You are on page 1of 8

Republic of the Philippines

Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL
ELECTRICAL INSTALLATION AND MAINTENANCE
WEEKLY HOME LEARNING PLAN
Learner’s Name Grade & Section Gr 11 – EIM (Bonifacio) Quarter and Week 1st Quarter, Week 1
School Pagbilao Grande Island NHS District Pagbilao II Date September 13-17, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)
6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Quarter I Electrical Installing Introduction Modular Learning
Week 1 Installation and Electrical The learners will walkthrough of the lesson expectations. Modular-Print
Maintenance Lighting Learners will read the objectives to guide them on the learning targets Parents are ask to
System, Learners will answer a pre-assessment test. get and submit the
Auxiliary Development module in their
Outlets and Learners will elaborate safety first. respective LGUs or
Lighting Explain the general rules of shop safety rules and special rules for electrical/electronics in school whichever
Fixtures laboratory. is preferred.
(Practice Know the different safety signs in the laboratory.
Occupational Identify the personal protective equipment.
Health and Engagement
Safety Learners will describe the meaning of the given safety/warning signs.
Procedure) Identify the Do’s and Don’t while performing jobs in the laboratory.
Always practice “Think Plan Ahead”.
Assimilation
The learners will make a video role playing (minimum of 1 minute) about any scenario of
safety work place rules and regulation. Performance Rubrics will be given)
I learned that ___________.
I understand that ____________.
I realize that ______________
11:30AM Lunch Break
– 1:00PM
1:00PM –
3:00PM
Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA

Position: Teacher II Position: Principal II


Date: September 13, 2021 Date:
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL
ELECTRICAL INSTALLATION AND MAINTENANCE
WEEKLY HOME LEARNING PLAN

Learner’s Name Grade & Section Gr 11 – Bonifacio Quarter and Week 1st Quarter, Week 2
School Pagbilao Grande Island NHS District Pagbilao II Date September 20-24, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)

6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Quarter II Electrical Installing Introduction Modular Learning
Week 2 Installation and Electrical The learners will walkthrough of the lesson expectations. Modular-Print
Maintenance Lighting Learners will read the objectives to guide them on the learning targets Parents are ask to
System, Learners will answer a pre-assessment test. get and submit the
Auxiliary Development module in their
Outlets and Learners will identify the different electrical symbols and signs. respective LGUs or
Lighting Select the appropriate electrical symbols and signs according to the job requirements. in school whichever
Fixtures Engagement is preferred.
(Interpret Learners will draw at least 30 electrical symbols with description.
Technical Identify the electrical symbols and sign used in an electrical plan.
Drawings and Assimilation
Plans) The learners will make a simple electrical plan and apply the appropriate electrical
symbols.

I learned that ___________. I understand that ____________. I realize that ______________

11:30AM Lunch Break


– 1:00PM
1:00PM –
3:00PM
Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA

Position: Teacher II Position: Principal II


Date: September 20, 2021 Date:
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL

ELECTRICAL INSTALLATION AND MAINTENANCE


WEEKLY HOME LEARNING PLAN

Learner’s Name Grade & Section Gr 11 - Bonifacio Quarter and Week 1st Quarter, Week 3
School Pagbilao Grande Island NHS District Pagbilao II Date September 27-October 1, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)

6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Week 2 Electrical QUARTER I Introduction Modular Learning
Installation and PREPARING Learners will identify different tools and where it used. Modular-Print
Maintenance ELECTRIC The learners will cite different materials needed to do the job. Parents are ask to
AND Development get and submit the
HYDRAULIC The learners will name the electrical tools and materials that will be presented. module in their
TOOLS The learners will cite where the electrical tools / materials where used. respective LGUs or
LO 1. 1 Engagement in school whichever
Identify How can you do your work do be accomplish easy and fast? is preferred.
Electrical and Learners will cite a real-life situation using different electrical tools in performing jobs.
Hydraulic Tools Assimilation
The learners will demonstrate the proper uses of different electrical tools/materials.
Learners will answer the question provided on the module.
Reflection
I learned that ___________. I understand that ____________. I realize that ______________.

11:30AM Lunch Break


– 1:00PM
1:00PM –
3:00PM

Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA
Position: Teacher II Position: Principal II
Date: September 27, 2021 Date:
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL
ELECTRICAL INSTALLATION AND MAINTENANCE
WEEKLY HOME LEARNING PLAN
Learner’s Name Grade & Section Gr 11 - Bonofacio Quarter and Week 1st Quarter, Week 4
School Pagbilao Grande Island NHS District Pagbilao II Date October 4-8, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)

6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Week 3 Electrical LO 1.2 Introduction Modular Learning
Installation and Requisition Slip The learners will walkthrough of the lesson expectations. Modular-Print
Maintenance Form Learners will read the objectives to guide them on the learning targets Parents are ask to
The learners will observe the given electrical wiring diagram get and submit the
Development module in their
The learners will identify all the electrical tools and materials that are needed to perform respective LGUs or
the job that is in the wiring diagram in school whichever
Engagement is preferred.
The learners will make a requisition form showing the quantity, unit, description, unit cost
and total cost of the electrical tools and materials needed for the job.
If there is/are tools/equipment will borrow, make an inventory form showing the tools are
function/not functioning, quantity, borrowed, missing.
Assimilation
The learners will make their own wiring diagram and make a requisition form and an
inventory form.
Reflection
I learned that ___________. I understand that ____________. I realize that ______________.

11:30AM Lunch Break


– 1:00PM
1:00PM –
3:00PM
Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA
Position: Teacher II Position: Principal II
Date: October 4, 2021 Date:
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL
ELECTRICAL INSTALLATION AND MAINTENANCE
WEEKLY HOME LEARNING PLAN

Learner’s Name Grade & Section G 11 - Bonifacio Quarter and Week 1st Quarter, Week 5
School Pagbilao Grande Island NHS District Pagbilao II Date October 11-15, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)

6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Week 5 Electrical Perform Introduction Modular Learning
Installation and Mensuration The learners will walkthrough of the lesson expectations. Modular-Print
Maintenance and Calculation Learners will read the objectives to guide them on the learning targets Parents are ask to
Learners will answer a pre-assessment test. get and submit the
Development module in their
Learners will identify different types of measuring instrument and its classification. respective LGUs or
Engagement in school whichever
Learners will test the different types of measuring instruments according to its purpose. is preferred.
Follow the safety precaution and guidelines while using the instrument.
Wear PPE while performing tasks.
Assimilation
The learners will answer the activities o the module.
Learners will answer the question provided on the module.
Reflection
I learned that ___________. I understand that ____________. I realize that ______________.

11:30AM Lunch Break


– 1:00PM
1:00PM –
3:00PM
Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA

Position: Teacher II Position: Principal II


Date: October 11, 2021 Date:
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL
ELECTRICAL INSTALLATION AND MAINTENANCE
WEEKLY HOME LEARNING PLAN

Learner’s Name Grade & Section Gr 11 - Bonifacio Quarter and Week 1st Quarter, Week 6
School Pagbilao Grande Island NHS District Pagbilao II Date October18-22, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)

6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Week 6 Electrical System of Introduction Modular Learning
Installation and Measurement The learners will walkthrough of the lesson expectations. Modular-Print
Maintenance Learners will read the objectives to guide them on the learning targets Parents are ask to
Development get and submit the
Learners will read the learning content about multi tester, its types of multi tester and parts module in their
of multi tester. respective LGUs or
Proper care and maintenance of multi tester will be presented. in school whichever
How to read the meter scale of the multi tester. is preferred.
What is a continuity lamp tester?
How and what are the materials needed in making continuity lamp tester?
Engagement
Learners will do the activity provided on module about reading meter using multi tester
and continuity lamp tester..
Assimilation
Learners will answer the question provided on the module.
Reflection
I learned that ___________. I understand that ____________. I realize that ______________.

11:30AM Lunch Break


– 1:00PM
1:00PM –
3:00PM
Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA
Position: Teacher II Position: Principal II
Date: October 18, 2021 Date:
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL

ELECTRICAL INSTALLATION AND MAINTENANCE


WEEKLY HOME LEARNING PLAN

Learner’s Name Grade & Section Gr 11 - Bonifacio Quarter and Week 1st Quarter, Week 7
School Pagbilao Grande Island NHS District Pagbilao II Date October 25-29, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)

6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Week 7 Electrical Perform Introduction Modular Learning
Installation and Mensuration The learners will walkthrough of the lesson expectations. Modular-Print
Maintenance and Calculation Learners will read the objectives to guide them on the learning targets Parents are ask to
Learners will answer a pre-assessment test. get and submit the
Development module in their
System of measurement will discuss on module. respective LGUs or
Conversion of measure from English to metric and vice versa will introduce. in school whichever
Engagement is preferred.
Learners will do conversion of measurement from English to metric and vice versa..
Assimilation
The learners will answer the self-check in the module.
Learners will answer the question provided on the module.
Reflection
I learned that ___________. I understand that ____________. I realize that ______________.

11:30AM Lunch Break


– 1:00PM
1:00PM –
3:00PM
Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA
Position: Teacher II Position: Principal II
Date: October 25, 2021 Date:
Republic of the Philippines
Department of Education
REGION IV-A CALABARZON
DIVISION OF QUEZON
PAGBILAO GRANDE ISLAND NATIONAL HIGH SCHOOL

ELECTRICAL INSTALLATION AND MAINTENANCE


WEEKLY HOME LEARNING PLAN

Learner’s Name Grade & Section Gr 11 - Bonifacio Quarter and Week 1st Quarter, Week 8
School Pagbilao Grande Island NHS District Pagbilao II Date November 2=5, 2021
Day & Learning Area Learning Learning Tasks Mode of Delivery
Time Competency (Anchored on IDEA Lesson Exemplar)

6:00AM – Morning routine: Wake up, pray, make up your bed, eat breakfast, take a bath, and get ready
8:00AM for a wonderful day.
9:00AM – Have a short exercise, meditation or bonding with the family.
9:30AM
Week 8 Electrical Cables and Introduction Modular Learning
Installation and Wires The learners will walkthrough of the lesson expectations. Modular-Print
Maintenance Learners will read the objectives to guide them on the learning targets Parents are ask to
Learners will answer a pre-assessment test. get and submit the
Development module in their
Read information sheet about wires and cables on SLM respective LGUs or
The learners will differentiate cables from wires. in school whichever
Engagement is preferred.
Learners will determine the conversion of conductors from American Wire Gauge (AWG)
to wire Diameter Millimeter (mm). Conversion Table will introduce at SLM.
Assimilation
The learners will answer self-check activity.
Reflection
I learned that ___________. I understand that ____________. I realize that ______________.

11:30AM Lunch Break


– 1:00PM
1:00PM –
3:00PM

Signature: Signature:
Prepared by: RONALDO A. RATIO Checked by: ROWENA S. OBLEA
Position: Teacher II Position: Principal II
Date: November 2, 2021 Date:

You might also like