Dated: - 30.07.2022
As per Dy. Chg. L.NO. 802-M/9/17/watering/Pt.IX/MC-I dated-17.02.2021 we the under signed jointly checked the position of water pressure at
platform No. 1,2,3,4 & RPC-IV LINE as well as NG washing line:-

Platform:-
WATER PRESSURE AFTER OPEN 10 WATER PRESSURE AFTER
NO. OF NO. OF
NO. OF NO. OF CAPACITY OF HYDRANTS OPEN 20 HYDRANTS
PF HYDRANTS COACHES
HYDRANTS HYDRANTS PLATEFORM WITHOUT WITHOUT WITH REMARKS
NO. NOT TO BE WITH BOOSTER
AVAILABLE WORKING COACHES BOOSTER BOOSTER BOOSTER
WORKING WATERED PUMP
PUMP PUMP PUMP
Booster
1 pump is
69 69 - 18 21 26 Not working 20
1 not
working
Booster
2
75 75 - 18 21 72 15 30 pump is
2
55 available

Booster
3
81 80 01 19 19 42 55 20 22 pump is
3
available

NG WASHING LINE:-
There are 02 parallel pipe lines each of line has 07 hydrants 04 hydrants in each pipe lines in working condition:-
By opening 02 hydrants water pressure is 40 & 45 LPM.
RPC-iv line: - Capacity of line is 23 coaches water facilities is available for all the coaches 78 hydrants is available & all in
working condition. Water pressure is by opening (I) 10 hydrants 25 LPM .
(ii) 20 hydrants 40 LPM.

SSE/C&W/PTK SSE/POWER/PTK SSE/WORKS/PTK


No: 12/1-RS Office of the
Date: 30TH JUL- 2022 SSE I/C(C&W)
N Rly, Pathankot

LIGHTING POSITION OF WASHING LINE C&W DEPOT PATHANKOT

Pit Lights Pole Lights Catwalk Lights

Total Total Total


W/L No
No. of Not No. of Not No. of Not
Working Missing Working Missing Working Missing
Pit Working Pole Working Cat Walk Working
Lights Lights Lights

NG 36 26 10 - 9 9 - - - - - -

Remarks:-

(i) Pole lights used for catwalk also.


(ii) Low height side LED Lamps provided for Trolley examination in lieu of Pit Lights.

SSE/C&W/PTK SSE/POWER/PTK SSE/WORKS/PTK