Topology algorithms
February 2005
Introduction
Idiff CZ = Idiff Z1
DZ1
⇒ Even, if no current can exist in the DZ1 or DZ2, there are 2 current nodes, and
the value of the current in the CT7 is monitored
DZ1 DZ2
No CT => no control
⇒The CT of PU7 is removed from the current node of zone 1 because both
boundaries of the CT are connected to the same current node
⇒ If a fault is detected in DZ 1, the Dead Zone Signal in PU can be used for remote trip
(connected to relay and sent to the other side of the line)
DZ1
DZ1
The DDB signal “Aux Volt Superv” is not used. When the Auxiliary Voltage
disappears, the status of auxiliary contacts is 0 and 0, so the CB and isolators are
considered closed in the topology
CZ PU7 PU9 PU10 PU11 PU12
Zone 1 x x x x x
⇒The CT of PU7 is removed from the current node of zone 1 because both
boundaries of the CT are connected to the same current node
DZ1
Zone 3
Zone 3
DZ 1 =DZ2
»There is a problem with auxiliary contacts of the CB in bus-coupler, the CB is closed when the
auxiliary contacts indicated open.
In the topology, the CB is considered open when there is flowing current in the bus-coupler PU7
and PU8. There is the same differential current in zone 3 and DZ 1 which is highest that ID>1
»After the end of the circuitry fault timer.
The zone 3 and the dead zone are blocked for circuitry fault. Differential current of zone 3 and
dead zone are removed from the check zone element.
CZ PU7 PU8 PU9 PU10 PU11 PU12
Zone 1 x x x x
Zone 2 x x x x
Zone 3 x
DZ 1 x
DZ 1 Zone 3
Zone 5
Zone 5
CZ PU7 8 9 10 11 12 13 14 15 16 17 18
Zone 1 x x x x x
»There is a problem with auxiliary contacts of Zone 2 x x x
the isolator bus-section, the isolator is closed Zone 3 x x x
when the auxiliary contacts indicated open. Zone 4 x x x x x
In the topology, the isolator is considered Zone 5 x x x
open when there is flowing current between
BB2 and BB3
»After the end of the
circuitry fault timer.
The BB2 and BB3 will be Zone 5
blocked for circuitry fault
and remove from check
zone element
Problem on
isolator position
CZ of the first CU
CZ of the second CU
29 > MiCOM P740 phase 1 - Topology Algorithms - February 2005 29
» Feeder PU8a (BB1) and PU9b (BB2) are disconnected, isolator and CB are opened
DZ 1
DZ 2
» Feeder PU8a (BB1) and PU9b (BB2) are disconnected, isolator and CB are opened
CZ of the second CU
31 > MiCOM P740 phase 1 - Topology Algorithms - February 2005 31
DZ 1
DZ 1
When circuirtry fault timer is elapsed,
all the busbar BB1 is blocked
No impact on the CZ of
the second CU
34 > MiCOM P740 phase 1 - Topology Algorithms - February 2005 34
No impact on the CZ of
the second CU
35 > MiCOM P740 phase 1 - Topology Algorithms - February 2005 35