BILL OF QUANTITIES

FOR

PROPOSED RENOVATION OF LARGE DINING HALL

AT

FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU


IMUSIN, OGUN STATE

BILLS OF QUANTITIES

FEBRUARY, 2020

Page 1 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

PRELIMINARIES

Page 2 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Allow provisional sum of N100,000.00 (One Hundred


Thousand Naira Only) to cover the following items under
preliminaries.

(D20) EXCAVATION AND EARTHWORK


Information
The work in this section comprises excavations,
laterite and hardcore fillings, reinforced raft ground
beams, lift shaft walls, sump pit and other ancillary
works up to and including ground floor slab

A Insurance
B Levels and Setting out of works
C Temporary Offices and Storage accomodation
(Including Removal)
D Welfare and Safety
E Contractor to provide paint, Scafolding etc
F Protection against damage
G Telephone
H Water for works
J Testing Materials
K Clearing rubbish and leaving perfect Sum 100,000
L Site board
M Progress Chart
N Progress Photographs
P Defects after completion
Q Exterminate and Prevent Test
R Watching and Lighting
S Temporary lighting and power
T Site meetings
U Temporary disposal of rain water
V National profident fund
W Foreman - in - Charge
X Supervision
Y Temporary messroom
Z Temporary Sanitation accommodation.

Preliminaries 100,000.00
Carried to General Summary 100,000.00

Page 3 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

LARGE DINING HALL

Page 4 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


1NOS MAIN DINING HALL BLOCK

DEMOLITION

Allow a provisional sum for removal of existing roofing


sheets Sum

ROOF CONSTRUCTION AND COVERING


G20: TIMBER CARCASSING

Allow a provisional sum for repairs to and including raising


of the roof carcassing to approved heights by the Architect
and replacement of spoilt Hardwood Timber roof members
well seasoned and treated with solignum in:
A 75 x 100mm wall plates m

B 50 x 150mm King Post @ 1200mm c-c m

C 50 x 150mm tie beam @ 1200mm c-c m

D 50 x 150mm rafters @ 1200mm c-c m

E 50 x 75mm purlins @ 900mm c-c m

F 50 x 100mm structs m

G 50 x 50 noggins m -

H 38mm x 280mm deep Hardwood facia board m

H72: ALUMINIUM STRIP/SHEET COVERING/FLASHINGS

Replace existing galvanised roofing sheets with 0.55m gauge


long span Aluminium roofinh sheet nailed to purlins at
900mm centres (Measured Separately) in accordance with
manufacturer's instruction complete with associated linings
and accessories.
A Covering m2 -
B Ridge Cap 600mm girth m -
C Valley gutters 600mm girth m -
D Eaves angles m -

Roof Construction and Covering carried to summary -

Page 5 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


DOORS AND WINDOWS
L20:DOORS AND WINDOWS
STEEL DOOR

Supply andd install the 70mm thick Metal casement security


steel door, single swing from approved manufacturer, and
repair existing metal doors.

Complete with 50mm x 230mm steel frame, sub frame and


Ironmongery, plugged to blockwall / concrete grouted with
cement and sand (1:3) and fixing cramp to suit opening.

Repair Existing Double leaves casement entrance door, size


A 1800mm x 2100mm high. 6 Nr 20,000.00 120,000.00
-
B New Double leaves:Size 1200mm x 2100mm high Nr -
-
C Single Leaf Metal door size 900mm x 1200mm high Nr -

WOODEN DOOR

Quality 50mm thick hardwood solid core panel door,


complete with well treated door frames, Sub frames,
architrave and iron mongeries: or equal and approved
manufacturer: factory finished with hardwood lipping on all
edges and fixing cramp to suit opening.

D Single Leaf door size 900mm x 1200mm high Nr -

E Single Leaf door size 750mm x 1200mm high Nr -

ALUMINIUM PROFILE FRAME CASEMENT WINDOW


COMPLETE WITH SLIDE NETTINGS

Replace existing louvre glazed window opening with approved


standard powder coated casement aluminium windows profiles
complete with necessary iron mongeries, 5mm thick tinted
glazing complete with netting and approved burglar proofing
security measured separately with quality accessories and
builders work making good in:

F Size 2400mm x 1200mm High Nr -

G Size 1200mm x 1200mm High Nr -

H Size 2400mm x 600mm High Nr -

I Size 600mm x 600mm High Nr -

J Allow for repair of Existing Steel burglar proofing 1.0 LS 75,000.00 75,000.00

Door and Windows carried to Summary


195,000.00

Page 6 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


SURFACE FINISHES
Wall
M20: PLASTERED / RENDERED / ROUGHCAST
Mortar, cement and sand (1:3); rendering on blockwall and
screeded backing

12mm thick rendering on additional blockwall above wall plate


A level internally and externally m2 -

B Ditto 12mm thick rendering on defective interior walls m2 -

C 12mm thick backing on walls to receive tiles m2 -

D Plain, width not exceeding 300mm m2 -

250 x 400 x 6mm white glazed vitrified ceramic wall tiles laid
on wall with built joint including painting with colour matching
cement tiles not lower than N1100/m2
E Walls m2 -

F Plain, width not exceeding 300mm m2 -

Floor
M10: SAND CEMENT / CONCRETE / SCREEDS /
TOPPINGS
Mortar, cement and sand (1:3); screeded backing
G 40mm thick on floor to receive tiles 1,080.0 m2 800.00 864,000.00

H plain, width not exceeding 100mm 134.0 m2 100.00 13,400.00

M40: STONE / CONCRETE / QUARRY / CERAMIC /


TILING / MOSIAC
unpolished vitrified floor tiles, buff; 3 joints,

symmetrical layout; bedding in cement mortar (1:3); laid on


floor with built joint including painting with colour matching
cement. Tiles not lower than N1600.00/m2

J on floor 1,080.0 m2 3,500.00 3,780,000.00

K Plain, width not exceeding 100mm 134.0 m2 250.00 33,500.00

1200mm x 1200mm Asbestos free flat sheet nailed to


1200mm x 1200mm hardwood noggings measured separately
finished to manufacturer's fixing details

L On Interior ceiling m2 -

M Ditto exterior ceiling m2 -

Surface Finished Carried to Summary 4,690,900.00

Page 7 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


PAINTING AND DECORATION
M60: PAINTING AND DECORATION

Prepare and apply three full coats of emulsion paint as


approved on the following:

A Walls internally and externally 1,527.6 m2 750.00 1,145,700.00

B Soffit of ceiling sheets internally and externally 1,080.0 m2 750.00 810,000.00

C Plain, width not exceeding 300mm 400.0 m2 200.00 80,000.00

D Isolated column and beam 100.0 m2 750.00 75,000.00

Prepare and apply two full coats of glass paint as approved


on the following:

E Fascia board in gloss finish 200.0 m 400.00 80,000.00

All casement metal doors, windows and hardwood doors in gloss


F finish 200.0 m2 400.00 80,000.00

Painting and Decoration Carried to Summary 2,270,700.00

Page 8 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

EXTERNAL WORKS

Page 9 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


EXTERNAL WORKS

Provide and lay 900mm wide x 100mm thick concrete floor


(1:2:4 Mix), around the perimeter of the dinning block as
A Directed by the Architect 8.7 m2 27,500.00 239,250.00

External Works Carried to Summary 239,250.00

Page 10 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

MECHANICAL INSTALLATION

Page 11 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MECHANICAL ENGINEERING INSTALLATIONS
Allow the P.C. sum of N 100,000.00 (one Hundred Thousand Sum 100,000.00
A Naira only) for any piping, internal pipe, surface pipe
soil pipe, and waste pipe details to architect specification

C Washing hand basin including all accessories 12 Nr 20,000.00 240,000.00

External Works Carried to Summary 340,000.00

Page 12 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ELECTRICAL ENGINEERING INSTALLATION

Page 13 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


ELECTRICAL ENGINEERING INSTALLATIONS

Allow the P.C. sum of N 400,000.00 (Four hundred Thousand Sum 400,000.00
naira only)
for the following internal electrical works:
Equipment and control gears
A Fittings and accessories
Conduits
Cables
i Final sub circuits
ii Earthing and Ancillaries
B Repair of Existing Ceiling Fans / Purchase of 10Nos Ceiling fans

External Works Carried to Summary 400,000.00

Page 14 of 68
Proposed Renovation of Mini Dining Hall at the Federal Science and Technical College. Ijebu Mushin.

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


GENERAL SUMMARY
1 PRELIMINARIES 100,000.00

2 MAIN DINNING HALL (Roof Construction and Covering) -

3 DOOR AND WINDOW 195,000.00

4 SURFACE FINISHES 4,690,900.00

5 PAINTING AND DECORATION 2,270,700.00

6 EXTERNAL WORKS 239,250.00

7 MECHANICAL INSTALLATION 340,000.00

8 ELECTRICAL ENGINEERING INSTALLATION 400,000.00

9 SUBTOTAL 8,235,850.00

10 ADD 2.5% CONTIGENCY 205,896.25

11 SUBTOTAL 8,441,746.25

12 ADD 5% CONTRACT ADMINISTRATION 422,087.31

13 SUBTOTAL 8,863,833.56

14 ADD 7.5% V.A.T 664,787.52

15 SUBTOTAL 9,528,621.08

MAIN DINING HALL


TOTAL =N= 9,528,621.08

Page 15 of 68
LIST OF EQUIPMENT FOR AGRIC ENGINEERING
S/N SOIL AND MECHANICS SECTION QUANTITY
1 Soil mositure meter 1
2 sieve (china type) 1
3 Psychrometer (digital) 1
4 Piezometer Tube 1
5 Condutivity meter 1
6 Density Bottle (50ml) 1
7 pH meter with probe 1
8 Anemometer 1
9 Mortar and Pestle 1
10 Weather station Equipment (Data logger) 1
11 Round bottom flask - 250ml 1
12 Round bottom flask - 500ml 1
13 Beaker - 250ml 1
14 Beaker - 500ml 1
15 Measuring cylinder - 250ml 1
16 Measuring cylinder - 500ml 1
17 Glass funnel (Small) 1
18 Glass funnel (Medium) 1
19 Thermometer 1
20 Stop watch 1
21 pH/EC/TDS/Temperature meter 1
22 2inches PVC pipe 300
23 Soil Testing kit 1
24 Flow gauge (submerssible) 1
25 Tensiometer (30cm, 50cm, 100cm) 1
26 Centrifugal pump (3inches) 1
27 Transfer pump (3 inches) 1

WELDING AND MACHNIERY SECTION


1 Engineering Tape 5
2 Surveyors Tape 1
3 Welding Apron 3
4 Twist drill box 1
5 Welding shield 3
6 wire brush 3
7 Tapping Hammer 3
8 Set of files (smooth, rough,m-flat, round) 2
9 Welding tong 5

HANDWRITTEN COMPILED LIST


1 High tension fibre ladder 2
2 multipurpose ladder / collapsible one 2
3 Compression Tester 1
4 Cylinder bore gauge 1
5 Value spring tester 1
6 Injection nozzle tester 1
7 Dynamometer 1
8 Placimeter 1
9 Transducers 1
10 Spark Plug Testers 1
11 Oil pressure gauge 1
12 Glenometer 1
13 Distributor Tester 1
14 Weighing Balance 1
15 Hydrometer 1
16 Water level indicator 1
17 Ground water sampler 1
18 Water Sampler 1
19 Flow meter 1
20 Weirs 1
21 Flumes 1
22 Water Control gates 1
23 Raing gauges 1
24 Soil Mositure Tester 1
25 Grain moisture tester 1
26 Hydrometer 1
27 Perimometer 1
28 Psychometer 1
29 Thermometer (Assorted) 1
30 Thermocouples (Various sensitivity) 1
31 Pheometer 1
32 Viscometer 1
33 Compression gauge 1
34 Extensometer 1
35 Tension jig 1
CAPITAL PROJECTS 2022

BILL OF QUANTITIES

FOR

PROPOSED RENOVATION OF PRINCIPAL'S QUARTERS

AT

FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU


IMUSIN, OGUN STATE

BILLS OF QUANTITIES

MAY, 2022

Page 18 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Allow provisional sum of N100,000.00 (One Hundred and


Thousand Naira Only) to cover the following items under
preliminaries.

(D20) EXCAVATION AND EARTHWORK


Information
The work in this section comprises excavations,
laterite and hardcore fillings, reinforced raft ground
beams, lift shaft walls, sump pit and other ancillary
works up to and including ground floor slab

A Insurance
B Levels and Setting out of works
C Temporary Offices and Storage accomodation
(Including Removal)
D Welfare and Safety
E Contractor to provide paint, Scafolding etc
F Protection against damage
G Telephone
H Water for works
J Testing Materials
K Clearing rubbish and leaving perfect Sum 100,000
L Site board
M Progress Chart
N Progress Photographs
P Defects after completion
Q Exterminate and Prevent Test
R Watching and Lighting
S Temporary lighting and power
T Site meetings
U Temporary disposal of rain water
V National profident fund
W Foreman - in - Charge
X Supervision
Y Temporary messroom
Z Temporary Sanitation accommodation.

Preliminaries 100,000.00
Carried to General Summary 100,000.00

Page 19 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MAIN BUILDING

PERIMETER BLOCKWALL / PARTITION / COMPOUND FLOOR

C Excavate foundation trench exceeding


0.30m width, maximum depth not exceeding
2.00m starting at stripped level 48 m3 -

E Disposal of excavated material/Removed surplus


Remove excavated material from site distance 38 m3 -
not exceeding 100 meters and deposit, spread and
level where directed

Plain in-situ conrete; B.S.5328, designed


mix C20, 20 aggregate, minimum cement content
304 kg/m3; vibrated
D Foundation bed 225mm thick 8.75 m3 -
C Ditto in column base 1.5 m3 -
E Oversite floor /Step slab 100mm thick 28 m3 -
E RC Column (rate to include shuttering and Reinforcement) 1.25 m3 -

Superior quality hollow sandcrete blockwall


bedded and jointed in cement sand mortar (1:6 )
with cavities filled solid with plain in-situ concrete
(1:2:4)

A Wall 225mm thick 150 m2 -

Blockwall carried to summary carried to summary -

Page 20 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MAIN BUILDING
ROOF CONSTRUCTION AND COVERING
G20: TIMBER CARCASSING

Allow a provisional sum for repairs roof carcassing including


increasing (king post and other wooden members by 600mm
or to approved heights by the Engineer and replacement of
spoilt Hardwood Timber roof members well seasoned and
treated with solignum in:
A 75 x 100mm wall plates m

B 50 x 150mm King Post @ 1200mm c-c m

C 50 x 150mm tie beam @ 1200mm c-c m

D 50 x 150mm rafters @ 1200mm c-c m Sum 150,000.00

E 50 x 75mm purlins @ 900mm c-c m

F 50 x 100mm structs m

G 50 x 50 noggins m -

H 38mm x 280mm deep Hardwood facia board m

H72: ALUMINIUM STRIP/SHEET COVERING/FLASHINGS

Replace existing galvanised roofing sheets and Provide New


roofing sheets to extension at the front of the dining hall
with 0.45m gauge long span Aluminium roofing sheet nailed
to purlins at 900mm centres (Measured Separately) in
accordance with manufacturer's instruction complete with
associated linings and accessories.
A Covering 500.0 m2 -
B Ridge Cap 600mm girth 38.0 m -
C Valley gutters 600mm girth 25.0 m -
D Eaves angles 25.0 m -

Roof Construction and Covering carried to summary

Page 21 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


DOORS AND WINDOWS
L20:DOORS AND WINDOWS
STEEL DOOR

Supply / Repair existing metal door with not less than 70mm
thick Metal casement security steel door, single swing with
minimum of 3-metal hinge

Complete with 50mm x 230mm steel frame, sub frame and


Ironmongery, plugged to blockwall / concrete grouted with
cement and sand (1:3) and fixing cramp to suit opening.
Provide imported security door to entrance and exit of
A
buildings:
1200mm x 2100mm 1 Nr -

WOODEN DOOR

Provide and Install quality imported 50mm thick hardwood


solid core panel door, complete with well treated door
frames, Sub frames, architrave and iron mongeries: or
equal and approved manufacturer: factory finished with
hardwood lipping on all edges and fixing cramp to suit
opening.

B Single Leaf door size 900mm x 1200mm high 5 Nr -

C Single Leaf door size 750mm x 1200mm high 3 Nr -

ALUMINIUM PROFILE FRAME CASEMENT / SLIDING


WINDOW COMPLETE WITH SLIDE NETTINGS

Replace existing louvre glazed window opening with approved


standard powder coated casement / sliding aluminium
windows profiles complete with necessary iron mongeries,
5mm thick tinted glazing complete with netting and approved
burglar proofing security measured separately with quality
accessories and builders work making good in:
F Size 1800mm x 1500mm High (Casement) 8 Nr -
G Size 1500mm x 1200mm High (Casement) 2 Nr -
I Size 600mm x 600mm High (Casement) 3 Nr -

J Allow for repair of Existing Steel burglar proofing including


verandah steel burglary. 1.0 LS 50,000.00 50,000.00

Door and Windows carried to Summary

Page 22 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


SURFACE FINISHES
Wall
M20: PLASTERED / RENDERED / ROUGHCAST
Mortar, cement and sand (1:3); rendering on blockwall and
screeded backing

A
12mm thick rendering on blockwall partition 350.0 m2 -

B Ditto 12mm thick rendering on defective interior walls 50.0 m2 -

C 12mm thick backing on walls to receive tiles 80.0 m2 -

D Plain, width not exceeding 300mm 10.0 m2 -

250 x 400 x 6mm white glazed vitrified ceramic wall tiles


laid on wall with built joint including painting with colour
matching cement tiles.
E Walls 80.0 m2 -

F Plain, width not exceeding 300mm 10.0 m2 -

Floor
M10: SAND CEMENT / CONCRETE / SCREEDS /
TOPPINGS
Mortar, cement and sand (1:3); screeded backing
G 40mm thick on floor to receive tiles 80.0 m2 -

H plain, width not exceeding 100mm 25.0 m2 -

M40: STONE / CONCRETE / QUARRY / CERAMIC /


TILING / MOSIAC
unpolished vitrified floor tiles, buff; 3 joints,

symmetrical layout; bedding in cement mortar (1:3); laid on


floor with built joint including painting with colour matching
cement.

J on floor 210.0 m2 -

K Plain, width not exceeding 100mm 25.0 m2 -

CEILING
Allow for removal of existing PVC ceilings, caefully removed
and stored. Refer to Engineers directive. Sum 50,000.00

L POP Ceiling finish for Internal use 165.0 m2 -

M 600mm x 600mm Asbestos ceiling finish for External use 200.0 m2 -

Surface Finished Carried to Summary

Page 23 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


PAINTING AND DECORATION
M60: PAINTING AND DECORATION

Prepare and apply three full coats of emulsion paint as


approved on the following:

A Walls internally and externally 620.0 m2 -

B Soffit of ceiling sheets internally and externally 180.0 m2 -

C Plain, width not exceeding 300mm 100.0 m2 -

D Perimeter Fence 258.0 m2 -

Prepare and apply two full coats of gloss paint as approved


on the following:
E Fascia board in gloss finish 80.0 m -

F All casement metal doors, windows and hardwood doors in gloss


finish 25.0 m2 -

Painting and Decoration Carried to Summary -

Page 24 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


EXTERNAL WORKS / PERIMETER FENCE

Provide and lay 500mm wide x 300mm thick concrete floor


A
(1:2:4 Mix), around the perimeter of the building as Directed
by the Engineer 30 m -

B Steel Entrance Gate attached to perimeter fence, with


allowance of pedestrian opening (3.6m width) - Double leaf 1 Nos -

C 225mm Blockwall Perimeter drainage (600mm x 600mm internal


opening) 20 m -

225mm Blockwall steps at Building entrance (rate to include


D
screeding) 8 m2 -

fabrication and installation of metal railings on perimeter


E
fence. Height not above 1.2m. 40 m -

F
Anti - climb security wires 75 m -

G
Allow for metal burglary at the main entrance to the building. 1 LS 150,000.00 150,000.00
External Works Carried to Summary

Page 25 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MECHANICAL ENGINEERING INSTALLATIONS
Pipe Services
Allow the P.C. sum of N250,000.00 (Two Hundred and Fifty Thousand
A Naira only) for any pipe fittings work in Sum 250,000.00
connection with plumbing installation, repair of existing

chambers. Evacution of septic tank and construction o f new


chambers
B W.C complete with all accessories 2 Nr -

C wash hand basin 2 Nr -

E Kitchen sink 1 Nr -

F Towel rail 2 Nr -

G Soap dish 2 Nr -

H Toilet roll holder 2 Nr -

J Mirror 450 x 450mm high 2 Nr -

K 2500 litres plastic water tank 1 Nr -

L Water stand 1 Nr -

F Provide Borehole around the Building 1.00 Nr -

FITINGS / FURNITURE
Ward Robe
A Ward Robe sizes 1800 x 600 x 3000mm high 3 No -

Kitchen cabinet
B Kitchen cabinet sizes 3900 x 600 x 900mm high 1 No -

Mechanical Engineering Installations Carried to Summary

Page 26 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


ELECTRICAL ENGINEERING INSTALLATIONS

Allow the P.C. sum of N 500,000.00 (Five hundred Thousand Sum 500,000.00
naira only)
for the following internal electrical works:
Equipment and control gears
A Fittings and accessories
Conduits
Cables
i Final sub circuits
ii Earthing and Ancillaries
iii Electrical lightings (internal and external)
B Purhase of:
i Ceiling Fans
ii Wall Fans
iii 1.5hp Split AC 1 No -
iv 1.0hp Split AC 1 No -

Electrical Engineering Installations Carried to Summary

Page 27 of 68
CAPITAL PROJECTS 2022

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


GENERAL SUMMARY
1 PRELIMINARIES 100,000.00

1 PERIMETER BLOCKWALL / PARTITION / COMPOUND FLOOR -

2 ROOF CONSTRUCTION AND COVERING -

3 DOORS AND WINDOWS -

4 SURFACE FINISHES -

5 PAINTING AND DECORATION -

6 EXTERNAL WORKS / PERIMETER FENCE -

7 MECHANICAL ENGINEERING INSTALLATIONS -

8 ELECTRICAL ENGINEERING INSTALLATIONS -

9 SUBTOTAL

10 ADD CONTIGENCY 100,000.00

11 SUBTOTAL

12 ADD 5% CONTRACT ADMINISTRATION -

13 SUBTOTAL -

14 ADD 7.5% V.A.T -

15 SUBTOTAL -

MAIN DINING HALL


TOTAL =N= -

Page 28 of 68
2022 capital projects

BILL OF QUANTITIES

FOR

PROPOSED RENOVATION OF SENIOR DINING HALL


.

AT

FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU


IMUSIN, OGUN STATE

BILLS OF QUANTITIES

MAY, 2022

Page 29 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Allow provisional sum of N100,000.00 (One Hundred


Thousand Naira Only) to cover the following items under
preliminaries.

(D20) EXCAVATION AND EARTHWORK


Information
The work in this section comprises excavations,
laterite and hardcore fillings, reinforced raft ground
beams, lift shaft walls, sump pit and other ancillary
works up to and including ground floor slab

A Insurance
B Levels and Setting out of works
C Temporary Offices and Storage accomodation
(Including Removal)
D Welfare and Safety
E Contractor to provide paint, Scafolding etc
F Protection against damage
G Telephone
H Water for works
J Testing Materials
K Clearing rubbish and leaving perfect Sum 100,000
L Site board
M Progress Chart
N Progress Photographs
P Defects after completion
Q Exterminate and Prevent Test
R Watching and Lighting
S Temporary lighting and power
T Site meetings
U Temporary disposal of rain water
V National profident fund
W Foreman - in - Charge
X Supervision
Y Temporary messroom
Z Temporary Sanitation accommodation.

Preliminaries 100,000.00
Carried to General Summary 100,000.00

Page 30 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


1NOS MAIN DINING HALL BLOCK

ROOF CONSTRUCTION AND COVERING

Allow a provisional sum for removal of existing roofing


sheets Sum 100,000.00

G20: TIMBER CARCASSING

Allow a provisional sum for repairs to and including


extension to the new corridor / verandah at the front of
the dining hall and increase roof carcassing (king post and
other wooden members by 600mm or to approved heights by
the Engineer and replacement of spoilt Hardwood Timber
roof members well seasoned and treated with solignum in:
A 75 x 100mm wall plates m

B 50 x 150mm King Post @ 1200mm c-c m

C 50 x 150mm tie beam @ 1200mm c-c m

D 50 x 150mm rafters @ 1200mm c-c m Sum 500,000.00

E 50 x 75mm purlins @ 900mm c-c m

F 50 x 100mm structs m

G 50 x 50 noggins m -

H 38mm x 280mm deep Hardwood facia board m

H72: ALUMINIUM STRIP/SHEET COVERING/FLASHINGS

Replace existing galvanised roofing sheets and Provide New


roofing sheets to extension at the front of the dining hall
with 0.55m gauge long span Aluminium roofing sheet nailed
to purlins at 900mm centres (Measured Separately) in
accordance with manufacturer's instruction complete with
associated linings and accessories.
A Covering 1,505.0 m2 -
B Ridge Cap 600mm girth 150.0 m -
C Valley gutters 600mm girth 150.0 m -
D Eaves angles 150.0 m -

E Allow for provision of felting to appropriate locations on roof sum 150,000.00

Roof Construction and Covering carried to summary

Page 31 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


DOORS AND WINDOWS
L20:DOORS AND WINDOWS
STEEL DOOR

Supply andd install the 70mm thick Metal casement security


steel door, single swing from approved manufacturer, and
repair existing metal doors.

Complete with 50mm x 230mm steel frame, sub frame and


Ironmongery, plugged to blockwall / concrete grouted with
cement and sand (1:3) and fixing cramp to suit opening.

Repair Existing Double leaves casement entrance door, size


A 1800mm x 2100mm high. 8 Nr -
New Double leaves:Size 1200mm x 2100mm high (3Nos store &
B 1no. Verandah) 4 Nr -
C New Single leave:Size 900mm x 2100mm high (Ext. Toilet) 1 Nr -

WOODEN DOOR

Quality 50mm thick hardwood solid core panel door,


complete with well treated door frames, Sub frames,
architrave and iron mongeries: or equal and approved
manufacturer: factory finished with hardwood lipping on all
edges and fixing cramp to suit opening.

D Double Leaf door size 1200mm x 2100mm high 1 Nr -

E Single Leaf door size 900mm x 2100mm high 2 Nr -

ALUMINIUM PROFILE FRAME SLIDING WINDOW


COMPLETE WITH SLIDE NETTINGS

Replace existing louvre glazed window opening with approved


standard powder coated sliding aluminium windows profiles
complete with necessary iron mongeries, 5mm thick tinted
glazing complete with netting and approved burglar proofing
security measured separately with quality accessories and
builders work making good in:

F Size 3000mm x 1200mm High 18 Nr -

G Size 3000mm x 600mm High 18 Nr -

H Size 1800mm x 1800mm High 4 Nr -

I Size 1200mm x 1200mm High 2 Nr -

J Size 600mm x 600mm High 4 Nr -

K Allow for repair of Existing Steel burglar proofing 1 LS 100,000.00 100,000.00

Door and Windows carried to Summary

Page 32 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


SURFACE FINISHES
Wall
M20: PLASTERED / RENDERED / ROUGHCAST
Mortar, cement and sand (1:3); rendering on blockwall and
screeded backing

12mm thick rendering on additional blockwall above wall plate


A level internally and externally 50.0 m2 -

B Ditto 12mm thick rendering on defective interior walls 50.0 m2 -

C 12mm thick backing on walls to receive tiles 50.0 m2 -

D Plain, width not exceeding 300mm 10.0 m2 -

250 x 400 x 6mm white glazed vitrified ceramic wall tiles


laid on wall with built joint including painting with colour
matching cement tiles.
E Walls 50.0 m2 -

F Plain, width not exceeding 300mm 10.0 m2 -

Floor
M10: SAND CEMENT / CONCRETE / SCREEDS /
TOPPINGS
Mortar, cement and sand (1:3); screeded backing
G 40mm thick on floor to receive tiles 850.0 m2 -
H plain, width not exceeding 100mm 100.0 m2 -
I 40mm Thick floor screed (Non-tiles area) 150.0 m2 -

M40: STONE / CONCRETE / QUARRY / CERAMIC /


TILING / MOSIAC
unpolished vitrified floor tiles, buff; 3 joints,

symmetrical layout; bedding in cement mortar (1:3); laid on


floor with built joint including painting with colour matching
cement.

J on floor 850.0 m2 -

K Plain, width not exceeding 100mm 100.0 m2 -

1200mm x 1200mm Asbestos free flat sheet nailed to


1200mm x 1200mm hardwood noggings measured separately
finished to manufacturer's fixing details
L On Interior ceiling 950.0 m2 -

M Ditto exterior ceiling 210.0 m2 -

Surface Finished Carried to Summary -

Page 33 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


PAINTING AND DECORATION
M60: PAINTING AND DECORATION

Prepare and apply three full coats of emulsion paint as


approved on the following:

A Walls internally and externally 1,750.0 m2 -

B Soffit of ceiling sheets internally and externally 1,250.0 m2 -

C Plain, width not exceeding 300mm 100.0 m2 -

D Isolated column and beam 50.0 m2 -

Prepare and apply two full coats of glass paint as approved


on the following:

E Fascia board in gloss finish 150.0 m -

F All burglary, doors and metal finish to the building 100.0 m2 -

Painting and Decoration Carried to Summary -

Page 34 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


EXTERNAL WORKS

Provide Grade 20 Reinforced Concrete (1:3:6) Mix: Rate to


Include formwork, reinforcement, concrete and making good
surfaces of the concrete.

External Columns at 3.0m spacing on the New Corridor


A Extension (0.45m x 0.225m x 3m) 4 m3 -
B Beams to Connect Columns (0.45m x 0.225m) 5 m3 -

External Works Carried to Summary -

Page 35 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MECHANICAL ENGINEERING INSTALLATIONS
Allow the P.C. sum of N 150,000.00 (One Hundred and Fifty Thousand Sum 150,000.00
A Naira only) for any piping, internal pipe, surface pipe
soil pipe, and waste pipe details to architect specification

B Washing hand basin including all accessories 12 Nr -

C 2000 litres plastic tank 1 Nr -

Water stand (0.75m elevated stand with 3Nos standpipe),to


include perimeter drainage wall around the water stand with
D floor drain and floor tiles. 1 LS 150,000.00 150,000.00

Mechanical Works Carried to Summary

Page 36 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


ELECTRICAL ENGINEERING INSTALLATIONS

Allow the P.C. sum of N 850,000.00 (Eight Hundred and Fifty Sum 850,000.00
Thousand naira only)
for the following internal electrical works:
Equipment and control gears
A Fittings and accessories
Conduits
Cables
i Final sub circuits
ii Earthing and Ancillaries
Repair of 10Nos Existing Ceiling Fans / Purchase of 30Nos New
B Ceiling fans

External Works Carried to Summary 850,000.00

Page 37 of 68
2022 capital projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


GENERAL SUMMARY
1 PRELIMINARIES 100,000.00

2 ROOF CONSTRUCTION AND COVERING -

3 DOORS AND WINDOWS -

4 SURFACE FINISHES -

5 PAINTING AND DECORATION -

6 EXTERNAL WORKS -

7 MECHANICAL ENGINEERING INSTALLATIONS -

8 ELECTRICAL ENGINEERING INSTALLATIONS

9 SUBTOTAL

10 ADD CONTIGENCY 100,000.00

11 SUBTOTAL

12 hklm8h h bn7yuih -

13 SUBTOTAL -

14 ADD 7.5% V.A.T -

15 SUBTOTAL -

MAIN DINING HALL


TOTAL =N= -

Page 38 of 68
2022 Capital Projects

BILL OF QUANTITIES

FOR

PROPOSED RENOVATION OF GIRLS HOSTEL

AT

FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU


IMUSIN, OGUN STATE

BILLS OF QUANTITIES

MAY, 2022

Page 39 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Allow provisional sum of N100,000.00 (One Hundred and


Thousand Naira Only) to cover the following items under
preliminaries.

(D20) EXCAVATION AND EARTHWORK


Information
The work in this section comprises excavations,
laterite and hardcore fillings, reinforced raft ground
beams, lift shaft walls, sump pit and other ancillary
works up to and including ground floor slab

A Insurance
B Levels and Setting out of works
C Temporary Offices and Storage accomodation
(Including Removal)
D Welfare and Safety
E Contractor to provide paint, Scafolding etc
F Protection against damage
G Telephone
H Water for works
J Testing Materials
K Clearing rubbish and leaving perfect Sum 100,000
L Site board
M Progress Chart
N Progress Photographs
P Defects after completion
Q Exterminate and Prevent Test
R Watching and Lighting
S Temporary lighting and power
T Site meetings
U Temporary disposal of rain water
V National profident fund
W Foreman - in - Charge
X Supervision
Y Temporary messroom
Z Temporary Sanitation accommodation.

Preliminaries 100,000.00
Carried to General Summary 100,000.00

Page 40 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MAIN HOSTEL BLOCK

BLOCKWALL

A 225mm Blockwall partiition wall 35 m2 -


B 150mm Blockwall partition wall 20 m2 -

C
Allow for demolition of existing wall to create door opening Sum 15,000.00

Reinforced concrete in Lintel (G20, works to include conrete


D works, reinforcement, shuttering and making good durface of
concrete.) 2 m3 -

Blockwall carried to summary carried to summary

ROOF CONSTRUCTION AND COVERING


G20: TIMBER CARCASSING

Allow a provisional sum for repairs of roof truss frame and


damaged nogging timbers with Hardwood Timber roof
members, well seasoned and treated with solignum in:
A 75 x 100mm wall plates m

B 50 x 150mm King Post @ 1200mm c-c m

C 50 x 150mm tie beam @ 1200mm c-c m

D 50 x 150mm rafters @ 1200mm c-c m Sum 100,000.00

E 50 x 75mm purlins @ 900mm c-c m

F 50 x 100mm structs m

G 50 x 50 noggins m -

H 38mm x 280mm deep Hardwood facia board m

H72: ALUMINIUM STRIP/SHEET COVERING/FLASHINGS

Replace existing galvanised roofing sheets with 0.55m gauge


long span Aluminium roofinh sheet nailed to purlins at 900mm
J
centres (Measured Separately) in accordance with
manufacturer's instruction complete with associated linings and
accessories. Sum 150,000.00
Roof Construction and Covering carried to summary 250,000.00

Page 41 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


DOORS AND WINDOWS
L20:DOORS AND WINDOWS
STEEL DOOR

Supply / Repair existing metal door with not less than 70mm
thick Metal casement security steel door, single swing with
minimum of 3-metal hinge

Complete with 50mm x 230mm steel frame, sub frame and


Ironmongery, plugged to blockwall / concrete grouted with
cement and sand (1:3) and fixing cramp to suit opening.

A Repair Existing Double leaves casement entrance door, size


1800mm x 2100mm high. 5 Nr -
-
Repair Existing Double leaves casement entrance door, size
B
1200mm x 2100mm high. 8 Nr -
WOODEN DOOR

Provide and Install quality 50mm thick hardwood solid core


panel door, complete with well treated door frames, Sub
frames, architrave and iron mongeries: or equal and
approved manufacturer: factory finished with hardwood
lipping on all edges and fixing cramp to suit opening.

C Single Leaf door size 900mm x 1200mm high 4 Nr -

D Single Leaf door size 750mm x 1200mm high 15 Nr -

Windows
Provisional sum for window and works listed below
E Replace damaged louvre blades

F
Purchase / Install new louve engine to damaged ones 1.0 LS 300,000.00 300,000.00
G provide Bokoharam Mesh net to all windows

ALUMINIUM PROFILE FRAME CASEMENT / SLIDING


WINDOW COMPLETE WITH SLIDE NETTINGS

Replace existing louvre glazed window opening with approved


standard powder coated casement / sliding aluminium
windows profiles complete with necessary iron mongeries,
5mm thick tinted glazing complete with netting and approved
burglar proofing security measured separately with quality
accessories and builders work making good in:
H Size 1800mm x 1200mm (Casement) 2 Nr -
I Size 1500mm x 1200mm (Casement) 40 Nr -
J Size 600mm x 600mm (Casement) 2 Nr -

K Allow for repair of Existing Steel burglar proofing including


verandah steel burglary. 1.0 LS 100,000.00 100,000.00

Door and Windows carried to Summary

Page 42 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


SURFACE FINISHES
Wall
M20: PLASTERED / RENDERED / ROUGHCAST
Mortar, cement and sand (1:3); rendering on blockwall and
screeded backing

A
12mm thick rendering on blockwall partition 50.0 m2 -

B Ditto 12mm thick rendering on defective interior walls 50.0 m2 -

C 12mm thick backing on walls to receive tiles 50.0 m2 -

D Plain, width not exceeding 300mm 20.0 m2 -

250 x 400 x 6mm white glazed vitrified ceramic wall tiles


laid on wall with built joint including painting with colour
matching cement tiles.
E Walls 50.0 m2 -

F Plain, width not exceeding 300mm 20.0 m2 -

Floor
M10: SAND CEMENT / CONCRETE / SCREEDS /
TOPPINGS
Mortar, cement and sand (1:3); screeded backing
G 40mm thick on floor to receive tiles 1,350.0 m2 -

H plain, width not exceeding 100mm 150.0 m2 -

M40: STONE / CONCRETE / QUARRY / CERAMIC /


TILING / MOSIAC
unpolished vitrified floor tiles, buff; 3 joints,

symmetrical layout; bedding in cement mortar (1:3); laid on


floor with built joint including painting with colour matching
cement.

J on floor 1,350.0 m2 -

K Plain, width not exceeding 100mm 150.0 m2 -

CEILING
Allow for removal of existing PVC ceilings, cart away to
spoil Sum 20,000.00

1200mm x 1200mm Asbestos free flat sheet nailed to 1200mm


x 1200mm hardwood noggings measured separately finished to
manufacturer's fixing details

L On Interior ceiling (damaged sections only) 150.0 m2 -

M Ditto exterior ceiling 120.0 m2 -

Surface Finished Carried to Summary 20,000.00

Page 43 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


PAINTING AND DECORATION
M60: PAINTING AND DECORATION

Prepare and apply three full coats of emulsion paint as


approved on the following:

A Walls internally and externally 1,438.0 m2 -

B Soffit of ceiling sheets internally and externally 300.0 m2 -

C Plain, width not exceeding 300mm 300.0 m2 -

D Isolated column and beam 75.0 m2 -

Prepare and apply two full coats of gloss paint as approved


on the following:
E Fascia board / column in gloss finish 200.0 m -

F All casement metal doors, windows and hardwood doors in gloss


finish 100.0 m2 -

Painting and Decoration Carried to Summary -

Page 44 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


EXTERNAL WORKS / PERIMETER FENCE QUADRANGLE

Provide and lay 500mm wide x 300mm thick concrete floor


A
(1:2:4 Mix), around the perimeter of the Hostel block as
Directed by the Architect 160 m -

B 225mm in Blockwall in Perimeter fence (Blockwall and Wall


Screed) 60 m2 -

C Steel Entrance Gate attached to perimeter fence, with


allowance of pedestrian opening (3.6m width) - Double leaf 1 Nos -

D RC Column and foundation bases - G20 Mix (1:2:4) (Works to


include reinforcement, shuuttering and making good surface) 3 m3 -

E Mortar, cement and sand (1:3); screeded to exsiting concrete


surface of hostel qudrangle. Thicknes not more than 50mm 150 m2 -

F 225mm Blockwall Perimeter drainage (600mm x 600mm internal


opening) including concrete floor 100mm. 25 m -

Reinforced concrete internal drainage, with RC removable


G cover. Dimension of drain is 600mm x 600mm x 100mm Thick,
Cover 75mm Thick G20 (Mix 1:2:4) 15 m -

225mm Blockwall steps at Building entrance (rate to include


H
screeding) 23 m2 -

External Works Carried to Summary -

Page 45 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MECHANICAL ENGINEERING INSTALLATIONS
Allow the P.C. sum of N 100,000.00 (One Hundred Thousand Sum 100,000.00
A Naira only) for any piping, internal pipe, surface pipe
soil pipe, and waste pipe details to architect specification

B Flush toilets inclduing all accessories 12 Nr -

C Allow PC for repair of existing chambers, construction of new


chambers Sum 100,000.00

Provide Blockwall filled with Weak concrete Water stand to be


placed at student quadranle (0.75m elevated stand with 6Nos
D standpipe), 1.00 Nr -

Mechanical Engineering Installations Carried to Summary

Page 46 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


ELECTRICAL ENGINEERING INSTALLATIONS

Allow the P.C. sum of N 400,000.00 (Four hundred Thousand Sum 400,000.00
naira only)
for the following internal electrical works:
Equipment and control gears
A Fittings and accessories
Conduits
Cables
i Final sub circuits
ii Earthing and Ancillaries
B Repair of Existing Ceiling Fans

Electrical Engineering Installations Carried to Summary 400,000.00

Page 47 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


GENERAL SUMMARY
1 PRELIMINARIES 100,000.00

1 BLOCKWALL -

2 ROOF CONSTRUCTION AND COVERING 250,000.00

3 DOORS AND WINDOWS -

4 SURFACE FINISHES

5 PAINTING AND DECORATION -

6 EXTERNAL WORKS / PERIMETER FENCE QUADRANGLE -

7 MECHANICAL ENGINEERING INSTALLATIONS -

8 ELECTRICAL ENGINEERING INSTALLATIONS 400,000.00

9 SUBTOTAL

10 ADD CONTIGENCY 100,000.00

11 SUBTOTAL

12 ADD 5% CONTRACT ADMINISTRATION -

13 SUBTOTAL -

14 ADD 7.5% V.A.T -

15 SUBTOTAL -

MAIN DINING HALL


TOTAL =N= -

Page 48 of 68
DETAILED ENGINEERING DESIGN, CONSTRUCTION SUPERVISION OF INTERNAL ROAD NETWORKS
FOR FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU MUSHIN. OGUN STATE
PRELIMINARIES

BILL NO. 1: PRELIMINARIES

ITEM
DESCRIPTION UNIT QTY RATE AMOUNT (NGN)
No.
Allow for the provision and erection of road signs -
1.01 regulatory signs, warning signs, kilometer posts, PS 1 50,000.00 50,000.00
etc.

Allow for the removal and relocation of existing


1.02 installation for the electricity, telephone, water PS 1 200,000.00 200,000.00
supply and other utilities.

Allow for maintenace of the road in a trafficable


1.03 LS 1 75,000.00 75,000.00
condition throughout the works.

Demolish existing fence to allow for bringing plant


and equipment and restore to original state as at
before demolition works and also for preparing
access road where necessary. Completed works
1.04 measured as lump sum. Works also to include LS 1 200,000.00 200,000.00
provision of Temporary cordon on the demolished
fence.The width of fence not to exceed 10m and
approval sought from the supervising Engineer
before task is executed.

Sub-Total 525,000.00
Add 5% VAT -
Total of Bill No. 1 Carried to Summary 525,000.00
DETAILED ENGINEERING DESIGN, CONSTRUCTION SUPERVISION OF INTERNAL ROAD NETWORKS
FOR FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU MUSHIN. OGUN STATE

BILL OF QUANTITIES (ROAD 1- DUAL CARRIAGEWAY 100m)


BILL OF QUANTITIES (ROAD 2 - SINGLE CARRIAGEWAY 175m)

SUMMARY PAGE

Bill No. Description Amount (N)


1.00 Preliminaries 525,000.00
2.00 Site Clearance and Earthworks 0.00
3.00 Culverts and Drains 0.00
4.00 Pavement and Surfacing 0.00
Sub-Total (I)
Allow Contingencies 100,000.00
Sub-Total (II)
Allow 5% PA 0.00
Allow 7.5% VAT 0.00
GRAND TOTAL 0.00

BILL No.2 - SITE CLEARANCE AND EARTHWORKS


S/No Description Qty Unit Rate Amount

2.00 SITE CLEARANCE AND EARTHWORKS

2.01 Clear site on either side of centre line of the road of


all bushes, shrubs, grasses and trees, as directed,
including the removal of vegetable top-soil to a
maximum depth of 150mm 1300.00 m2 -

2.02 Excavate any material except rock in cuttings and


side drains, haul excavated material any distance,
deposit, spread and compact to 100% B.S.
compaction as filling for road surface, embankment,
median and margins, shape formation and trim
slopes to require cross-sections. All measured as
completed work in final situ 335.00 m3 -

2.03 Excavate good lateritic material from approved


borrow pits, haul excavated material any distance,
deposit, spread in 150mm layers and compact to
100% B.S compaction as filling in road surface,
embankments and margins, shape formation and
trim slopes to required cross-section. All measured
as completed work in final situ 105.00 m3 -

2.04 Excavate any material in cutting and side drains


except rock and haul excavated material to spoil as
directed 135.00 m3 -

2.05 Excavate in rock cuttings and side drains and either


use or haul to spoil as directed 5.00 m3 -

Total of Bill No. 2, Carried Summary -


BILL No.3 - CULVERTS AND DRAINS

S/No Description Qty Unit Rate Amount

3.00 CULVERTS AND DRAINS

3.01 Construction of One side Blockwall, One side G20


concrete wall and concrete base Lined drain.
Works to include reinforcement, formwork, blocks,
weak concrete as shown in the drawings and as
directed by the Engineer. Refer to (LINED DRAIN
1) in DWG B1-S1 330.00 m -

3.02 Construction of G20 concrete covered Lined drain.


Works to include reinforcement, formwork,
blinding, concrete as shown in the drawings and as
directed by the Engineer. Refer to (LINED DRAIN 50.00 m -
2) in DWG B1-S1

3.03 Median kerb (550m x 150mm) 300.00 m -

Sub-Total of Bill No. 3, Carried to Summary -


BILL No.4 - PAVEMENT AND SURFACING

S/No Description Qty Unit Rate Amount

4.00 PAVEMENT AND SURFACING


4.01 Shape and compact subgrade in cuttings to 100%
BS compaction 253.00 m2 -

4.02 Provide, spread, shape and compact to 100% West


African standard compaction approved naturally
occurring material (Laterite, gravel etc), 150mm
thickness as shown in drawing, as sub-base and
shoulders in layers of 150mm of compacted
thickness; Haulage inclusive. 153.00 m3 -

Sub-Total of Bill No. 4, Carried to Summary -


BILL OF QUANTITIES

FOR

FURNISHING OF LABORATORIES

AT

FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU


IMUSIN, OGUN STATE

BILLS OF QUANTITIES

MAY, 2022
ITEM DESCRIPTION QTY UNIT RATE AMOUNT
CHEMISTRY LABORATORY
Provide labortory tables. (Specification details: Wooden frame
of L=7200mm x B =1200mm x H=1200mm, 400mm x 250mm
white tiles laid over top of Table, 400mm High by 900mm width
101 (3Nos) reagent rack, 3Nos Ceramic Washing basin, 3Nos Double
Metal water rotating tap, 3Nos gas outlet.) see attached
picture for details
4.0 Nr -

Provide labortory Demonstration tables. (Specification details:


Wooden frame of L3600mm x B1200mm x H120omm, 400mm x
250mm white tiles laid over top of Table, 400mm High by
900mm width (2Nos) reagent rack, 2Nos Ceramic Washing
102
basin, 2Nos Double Metal water rotating tap, 2Nos gas outlet.)
see attached picture for details

1.0 Nr -

Provide Wooden Stools. (Specification details: Wooden stool


103
with Circular seat = 0.3m Diameter, H=0.75m) 45.0 Nr -

Provide Office Tables (4Ft Wooden Table with Single pedestal,


104 details include: L1200mm x D600mm x H750mm inclusive of
3Nos Drawers) 2.0 Nr -

Provide Office Chairs (601 C-Leg Visitor Chair with leather


105
seat) 2.0 Nr -

Provide Two Door Refrigertor (Details include: 230 - 270Litres,


106
Three Glass Shelves, Refrigerator 100%) 1.0 Nr -

107 Provide Executive Seven seater leather Sofa 1.0 Nr -

Provide Giant Ceiling fans (Details include: 60'' 3 - Blades with


108 Colourful designs, High Speed motor made from Copper, Single
phase power input and Wall speed Control with 5 - speeds
selection) 2.0 Nr -

Provide Wooden Cupbaord (Details include: L=6m x B=0.4m x


109
H=2.4m) 1.0 Nr -

Allow provisional sum for the Gas supply and Water reticulation
110 of Laboratory. Work to include provision of 1No 50Kg Cylinder
filled with Gas. 1.0 PS 250,000.00 250,000.00

Chemistry Laboratory Bill Carried Summary


ITEM DESCRIPTION QTY UNIT RATE AMOUNT
PHYSICS LABORATORY
Provide labortory tables. (Specification details: Wooden frame
of L=7200mm x B =1200mm x H=1200mm, 400mm x 250mm
201 white tiles laid over top of Table, with 4Nos Socket outlet.) see
attached picture for details
4.0 Nr -

Provide labortory Demonstration tables. (Specification details:


Wooden frame of L3600mm x B1200mm x H120omm, 400mm x
250mm white tiles laid over top of Table, 400mm High by
900mm width (2Nos) reagent rack, 2Nos Ceramic Washing
202
basin, 2Nos Double Metal water rotating tap, 2Nos gas outlet.)
see attached picture for details

1.0 Nr -

Provide Wooden Stools. (Specification details: Wooden stool


203
with Circular seat = 0.3m Diameter, H=0.75m) 45.0 Nr -

Provide Office Tables (4Ft Wooden Table with Single pedestal,


204 details include: L1200mm x D600mm x H750mm inclusive of
3Nos Drawers) 2.0 Nr -

Provide Office Chairs (601 C-Leg Visitor Chair with leather


205
seat) 2.0 Nr -

Provide Giant Ceiling fans (Details include: 60'' 3 - Blades with


206 Colourful designs, High Speed motor made from Copper, Single
phase power input and Wall speed Control with 5 - speeds
selection) 2.0 Nr -

Provide Wooden Cupbaord (Details include: L=6m x B=0.4m x


207
H=2.4m) 1.0 Nr -

Physics Laboratory Bill Carried Summary -


ITEM DESCRIPTION QTY UNIT RATE AMOUNT
BIOLOGY LABORATORY
Provide labortory tables. (Specification details: Wooden frame
301
of L=7200mm x B =1200mm x H=1200mm) 3.0 Nr -

Provide labortory Demonstration tables. (Specification details:


302 Wooden frame of L3600mm x B1200mm x H1200mm)
1.0 Nr -

Provide Wooden Stools. (Specification details: Wooden stool


303
with Circular seat = 0.3m Diameter, H=0.75m) 45.0 Nr -

Provide Office Tables (4Ft Wooden Table with Single pedestal,


304 details include: L1200mm x D600mm x H750mm inclusive of
3Nos Drawers) 2.0 Nr -

Provide Office Chairs (601 C-Leg Visitor Chair with leather


305
seat) 2.0 Nr -

Provide Deep Freezer (Details include:200 - 250L, LED Door


306
lamp, High Efficiency Compressor) 1.0 Nr -

Provide Giant Ceiling fans (Details include: 60'' 3 - Blades with


307 Colourful designs, High Speed motor made from Copper, Single
phase power input and Wall speed Control with 5 - speeds
selection) 4.0 Nr -

308 Provide 50inch UHD Smart TV 1.0 Nr -

Biology Laboratory Bill Carried Summary -


ITEM DESCRIPTION QTY UNIT RATE AMOUNT
GENERAL SUMMARY
A CHEMISTRY LABORATORY -

B PHYSICS LABORATORY -

C BIOLOGY LABORATORY -

D TOTAL -

F SUBTOTAL -

G ADD 7.5% V.A.T -

H GRAND TOTAL -
2022 Capital Projects

BILL OF QUANTITIES

FOR

PROPOSED RENOVATION OF E-LIBRARY

AT

FEDERAL SCIENCE AND TECHNICAL COLLEGE, IJEBU


IMUSIN, OGUN STATE

BILLS OF QUANTITIES

MAY, 2022

Page 59 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT

Allow provisional sum of N100,000.00 (One Hundred and


Thousand Naira Only) to cover the following items under
preliminaries.

(D20) EXCAVATION AND EARTHWORK


Information
The work in this section comprises excavations,
laterite and hardcore fillings, reinforced raft ground
beams, lift shaft walls, sump pit and other ancillary
works up to and including ground floor slab

A Insurance
B Levels and Setting out of works
C Temporary Offices and Storage accomodation
(Including Removal)
D Welfare and Safety
E Contractor to provide paint, Scafolding etc
F Protection against damage
G Telephone
H Water for works
J Testing Materials
K Clearing rubbish and leaving perfect Sum 100,000
L Site board
M Progress Chart
N Progress Photographs
P Defects after completion
Q Exterminate and Prevent Test
R Watching and Lighting
S Temporary lighting and power
T Site meetings
U Temporary disposal of rain water
V National profident fund
W Foreman - in - Charge
X Supervision
Y Temporary messroom
Z Temporary Sanitation accommodation.

Preliminaries 100,000.00
Carried to General Summary 100,000.00

Page 60 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


BLOCKWALL REPAIR

A 225mm Blockwall External wall (Works to include laying of


blocks and Screeding with cement mortar 1:3) 30 m2 -

Blockwall carried to summary carried to summary -

ROOF CONSTRUCTION AND COVERING


G20: TIMBER CARCASSING

Allow a provisional sum for repairs of roof truss frame and


damaged nogging timbers with Hardwood Timber roof
members, well seasoned and treated with solignum in:
A 75 x 100mm wall plates m

B 50 x 150mm King Post @ 1200mm c-c m

C 50 x 150mm tie beam @ 1200mm c-c m

D 50 x 150mm rafters @ 1200mm c-c m Sum 200,000.00

E 50 x 75mm purlins @ 900mm c-c m

F 50 x 100mm structs m

G 50 x 50 noggins m -

H 38mm x 280mm deep Hardwood facia board m

H72: ALUMINIUM STRIP/SHEET COVERING/FLASHINGS

Replace existing galvanised roofing sheets with 0.55m gauge


long span Aluminium roofinh sheet nailed to purlins at 900mm
J
centres (Measured Separately) in accordance with
manufacturer's instruction complete with associated linings and
accessories. Sum 200,000.00

K Allow for felting with water proof materials around all wall
sections in roof covering. Sum 700,000.00
Roof Construction and Covering carried to summary 1,100,000.00

Page 61 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


DOORS AND WINDOWS
L20:DOORS AND WINDOWS
STEEL DOOR

Replace existing entrance metal door with not less than


70mm thick Metal casement security steel door,Double
single swing with minimum of 3-metal hinge. Complete with
A
50mm x 230mm steel frame, sub frame and Ironmongery,
plugged to blockwall / concrete grouted with cement and
sand (1:3) and fixing cramp to suit opening. (imported steel
door) - 1.8m x 2.1m 1 Nr -
-

Repair Existing Double leaves Internal Steel door, size 1200mm


B x 2100mm high. (Works to include repair, refixing in place,
fixing of new key locks and metal handle) 2 Nr -
-

WOODEN DOOR

Provide and Install quality 50mm thick hardwood solid core


panel door, complete with well treated door frames, Sub
frames, architrave and iron mongeries: or equal and
approved manufacturer: factory finished with hardwood
lipping on all edges and fixing cramp to suit opening.

C Single Leaf door size 900mm x 1200mm high 2 Nr -

Windows

D Allow for Repairs of Steel hand rail and Fabrication of New


hand rail to specified locations. 1.0 LS 200,000.00 200,000.00

Door and Windows carried to Summary

Page 62 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


SURFACE FINISHES
A Allow for rescreeding of walls Sum 200,000.00

Floor
M10: SAND CEMENT / CONCRETE / SCREEDS /
TOPPINGS
Mortar, cement and sand (1:3); screeded backing
B 40mm thick on floor to receive tiles 20.0 m2 -

C plain, width not exceeding 100mm 2.0 m2 -

M40: STONE / CONCRETE / QUARRY / CERAMIC /


TILING / MOSIAC
unpolished vitrified floor tiles, buff; 3 joints,

symmetrical layout; bedding in cement mortar (1:3); laid on


floor with built joint including painting with colour matching
cement.

D on floor 20.0 m2 -

E Plain, width not exceeding 100mm 2.0 m2 -

CEILING

Allow for repairs of Celotex (Acoustic) ceiling hangers and


provision of new replacement to damaged ceiling panels. Sum 200,000.00

Surface Finished Carried to Summary

Page 63 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


PAINTING AND DECORATION
M60: PAINTING AND DECORATION

Prepare and apply three full coats of emulsion paint as


approved on the following:

A Walls internally and externally (Library building and Gate


houses) 2,150.0 m2 -

A Walls externally (Library building and Gate houses) - Water


Resistant paints 500.0 m2 -

B Plain, width not exceeding 300mm 200.0 m2 -

C Isolated column and beam 75.0 m2 -

Prepare and apply two full coats of glass paint as approved


on the following:
D Fascia board / column in gloss finish 100.0 m -

E All casement metal doors, windows and hardwood doors in gloss


finish 100.0 m2 -

Painting and Decoration Carried to Summary -

Page 64 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


EXTERNAL WORKS

A Provide oversite 150mm thick concrete floor (1:3:6 Mix), at the


front of the main building. 30 m3 -

B 225mm Blockwall Perimeter drainage (600mm x 600mm internal


opening) including 100mm concrete floor, 100mm thick. 25 m -

C Provide 3000L Tank 1 Nos -

Provide and lay 500mm wide x 300mm thick concrete floor


D
(1:2:4 Mix), around the perimeter of the building as Directed
by the Architect 40 m -

Water stand (225mm blockwall with RC 150mm Slab, height of


stand not more than 3.6m) - to be placed at the rear of the
E building 1.00 Nr -

External Works Carried to Summary -

Page 65 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


MECHANICAL ENGINEERING INSTALLATIONS
Allow the P.C. sum of N 300,000.00 (ThreeHundred Thousand Sum 300,000.00
A Naira only) for any piping, internal pipe, surface pipe
soil pipe, and waste pipe details to architect specification

Mechanical Engineering Installations Carried to Summary 300,000.00

Page 66 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


ELECTRICAL ENGINEERING INSTALLATIONS

Allow the P.C. sum of N 200,000.00 (Two hundred Thousand Sum 200,000.00
naira only)
for the following internal electrical works:
Equipment and control gears
A Fittings and accessories
Conduits
Cables
i Final sub circuits
ii Earthing and Ancillaries
B Repair of Existing Ceiling Fans / Purchase of 5Nos wall fans

Electrical Engineering Installations Carried to Summary 200,000.00

Page 67 of 68
2022 Capital Projects

ITEM DESCRIPTION QTY UNIT RATE AMOUNT


GENERAL SUMMARY
1 PRELIMINARIES 100,000.00

1 BLOCKWALL REPAIR -

2 ROOF CONSTRUCTION AND COVERING 1,100,000.00

3 DOORS AND WINDOWS -

4 SURFACE FINISHES -

5 PAINTING AND DECORATION -

6 EXTERNAL WORKS -

7 MECHANICAL ENGINEERING INSTALLATIONS 300,000.00

8 ELECTRICAL ENGINEERING INSTALLATIONS 200,000.00

9 SUBTOTAL

10 ADD CONTIGENCY 100,000.00

11 SUBTOTAL

12 ADD 5% PROJECT ADMINISTRATION -

13 SUBTOTAL -

14 ADD 7.5% V.A.T -

15 SUBTOTAL -

MAIN DINING HALL


TOTAL =N= -