Contractor:_________________________________________________________________________
Subcontractor:______________________________________________________________________
Date Start: Target Date of
__________________________________ Accomplishment:_______________________________
GROUND FLOOR
TOTAL SQM
AREA(s) FINISHES AND INCLUSIONS (Measured
wall to wall)
GROUND FLOOR
LIVING AREA
Flooring
-Use 60 x 60 cm Vitrified Tiles (Color/ Design refer to
swatch(s) given.
-Use Tile adhesive
-Use tile grout
Ceiling:
Cove layout ( see working drawings for details)
Use gypsum board ______ mm THK.
Use metal furring for framing.
Use skim coat for finishing
Use flat white paint.
Walls:
@ Exterior Walls
1
(Note: General Contractor Logo only )
Use 6’’ CHB plastered finish
Use skim coat
Use flat white latex paint primer
Use semi-gloss paint for finishing
Rebars: Specified @ drawings.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
Use Royu brand switches and convenience outlet
(No. Will be based on drawings, BOM and BOQ
given.)
-Include panel Board.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
2
(Note: General Contractor Logo only )
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Flat Ceiling
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
Inclusions:
-1.80 li. mts. Cabinets
-Use ¾ “ Marine Plywood
3
(Note: General Contractor Logo only )
- Use Laminate Finish (Color/ Design refer to
swatch(s) given).
-1.80 li. mts. Hanging Cabinets
-Use ¾ “ Marine Plywood
- Use Laminate Finish (Color/ Design refer to
swatch(s) given).
-Fixture Inclusion
1-sink (Single-Tub w/ Drain)
1-Single lever kitchen faucet (gooseneck)
Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout
Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
4
(Note: General Contractor Logo only )
Fixtures:
Wall hang lavatory
Water Closet
Bidet Spray
Faucet ( Single handle basin mixer faucet) as
indicated number(s)
Telephone Shower (if included @ draings)
Appurtenances:
Soap and Tissue Holder
Fittings
Flooring:
Concrete Pavement
@ Counter top 60 cm X 60 cm tiles
SERVICE AREA @Depressed at sink area
PLUMBING:
-Hose bibb and roughing-in
PORCH Concrete pavement
LANAI Concrete pavement
Flooring:
Concrete Pavement
CARPORT
PLUMBING:
-Hose bibb and roughing-in
MAID’S ROOM
Flooring:
- HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
5
(Note: General Contractor Logo only )
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
Flooring:
- HDF Wood Laminate 194 x 1212 x 8mm
(color/design as per approved swatch of client) -Use
–Use adhesive based on installation process
required.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
MASTER
-Use flat white latex paint primer
BEDROOM
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.
6
(Note: General Contractor Logo only )
required.
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Layout please based on working drawings
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
shown @ drawings.
INCLUSIONS:
Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
7
(Note: General Contractor Logo only )
-Use tile Grout
Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
Appurtenances:
Soap and Tissue Holder
Fittings
Walls:
@ Exterior Walls
-Use 6’’ CHB plastered finish
-Use skim coat
-Use flat white latex paint primer
8
(Note: General Contractor Logo only )
-Use semi-gloss paint for finishing
-Rebars: Specified @ drawings.
@Interior Walls
-Use 6 mm HardieFlex or approved as equal drywall
-Use skim coat
-Use flat white latex paint primer
-Use semi-gloss paint for finishing
-Use studs and tracks (see drawings for details)
Note: Except toilet and bath(s) and Powder
Room(s).
Ceiling:
Flat Ceiling
-Use gypsum board ______ mm THK.
-Use metal furring for framing.
-Use skim coat for finishing.
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans, load computation and schedule
shown @ drawings.
INCLUSIONS:
Walls:
-Use 4’’ CHB wall
-Use 30 cm x 60 cm glazed tiles (Color/ Design refer
to swatch(s) given.)for Finishing
-Use tile adhesive
-Use tile Grout
Ceiling:
Flat Ceiling
-Use 3.5 mm THK HardieFlex or approved as equal
plaster board.
9
(Note: General Contractor Logo only )
-Use metal furring for framing.
-Use skim coat for finishing
-Use flat white paint.
Electrical:
Roughing-in based on schedule and lay-out based on
electrical plans,load computation and schedule
Shown @ drawings.
Use Royu brand switches and convenience outlet.
(No. Will be based on drawings, BOM and BOQ
given.)
Include panel Board.
Plumbing:
-Use specified sanitary pipes and fittings @ BOM,
BOQ and Working Drawings.
-Use specified waterline pipes and fittings @ BOM,
BOQ and Working Drawings.
Appurtenances:
Soap and Tissue Holder
Fittings
BALCONY FLOORING:
-Use plain concrete pavement
-Use waterproofing
RAILING
-Use 2” x 2” tubular painted.
ROOFING -Use gauge 24 pre-painted long span roofing.
-Use reflective bubble insulation.
10
(Note: General Contractor Logo only )
FINISHING Note: This may include claddings, wood and tiles.
EAVES -Use 3.5mm THK HARDIEFLEX OR APPROVED AS
EQUAL PLASTER BOARD.
-Use plain White Paint/ Wood Stain if specified.
Construction of _____________________________________________________________________
(Project Nature)
At ________________________________________________________________________________
(Location)
11
(Note: General Contractor Logo only )
SUB-CONTRACTOR AGREEMENT
THIS AGREEMENT is made this 5th of September 2021 between (Insert Name & Address
of General Contractor) (Hereafter, called “GENERAL CONTRACTOR”),
In consideration of payment to be made by the General Contractor to the Sub-Contractor, the Sub-
Contractor hereby covenants with the General Contractor to execute, complete and maintain the
Sub-Contract works in conformity in all respects with the terms and conditions of this Agreement.
In WITNESS thereof the General Contractor and the Sub-Contractor have hereunto set their
respective hands the day and the year first above written.
____________________________ ____________________________
Printed Name and Signature Printed Name and Signature
12
(Note: General Contractor Logo only )
ACKNOWLEDGMENT
BEFORE ME, a Notary Public, on this _______ day of ____________ , personally appeared
the following and exhibited their government-issued identification cards bearing their respective
photographs and signatures.
NAME ID NO.
They are known to me to be the same persons who signed this Sub-Contractor
Agreement consisting of 12 pages including the Annex and this page on which this
acknowledgment is written. They confirmed that the same is their voluntary act and deed
including that of the corporations that they represent.
13