Strategic Planning PT. Balfour Beatty Sakti Indonesia
Project Budgeting Project Manager
Construction Management Februari 2017 - Januari 2019 (2 tahun)
Jakarta Selatan

Certifications Name Project : Wood Chip Mill.

1. SKA AHLI UTAMA MANAJEMEN Location : Penajam - East Kalimantan


PROYEK
2. SKA AHLI MADYA MANAJEMEN Meeting site and office,
KONSTRUKSI
Holding kick of meeting,
Preparation works, Planning organization and construction works, Weekly
meeting, Preparation before begining project, Interim and completion
inspection of the project, Weekly and Monthly Progress Report.

Phase 1 :
- Piling Mini Concrete for Foundation Equipment, Conveyor and Building.
- Piling Steel Pipe for Foundation Equipment, Conveyor and Jetty.
- Foundation Concrete Equipment, Conveyor and Building Facilities
Supporting.
(Roller Debarker, Hopper/Reclaimer, Chip Screen, Disc Chipper, Bark Chipper,
Pump Room,
Tank Foundation, Conveyor, Mobile Equipment, MCC Building and Weight
Scale Entrance Gate).
- Steel Structure and Finishing work for MCC Building, Weight Scale Entrance
Gate, Bark Chipper,
Chip Screen, Disc Chipper, Pump Room and Mobile Equipment.
- Steel Pipe for Jetty and Walkway Jetty.
Phase 2 :
- Drainage and Road Pavement Concrete.
- Foundation Tower Lighting and Post Road Lighting.

PT. Paramita Bangun Sarana


Deputy PM (Construction Manager)
Mei 2012 - Februari 2017 (4 tahun 10 bulan)
Jakarta Selatan, Jakarta Raya, Indonesia

  Page 1 of 3
   

Summary Project :

Constructions Tanks :
Methanol Tank (2TankCS@3000MT), Refined Bleached Deodorized Palm
Oil (2TankCS@500MT), Slop Biodiesel (1TankCS@200MT), Slop Glycerin
(1TankSS304@200MT), Crude Glycerin (CG) (2TankSS304@3000MT),
Yellow Glycerin (YG)(1TankSS304@200MT), Intermediate Biodiesel
(2TankCS@1000MT), Biodiesel (Methyl Ester) (4TankCS@5000MT),
Refined Glycerin Day Tank (RGD) (2TankSS304@200MT), Refined Glycerin
(RG) (4TankSS304@1000MT), Pitch Glycerin (PG) (2TankCS@100 MT),
Fatty Matter (FM) (1TankSS304@200MT), Sodium Methylate (NaOCH3)
(2TankCS@500MT), Hydrochloric Acid (HCl 36%) ( 3TankFRP@200 MT ),
Sodium Hydroxide (NaOH 45%) (1TankCS@50MT), Phosphoric Acid (H3PO4
75%) (1TankSS304@50MT).
PRETREATMANT PLANT, BIODIESEL PLANT, COLD FILTRATION PLANT.
Building Concrete :
Chemical Tank Pump Room, Methanol Tank Pump Room, Pump Room
Biodiesel and Intermediate, Substation Building, Loading Station, Drum Filling
and Warehouse, Fire Pump House, Generator, Pipe Bridge.
Infrastructures :
Concrete Road, Drainage (Precast U-Ditch and Box Culvert), PJU.
Steel Structures :
Chemical Tank Pump Room, Methanol Tank Pump Room, Pump Room
Biodiesel and Intermediate, Substation Building, Loading Station, Drum Filling
and Warehouse, Fire Pump House, Generator, Pipe Bridge.
Piping :
OSBL & ISBL

Constructions :
Refinary & Fractionation Plant CBS - (11 Fl : 36Mx36Mx36.45M).
Hydrogenation Plant CBS - (8 Fl : 15Mx12Mx29.35M).
Cooling Tower Fractination CCT 2 Ea, Refinary CCT 2 Ea, Refinary DCT 2 Ea.

Contruction Tanks :
CPO 3450MT-10 Unit, RBDOL 3450MT-2 Ea, PFAD 3450MT-3 Ea.
Water Tank 3450MT-5 Ea.

New Refinary & Fractionation Plant 2 - (10 Fl :35Mx36Mx45.5M).


New Warehouse - (4 Fl:144.5Mx112Mx36M).
New Loading Unloading (94.5Mx6.5Mx8M).

  Page 2 of 3
   

Weight Bridge
WTP&WWTP

Pendidikan
Universitas Gadjah Mada (UGM)
S2 - Master’s Degree, Civil & Structural Engineering · (2002 - 2004)

Universitas Islam Indonesia


S1 - Bachelor's degree, Civil & Planning Engineering · (1997 - 2002)