SUBCONTRACTOR CHECKLIST
Project:
Client Name: LOCATION:
________________________________ _______________________________
Contractor:_________________________________________________________________________
Subcontractor:______________________________________________________________________
Date Start: Target Date of
__________________________________ Accomplishment:_______________________________
ARCHITECTURAL:
HOUSE CONSTRUCTION (LIVABLE AND USABLE AREAS
LANDSCAPING
FENCE AND GATE
OTHERS (PLEASE
SPECIFY):____________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
GROUND FLOOR
TOTAL SQM
AREA(s) FINISHES AND INCLUSIONS (Measured
wall to wall)
GROUND FLOOR
LIVING AREA
Flooring
-Use 60 x 60 cm Vitrified Tiles (Color/ Design refer to
swatch(s) given.
-Use Tile adhesive
-Use tile grout
Ceiling:
Cove layout ( see working drawings for details)
Use gypsum board ______ mm THK.
Use metal furring for framing.
Use skim coat for finishing
Use flat white paint.
Walls:
@ Exterior Walls
Use 6’’ CHB plastered finish
INSERT LETTERHEAD HERE
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
Use Royu brand switches and convenience outlet
(No. Will be based on drawings, BOM and BOQ
given.)
-Include panel Board.
Flooring:
-Use 60 x 60 cm Vitrified Tiles (Color/ Design refer to
swatch(s) given).
-Use Tile adhesive
-Use tile grout
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
DINING AREA -Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
INSERT LETTERHEAD HERE
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Flat Ceiling
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
Inclusions:
-1.80 li. mts. Cabinets
-Use ¾ “ Marine Plywood
- Use Laminate Finish (Color/ Design refer to
swatch(s) given).
-1.80 li. mts. Hanging Cabinets
INSERT LETTERHEAD HERE
Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout
Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
Flooring:
Concrete Pavement
@ Counter top 60 cm X 60 cm tiles
SERVICE AREA @Depressed at sink area
PLUMBING:
-Hose bibb and roughing-in
PORCH Concrete pavement
LANAI Concrete pavement
Flooring:
Concrete Pavement
CARPORT
PLUMBING:
-Hose bibb and roughing-in
MAID’S ROOM
Flooring:
- HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
INSERT LETTERHEAD HERE
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
Flooring:
- HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
MASTER
-Use flat white latex paint primer
BEDROOM
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
INSERT LETTERHEAD HERE
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
INCLUSIONS:
Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout
Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
INSERT LETTERHEAD HERE
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
Appurtenances:
Soap and Tissue Holder
Fittings
Flooring:
- HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
__ BEDROOM (S) -Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
INSERT LETTERHEAD HERE
Ceiling:
Flat Ceiling
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.
INCLUSIONS:
Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout
Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
INSERT LETTERHEAD HERE
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
Appurtenances:
Soap and Tissue Holder
Fittings
BALCONY FLOORING:
-Use plain concrete pavement
-Use waterproofing
RAILING
-Use 2” x 2” tubular painted.
ROOFING -Use gauge 24 pre-painted long span roofing.
-Use reflective bubble insulation.
Construction of _____________________________________________________________________
(Project Nature)
At ________________________________________________________________________________
(Location)
SUB-CONTRACTOR AGREEMENT
and_______________________________________________________________________________
(Company Name and Address- Sub-Contractor)
In WITNESS thereof the Contractor and the Sub-Contractor have hereunto set their respective hands
the day and the year first above written.
INSERT LETTERHEAD HERE
____________________________ ____________________________
Printed Name and Signature Printed Name and Signature