Strategic Planning PT. Balfour Beatty Sakti Indonesia
Project Budgeting Project Manager
Construction Management Februari 2017 - Januari 2019 (2 tahun)
Jakarta Selatan
Phase 1 :
- Piling Mini Concrete for Foundation Equipment, Conveyor and Building.
- Piling Steel Pipe for Foundation Equipment, Conveyor and Jetty.
- Foundation Concrete Equipment, Conveyor and Building Facilities
Supporting.
(Roller Debarker, Hopper/Reclaimer, Chip Screen, Disc Chipper, Bark Chipper,
Pump Room,
Tank Foundation, Conveyor, Mobile Equipment, MCC Building and Weight
Scale Entrance Gate).
- Steel Structure and Finishing work for MCC Building, Weight Scale Entrance
Gate, Bark Chipper,
Chip Screen, Disc Chipper, Pump Room and Mobile Equipment.
- Steel Pipe for Jetty and Walkway Jetty.
Phase 2 :
- Drainage and Road Pavement Concrete.
- Foundation Tower Lighting and Post Road Lighting.
Page 1 of 3
Summary Project :
Constructions Tanks :
Methanol Tank (2TankCS@3000MT), Refined Bleached Deodorized Palm
Oil (2TankCS@500MT), Slop Biodiesel (1TankCS@200MT), Slop Glycerin
(1TankSS304@200MT), Crude Glycerin (CG) (2TankSS304@3000MT),
Yellow Glycerin (YG)(1TankSS304@200MT), Intermediate Biodiesel
(2TankCS@1000MT), Biodiesel (Methyl Ester) (4TankCS@5000MT),
Refined Glycerin Day Tank (RGD) (2TankSS304@200MT), Refined Glycerin
(RG) (4TankSS304@1000MT), Pitch Glycerin (PG) (2TankCS@100 MT),
Fatty Matter (FM) (1TankSS304@200MT), Sodium Methylate (NaOCH3)
(2TankCS@500MT), Hydrochloric Acid (HCl 36%) ( 3TankFRP@200 MT ),
Sodium Hydroxide (NaOH 45%) (1TankCS@50MT), Phosphoric Acid (H3PO4
75%) (1TankSS304@50MT).
PRETREATMANT PLANT, BIODIESEL PLANT, COLD FILTRATION PLANT.
Building Concrete :
Chemical Tank Pump Room, Methanol Tank Pump Room, Pump Room
Biodiesel and Intermediate, Substation Building, Loading Station, Drum Filling
and Warehouse, Fire Pump House, Generator, Pipe Bridge.
Infrastructures :
Concrete Road, Drainage (Precast U-Ditch and Box Culvert), PJU.
Steel Structures :
Chemical Tank Pump Room, Methanol Tank Pump Room, Pump Room
Biodiesel and Intermediate, Substation Building, Loading Station, Drum Filling
and Warehouse, Fire Pump House, Generator, Pipe Bridge.
Piping :
OSBL & ISBL
Constructions :
Refinary & Fractionation Plant CBS - (11 Fl : 36Mx36Mx36.45M).
Hydrogenation Plant CBS - (8 Fl : 15Mx12Mx29.35M).
Cooling Tower Fractination CCT 2 Ea, Refinary CCT 2 Ea, Refinary DCT 2 Ea.
Contruction Tanks :
CPO 3450MT-10 Unit, RBDOL 3450MT-2 Ea, PFAD 3450MT-3 Ea.
Water Tank 3450MT-5 Ea.
Page 2 of 3
Weight Bridge
WTP&WWTP