2 29-Jan-2021 C. Vieira J. Faria P. Silva Issued for Construction

1 21-Dec-2020 L. Simões E. Alves P. Silva Revision after peer review. Clouded.

Index Date Issued Reviewed Released Revision Details

OWNER: OWNERS ENGINEER:


Revision: 2
Status: AP
Released: Pedro.Silva (2021-01-29)

PROJECT: PROJECT No.:

SARIR GAS UTILIZATION Project J-22 OKP037


Title Supplier
Date Name

Issued 25-Sep-2020 Luís Simões Drawing


Checked: J.Faria (2021-01-29)

GENERAL
Eduardo
Reviewed 25-Sep -2020
Alves CATHODIC PROTECTION BOXES
Released 25-Sep -2020 Pedro Silva REBARS BENDING SCHEDULE Supplier Doc. No.

20246-STR-BS-001
Document No. Revision Status

2
Issued: E.Alves (2020-09-25)

000-3CL2001518-FS-DR AP
Owner Document No. Format Scale

Sr-J22-C-27085 A4 N/A

Sheet Sheets
Document No.: 000-3CL2001518-FS-DR

1 2
Status list: IE – In Edition; IP – In progress; CH – Checked; RF – Refused; AC – Approved with comments; NA – Not approved; AP – Approved; EL – Eliminated; AB – As built; OB – Obsolete; AA – Awaiting for
External Approval; AE – Approved by External Entity; ACE – Approved with Comments by External Entity; REE – Refused by External Entity;

© PROMANEC, Lda. No part of this document may be copied, photocopied, reproduced, transmitted or otherwise duplicated on any medium without the prior written consent of PROMANEC, Lda. The
information contained in this document is proprietary and may not be used for any purpose other than that for which it has been supplied by PROMANEC, Lda. nor may such information be disclosed to
third parties without the prior written consent of, and upon such terms as may be stipulated by PROMANEC, Lda. This document and all copies made thereof shall be returned on demand
NOTES

Ø Shape Length Mass % of


Mark [mm] [mm] [mm] QTY [kg] Notes
total

ANGLE BAR
2 2 1050

50x50x5, ON
ANGLE BAR 50x50x5, 1 Ø12 1414 854 1072.04 44.1%

200

200
ON CONCRETING
CONCRETING

850

Ø12
475

475
2 1214 1220 1314.87 54.1%

200

200
1000

1000
87.5

87.5
1 1 1 1 I
1250
³
3 Ø12 1614 14 20.06 0.8%

200

200
437.5

437.5
Ø75mm PVC PIPE,
ON CONCRETING Ø75mm PVC PIPE,
ON CONCRETING

I
VAR. VAR. VAR. VAR. 250 300 300 300 250
850
1200 1400 ³
4 Ø12 1214 20 21.56 0.9%

200

200
2 2 Total mass = 2429 kg

FOUNDATION TYPE I, II, III, IV, FOUNDATION TYPE V or VI TABLE


SPLITTER AND NEGATIVE BOXES PLAN VIEW BAR BENDING SCHEDULE
PLAN VIEW SCALE 1:20 NO SCALE
SCALE 1:20

Ø75mm PVC PIPE, Ø75mm PVC PIPE,


ON CONCRETING ON CONCRETING

ANGLE BAR 50x50x5, ANGLE BAR 50x50x5, Ø75mm PVC PIPE, ANGLE BAR 50x50x5, ANGLE BAR 50x50x5, ANGLE BAR 50x50x5, Ø75mm PVC PIPE, ANGLE BAR 50x50x5,
ON CONCRETING ON CONCRETING ON CONCRETING ON CONCRETING ON CONCRETING ON CONCRETING ON CONCRETING ON CONCRETING
Summary
Ø [mm] Mass [kg] Lenght [m]
50 50 50 50 50 50 50 50 Ø12 2428.6 2729
VALID ONLY FOR REBAR DETAIL REFERENCE
50

50

50

50
TABLE
THIS DRAWING MUST BE SEEN TOGETHER WITH THE
350

350

350

350
REINFORCEMENT WEIGHT
300

300

300

300
NO SCALE
GENERAL REFERENCE DRAWINGS:
100 VAR. VAR. VAR. VAR. 100 100 437.5 87.5 475 100 100 250 300 300 300 250 100 100 437.5 87.5 475 100 "000-BCL2000665-EL-DR" (Type I)
1200 1000 1400 1000
"000-BCL2000097-EL-DR" (Type II)
COMPACTED SOIL COMPACTED SOIL COMPACTED SOIL COMPACTED SOIL
"000-BCL2000098-EL-DR" (Type III)
FOUNDATION TYPE I, II, III, IV, FOUNDATION TYPE I, II, III, IV, FOUNDATION TYPE V or VI FOUNDATION TYPE V or VI "000-BCL2000099-EL-DR" (Type IV)
SPLITTER AND NEGATIVE BOXES SPLITTER AND NEGATIVE BOXES SECTION 1-1 SECTION 2-2 "000-BCL2000414-EL-DR" (Type V)
SECTION 1-1 SECTION 2-2 SCALE 1:20 SCALE 1:20
SCALE 1:20 SCALE 1:20 "000-BCL2000415-EL-DR" (Type VI)
"000-BCL1901654-EL-DR" (Splitter BOX)
"000-BCL1900657-EL-DR" (NEGATIVE BOX)
"000-BCL2000700-EL-LS" (Foreign Boxes / Test Post Locations)

2 2
1 7Ø12//150 3 7Ø12//150
425

425
87.5

87.5
1000

1000

1 1 1 1
2 10Ø12//150 2 10Ø12//150
487.5

487.5

VAR. VAR. VAR. VAR. 250 300 300 300 250


1200 1400

2 2
FOUNDATION TYPE I, II, III, IV,
SPLITTER AND NEGATIVE BOXES FOUNDATION TYPE V or VI
REBAR REINFORCEMENT - PLAN VIEW REBAR REINFORCEMENT - PLAN VIEW
SCALE 1:20 SCALE 1:20

2 10Ø12//150 1 7Ø12//150 1 7Ø12//150 2 10Ø12//150 4 10Ø12//150 3 7Ø12//150 3 7Ø12//150 4 10Ø12//150 2 29-Jan-2021 Carlos Vieira José Faria Pedro Silva Issued for Construction

1 21-Dec-2020 Luís Simões Eduardo Alves Pedro Silva Revision after peer review.
50

50

50

50
Index Date Issued Reviewed Released Revision Details
350

350

350

350
300

300

300

300
OWNER: OWNER'S ENGINEER:
Revision: 2

2 10Ø12//150 1 7Ø12//150 1 7Ø12//150 2 10Ø12//150 4 10Ø12//150 3 7Ø12//150 3 7Ø12//150 4 10Ø12//150


Status: AP

100 VAR. VAR. VAR. VAR. 100 100 437.5 87.5 475 100 100 250 300 300 300 250 100 100 437.5 87.5 475 100
1200 1000 1400 1000
PROJECT: PROJECT No.:
Released: Pedro.Silva (2021-01-29)

1050 850 1250 850


SARIR GAS UTILIZATION Project J-22 OKP037
1 7Ø12//150 N=7 L=1414
200

200

200

200
200

200

200

200
2 10Ø12//150 N=10 L=1214 3 7Ø12//150 N=7 L=1614 4 10Ø12//150 N=10 L=1214 Date Name Title Supplier
200

200

200

200
200

200

200

200
Issued Drawing
25-09-2020 Luís Simões
Checked: J.Faria (2021-01-29)

1050 850 1250 850 GENERAL


Reviewed
2 10Ø12//150 N=10 L=1214 4 10Ø12//150 N=10 L=1214 25-09-2020 Eduardo Alves
1 7Ø12//150 N=7 L=1414 3 7Ø12//150 N=7 L=1614 CATHODIC PROTECTION BOXES
Released Supplier Doc. No.
25-09-2020 Pedro Silva REBARS BENDING SCHEDULE 20246-STR-BS-001

Document No. Revision Status


Issued: E.Alves (2020-09-25)

000-3CL2001518-FS-DR 2 AP
FOUNDATION TYPE I, II, III, IV, FOUNDATION TYPE I, II, III, IV, FOUNDATION TYPE V or VI FOUNDATION TYPE V or VI
SPLITTER AND NEGATIVE BOXES SPLITTER AND NEGATIVE BOXES REBAR REINFORCEMENT - SECTION 1-1 REBAR REINFORCEMENT - SECTION 2-2 Owner Document No. Format Scale

REBAR REINFORCEMENT - SECTION 1-1 REBAR REINFORCEMENT - SECTION 2-2 SCALE 1:20 SCALE 1:20 Sr-J22-C-27085 A1 1:20
SCALE 1:20 SCALE 1:20
Document No.: 000-3CL2001518-FS-DR

Sheet Sheets

2 2
Internal Status list: IE - In Edition; IP - In progress; CH - Checked; RF - Refused; AC - Approved with comments; NA - Not approved; AP - Approved; EL - Eliminated; AB - As built;
OB - Obsolete; AA - Awaiting for External Approval; AE - Approved by External Entity; ACE - Approved with Comments by External Entity; REE - Refused by External Entity;
© PROMANEC, Lda. No part of this document may be copied, photocopied, reproduced, transmitted or otherwise duplicated on any medium without the prior written consent of PROMANEC, Lda.
The information contained in this document is proprietary and may not be used for any purpose other than that for which it has been supplied by PROMANEC, Lda. nor may such information be
disclosed to third parties without the prior written consent of, and upon such terms as may be stipulated by PROMANEC, Lda. This document and all copies made thereof shall be returned on demand.

You might also like