Selection committee :- Comments
Unit TPM Unit QA Unit MAINT. Unit HR Unit HEAD Corp-TPM SBU
Ashok Iron Group - TPM 2008-09 Month :-
SUGGESTION RAGISTER - Summery
Best Five Amount Gift Item
Sr.No. Date Suggestion Number Suggestion Operator Name Dept./Location Remarks
Suggestions allotted issued
Total
Selection committee :- 1) Number kaizens collected
Unit TPM Unit QA Unit MAINT. Unit HR Unit HEAD Corp-TPM SBU
Ashok Iron Group TPM-2008-09
MODEL MACHINE - CHECK LIST SHEET
Name of the Team Area : PLANT ----------
NAME O
Sl no. Check Points
1
04 Initial Cleaning
c) OEE - Trend
TOTAL points
TOTAL score in %
EVALUATION CRITERIA
2 Marks - Almost Zero Implementation
4 Marks - Implementation Started
6 Marks - Partial Implementation
8 Marks - Full Implementation
10 Marks - Very Effective Implementation
T SHEET
Name of the Auditee : Unit Head / TPM leader / HR head
Target : Average of Model Machine 75%
(points will be converted to percentage)
2 3 4 5
Ashok Iron Group - TPM 2008-09
Date of
Preparation
Classification
Improvement Cases
Division
Trouble Cases
4. Troubleshooting
Actual Results
Date Executed
Teacher
Student
ed By
on
Ashok Iron Group TPM 2008-09
HOUSE KEEPING (1S&2S )– CHECK LIST SHEET
Name of the Team Area : Plant ---------------
Total : 2S office
NOTE : Overall Unit score will be through mail.
1
S
2S chart -
c
h
a
r
t
-
S
h
o
p
f
l
o
o
r
8012
6734
3
8012
6734
2S chart
1S
ch
ar
t
-
O
f
ic
e
8 2
7 0 3
6 4
3
K LIST SHEET
Date :
Zones
2 3 4 5 6 7 8 9 10 11 12 13 14 15
Zones
2 3 4 5 6 7 8 9 10 11 12 13 14 15
2S chart - Shop floor
60
40
20
0
3 2
40
20
0
3 2
2S chart - Office
60
40
20
0
3 2
AIG Model Machine Machine layout
Dust RW/Rejected
Chips trolley material
collect
or
Cont Tool
rol Machine /kit
pane stand
l
Opr
IN PUT Inspection OUT PUT
material stand material
Find attachement
Kaizen Sheet
Pillar KK JH PM QM IC E&T OTPM SH&E
Ashok Iron Works Loss/Step No.
Result Area P Q C D S M
Kaizen Kaizen
Theme Idea
Problem / Present Status: Countermeasure:
(Before) (After)
Analysis: Results:
Before
Area/Model Kaizen S.No.
Operation Start Date
Machine Finish Date
BM
Target
Team Members:
Benefits:
Standards/Documents Issued/Updated
JH Standards OPL
PM Standards OQA Std.
Work Instruction Gauges
Part Drawing FQA Std.
Process Sheet
Tool Drawings
After
Ashok Iron Group
TPM BOARD - MODEL MACHINE Plant- -------------
Model machine Team Structure (1) Trend graph OEE - Monthly Trend Graph - (1) One Point Lesson sheets
(2) Productivity - (1) Customer (2) MP sheet
Monthly complaints- Nos., Monthly
(2) Internal rejection - Percentage,
Monthly
(3) Cp, Cpk
Check Sheet - (1) Production - Day wise Trend Trend Graph Trend Graph -
(1) Model machine graph (1) RW - Qty,
Monthly (1) Accidents - Monthly
(2) Zone (2) Salvage - Qty,
Monthly
(3)Pareto of Defects - Monthly
Tag Trend Graph - (1) Trend Graph - Monthly Break Trend graph - Cost Trend Graph ;-
(1) Tag put down Hours (1) (1) Delivery Adherence - Monthly
(2) Tag removed (2) Trend Graph - Consumables cost - Monthly (2) Schedule
Monthly Occurrence (2) Adherence- Monthly
Power cost -Monthly
(3) Maintainance
cost- Monthly
Trend Graph - Before / After Photos for Trend Graph - Losses 1) Machine layout
(1) Suggestion (1) kaizen (1) No load - Hrs,
(2) Kaizen Monthly
(2) Suggestion (2) No power - Hrs, monthly
(3)House keeping ( If (3) Set up change time - Hrs, Monthly
availability)