FORM –
Site:
1.b FIELD VERIFICATION – Pare DOS (2) vehículos en el área y confirme el cumplimiento
Comments (Work as Done vs. Work as Control failures enter in IEM
# Critical Control
Intended) Control improvements enter in GRC
1.7 Is the driver authorised to drive the specific
vehicle / equipment type?
Does the vehicle / equipment comply with
1.8
MMG vehicle standards?
1.9 Was the vehicle pre-start check done?
Are remote control equipment If relevant – Observe the use of remote controlled equipment and confirm that the method
1.12
procedures being complied with? complies with the appropriate procedure.
2.1 Obtain a copy of the Site Traffic Management Plan. Confirm that the plan is current,
Is the Traffic Management Plan up-to
complies with the common Traffic Management Plan template, has the correct
date endorsed and approved?
endorsements and approvals and is located in the MMG Library
Discuss with the Technical Services group as to whether there have been any changes to
Have any road modifications been
2.2 mine roads over the past period. Confirm that the changes comply with the endorsements
endorsed and approved?
and approvals as outlined in the Traffic Management Plan.