed air Hot Oil Steam Boiler


 D UTILITIES SYSTEM
DG package Package Package

Electrical
ABB CONTROL Substation
 E SUPPORT SYSTEM UPS/BATTERY PIPING
SYSTEM (SWITCHGEAR/
MCC)

Warehouse &
F BUILDING SYSTEM Admin office Laboratory Blending area
laydown
R

Filling Line - Filling Line -


Filling Line -Pail
Large Bottle Small Bottle
Lines
Lines Lines

Safety Showers
FOAM
SPRINKLER and Utilities
MONITOR
Stations

Oily Water
Sewerage

HVAC SMB SSU

Sewage and
Maintenance
storm water Tank Farms
shed
system