Physical Progress in Mandleshwar Sewerage Project day)
Parishad Package, District- District- Khargone Projeet Name:- Improvement of Sewerage Scheme of Mandleshwar Nagar Parisnarcage, Kharuone Contractor Name::-M/s. M/s Engineering Professional Co. Pvt. Ltd. AAnd South Construction Co. Gujrat(Constructio Co. Pvt. Ltd1 Pvt. Ltd.(JV) Component Wise Progress of 1Struction orks Target of last 15 day Target Achieved for last 15 day Remark Component Unit Capacity/Qty.| Component Component Target Achieved No. Target Excavation for SBR Basin is in 60% Excavation SBR Work start SBR Chlorine Contact Tank & Raft of CCT Completed. progress. Completed Chlorine Contact Tank & Chlorination Work start Side wall casting is in ChlorinationRoom Room progress Treated Water Sump Work start Treated Water Sump Raft of TreatedWater sump completed. Admin/SCADA /Lab &Air Ground Beam of Admin/SCADA/Lab Admin/SCADA /Lab &Air Blower Room Work start Blower Room Completed. Plinth Beam work is in Sewerage Treatment MLD Droaress Centrifuge Building, Plant Centrifuge Building, Sludge sump o Footing of colunm is in Work start progrees PumpHouse Sludge sump &Pump Plinth Beam of DG Room Completed. DGRoomm Work start DG Roomn Guard room Colunm(2.4M) above plinth Guard Room Work stat Guard Room |level beam has completed. Unit is in progress Primary Treatmemt Unit Work start Primary Treatmemt EXcavation 2 Network Total laying - 6.355 Km out of 250 dia of pipe line a Sewer Network Km 15.887 IKM 200 M |15.887Km work b House to main hole Km Total laying -2.550Km network Total Manhole Constructed - 318 3 Manholes Nos 800 Nos out of800 Nos. House Service Total HSC Constructed -430Nos 100 Connection 4 Nos 820 70 Connection servey Connection out of 820 Nos servey Hydrotesting KM 900 M Pumping station a |MPS MLD 3 DEMARCATION OF SITE NOT DANE b |IPS 1(Ganga Jhira) KL 1.12 DEMARCATION OF SITE NOT DENE cIPS 2(Near Jail) I.12 DEMARCATION OF SITE NOT DANE