EQUIPMENT TYPE:

WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING DROP TEST

DATE: 08/03/20222
Tag No: 600 WF1
Material: CLINKER
Capacity (tph): 225
Set Point (tph): 100.00 -
Load (kg/m): 208.00 -
Speed (Hz) 17.83 .
Gate Position (%) . .

CORRECTION
Time 16:40 -
Duration(Min) 4.0 -
Totalizer (Tons) 6.06 -

AFTER
Bin Loss\Actual (Tons) 6.09 -
Difference (Tons) 0.03 #VALUE!
Error (%) 0.51 #VALUE!
Average Error (%) 0.51
Correction Factor 0.970
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 02/05/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 40.00 -
Load (kg/m):% 50.00 -
Speed (Hz) - .
Gate Position (%) 20.00 .

CORRECTION
Time 8:22:38 9:54
Duration(Min) 1.3 -
Totalizer (Tons) 58.00

AFTER
Bin Loss\Actual (Tons) 48.00
Difference (Tons) -10.00 0.00
Error (%) -20.83 #DIV/0!
Average Error (%) -20.83
Correction Factor Old -1 New-1.09
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Old Correction
Count-22172, New-23666

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 21/05/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 54.00 -
Load (kg/m):% 50.00 -
Speed (Hz) - .
Gate Position (%) 20.00 .

CORRECTION
Time 6:24:51 7:41
Duration 1.2 -
Totalizer (Tons) 50.03

AFTER
Bin Loss\Actual (Tons) 58.00
Difference (Tons) 7.97 0.00
Error (%) 13.74 #DIV/0!
Average Error (%) 13.74
Correction Factor Old -1.09 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Old Correction
Count-23666, New-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 21/05/20222

1:16

New-1.10
UCT Old Correction

ure (Inst HOD)


EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 27/05/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 61.00 -
Load (kg/m):% 66.00 -
Speed (Hz) - .
Gate Position (%) 30.00 .

CORRECTION
Time 14:56:59 16:02
Duration 0.7 mints
Totalizer (Tons) 60.00

AFTER
Bin Loss\Actual (Tons) 60.00
Difference (Tons) 0.00 0.00
Error (%) 0.00 #DIV/0!
Average Error (%) 0.00
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 27/05/20222

14:56:59
16:02:21
1:05:22

New-1.10
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

14:56:59 16:02:21 1:05:22


110 50 60
23 83 60
0
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 01/06/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 60.00 -
Load (kg/m):% 55.00 -
Speed (Hz) - .
Gate Position (%) 25.00 .

CORRECTION
Time 16:49:00 17:40;29
Duration 50.1 mints
Totalizer (Tons) 53.00

AFTER
Bin Loss\Actual (Tons) 50.14
Difference (Tons) -2.86 0.00
Error (%) -5.70 #DIV/0!
Average Error (%) -5.70
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 01/06/20222

14:56:59
16:02:21
1:05:22

New-1.10
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

16:49:00 17:40:29 0:51:29


100.2 50.06 50.14
96 149 53
-5.70402872
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 02/06/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 35.00 -
Load (kg/m):% 30.00 -
Speed (Hz) - .
Gate Position (%) 18.00 .

CORRECTION
Time 9:07:00 9:34
Duration 27.2 mints
Totalizer (Tons) 25.00

AFTER
Bin Loss\Actual (Tons) 25.00
Difference (Tons) 0.00 0.00
Error (%) 0.00 #DIV/0!
Average Error (%) 0.00
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 02/06/20222

14:56:59
16:02:21
1:05:22

New-1.10
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

9:07:01 9:34:17 0:27:16


75 50 25
4 29 25
0
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 09/06/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 50.00 -
Load (kg/m):% 51.00 -
Speed (Hz) - .
Gate Position (%) 35.00 .

CORRECTION
Time 13:05:52 9:34
Duration 92.1 mints
Totalizer (Tons) 85.00

AFTER
Bin Loss\Actual (Tons) 79.53
Difference (Tons) -5.47 0.00
Error (%) -6.88 #DIV/0!
Average Error (%) -6.88
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 09/06/20222

New-1.10
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

13:05:52 14:38:03 1:32:11


150.03 70.5 79.53
22 107 85
-6.877907708
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 11/06/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 50.00 -
Load (kg/m):% 49.00 -
Speed (Hz) - .
Gate Position (%) 30.00 .

CORRECTION
Time 23:30:42 0:11
Duration 40.6 mints
Totalizer (Tons) 41.00

AFTER
Bin Loss\Actual (Tons) 38.80
Difference (Tons) -2.20 0.00
Error (%) -5.67 #DIV/0!
Average Error (%) -5.67
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 11/06/20222

New-1.10
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

23:30:42 0:11:38 0:40:56


115.4 76.6 38.8
2 43 41
-5.670103093
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 11/07/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 50.00 -
Load (kg/m):% 49.00 -
Speed (Hz) - .
Gate Position (%) 30.00 .

CORRECTION
Time 23:30:42 0:11
Duration 40.6 mints
Totalizer (Tons) 45.00

AFTER
Bin Loss\Actual (Tons) 39.00
Difference (Tons) -6.00 0.00
Error (%) -15.38 #DIV/0!
Average Error (%) -15.38
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 11/07/20222

New-1.10
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

20:17:36 21:17:41 1:00:05


116.4 77.4 39
146 191 45
-15.38461538
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING DROP TEST

DATE: 01/09/2021
Tag No: 600 WF2
Material: slag
Capacity (tph): 225
Set Point (tph):
Load (kg/m):
Speed (Hz) . .
Gate Position (%) . .

CORRECTION
Time
Duration(Min)
Totalizer (Tons)

AFTER
Bin Loss\Actual (Tons)
Difference (Tons) 0.00 0.00
Error (%) #DIV/0! #DIV/0!
Average Error (%) #DIV/0!
Correction Factor 1.000
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 01/09/2021

DUCT

ure (Inst HOD)


EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING DROP TEST

DATE: 08/03/2022
Tag No: 600 WF3
Material: GYPSUM
Capacity (tph): 22
Set Point (tph): 6.00 -
Load (kg/m): 52.00 -
Speed (Hz) 30.00 .
Gate Position (%) . .

CORRECTION
Time 15:50 -
Duration(Min) 20.0 -
Totalizer (Tons) 2.01 -

AFTER
Bin Loss\Actual (Tons) 2.02 -
Difference (Tons) 0.01 #VALUE!
Error (%) 0.69 #VALUE!
Average Error (%) 0.69
Correction Factor 1.020
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING DROP TEST

DATE: 08/03/2022
Tag No: 600 WF3
Material: GYPSUM
Capacity (tph): 22
Set Point (tph): 6.00 -
Load (kg/m): 52.00 -
Speed (Hz) 30.00 .
Gate Position (%) . .

CORRECTION
Time 15:50 -
Duration(Min) 20.0 -
Totalizer (Tons) 2.01 -

AFTER
Bin Loss\Actual (Tons) 2.02 -
Difference (Tons) 0.01 #VALUE!
Error (%) 0.69 #VALUE!
Average Error (%) 0.69
Correction Factor 1.020
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 18/07/20222
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 44.94 -
Load (kg/m):% 40.50 - Start Time Stop Time Difference

Speed (Hz) - . 16:41:30 18:06:09 1:24:39


Gate Position (%) 22.10 . 140.1 85.6 54.5

CORRECTION
6 60 54
Time 16:41:30 18:06 0.9174311927
Duration 1.2 Hours
Totalizer (Tons) 54.00

AFTER
Bin Loss\Actual (Tons) 54.50
Difference (Tons) 0.50 0.00
Error (%) 0.92 #DIV/0!
Average Error (%) 0.92
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 23/07/2022
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 44.94 -
Load (kg/m):% 40.50 -
Speed (Hz) - .
Gate Position (%) 22.10 .

CORRECTION
Time 16:41:30 18:06
Duration 1.2 Hours
Totalizer (Tons) 56.00

AFTER
Bin Loss\Actual (Tons) 69.70
Difference (Tons) 13.70 0.00
Error (%) 19.66 #DIV/0!
Average Error (%) 19.66
Correction Factor New-1.10 New-1.10
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25374

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 23/07/2022

New-1.10 200
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

19:16:48 20:36:27 1:19:39


114.3 44.6 69.7
134 190 56
19.655667145
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 29/07/2022
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 38.94 -
Load (kg/m):% 36.00 -
Speed (Hz) - .
Gate Position (%) 10.00 .

CORRECTION
Time 15:56:17 18:06
Duration 0.6 Hours
Totalizer (Tons) 34.00

AFTER
Bin Loss\Actual (Tons) 30.20
Difference (Tons) -3.80 0.00
Error (%) -12.58 #DIV/0!
Average Error (%) -12.58
Correction Factor New-1.10 New-1.09
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-24504

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 29/07/2022

New-1.09 200
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

16:05:25 17:02:04 0:56:39


130.2 100 30.2
158 192 34
-12.58278146
EQUIPMENT TYPE:
WEIGH FEEDER SFF BW

CALIBRATION METHOD:
CHECK WEIGHING BIN DROP TEST

DATE: 29/07/2022
Tag No: 680FM01
Material: FLY ASH
Capacity (tph): 105
Set Point (tph): 38.50 -
Load (kg/m):% 36.00 -
Speed (Hz) - .
Gate Position (%) 10.00 .

CORRECTION
Time 17:13:02 18:00:29
Duration 0.5 Hours
Totalizer (Tons) 27.00

AFTER
Bin Loss\Actual (Tons) 25.40
Difference (Tons) -1.60 0.00
Error (%) -6.30 #DIV/0!
Average Error (%) -6.30
Correction Factor New-1.10 New-1.07
Remarks,If any:AS RESULTS ARE OK, NO FURTHER DROP TEST CONDUCT Correction
Count-25597

formula for error calculation,


= (Actual-Totalizer/actual)*100

Signature (Prod&Proces). Sign (Inst Engr) Signature (Inst HOD)


DATE: 29/07/2022

New-1.07
UCT Correction

ure (Inst HOD)


Start Time Stop Time Difference

17:13:02 18:00:29 0:47:27


95 69.6 25.4
199 226 27
-6.299212598