PROJECT PROGRESS DIARY

BE MECHANICAL
2021-22

1
PROJECT TITLE: Production Planning and Control in Industrial
Engineering

PROJECT GUIDE: Prof. Madhavi Harne

PROJECT EXECUTED BY:


Sr. No. Enrollment No. Name of student Signature
01 BE18F02F014 Saurabh Chindhe

2
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE
We discussed about the course its importance,
credits and the course outcomes.
Better interaction between Technical Institutions
and Industry is the need of the hour. This aspect has
great bearing on the Engineering Curriculum,
exposure of industrial atmosphere to engineering
students and subsequent placement of young
graduate engineers in industries across the country.
With the advent of globalization and opening up of
the Indian economy to outside world, competition
among industries has become tough. To resolve their
engineering problems they look up to the
Engineering Institutions. Similarly, there is an
urgent need to prepare engineering students to be
Course entrepreneurs, by introducing them to newer
technologies and engineering methodologies. These
5th March Introduction objectives can only be achieved well by bridging the
2021 gap between industry and the academic institute.

3
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE
Industrial Interaction is the course in
which we have to visit industries and
get knowledge about what work is done
in the industry, how it is done, which
machines are used how the process is
happening and how the different
theories we studied in our books are
implemented in the industry.
But, unfortunately because the
pandemic and ongoing lockdown we
decided to go through a online course
!9th March individually.
Our guided Madam Harne instructed
about which course will benefit us and
enhance our learning.
2021 Finding industries to visit We were given the task to find a good
online course which will increase our
knowledge.

4
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE
In this day we came with our task done,
so we have selected the course.
In this course the paper examines the
current state of Production Planning and
Control (PPC), identifies some technical
and systems changes that have occurred
over recent years and links these with the
requirements being placed on companies
16th April Course Selection by the market. PPC is being asked to
2021 respond effectively to these internal and
external changes by being more dynamic
and providing better control of resources
and delivery performance. Some of the
requirements to be satisfied by the new
PPC systems are identified. To meet these
requirements, it is suggested that better
understanding is required of how different
factors affect PPC systems performance
and that administrative systems need
improving. The quantitative, administrative
and behavioural aspects of PPC are
discussed. A framework for developing an
agenda for action and research is provided.

5
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE
On this secession our course guide
asked us what we have learned till this
day in our ongoing online course.
So, I explained her that I have finished
with my half of the Course.
30th April Madam insisted me to explain my tasks
2021 Course Update to the rest of my group mates, this will
surely increase their knowledge.
Everyone explained what we have
learned till now.
Madam also informed that we have
make the report on the Industrial
Interaction course.
Our guide explained us the format we
have to maintain and the letter sizing,
fonts and spacing to be maintained in
the report.
We were almost to finish up with the
online course, therefore madam said us
to submit our reports in next session.

6
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

7th May End note and Report Checking This was the last session in which we
2021 explained about the outcome I any
fellow classmate learned in this online
course
I explained her all about my course and
the activities I did in my course.
Also the Case study I have done in my
course.
In the last we submitted our reports to
our guide and at the same time she
checked them and suggested us
changes and we implemented
suggestion and the final report is ready.

7
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

8
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

9
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

10
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

11
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

12
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

13
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

14
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

15
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

16
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

17
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

18
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

19
PROJECT PROGRESS REPORT
DATE ACTIVITY DISCUSSION REMARK SIGN. OF
GUIDE

20

You might also like