Assembly instruction procedure

BLOWING & COATING DIVISION

MACHINES: UNIVERSAL AND HIGH SPEED OP: A 405


WORK SEQUENCE: WHEEL ASSEMBLY Page: 1/6
S/Assy: Mold base raising/lowering cam Rev.: D
Drawing: 11246732 (PM) 11245443 (MM) 11241519 (GM- SBO 34) 11285645 (TM) Date: 02/02/12

Previous OP: A 080-1 Next OP: A 395

Acceptance
Tools
criteria

1) INSTALLING THE MOLD BASE RAISING/LOWERING CAM UNIT

a) Check the dimension A on the cam


0
Dimension A: 70 mm
- 0.1
Record the dimension A on the inspection record form

b) Install the stops on the cam

c) Install the detector support on the attaching bracket

d) Install the attaching bracket on the transfer plate (OP 011)

2) ASSEMBLING AND ADJUSTING THE MOLD BASE RAISING/LOWERING CAM

Note the supplier's name and the cam batch number on the traceability
component record sheet C1000 in C 405 (see procedure MO 22)

a) Install the cam supports on the table (OP 011) with tools 1 to pre-position
them

Tool 1: 11258407

b) Adjust the cam concentricity C

Concentricity tolerance C: 0 ± 0.1 mm

Record the concentricity tolerance C on the inspection record form

c) Tighten the attaching screws and then consecutively drill and ream the
supports with the transfer plate (OP 011)

d) Replace the tools 1 by the attaching screws

e) Install the cam on the supports and adjust the dimension B

Dimension B: 124 ± 0.1 mm

Temporary dimension B only for SBO PM: 194 ± 0.1 mm

Record the dimension B on the inspection record form

10005365500201EN.xls
OP : A 405
DIVISION BLOWING & COATING Setup diagram Page : 2/4
Revision : B
MACHINES : SBO UNIVERSAL ET HIGH SPEED Date : 28/03/06

Stop

Tooling
11258407

Cam support

Screw CHc M10

Tooling
11258407
Side connector
for SBO PM
A

Detector support &


Attaching bracket
A

10005365500301EN.slddrw
Assembly instruction procedure
BLOWING & COATING DIVISION

MACHINES: UNIVERSAL AND HIGH SPEED OP: A 405


WORK SEQUENCE: WHEEL ASSEMBLY Page: 3/6
S/Assy: Mold base raising/lowering cam Rev.: D
Drawing: 11246732 (PM) 11245443 (MM) 11241519 (GM- SBO 34) Date: 02/02/12
11285645 (TM)

Previous OP: Next OP:

Acceptance
Tools
criteria

2) ASSEMBLING AND ADJUSTING THE MOLD BASE RAISING/LOWERING CAM

f) Adjust the level of the straight parts of the cam (infeed and outfeed) of the
mold base raising/lowering cam

Level toleranceN: 0.05 mm max

Record the level tolerance N on the inspection record form

3) ASSEMBLING THE HOUSING ON THE TRANSFER PLATE

Install the housing on the transfer plate (OP 011)

Housing

10005365500201EN.xls
OP : A 405
DIVISION BLOWING & COATING Setup diagram Page : 4/4
Revision : B
MACHINES : SBO UNIVERSAL & HIGH SPEED Date : 28/03/06

Côte B
Rule

Rotating plate

for SBO PM
Côte B
Cote = 194 mm

Mold base up down cam

Cam support

Rotating plate Mold base up down cam

Dial gauge

10005365500401EN.slddrw
Fiche d'instruction de montage
DIVISION BLOWING & COATING

MACHINES : UNIVERSAL AND HIGH SPEED OP : A 405


GAMME : WHEEL ASSEMBLY Page : 5/6
S/Ensemble : Mold base raising/lowering cam Indice : D
Plan : 11246732 (PM) 11245443 (MM) 11241519 (GM- SBO 34) 11285645 (TM) Date : 02/02/12
11295926 (VERTE)

OP précédente : A 080-1 OP suivante : A 395

Critères
Outillages
d'acceptation

Height adjustment of Mold base raising/lowering cam :


(Input height of cam = 70mm)

1) Put the tool in the axis of the rotating plate (position 1) and center on the cam
Tighten it with the screw (M16)
Tool : To number

2) Put the tool at the input of the cam


3) Adjust the gap at 5/100 between cam and feeler gauge to have the
dimension B

10005365500201EN.xls
Fiche d'instruction de montage
DIVISION BLOWING & COATING

MACHINES : UNIVERSAL AND HIGH SPEED OP : A 405


GAMME : WHEEL ASSEMBLY Page : 6/6
S/Ensemble : Mold base raising/lowering cam Indice : D
Plan : 11246732 (PM) 11245443 (MM) 11241519 (GM- SBO 34) 11285645 (TM) Date : 02/02/12
11295926 (VERTE)

OP précédente : A 080-1 OP suivante : A 395

Critères
Outillages
d'acceptation

4) Turn the rotating plate to put the tool at the cam output
3) Adjust the gap at 5/100 between cam and feeler gauge to have the
dimension B

10005365500201EN.xls
Inspection record form
BLOWING & COATING DIVISION

MACHINES: UNIVERSAL AND HIGH SPEED OP: C 405


WORK SEQUENCE: WHEEL ASSEMBLY Page: 1/1
S/Assy: Mold base raising/lowering cam Rev.: B
Drawing: 11246732 (PM) 11245443 (MM) 11241519 (GM- SBO 34) 11285645 (TM) Date: 28/03/06

Acceptance Results Signature


OP Tools
criteria obtained Date

A 405 1-a) Check of dimension A 70 0 mm


- 0.1

2-b) Adjustment of concentricity C 0 ± 0.1 mm

2-e) Adjustment of the cam as per dimension B 124 ± 0.1 mm

Temporary dimension B only for SBO PM: 194 ± 0.1 mm

2-f) Adjusting the cam level N 0.05 mm max

Remarks: