Department of Textile Engineering
CERTIFICATE
___________________________ ___________________________
___________________________ ___________________________
Examiner - 1 Examiner - 2
2
Department of Textile Engineering
ACKNOWLEDGMENT
We, the students of NED University of Engineering and Technology express our deep
sense of gratitude to (Chairman, Textile department) and our teacher Engr. Dr. Shenela
Naqvi (Assistant Professor) for their sincere guidance and inspiration.
We are sincerely thankful to Mr. Azam Amin (Manager Quality Management System), Ms
Quratulain (Manager HR) and Mr. Suleman Javed (Assistant Manager Quality
Management System) along with Mr. Haris Ahmed Siddique (Senior Executive Officer
Quality Management System) for there continues help and guidance during the project and
provides ease of hand during the collection of data and implementation of changes.
3
Department of Textile Engineering
ABSTRACT
4
Department of Textile Engineering
CONTENTS
CHAPTER 1 INTRODUCTION ...................................................................................... 12
1.1 PROJECT AIM .................................................................................................. 12
1.2 PROJECT OBJECTIVES ....................................................................................... 12
1.3 PROJECT BACKGROUND AND IMPORTANCE .............................................. 12
1.4 PROJECT PLANNER ............................................................................................ 14
CHAPTER 2 LITERATURE REVIEW ........................................................................... 16
2.1 WHY IT’S NEEDED .............................................................................................. 16
2.2 COMPETITIVE BENEFITS OF LEAN MANUFACTURING ........................ 17
2.3 5S........................................................................................................................ 18
2.3.1 CASE STUDY REGARDING 5S ......................................................................................... 19
2.4 THE OVERALL LEAN APPROACH .............................................................. 21
2.5 ELIMINATING THE WASTES ........................................................................ 22
2.6 PREVIOUS PROJECTS RELATED TO LEAN ............................................... 23
2.7 LEAN IMPLEMENTATION MODEL .................................................................. 25
CHAPTER 3 5S ................................................................................................................ 26
3.1 SCOPE .................................................................................................................... 26
3.2 PROBLEMS IDENTIFIED IN THE STITCHING, PACKING AND DYEING
DEPARTMENT............................................................................................................ 26
3.3 METHODOLOGY AND DATA COLLECTION.................................................. 31
3.3.1 SORT .............................................................................................................................. 31
3.3.2 SEITON – SET IN ORDER ................................................................................................ 34
3.3.3 SET IN ORDER ................................................................................................................ 36
3.3.4 SEISO – SHINE................................................................................................................ 38
....................................................................................................................................... 39
3.3.5 SEIKETSU – STANDARDIZE ............................................................................................. 41
3.3.6 SUSTAIN ........................................................................................................................ 43
3.4 OUTCOME ............................................................................................................. 43
3.5 AUDITS THAT WERE PERFORMED ................................................................. 43
3.6 STEPS TO IMPLEMENT 5S ................................................................................. 44
3.6.1 STEP 1 IDENTIFYING CURRENT SITUATION ................................................................... 44
3.6.2 STEP 2 PLANNING AND PREPARATION ......................................................................... 44
5
Department of Textile Engineering
6
Department of Textile Engineering
7
Department of Textile Engineering
TABLE OF FIGURES
Figure 2.1 Occurrences of Lean Methods in The Papers Reviewed. Methods That Appear
Only Once Are Omitted from The Results [7].................................................................. 23
Figure 2.2 Lean Implementation Models [9] .................................................................... 25
Figure 3.1 Sacks were laying on floors in an unorderly ................................................... 26
manner, due to mismanagement ....................................................................................... 26
Figure 3.2 Non organized placement of tools and accessories in the shelves .................. 27
Figure 3.3 Trollies placed in an unorganized manner....................................................... 27
Figure 3.4 Improper stacking of trolleys in front of wash box in dyeing department ...... 28
Figure 3.5 Trim card not properly visible and updated by the time ................................. 28
Figure 3.6 Bobbins and tools were not arranged according to their colors in their
respective shelves and marking of shelves needed ........................................................... 29
Figure 3.7 Overloaded piles of towels that were ready to dispatch for inspection but due
to the lack of responsibility in workers no one was available to do the job ..................... 29
Figure 3.8 Improper placement of inventory in front of VM board ................................. 30
Figure 3.9 No proper identification on the crates and trollies was observed .................... 30
Figure 3.10 Unnecessary bags placed with sewing machines which may cause hindrances
in operation for workers .................................................................................................... 31
Figure 3.11 Removal of unnecessary bags has been done ................................................ 31
Figure 3.12 Blocked floor space due to stacked trolleys .................................................. 32
Figure 3.13 Properly cleaned floor space with no unnecessary stacked trolleys .............. 32
Figure 3.14 Unnecessary cartons and poly bags were randomly laid on the floor ........... 33
Figure 3.15 Unnecessary cartons and poly bags has been removed from the floor and
Proper arrangement of cartons has been done .................................................................. 33
Figure 3.16 Bobbins were not arranged according to their colors in their respective
shelf’s. Marking of shelf’s needed .................................................................................... 34
Figure 3.17 Proper arrangements of the bobbins, accordingly with respect to their colors
needed. Tag each shelf with respect to its color ............................................................... 34
Figure 3.18 Trollies were placed in front of assessment wall........................................... 35
Figure 3.19 Assessment wall should be clear no trollies or stuff should be placed in front
of it, trollies should be place in their appropriate place .................................................... 35
Figure 3.20 Greige storage area was not properly arranged, blocked pathways were
observed ............................................................................................................................ 36
Figure 3.21 Proper placement of material on pallets and cleared pathways ..................... 36
Figure 3.22 Sacks were laying on floors in an unorderly manner, due to mismanagement
........................................................................................................................................... 37
Figure 3.22 First in first out sorting method needs to be practice on regular basis. In case
of overloading spare shelf need to be there ...................................................................... 37
Figure 3.22 Bobbins were not arranged according to their colors in their respective
shelf’s. Marking of shelf’s needed .................................................................................... 38
8
Department of Textile Engineering
Figure 3.23 Proper arrangements of the bobbins, accordingly with respect to their colors
needed. Tag each shelf with respect to its color ............................................................... 38
Figure 3.24 Crates were not properly labeled which is not appropriate and unidentifiable
........................................................................................................................................... 39
Figure 3.25 After 5S implementation crates are tagged properly ..................................... 39
Figure 3.26 Not properly arranged and labeled shelf’s..................................................... 40
Figure 3.27 Proper arrangement and tagging have been done to the shelves in the
stitching department .......................................................................................................... 40
Figure 4.1 Visual Management with Data Display [10] ................................................... 48
........................................................................................................................................... 48
Figure 4.2 & Figure 4.3 Visual Management with Markings [10] ................................... 48
Figure 4.4 Visual Management with Tools and Parts [10] ............................................... 49
Figure 4.5 5S Board [11] .................................................................................................. 50
Figure 4.6 Improvement Boards [12]................................................................................ 50
Figure 4.7 KPIS and Production board before .................................................................. 51
Figure 4.8 New KPIS and Production boards ................................................................... 51
Figure 4.9 Bobbins were not arranged according to their colors in their respective shelf’s.
........................................................................................................................................... 52
Figure 4.10 Proper arrangements of the bobbins, accordingly with respect to their colors
needed with proper tags. ................................................................................................... 52
Figure 4.11 No proper arrangement of tools. .................................................................... 53
Figure 4.12 Proper labeling and setting of tools and parts have been done. ..................... 53
Figure 4.13 not properly arranged and labeled shelf’s ..................................................... 54
Figure 4.14 proper arrangement and tagging has been done to the shelves in the stitching
department......................................................................................................................... 54
Figure 4.15 Design for KPI’s Boards ............................................................................... 56
Figure 5.1 Example for line balancing [12] ...................................................................... 57
Figure 5.2 Data Collected from Time Motion Study of Central Packing Department ..... 59
Figure 5.3 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department ............................................................................................. 59
Figure 5.4 Data Collected from Time Motion Study of Central Packing Department ..... 60
Figure 1.5 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department ............................................................................................. 60
Figure 5.6 Data Collected from Time Motion Study of Central Packing Department ..... 62
Figure 5.7 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department ............................................................................................. 62
Figure 5.8 Data Collected from Time Motion Study of Central Packing Department ..... 63
Figure 5.9 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department ............................................................................................. 63
Figure 5.10 Data Collected from Time Motion Study of Central Packing Department ... 65
9
Department of Textile Engineering
Figure 5.11 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department ............................................................................................. 65
Figure 5.12 Data Collected ............................................................................................... 67
Figure 5.13 Graphical Representations of Data ................................................................ 67
Figure 5.14 Data Collected ............................................................................................... 68
Figure 5.15 Graphical Representations of Data ................................................................ 68
Figure 6.1 Program Windows [14] ................................................................................... 71
Figure 6.2 Models [13] ..................................................................................................... 72
Figure 6.3 Connector [13] ................................................................................................. 72
Figure 6.4 Dialog windows [13] ....................................................................................... 73
Figure 6.5 Event controllers [13] ...................................................................................... 73
Figure 6.6 Dyeing Flow Chart .......................................................................................... 74
Figure 6.7 Plant Simulation of Dyeing Department ......................................................... 75
Figure 6.8 Plant Simulation of Dyeing Department ......................................................... 76
Figure 6.9 Complete Dyeing Floor chart .......................................................................... 77
Figure 6.10 Half Bleach Resource Statistic Chart ............................................................ 78
Figure 6.11 Full Bleach Resource Statistics Chart ........................................................... 79
Figure 6.12 As-is scenario of dyeing floor ....................................................................... 80
Figure 6.13 Graphical representation of current scenario of dyeing department ............. 80
Figure 6.15 Graphical representation of proposition no.1 for Dyeing Department .......... 82
Figure 6.16 Proposed scenario no.2 for Dyeing Department............................................ 84
Figure 6.17 Graphical representation of proposition no.2 of Dyeing Department ........... 84
Figure 6.18 Proposed scenario 3 for Dyeing Department................................................. 86
Figure 6.19 Graphical representation of proposition no.3 of Dyeing Department ........... 86
10
Department of Textile Engineering
LIST OF TABLES
Table 1.1 Project Planner .................................................................................................. 14
Table 1.1 Project Planner (Continued).............................................................................. 15
Table 3.1 Weekly or monthly audits were set................................................................... 41
Table 3.1 Weekly or monthly audits were set (Continued) .............................................. 42
Table 3.2 5s Audit Results ................................................................................................ 43
Table 6.1 Analyses and proposition for dyeing department (Half-Bleach) ...................... 78
Table 6.2 Analysis and proposition for Dyeing Department (Full Bleach) ...................... 79
Table 6.3 Analysis of the current scenario of dyeing department .................................... 81
Table 6.4 Proposition no.1 for Dyeing Department .......................................................... 83
Table 6.5 Proposition no.2 for Dyeing Department .......................................................... 85
Table 6.6 Proposition no.3 for Dyeing Department .......................................................... 87
11
Department of Textile Engineering
CHAPTER 1 INTRODUCTION
12
Department of Textile Engineering
Targeted values for the Feroze1888 Mills Limited are the maximum values that may
achieve in the given period, indicating the continuous improvement in the respective firm.
13
Department of Textile Engineering
- Implementation on floor.
stitching and
packing
Simulate the process of Packing and
21-02-20 10
identify the improvement opportunities.
Simulation
14
Department of Textile Engineering
14-09-20
DYEING AND
Simulation 16
PROCESSING Simulate the process of Dyeing and
Processing and identify the improvement
opportunities.
15
Department of Textile Engineering
The concept of Lean manufacturing was originated from Japan after the Second World
War. Lean Manufacturing consists of many tools that help in improving productivity and
quality and reducing the cost of manufacturing. Various authors have documented
quantitative benefits of lean implementation such as improvement in production lead time,
processing time, cycle time, set up time, inventory, defects and scrap, and overall
equipment effectiveness. The various qualitative benefits include improved employee
morale, effective communication, job satisfaction, standardized housekeeping, team
decision making, etc. All these benefits from application of lean methodology leads to
increased productivity and cost reduction. The modern concept of Lean
Manufacturing/management can be traced to the Toyota Production System (TPS),
pioneered by Japanese engineers Taiichi Ohno and Shigeo Shingo. Toyota produced
automobiles with lesser inventory, human effort, investment, and defects and introduced a
greater and ever-growing variety of products. TPS consists of two components – Just-In-
Time (JIT) production system and a respect-for-human system – with focus on active
employee participation and elimination of wasted movements by workers. In 1983 Monden
introduced the JIT concepts to a broad audience in the USA emphasizing the importance
of small lot sizes, mixed model production, multifunction workers, preventive
maintenance, and JIT delivery by suppliers. TPS itself has undergone many improvements
during its journey over the last 40 years.
LM over the time has seen a lot of transformations which have been discussed by
contributors such as Womack et al. (1990), Womack and Jones (1996), Oliver et
al. (1996), Delbridge (1998), Shah and Ward (2003), Delbridge et al. (2000), Bicheno
(2004), Hines et al. (2004), Holweg (2007), Bhasin (2008), etc [1].
16
Department of Textile Engineering
of motion and defects, to minimize these wastages there are various tools and techniques
to implement in an industry such as; Total Productive Maintenance (TPM), Total Quality
Management (TQM), Failure Mode and Effect Analysis (FMEA), 5S, Quality Function
Deployment (QFD), Kaizen, Kanban, Value Stream Mapping (VSM), etc. Salem
developed a new ‘lean assessment tool’ to quantify the results of lean implementation. The
assessment tool evaluates six lean construction elements: last planner, increased
visualization, huddle meetings, first-run studies, 5S’s, and fail safe for quality. Shah and
Ward mapped the operational space corresponding to conceptual space surrounding lean
production. Configuration theory provides the theoretical underpinnings and helps to
explain the synergistic relationships among its underlying components. Black discusses
four design rules for implementing the TPS. Hicks deal with the development of a
conceptual framework for a set of lean principles supporting the improvement of
information management and the overall information systems infrastructure. Lander and
Liker have dealt with a case study of a low volume highly customized artistic clay-tile
company. They have illustrated the process by which the firm used TPS to learn how to
understand its process, gain stability and control, empower its workforce, and become far
more profitable. Lean operations eliminate obvious wastes, reduce variability, reduce
inventory, and thereby reduce cost. Lean manufacturing is based on six principles which
include waste elimination, Pull Production, zero defects, Streamlining of processes,
Quality at the source and Continuous improvement. The principles of lean manufacturing
can be practiced only through the involvement of management and manufacturing
practices. Thus, the four enablers’ namely management responsibility leanness,
manufacturing management leanness, manufacturing strategy leanness, and technology
and workforce leanness play a vital role in lean manufacturing systems [2].
17
Department of Textile Engineering
Nystuen stated that product travel time can be reduced by 90%, inventory by 82% and
product lead time by 11% by applying lean manufacturing concepts in the organization.
Bicheno, Hines, Liker and Womack and Jones stated in their published research found that
lean manufacturing concepts are quite popular and followed in the automobile sector as
compared to other sectors. If lean manufacturing is implemented in a proper way, it can
lead to various positive improvements in the organization. Besides these benefits, lean
manufacturing also has many hidden benefits that play a vital role in industrial success
stories. These benefits have no direct role in the success stories of lean manufacturing
techniques but have the following very significant indirect roles that cannot be neglected.
Lean manufacturing techniques improve the quality of production. They also improve
working area safety for everyone. They even eliminate minor chances of mistakes in the
processes and methodology adopted for working.
2.3 5S
By applying 5S techniques and store management, each item, such as tools, raw materials,
etc., is easily traceable in the industry. There is visual control of each and everything in the
factory. A change in work culture is started in the industry with lean. Communication
increases with the workforce and they have a feeling of responsibility in the industry. With
work motion study, we can reduce workers’ effort and stress [2].
R. S. Agrahari et al (2015) explains the 5S methodology and their guidelines results in
obtaining safety, productivity, efficiency, and housekeeping practices [3].
S. R. Dulange (2013) implemented 5S principles in textile industries which results in
inventory cost reduction approx. 3500 INR to approx 3000 INR [3].
Marion, S C et al (2010) describes the main problems faced by industries and shares some
success stories that motivated industries to implement 5S to achieve their set goals.
K. Chandrasekar (2011) explains the role of workplace environment to the workers and
staff to enhance the efficiency and effectiveness of employees.
Vipulkumar C, Patel et al (2017) explained that through lean methodology Total Quality
Management can be achieved in a workplace, their study also shows improvements
possible by 5S implementation as reduction in breakdowns, reduction in wastages etc. [3].
Mr. Y.R. Chavall (2017) and their team implemented 5S principles in the workshop done
in a college. The main aim behind it was to spread the awareness and knowledge of 5S in
the college [4].
Saad Shaikh et al (2015) showed the implementation of 5S in one of the leading company
M.I.D.C (Ambernath Maharashta), which helps to manage material that can improve
environmental conditions, health and safety standards and increase productivity and quality
[4]. Also sorting gives more space for storing material, tools, and results in reduction of
searching time, hence improves the production and quality of products. It was observed
that by implementing 5S principles effectiveness surged from 55% to 75%.
18
Department of Textile Engineering
Assembly Line Balancing is the problem of assigning tasks to workstations. Ghosh and
Gagnon (1989) as well as Sarin and Erel (1998) provided detailed explanation on this topic.
Assembly line divided into three-line types including single-model, mixed-model and
multi-model, where single model assembles only one product and mixed-model assembles
multi products whereas multi model produces a sequence of batches [5].
The scope of the 5S technique work is very precise as it just evaluates the performance
factors and dimensions of an industrial organization. The characteristics of these specific
dimensions are also determined by using the same measures, the characteristics are then
proposed as questions and that helps in deciding whether the 5S technique is flexible or not
in order to enhance the growth of an organization. It must be kept in mind that the scope is
ambitious in that, but however, it explores a new vision at organization and total quality
approach. However, the research must be on realistic bases. The output of the research will
help us determine the 5S technique in the most suitable core for most quality management
and performance enhancement in any industrial organization.
Companies all around the globe use a technique comprised of five different Japanese
words; Seiri (sort), Seiton (set in order), Seisa (shine), Seiketsu (standardize), and Shitsuke
(sustain).
2.3.1.2.1 SORT
It means to sort out unnecessary things in the production line including all machinery, tools,
raw material, and equipment’s and removes all these unnecessary items which are not
needed for regular use.
Making list of the things needed on daily, weekly, or monthly basis and make list of all the
items removed and those which are new in.
2.3.1.2.3 SHINE
Next S from 5s is shine. Shine is referred to cleanliness. Everything in the workplace should
be easily accessible and kept clean. Make check lists to overlook the activities being
performed and strictly follow the routine.
19
Department of Textile Engineering
2.3.1.2.4 STANDARDIZE
After performing first three steps of 5S, everything in the workplace should be
standardizing. Make standard operating procedure (SOP) to perform activities on daily
basis and make regular audit to inspect and confirm that everything is being carried out in
a standard way.
2.3.1.2.5 SUSTAIN
Make sure that the standards are being followed regular and everything is in their place.
This is known as the 5S technique. The purpose of this system is to create a working
environment that is efficient, and capable to increase process speed and quality through
reduction of process waste. There is an immense need for experimental studies in the fields
of new management systems and their influence on a company’s production. Due to the
insufficiencies of visual evidence to show the positive impact of 5S on industrial
performance, this document aims to spot out the performance factors and components in
industries and to highlight the effectiveness of 5S implementation on organizational
production. To check the efficiency of the 5S, the surveying method is used. Data is
collected by distributing questionnaires among some couple of targeted organizations that
have implemented 5S techniques. The selection of these target organizations was
regardless of their field of work. The surveys were taken before and after the
implementation of the 5S plan. The results have shown that 5S usage can bring
improvement in an organization’s performance and productivity. This 5S plan is
independent of type, size its production or its services.
5S system supports the objectives of the companies and helps to achieve a higher and
constant enhancement in productivity.
2.3.1.3 OBJECTIVES OF 5S
There are several different measures that organizations and industries take to enhance the
quality and efficiency of their products and services. Generally, the preferable measures
for the companies are those which require less investment of capital and help the
organization to achieve the goals of the firm sooner and easily. Different sorts of techniques
require specific components, constituents, and ways that consider reaching their purpose.
The aim of this study is to compare company performance before and after the
implementation of the 5S technique. In a nutshell, the objectives of this research are to
identify the factors and characteristics of the industrial organization’s performance and to
highlight the effectiveness of the 5S implementation on the organization’s performance.
20
Department of Textile Engineering
help us determine the 5S technique in the most suitable core for most quality management
and performance enhancement in any industrial organization.
2.3.1.5 CONCLUSIONS
After studying about 5S and its consequences and after the implementation in an
organization. The 5S practices were proposed as the most suitable measure for industrial
growth and quality management. In this last section of the study, the conclusion of the
study and suggestion for future research will be expressed.
During the research, the 5S technique was proved very beneficial for industrial
organization and was approved by the results of the survey. It also shows that the technique
is quite serviceable, appropriate, and flexible.
The significant specifications of the TQM systems in the literature review, expert opinions,
and judgments helped in achieving the first objective of the study which focused on
evaluating the factors and components of industrial organizations.
With the assistance of Excel software, the second and the core objective of this research
was achieved which was a comparative measurement between the performance and growth
of the company before and after the 5S plan implementation. It highlighted the
effectiveness of this technique.
Assembly Line balancing could be classified into several types with different objectives
i.e. ALBP-I to ALBP-V
1. ALBP-I: minimizes the number of workstations, for a given cycle time.
2. ALBP-II: minimizes the cycle time, for a given number of workstations.
3. ALBP-III: maximizes the workload smoothness, for a given number of
workstations.
4. ALBP-IV: maximizes the work relatedness by arranging the tasks in a workstation.
5. ALBP-V: consider the multiple objectives with ALBP-III and ALBP-IV
simultaneously [5].
The techniques/approaches used to solve line balancing problems include analytical
method, simulation techniques etc.
21
Department of Textile Engineering
22
Department of Textile Engineering
Figure 2.1 Occurrences of Lean Methods in The Papers Reviewed. Methods That Appear
Only Once Are Omitted from The Results [7]
The aim of this project was to implement lean, six sigma and kaizen in the wet
processing department of textile industry by analyzing and limiting the processing
faults or by reducing the process waste.
They were scheduled to a single department of their respective industry which leads
to the improvement in the particular depart, if they had implemented it to some of
the other departs as well they would have increase the six sigma rating which
ultimately leads to save more cost as well as implementation of 5s in all departs
will lead to improve more processes efficiency and minimize wastages, on the other
hand we are implementing lean tools such as 5s, visual management and line
balancing in stitching, packing and dyeing department of the respective industry
which leads to the improvement in the working environment of various departments
such as reducing the man hour, idle time, excessive motion, unnecessary inventory
and over production.
There outcome precisely contain, that after the clear understanding of the problem
in define phase, the data of the faults generated in the processing department has
23
Department of Textile Engineering
been collected in the measure phase, the root cause analysis performed in the
analyze phase to segregate the root causes of the faults occurring in the processing
department. Corrective action plans were suggested to eliminate these faults in the
improve phase. Six Sigma was applied in the control phase after the corrective
action plans are taken. After the implementation of some corrective action plans the
sigma ratings had increased and the continues cycle kaizen is implemented in the
dyeing department of the respective mill. After performing a root cost analysis to
prevent the problem from arising again, the results are implemented, and the
processing cost decreased. The control phase ensured the successful
implementation to sustain improvement and to achieve long term process control.
Their aim was to increase the efficiency and productivity of stitching floors
producing home textile products in YOUNUS TEXTILE MILLS through system
simplification, process standardization, reducing waste and incremental
improvements by using modern techniques like kaizen and lean. As can be seen
that this project is bound to the stitching department only which limit their work to
the mentioned department along with which the overall improvement of the
industry is also up to a certain limit, on the other side our project of implementing
lean on stitching, packing and dyeing department helps to improve various aspects
in the mentioned departments.
There outcome concludes that, the 5S implementation ensures that the workplace
of the sub store of YOUNUS TEXTILE MILLS has been organized, tidy and was
made more efficient. By removing many unnecessary items, the waste of waiting
and inventory has been reduced and by arranging the things and standardizing them
had reduced the waste of motion up to 3-5% as the item are now easier to find.
Clean and comfortable environment of the store was achieved, and the checker was
made responsible to sustain these changes and check them on daily basis to achieve
continues improvement. [8]
24
Department of Textile Engineering
Lean manufacturing principles have been implemented in many different industries for
several years. A hierarchical approach to implementing lean is proposed. The sides of the
pyramid are shown as a cycle of arrows because implementing lean is a continuous process
that involves all the levels, and all the efforts should focus on improving customer
satisfaction.
Implementation of lean manufacturing should begin with Policy Deployment tools to
initiate cultural changes. Resistance to change by both management and shop floor workers
was most often cited as a barrier to implementing lean. Policy Deployment methods get
the workforce actively involved in the lean process. The next level is Visual Management.
Visual Management based projects build a foundation of stability in the process and may
provide early successes with using lean tools such as 5s and TPM. The next level is to
develop Continuous Improvement based projects. Shop floor personnel can identify areas
for improvements and use tools such as Rapid Improvement analysis and mistake proofing
devices. Building on the continuous improvement efforts, Standardized Work tools are
used to develop standard operating practices and set cycle times to meet customer
requirements. The final level is Just-In-Time tools, such as Kanban, supermarkets, and
quick changeover, which reduce waste such that the customer gets the right product at the
right time, directly impacting customer satisfaction.
VSM is shown outside of the pyramid, as it can be used for all levels of the Lean
Implementation Model [9].
25
Department of Textile Engineering
CHAPTER 3 5S
3.1 SCOPE
The 5S activity is to improve efficiency by eliminating waste of motion looking for tools,
information, and material etc. Other benefits of 5s activity include improved safety and
working environment.
26
Department of Textile Engineering
Figure 3.2 Non organized placement of tools and accessories in the shelves
27
Department of Textile Engineering
Figure 3.4 Improper stacking of trolleys in front of wash box in dyeing department
Figure 3.5 Trim card not properly visible and updated by the time
28
Department of Textile Engineering
Figure 3.6 Bobbins and tools were not arranged according to their colors in their
respective shelves and marking of shelves needed
Figure 3.7 Overloaded piles of towels that were ready to dispatch for inspection but due
to the lack of responsibility in workers no one was available to do the job
29
Department of Textile Engineering
Figure 3.9 No proper identification on the crates and trollies was observed
30
Department of Textile Engineering
31
Department of Textile Engineering
32
Department of Textile Engineering
33
Department of Textile Engineering
Figure 3.17 Proper arrangements of the bobbins, accordingly with respect to their
colors needed. Tag each shelf with respect to its color
34
Department of Textile Engineering
35
Department of Textile Engineering
36
Department of Textile Engineering
37
Department of Textile Engineering
Figure 3.22 Bobbins were not arranged according to their colors in their
respective shelf’s. Marking of shelf’s needed
Figure 3.23 Proper arrangements of the bobbins, accordingly with respect to their colors
needed. Tag each shelf with respect to its color
38
Department of Textile Engineering
39
Department of Textile Engineering
40
Department of Textile Engineering
How would you rate the order of placement of items? Is the placement proper
7
Set in order and within hand reach?
Is there anything obstructing that may cause excessive motion of human and
9
material?
10 Is there any dirt & dust available specially on machine/tools & equipment?
41
Department of Textile Engineering
Is updated 5S area map available at visible places? (Applicable for offices and
20
maintenance rooms)
Is there an item list present outside the cupboard mentioning what is inside it?
21
(Applicable for offices and maintenance rooms)
42
Department of Textile Engineering
3.3.6 SUSTAIN
1. Assign the time to do it
2. Start from the top
3. Create a reward system
4. Get everyone involved
5. Let them see it
3.4 OUTCOME
After implementing the 5s in stitching and packing department, it’s been observed that the
work force and management become more organized and aware of keeping the floor space
managed which leads to the improvement in many aspects such as workers are more aware
of keeping the things on its pre decided place and so they are capable of utilizing the
available space more effectively along with it flexibility to workers is also provided which
leads to balance process line and avoid variations.
Audit scores of various departments before and after implementation of lean tools are as
follows:
The result shows the significant improvement in the lean scores of the mention departments
of the industry.
43
Department of Textile Engineering
44
Department of Textile Engineering
45
Department of Textile Engineering
8. Items used less frequently than on a weekly basis but are still needed for current
work will be stored in a red tag area. All items in this red tag area will have a
designated and neatly labeled location for storage.
46
Department of Textile Engineering
4.1 INTRODUCTION
Visual Management is used to understand the situation easily by looking at it. The objective
of visual management is to get as much information as possible with as little observation
or time as possible. Visual Management is a lean tool employed in many places where
information is communicated with the help of visual signals instead of texts or other written
instructions. The design allows quick recognition of the information need to be
communicated to increase efficiency and clarity.
There are different directions we can go with visual management.
47
Department of Textile Engineering
Figure 4.2 & Figure 4.3 Visual Management with Markings [10]
48
Department of Textile Engineering
49
Department of Textile Engineering
50
Department of Textile Engineering
51
Department of Textile Engineering
52
Department of Textile Engineering
53
Department of Textile Engineering
Figure 4.14 proper arrangement and tagging has been done to the shelves in the stitching
department
54
Department of Textile Engineering
55
Department of Textile Engineering
56
Department of Textile Engineering
5.1 DEFINITION
Line balancing is an assembling function in which whole collection of production line tasks
are divided into equal portions. Well balanced lines avoid labor indolence and improve
productivity.
It is believed that Line Balancing (LB) is the problem of assigning operations to
workstations along an assembly line, in such a way that the assignment be optimal in some
sense. LB has been an optimization problem of significant industrial importance: the
efficiency difference between an optimal and a sub-optimal assignment can yield
economies (or waste) reaching millions of dollars per year.
57
Department of Textile Engineering
5.2.1 OBSERVATION 1
This time and motion study were done in the packing department of the industry, of the
product having quality code K2752-TWLIIKPA, having total 7 inline workers. 22 pieces
per carton are prepared over here.
58
Department of Textile Engineering
AS IS:
Central Packing
22 pieces/ carton
Figure 5.2 Data Collected from Time Motion Study of Central Packing Department
300.00
250.00
Work Division
200.00
150.00
Series1
100.00
50.00
0.00
1 2 3 4 5 6
Station
Figure 5.3 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department
59
Department of Textile Engineering
TO BE:
Central Packing
22 pieces/ carton
Figure 5.4 Data Collected from Time Motion Study of Central Packing Department
160.00
140.00
120.00
Work Division
100.00
80.00
40.00
20.00
0.00
1 2 3 4 5 6
Station
Figure 1.5 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department
60
Department of Textile Engineering
5.2.2 ANALYSIS FROM THE DATA COLLECTED FROM THE TIME MOTION
STUDY OF CENTRAL PACKING DEPARTMENT
The time motion study 1 is of the product whose quality code is K2752-TWLIIKPA
running in the central packing department of the industry. The as is situation of this studies
shows that the line is unbalanced and so variations may observe, which leads to increase
the idle time for the next station.
Station 5 is taking the maximum time to complete its assigned task, because of which
station 6 has to wait for its input which directly correlates with the waiting and variation in
the processing line.
Therefore, what need to be done is to balance the number of workers within the assembly
line by redistributing them in a way that no station would face the waiting time and
variations are reduced. So here, in the to be situation of the studies it is shown, if one
worker from the station 2 is transferred to the station 5 which is taking the maximum time,
it’s working efficiency is increased with the reduction in the idle time along with the
reduction in the variations of the processing line.
5.2.3 OBSERVATION 2
This time and motion study were done in the packing department of the industry, of the
product having quality code PEPCO12*12, having totaled 25 inline workers. 12 packets
rolls are prepared for a single poly and one packet roll contain 3 pieces of the product.
61
Department of Textile Engineering
AS IS:
Central Packing
Figure 5.6 Data Collected from Time Motion Study of Central Packing Department
30.00
25.00
20.00
Work Division
15.00
Work Division
10.00
5.00
0.00
1 2 3 4 5
Station
Figure 5.7 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department
62
Department of Textile Engineering
TO BE:
Central Packing
Figure 5.8 Data Collected from Time Motion Study of Central Packing Department
25.00
20.00
Work Division
15.00
5.00
0.00
1 2 3 4 5
Station
Figure 5.9 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department
63
Department of Textile Engineering
5.2.5 OBSERVATION 3
This time and motion study were done in the packing department of the industry, of the
product having quality code KS2860/9(AVP), having totaled 9 inline workers. 10 pieces
per carton are prepared over here.
64
Department of Textile Engineering
AS IS:
Central Packing
Quality: KS2860/9(AVP)A Colour code:K2529
Cycle Time (sec)
Operation No. of workers PCS per Reading 1 2 3 4 5 AVG time/PC Allowance Work Division
Station 1 Folding 4 10 50 57.5 47.5 70 57.5 56.5 64.975 16.24
Station 2 Tags Insertion 2 10 47.5 55 60 55 60 55.5 63.825 31.91
Station 3 Inspection 2 10 70 60 62.5 55 70 63.5 73.025 36.51
Station 4 Carton making 1 10 25 22 25 24 23 23.8 27.37 27.37
10pcs/Carton
Figure 5.10 Data Collected from Time Motion Study of Central Packing Department
40.00
35.00
30.00
Work Division
25.00
20.00
10.00
5.00
0.00
1 2 3 4
Station
Figure 5.11 Graphical Representations of Data Collected from Time Motion Study of
Central Packing Department
65
Department of Textile Engineering
5.2.6 ANALYSIS FROM THE DATA COLLECTED FROM THE TIME MOTION
STUDY OF CENTRAL PACKING DEPARTMENT
The current scenarios can be observed of the processing line have a product of quality code
KS2860/9(AVP). It is observed that station 1 is taking the minimum time for the
completion of its task while station 3 is taking the maximum time for the completion of its
task. This leads to the variation in the assembly line.
5.2.7 OBSERVATION 4
This time and motion study were done in the packing department of the industry, of the
product having quality code 11*11/11 OL having totaled 20 inline workers. 6 polies per
carton are prepared and single poly contains 4 packs, and each pack carries 9 pieces of the
product.
66
Department of Textile Engineering
AS IS:
Central Packing
AS-IS
Quality: 11*11/11 OL
Cycle Time (sec)
Operation No. of workers PCS per Reading 1 2 3 4 5 AVG time/PC Allowance Work Division
Station 1 Folding of the wash cloths 8 36 24 20 20 24 24 22.4 25.76 3.22
Station 2 Count, Mix & Sepration 2 36 10.6 12 10.6 10.6 10.6 10.88 12.512 6.26
Station 3 Lable folding 3 36 17.3 24 18.6 16 17.3 18.64 21.436 7.15
Station 4 Tags Insertion 2 36 2.8 1.83 2 2 2.16 2.158 2.4817 1.24
Station 5 Inspection 3 36 26.6 20 29.3 21.3 25.3 24.5 28.175 9.39
Station 6 Poly packaging(bag) 1 36 10.6 13 8.6 14.3 11 11.5 13.225 13.23
Station 7 Poly Sealing 1 36 9.6 8.3 13 5.3 9 9.04 10.396 10.40
6 poly/ carton
4 packs/poly
9Pcs/pack
14.00
12.00
10.00
Work Division
8.00
6.00
Work Division
4.00
2.00
0.00
1 2 3 4 5 6 7
Station
67
Department of Textile Engineering
TO BE:
Central Packing
TO-BE
Quality: 11*11/11 OL
Cycle Time (sec)
Operation No. of workers PCS per Reading 1 2 3 4 5 AVG time/PC Allowance Work Division
Station 1 Folding of the wash cloths 6 36 24 20 20 24 24 22.4 25.76 4.29
Station 2 Count, Mix & Sepration 2 36 10.6 12 10.6 10.6 10.6 10.88 12.512 6.26
Station 3 Lable folding 3 36 17.3 24 18.6 16 17.3 18.64 21.436 7.15
Station 4 Tags Insertion 1 36 2.8 1.83 2 2 2.16 2.158 2.4817 2.48
Station 5 Inspection 4 36 26.6 20 29.3 21.3 25.3 24.5 28.175 7.04
Station 6 Poly packaging(bag) 2 36 10.6 13 8.6 14.3 11 11.5 13.225 6.61
Station 7 Poly Sealing 2 36 9.6 8.3 13 5.3 9 9.04 10.396 5.20
6 poly/ carton
4 packs/poly
9Pcs/pack
216
8.00
7.00
6.00
Work Division
5.00
4.00
2.00
1.00
0.00
1 2 3 4 5 6 7
Station
68
Department of Textile Engineering
5.2.8 ANALYSIS FROM THE DATA COLLECTED FROM THE TIME MOTION
STUDY OF CENTRAL PACKING DEPARTMENT
The as is situation of time motion study no. 4 which has a quality code of 11*11/11 OL,
indicates that the station 6 is taking the maximum time for the completion of its pre define
work which becomes a bottle neck for the processing line, while station 4 is taking the
minimum time.
The subsequent line can be balanced by adjusting the number of workers from station 1 to
station 6, as well as from station 4 to station 5 which reduces variations in the processing
line.
69
Department of Textile Engineering
CHAPTER 6 SIMULATION
6.1 DEFINITION
Simulation is the reproduction of a real system and its dynamic processes in a model. The
aim is to achieve transferable findings for reality. In a wider sense, simulation means
preparing, implementing, and evaluating specific experiments using a simulation model.
We have suggested propositions through plant simulation software in the dyeing
department of the industry, the respective suggestions need to be considered for the
effective use of man and machine, and to have a balance processing line which will
effectively reduce the waiting’s and blockage in the line as well.
70
Department of Textile Engineering
71
Department of Textile Engineering
72
Department of Textile Engineering
73
Department of Textile Engineering
74
75
Figure 6.7 Plant Simulation of Dyeing Department
Department of Textile Engineering
76
Figure 6.8 Plant Simulation of Dyeing Department
Department of Textile Engineering
77
Figure 6.9 Complete Dyeing Floor chart
Department of Textile Engineering
Department of Textile Engineering
INTERPRETATION PROPOSITION
1 The Graph in the figure 6.10 shows that there What we could do is to either remove 1 or 2 cold
is some blockage in the Cold Pad Batch pad batch machine or instead we could add one
machine which shows that the output of Cold more wash box in place, so the input capacity of
Pad Batch machine is much higher than the wash box machines does increase along with less
input capacity of the next subsequent blockage in cold pad batch machine.
machine which is Wash Box.
2 From Simulation we got to know that the
combined output of the Cold Pad Batch
1,2,3,4 machine at 29% working is 11094.44
kg/8hrs.
3 And The combined output of Wash box 1,2
at 58% working is 11094.16 kg/8hrs.
78
Department of Textile Engineering
Table 6.2 Analysis and proposition for Dyeing Department (Full Bleach)
INTERPRETATION PREPOSITION
1. The Graph in the figure 6.11 shows that there Here, what we could do is to run single J-box so
is some blockage in the J Box 1, 2 machine excess inventory in avoided.
which shows that the output of J Box 1,2
machine is higher than the input of the next
subsequent machine which is MCS 2,3 Wash.
2. From Simulation we got to know that the
combined output of the J Box machine at
61% working is 11661.44 kg/8hrs.
3. And The combined output of MCS 2,3 at
62% working is 11660.8 kg/8hrs. [9]
79
Department of Textile Engineering
As IS
80
70
60
Percentage
50
40
30
20
10
0
washbo washbo
cpd 1 cpd 2 cpd 3 cpd 4
x1 x2
Working 29.49 29.49 29.49 29.49 58.97 58.97
Waiting 3.5 3.5 3.5 3.5 41.03 41.03
Blocked 67.01 67.01 67.01 67.01 0 0
80
Department of Textile Engineering
AS IS
MACHINE PRODUCTION/8HR
WORKING WAITING BLOCKED
NAME (METER)
CPD 1 29.49 3.5 67.01
CPD 2 29.49 3.5 67.01 39636
CPD 3 29.49 3.5 67.01
CPD 4 29.49 3.5 67.01
WASHBOX 1 58.97 41.03 0
39634
WASHBOX 2 58.97 41.03 0
81
Department of Textile Engineering
PROPOSITION 1
70
60
50
Percentage
40
30
20
10
0
washb washb washb
cpd 1 cpd 2 cpd 3 cpd 4
ox 4 ox 1 ox 3
Working 37.84 38.02 37.84 38.02 50.19 50.2 51.32
waiting 58.26 58.44 58.26 58.44 49.81 49.8 48.68
Blocked 3.9 3.54 3.9 3.54 0 0 0
82
Department of Textile Engineering
83
Department of Textile Engineering
PROPOSITION 2
70
60
50
Percentage
40
30
20
10
0
cpd 3 cpd 4 washbox 1 washbox 3
Working 58.97 58.97 58.97 58.97
Waiting 6.97 6.97 41.03 41.03
Blocked 34.06 34.06 0 0
84
Department of Textile Engineering
85
Department of Textile Engineering
PROPOSITION 3
90
80
70
Percentage
60
50
40
30
20
10
0
washbox washbox washbox
cpd 3 cpd 4
1 3 4
Working 76.42 75.3 50.57 50.57 50.57
Waiting 19.46 22.51 49.43 49.43 49.43
Blocked 4.12 2.19 0 0 0
86
Department of Textile Engineering
87
Department of Textile Engineering
CHAPTER 7 CONCLUSIONS
7.1 ANALYZE
So far we have come across to the technical analysis of the time motion study of dyeing
and packing department of various production lines. , along with the simulation of current
scenarios of the dyeing and packing department, which further clarifies the active working
environment that is been followed in the processing line for the manufacturing of the end
product. Propositions have been suggested for dyeing department which not only increases
the working efficiency of machines but also blockage and waiting of the machinery is
reduced.
We have also analyzed the current situation of the departmental floors by means of visual
management and 5s to identify the areas for improvement with respect to them.
7.2 OUTCOME
The outgrowth of our performed tasks is the implementation of 5S which direct towards
the sorting of process and procedures involved in production line , set in order some
mismanaged processes and shine the floor space by means of minimizing floor waste with
the help of various ideas such as by placing a polythene bag on each table along the grader
and by placing the cleaning schedule upfront, which need to be updated by the end of each
day with further modifications in the arrangement of products so the necessary items
remain in the hand reach of every worker.
We have also come across to the boards of visual management which will quantify and
analyze the daily production line of the particular department, which will give you a
complete guideline about the daily production, specify lean team members, final and inline
audit failure percentages, ratio of faults that occur on daily basis, safety, number of in
working machines and workers.
88
Department of Textile Engineering
5. The implementation of all the corrective action plans and control to sustain the
solutions. Track the results so that any drift back to previous results can be
monitored and addressed in a proactive manner.
7.3.1 IN 5S
We have implemented sort, set in order and shine components of 5s tool on floor space. To
standardized and sustain the implemented actions weekly audits need to be held to ensure
continuous improvement. Reward system for the appreciation of an active worker need to
come in action.
89
Department of Textile Engineering
REFERENCES
1. Pereira LG, Tortorella GL. A literature review on lean manufacturing in small
manufacturing companies. InProgress in Lean Manufacturing 2018 (pp. 69-89).
Springer, Cham.
2. Vinodh S, Joy D. Structural equation modeling of lean manufacturing practices.
International Journal of Production Research. 2012 Mar 15;50(6):1598-607.
3. Hama Kareem JA, Talib NA. A review on 5S and total productive maintenance and
impact of their implementation in industrial organizations. Advanced Science
Letters. 2015 May 1;21(5):1073-82.
4. BHARAMBE V, PATEL S, MORADIYA P, ACHARYA V.
IMPLEMENTATION OF 5S IN INDUSTRY: A REVIEW.
5. Chen JC, Chen CC, Lin YJ, Lin CJ, Chen TY. Assembly line balancing problem of
sewing lines in garment industry. In Proceedings of the 2014 International
Conference on Industrial Engineering and Operations Management Bali, Indonesia
2014 Jan 7 (pp. 7-9).
11. https://www.clarityvisualmanagement.com/wp-content/uploads/2017/08/Forbo-
Clarity-VM-Board2.jpg