You are on page 1of 1

Emergency Stop of level 2 Shorthand of the words:

ACl: Air-Cooler
STC: Stop Time Checking
DP: Differential Protection
DT: Discharge Tank
EG: Electrical Governor
EP: Electrical Protection
ESL: Emergency Stop Of Level
Governor failure during the Startup Generator Processing
ESV: Emergency Slide Valve
Exc: Excitation
Lost of EG. Soures
FBC: Mechanical Governor Feedback Cable
OR FC: Fire Center
WG. ≥ 51% AND Delay 2 sec. Impact to ESL. 1 (**) FF: Fire Fighting
FLP: Failuer Low Pressure
FOL: Failuer Oil Low Level
Startup Gen. Processing
Impact to Emergency Stop of level 2
GB: Generator Bearing
GAC: Generator Air Chamber
Gen: Generator
GGB: Generator Guide Bearing
GNS: Generator Normal Stop
GS: Generator Speed
Manual close Emergency Slide Valve
GSa: Generator Startup
Int: Internal
Man. close ESV. Trip
GCB. immediately Inc: Increasing
Close
IG: Intake Gate
Man: Manual
MDL: Motor Driving for Opening Limiter
MG: Mechanical Governor
Mechanical Governor failure (feedback cable broken) MT: Main Transformer
OLL: Oil Low Level
MG. failure (FbC. broken) OS: Over Speed
Pre: Pressure
Open Pro: Protection
ESV. immediately
Close PT: Pressure Tank
SPW: The Shear Pin Of Wicket Gate
When emergency stop of level 1 activated and Tem: Temperature
wicket gate unable to close to 10% (after 20 sec.) TGB: Turbine Guide Bearing
WG: Wicket Gate
ESL. 1 activated
AND Delay 20 sec.
WG. ≥ 10%
The Shear Pin Of Wicket Gate broken AND Impact to ESL. 3
When Generator have load, Generator OS. ≥ 115% but main SPW. broken
distribution valves can not fully closed
AND
Gen. OS. ≥ 115% WG. ≥ 2%
Gen. have load AND
MDV. not fully closed
Man. Reset (***) HOLD
AND
Hold & Reset

You might also like