Physical Progress in Mandleshwar Sewerage Project day)


Parishad Package, District-
District- Khargone
Projeet Name:- Improvement of Sewerage Scheme of Mandleshwar Nagar Parisnarcage,
Kharuone
Contractor Name::-M/s. M/s Engineering Professional Co. Pvt. Ltd. AAnd South Construction Co.
Gujrat(Constructio Co. Pvt. Ltd1
Pvt. Ltd.(JV)
Component Wise Progress of 1Struction
orks
Target of last 15 day Target Achieved for last 15 day Remark
Component Unit Capacity/Qty.| Component Component Target Achieved
No. Target Excavation for SBR Basin is in 60% Excavation
SBR Work start SBR
Chlorine Contact Tank & Raft of CCT Completed.
progress.
Completed
Chlorine Contact Tank & Chlorination Work start
Side wall casting is in
ChlorinationRoom
Room progress
Treated Water Sump Work start Treated Water Sump Raft of TreatedWater sump
completed.
Admin/SCADA
/Lab &Air Ground Beam of Admin/SCADA/Lab
Admin/SCADA /Lab &Air Blower Room Work start Blower Room
Completed. Plinth Beam work is in
Sewerage Treatment MLD Droaress
Centrifuge Building,
Plant Centrifuge Building, Sludge sump o
Footing of colunm is in
Work start progrees
PumpHouse Sludge sump &Pump
Plinth Beam of DG Room Completed.
DGRoomm Work start DG Roomn
Guard room Colunm(2.4M) above plinth
Guard Room Work stat Guard Room
|level beam has completed.
Unit is in progress
Primary Treatmemt Unit Work start Primary Treatmemt EXcavation
2 Network
Total laying -
6.355 Km out of 250 dia of pipe line
a Sewer Network Km 15.887 IKM 200 M
|15.887Km work
b House to main hole Km Total laying -2.550Km
network
Total Manhole Constructed - 318
3 Manholes Nos 800
Nos out of800 Nos.
House Service Total HSC Constructed -430Nos 100 Connection
4 Nos 820 70 Connection servey
Connection out of 820 Nos servey
Hydrotesting KM 900 M
Pumping station
a
|MPS MLD 3 DEMARCATION OF SITE NOT DANE
b |IPS 1(Ganga Jhira) KL 1.12 DEMARCATION OF SITE NOT DENE
cIPS 2(Near Jail) I.12 DEMARCATION OF SITE NOT DANE