FILING SYSTEM

FOR CONSTRUCTION SITES


LEGEND: C - Client; H - Head Office; S - Site; D - Destroy
Documents to be archived
FILING BATCH 01 - CONTRACT
Completion of
During project
project
File No. File Name
C H S D C H S D
01/01 Copies of all signed sub-contracts * * *
01/02 Copy of Completion Certificates / Handover Certificates * * * *
01/03 Construction Programme * *
01/04 Correspondence (Memos, letters, faxes, etc.) (Internal & External) * * *
01/05 Minutes of all meetings * * *
01/06 Approved Project Quality Plan * * *
01/07 Copy of the signed Contract * * *
01/08 Site Instructions & Register (Original) * *
01/09 Site Queries / Request for information / Technical Queries & Register * *
01/10 Drawing Register *
Note: Registers that are available electronicaly need not to be in the files

FILING BATCH 02 - COMMERCIAL


During project Completion of
project
File No. File Name
C H S D C H S D
02/01 Exports & Import documents (Permanent & Temporary) * * * *

FILING BATCH 03 - COSTING


During project Completion of
project
File No. File Name
C H S D C H S D
03/01 Cost Reports * * *
03/02 Plant, Formwork & Equipment cost sheets * *

FILING BATCH 04 - ORDERS


During project Completion of
project
File No. File Name
C H S D C H S D
04/01 Copies of Purchase Orders * * *

FILING BATCH 05 - REQUISITIONS


Completion of
During project
project
File No. File Name
C H S D C H S D
05/01 Requisitions * * *

FILING BATCH 06 - CERTIFICATES


During project Completion of
project
File No. File Name
C H S D C H S D

611478631.xlsx Rev: 0 1 of 4 30/05/2015


06/01 Monthly Certificate (Site, Client) * * *
06/02 Monthly Client Invoice * * *
06/03 Dayworks * * *
06/04 Variation Orders * *
06/05 Subcontract Payment certificate * * *

FILING BATCH 07 - PERSONNEL


During project Completion of
File No. File Name project
C H S D C H S D
07/01 Site Organogram *
07/02 Positions & Responsibilities * * *
07/03 Staff Register * *
07/04 Training Programme / Schedule * * *

FILING BATCH 08 - HEALTH & SAFETY


During project Completion of
File No. File Name project
C H S D C H S D
08/01 Appointments / Responsible Person(s) * * *
08/02 Health & Safety Audit reports *
08/03 Toolbox Talks & Attendance Register *
08/04 Emergency plans & procedures * *
08/06 Risk Assessments * *
08/07 Incident Register, Investigation Reports & Stats. * * *

FILING BATCH 09 - ENVIRONMENTAL


Completion of
During project
project
File No. File Name
C H S D C H S D
09/01 Approved Environmental Plan * *
09/02 Environmental Incident Register, Reports & Stats. * * * *
09/03 Emergency plans & procedures * *
09/04 Environmental Checklists, Inspection reports, etc. *
09/05 Appointment of Responsible Person(s) * * *
09/06 Risk Assessments * *

FILING BATCH 10 - MANUALS & PROCEDURES


During project Completion of
project
File No. File Name
C H S D C H S D
10/01 SHEQ Manual *
10/02 All Quality Procedure Manuals *
10/03 SABS 1200 *
10/04 Operations Manual *
10/05 Project specific Method Statements * *
10/06 Project specifications *
Note: If the above documentation is available elctronically, hard copies are not necessary

FILING BATCH 11 - QUALITY ASSURANCE & QUALITY CONTROL

611478631.xlsx Rev: 0 2 of 4 30/05/2015


Completion of
During project
project
File No. File Name
C H S D C H S D
11/01 Quality System Audit Reports * *
11/02 Batch Plant Inspections * *
11/03 Corrective Action Reports & Non-Conformance Reports (Site) * * *
11/04 Calibration schedule and certificates *

FILING BATCH 12 - QA DATA DOSSIERS


During project Completion of
File No. File Name project
C H S D C H S D
Shall include the approved Index Page by the Engineer
12/01 QA Data Dossiers * *

FILING BATCH 13 - LABOUR


During project Completion of
project
File No. File Name
C H S D C H S D
13/01 Wage Sheets * * *
13/02 Contracts of Employment * * *

611478631.xlsx Rev: 0 3 of 4 30/05/2015


CONSTRUCTION SITE FILING SYSTEM MATRIX

HOW TO USE THE MATRIX

NOTE: The filing system must be set up and controlled from a central location on site.

The batch number is for a specific


group of documents, e.g. contract,
commercial, costing, etc.
Defining the meaning of Colour coding can be used to make
letters – ‘C, H, S & D’. batches it easier to identify.

LEGEND: C - Client; H - Head Office; S - Site; D - Destroy


BATCH 01 - CONTRACT
Before start of Completion of
File # File Name During project
project project
C H S D C H S D C H S D
01/01 Tender and pre-tender correspondence X X X
01/02 All Sub Contracts X X X
01/03 Completion Certificates X X X X

These file numbers are to This section prescribes the The ‘X’ indicates where the
identify a file and relate it to a file names. You can have documentation shall be available during
specific batch. more than one set of the lifespan of a project. For example - if
File numbers must be displayed documents in one file. File a ‘X’ is under ‘S’, the documentation in
on the side of the file when names must be displayed on line with the ‘X’ in the “File Name”
standing upright in a cupboard or the front cover of the file. column, shall be readily available on site
shelve. at all times.