You are on page 1of 3

BE Form 07

Republic of the Philippines


Department Of Education
Region XII
Division of South Cotabato
BONIFACIO R. TAGABAN SR. INTEGRATED SCHOOL
Brgy. Kinilis Polomolok South Cotabato

Department of Education
BRIGADA ESKWELA
SCHOOL ACCOMPLISHMENT REPORT

DIVISION: SOUTH COTABATO REGION: XII


SCHOOL: BONIFACIO R. TAGABAN SR. INTEGRATED SCHOOL ID: 500458
SCHOOL
SCHOOL ADRESS: Brgy. Kinilis Polomolok South Cotabato
(Please check appropriate box)
Level: Type of School:
Elementary Central School
High School Non-Central School (complete)
Multigrade
Primary School/Incomplete
√ Integrated School
SCHOOL HEAD: Joy C. Nacar CONTACT NUMBER: 09465635548
PTA PRESIDENT: Florina M. Balcos CONTACT NUMBER: 09

A1. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED


Target Accomplishment Remarks
ROOFING WORKS: Roofs of 2 buildings filled Roofs of 2 buildings filled
with fallen leaves needs to with fallen leaves were 100% accomplished
be cleaned. cleaned.
Roofs of 1 building where Roofs of 1 building where
paints were faded need to paints were faded were 60% accomplished
be repainted. repainted.
Gutters of buildings filled Gutters of buildings filled
with dirt and fallen leaves with dirt and fallen leaves 100% accomplished
need to be cleaned. were cleaned.
Damaged gutters of
Damaged gutters of Lipunan
Lipunan building needs to 100% accomplished
building were repaired.
be repaired.
Repair of the collapsed Collapsed Fence were
20% Completed
MASONRY WORKS Fence repaired

Repair of Deteriorated Deteriorated Floor of Is Building


100% Accomplished
classroom floor of Is were repaired
Arms chairs need to be Arms chairs were painted
CARPENTRY WORKS 100% Accomplished
repair and repaired
Kinder & Grade one CL
Kinder classroom is under
room ceilings to be
repair
replaced
Classroom Doors need to be
Doors were repaired 100% Accomplished
repair
New blackboards need to be New Blackboard was
established for makeshift Established
Makeshift Makeshift was established 100% Accomplished
School Ground needs to
Ground Improvement School Grounds was cleaned
be cleaned and plants need 100% Accomplished
Works and plants was trimmed
to be trimmed
Gulayan sa paaralan needs Gulayan sa paaralan was
100% Accomplished
to be developed developed
Needs to constructs Plant Plant boxes for Is ground was
100% Accomplished
boxes constructed
B. DONATIONS/MATERIAL RESOURCES GENERATED (Use separate sheets, if needed)
Type of Donations Source Estimated Cost
50 hollowblocks, 10pcs 8mm round bar Anecito Baculna Jr. 900.00
Kevin R. Casicas and Paul Justiniani 548.00
Cash Marcelo D. Buan 120.00

TOTAL 3,748.00

C. VOLUNTEER SERVICES
Number of Volunteers
Type of Volunteer Name of Individuals Day Day Day Day Day Day
Total
1 2 3 4 5 6
Private Sectors:
1. PTA /SGC Officers 5 2 1 2 2 1 13
Community:
1. Parents 49 51 22 39 48 14 223
3. Private
Individual/Community 10 45 11 0 70 0 135
Member
4. Religious Organization 2 0 0 0 0 0 2
Government Agencies:
4. Barangay Officials 1 1 1 1 0 0 4
5. SK Officials 1 1 2 0 0 0 4

6. Municipal Employees 0 5 1 0 0 0 6

8. Philippine National Police 0 0 0 0 0 2 2


10. Barangay Workers 3 2 2 2 2 0 11
11. Students 23 19 25 20 19 12 118
12. Teachers 15 18 13 18 15 17 96
TOTAL 109 144 78 82 156 46 615

D. ESTIMATED COST OF VOLUNTEER SERVICES RENDERED. Refer to Guide for Computing Labor Cost. (Use
separate sheets, if needed)
Total Number of Total Number of
Type of Services Total Estimated Cost
Volunteers Hours Rendered
ROOFING WORKS:
Cleaning/sweeping of roofs and gutters @
16 4 2,512.00
20.00/hr
Painters @ 35.00/hr 3 4 500.00
Carpenters for repair and replacement of
2 4 1000.00
and gutter @ 40/hr
TOTAL 51 16 6,580
MASONRY WORKS:
Repair of Fence 3 4
Repair of CL Floor 2 4 600.00
TOTAL 7 12 1,200.00
CARPENTRY WORKS:
Repair of Chairs 5 8 500.00
New Blackboard 2 4 500.00
Repair of Ceilings 3 4 750.00
Repair of Doors 2 4 600.00
Makeshift 10 4 2,000.00
TOTAL 24 24 4,350.00
GROUND IMPROVEMENT WORKS:
Grass Weeding 50 66 1,500. 00
Ground Cleaning 100 494 4,656.00
Gulayan Sa Paaralan Development 46 80 2,000.00
Development of School Parks 15 77 1,070.00
TOTAL 111 717 9,226.00

E. SIGNIFICANT EVENTS/EXPERIENCES (Use separate sheets, if needed)


What happened? Who were involved? When What is/are its important contribution to the
operation of the school or to the existing needs of the
school?
Brigada Caravan Teachers, School Head PTA We’ve got a chance to inform the Barangay
Officers Brgy. Council Constituents regarding the upcoming Brigada
Eskwela 2022, Enrolment Period.
Held Posting of announcement PTA Officers, Teachers and Informed the community with the Schedule of the
to the entire puroks School Head Brigada Eskwela
School round Cleaning and Pupils, and Parents The school were cleaned and planted with flowers
gardening
Ground Clearing and School Head, Punong The campus for secondary were leveled, and Cleared
Improvement of Secondary Barangay, PTA Officers
Classroom Restructuring Teachers, School Head Parents All Classroom were reconstructed according to the
and Volunteers standards set by the district officers and region
guidelines
Office Enhancement Teachers School Heads, Office of the School Head was rearranged making it
Parents and Volunteers more presentable and organized

Construction of Plant boxes Teachers, School Head, Plant Boxes in the secondary campus were
Parents and Volunteers constructed

F. ISSUES AND CONCERNS (Describe briefly problems encountered and how resolved)

The best implementation of Brigada Eskwela: the school became very prepared during the opening of classes. It is also the
comeback of face to face classes.

G. LESSONS LEARNED/BEST PRACTICES

For best, post activity report, proper documentation must be given attention.

H. SUGGESTIONS TO STRENGTHEN BRIGADA ESKWELA PROJECT (include support needed from Central, Region
and Division Office that can increase the impact of Brigada Eskwela Project in your school.)

Effective and efficient advocacy play a vital role in organizing Brigada Eskwela

I. EVIDENCES/ATTACHMENTS
a. Photos (before, during and after)
b. Photocopy of all BE Forms (check if attached)
___√___ Form 01 ___√___ Form 05
___√ _ _ Form 02 ___ √___ Form 06
___√___ Form 03
___√___ Form 0

Prepared by: Date:

Submit copy of this completed form to ADOPT-A-SCOOL PROGRAM DISTRICT COORDINATOR or District Supervisor on
or before.

You might also like