DIMENSION PAPER

UNIVERSITI TUNKU ABDUL RAHMAN


PRACTICAL GROUP:
JOB TITLE : CLASS H PILING WORKS TAKER OFF : IBTISAM AZWANI
ELEMENT: PRECAST REINFORCED CONCRETE PILE DATE: Jun-19

PRECAST REINFORCED CONCRETE PILE

Drawing no: PLIB/1 & PLIB/2

Taking-off list
Plant and Equipment
1 Provision - sum sum H110
2 Moving and handling -sum sum H120

Piles, precast reinforced concrete pile


250mm X 250mm precast piles
3 Supply initial pile nr H261.1
4 Supply extension pile nr H261.2
5 Depth driven m H262
6 Jointing nr H264
7 Cut-off pile nr H266
8 Preparing heads nr H267
9 Static load test nr H510

300mm X 300mm precast piles


3 Supply initial pile nr H261.1
4 Supply extension pile nr H261.2
5 Depth driven m H262
6 Jointing nr H264
7 Cut-off pile nr H266
8 Preparing heads nr H267
9 Static load test nr H510

Squared by: Abstracted by: Checked by: Page 1


DIMENSION PAPER
UNIVERSITI TUNKU ABDUL RAHMAN
PRACTICAL GROUP:
JOB TITLE : CLASS H PILING WORKS TAKER OFF : IBTISAM AZWANI
ELEMENT: PRECAST REINFORCED CONCRETE PILE DATE: Jun-19

PLANT AND EQUIPMENT cont'd


H110 CL2
sum sum Provision of all necessary piling
plants and equipments,
transportation to the site, ext pile 6m
commencing level
handling, assembling, and
48.20m
removal off the site after
ext pile 6m
completion of operation.

H120 ext pile 6m

Moving and handling all piling


plants and equipments within the ext pile 6m
site, and from location to location
as often as is, and whenever
necessary for the execution of the
sum sum whole piling operation initial 9m
toe level 17.30
PILES
Precast reinforced concrete pile
250mm x 250mm G40 precast
reinforced concrete piles with
working loas of 120kN
H261.1
A total of 6 nos of pile points with Supply initial piles with rock shoes
250mm x 250mm cross section of 9m length and coated with 2
dimension, 6 nos of initial pile layers of bituminous oil
M12 with supply length 9m, 20nos, of 2
extension pile 6m, 2 4 (P1 at CL 45.00
4nos.extension pile 3m. A total of
169.48m depth driven. 2
Supply of piles 1 2 (P1 at CL 48.20
CL1 6
ext pile 3m
commencing level
45.00 m H261.2
ext pile 6m Supply extension piles of 6m
length and coated with 2 layers of
2 bituminous oil
ext pile 6m 2
3 12 (P1 at CL 45.00

ext pile 6m 2
1
4 8 (P1 at CL 48.20
20
initial 9m
toe level 17.30 H261.3
Supply extension piles of 3m
Commencing Level 1 = 45.00 length and coated with 2 layers of
Ddt toe level = 17.30 2 bituminous oil
27.70 2
1 4 (P1 at CL 45.00
Commencing Level 2 = 48.20
Ddt toe level = 17.30
30.90
Squared by: Abstracted by: Checked by: Page 2
DIMENSION PAPER
UNIVERSITI TUNKU ABDUL RAHMAN
PRACTICAL GROUP:
JOB TITLE : CLASS H PILING WORKS TAKER OFF : IBTISAM AZWANI
ELEMENT: PRECAST REINFORCED CONCRETE PILE DATE: Jun-19

cont'd
Depth diven
CL1= 45.00 H266
Cut-off piles
Commencing level = 45.00 2
Ddt toe level = 17.30 2 4 (P1 at CL 45.00
Ddt pile cap depth = 0.60
Add kicker = 0.075 2
1 2 (P1 at CL 48.20
27.18 6

CL2= 48.20
H267
Commencing level = 48.20 Preparing heads
Ddt toe level = 17.30 2
Ddt pile cap depth = 0.60 2 4 (P1 at CL 45.00
Add kicker = 0.075
2
30.38 1 2
6 (P1 at CL 48.20
(Quantity same as cut-off pile)
H262
2 Depth driven PILE TEST
2 H510
27.18 108.72 (P1 at CL 45.00 1 1 Initial static load test on 250mm x
250mm precast reinforced
concrete pile up to two times
2 working load of 960kN
1 30.38 60.76 (P1 at CL 48.20
169.48

Jointing

H264 M12 and A8


2 Jointing with butt weld all round
2
4 16 (P1 at CL 45.00
REPEAT the taking off for 300mm x 300mm cross sec
2
1 ** Refer to measurement rules
4 8 (P1 at CL 48.20 M12-each group items meaning
24 separate taking off for a
different size or diameter
1 Supply initial pile
2 Supply extension pile
3 Depth driven
4 Jointing
5 Cut-off pile
6 Preparing heads
7 Testing
Squared by: Abstracted by: Checked by: Page 3