CIVIL WORKS
1 Earthworks
1.01 Earth Clearing and Grubbing
1.02 Earth Bulk Excavation
1.03 Earth Structural Excavation
1.04 Earth Manual Trimming
1.05 Earth Backfilling and Compaction (Local)
1.06 Earth Hauling-out of Soil
2 Base Preparation Works
2.01 Base Gravel Bedding
2.02 Base Lean Concrete
3 Soil Protection Works
3.01 Soil P Shotcreting Works
4 Miscellaneous Works
4.01 MisceSoil Poisoning
4.02 MisceAnti-termite Reticulation System
4.03 MisceDamproofing
4.04 MisceVapor Barrier/Polyethylene Sheet
4.05 MisceWaterstop
STRUCTURAL WORKS
5 Slab-On-Grade
5.01 Slab- Slab-On-Grade - Concrete
5.02 Slab- Slab-On-Grade - Rebar
5.03 Slab- Slab-On-Grade - Formworks
6 Footing Tie Beam
6.01 Footi Footing Tie Beam - Concrete
6.02 Footi Footing Tie Beam - Rebar
6.03 Footi Footing Tie Beam - Formworks
7 Isolated Footing
7.01 Isolat Isolated Footing - Concrete
7.02 Isolat Isolated Footing - Rebar
7.03 Isolat Isolated Footing - Formworks
8 Combined Footing
8.01 CombiCombined Footing - Concrete
8.02 CombiCombined Footing - Rebar
8.03 CombiCombined Footing - Formworks
9 Mat Footing
9.01 Mat FMat Footing - Concrete
9.02 Mat FMat Footing - Rebar
9.03 Mat FMat Footing - Formworks
10 Wall Footing
10.01 Wall FWall Footing - Concrete
10.02 Wall FWall Footing - Rebar
10.03 Wall FWall Footing - Formworks
11 Column
11.01 ColumColumn - Concrete
11.02 ColumColumn - Rebar
11.03 ColumColumn - Formworks
12 Shear Wall
12.01 Shear Shear Wall - Concrete
12.02 Shear Shear Wall - Rebar
12.03 Shear Shear Wall - Formworks
13 Suspended Slab
13.01 SuspeSuspended Slab - Concrete
13.02 SuspeSuspended Slab - Rebar
13.03 SuspeSuspended Slab - Formworks
14 Ramp Slab
14.01 Ramp Ramp Slab - Concrete
14.02 Ramp Ramp Slab - Rebar
14.03 Ramp Ramp Slab - Formworks
15 Beams and Girders
15.01 BeamsBeams and Girders - Concrete
15.02 BeamsBeams and Girders - Rebar
15.03 BeamsBeams and Girders - Formworks
16 Ramp Beams and Girders
16.01 Ramp Ramp Beams and Girders - Concrete
16.02 Ramp Ramp Beams and Girders - Rebar
16.03 Ramp Ramp Beams and Girders - Formworks
17 Coupling Beams
17.01 CouplCoupling Beams - Concrete
17.02 CouplCoupling Beams - Rebar
17.03 CouplCoupling Beams - Formworks
18 Tanks and Pits
18.01 Tanks Tanks and Pits - Concrete
18.02 Tanks Tanks and Pits - Rebar
18.03 Tanks Tanks and Pits - Formworks
19 Stairs
19.01 Stairs Stairs - Concrete
19.02 Stairs Stairs - Rebar
19.03 Stairs Stairs - Formworks
20 Equipment Pad
20.01 EquipEquipment Pad - Concrete
20.02 EquipEquipment Pad - Rebar
20.03 EquipEquipment Pad - Formworks
21 Structural Steel
21.01 StructStructural Steel
ARCHITECTURAL WORKS
22 Masonry Works
22.01 MasonCHB 6" (Load Bearing)
22.02 MasonCHB 4" (Load Bearing)
22.03 MasonCHB 6" (Ordinary)
22.04 MasonCHB 4" (Ordinary)
22.05 MasonLintel Beam
22.06 MasonStiffener Column
22.07 MasonZocallo
22.08 MasonCornering
22.09 MasonFicem Dropwall (Below 1.5M)
22.1 MasonFicem Dropwall (Above 1.5M)
22.11 MasonFicem Drywall
23 Wall Finishes
23.01 Wall FOff-Formed / Rubbed Concrete
23.02 Wall FPlain Cement Plastered Finish (Exterior)
23.03 Wall FPlain Cement Plastered Finish (Interior)
23.04 Wall FStucco Finish
24 Floor Finishes
24.01 Floor Smooth Plain Cement Finish
24.02 Floor Concrete Topping
24.03 Floor Concrete Topping with Wire Mesh
24.04 Floor Concrete Floor Sealer
24.05 Floor Smooth Finish with Grooves
25 Tiling Works
25.01 Tiling 600x600mm Homogeneous Tiles
25.02 Tiling 600x300mm Homogeneous Tiles
25.03 Tiling Laminated Wood Floor Finish
26 Ceiling Finishes
26.01 Ceilin Off-Formed / Rubbed Concrete
26.02 Ceilin 9mm thk Fiber Cement Board w/ Frames
26.03 Ceilin 6mm thk Fiber Cement Board w/ Frames
26.04 Ceilin Ceiling Provision for Exhaust Fan
26.05 Ceilin Ceiling Manhole
26.06 Ceilin Ceiling Reveal / Shadow Line
26.07 Ceilin Bulkhead (Below 1.5m)
26.08 Ceilin Bulkhead (Above 1.5m)
27 Painting Works
27.01 Paint Skimcoat
27.02 Paint Flat Latex Paint
27.03 Paint Elastomeric Paint
27.04 Paint Semi-gloss Latex Paint
27.05 Paint WACU Grilles Paint
27.06 Paint Floor-mounted Railings Paint
27.07 Paint Wall-mounted Railings Paint
27.08 Paint Balcony Railings Paint
27.09 Paint Steel Gratings Paint
27.1 Paint Curb Paint
27.11 Paint Wheelstop Paint (2000mm)
27.12 Paint Parking Car Stall (Line Paint)
27.13 Paint Parking Car Stall (Number Paint)
27.14 Paint Column Guard Paint
28 Waterproofing Works
28.01 WaterIntegral Waterproofing
28.02 WaterFlexible Cementitious Waterproofing
28.03 WaterEpoxy Tank Lining
29 Toilet Fixtures
29.01 ToiletSoap Holder
29.02 ToiletTissue Paper Holder
30 Metalworks
30.01 MetalFloor-mounted Railings
30.02 MetalWall-mounted Railings
30.03 MetalBalcony Railings
30.04 MetalStair Nosings
30.05 MetalTrench Gratings (Traffic)
30.06 MetalColumn Guards (Angle Bar)
30.07 MetalManhole Cover (600x600)
30.08 MetalManhole Cover (900x900)
30.09 MetalCatch Basin Cover (450x450)
30.1 MetalCatch Basin Cover (500x500)
30.11 MetalCatch Basin Cover (550x550)
30.12 MetalSteel Plate Cover (600x1000)
30.13 Metal20mm Stainless Steel Ladder Rung
30.14 MetalWACU Grilles
31 Roofing Works
31.01 Roofi CPAC Roof Tiles
31.02 Roofi GI Roofing Sheet
31.03 Roofi Gutter
31.04 Roofi Gutter Paint
32 Miscellaneous
32.01 MisceWACU Concrete Ledge (Top and Bottom)
32.02 MisceACU Cover (Styro)
32.03 MisceCurb
32.04 MisceIsland
32.05 MisceWheelstop (2000mm)
32.06 MisceSeparator Beam
32.07 MisceHoisting Hook (3-ton)
32.08 MisceHoisting Hook (6-ton) and Hoisting Beam
32.09 MisceBaseboard in Varnish Paint Finish
32.1 MisceWindow Sill Moulding A
32.11 MisceWindow Sill Moulding B
32.12 MisceArc Moulding
32.13 MisceFaux Window Shutter Moulding
32.14 MisceStone Wall Cladding Finish
32.15 MisceCorbel
32.16 MisceFascia Board (250mm)
32.17 MisceCeiling Eaves
32.18 MisceMouldings Paint
32.19 MisceFascia Board Paint
32.2 MisceCeiling Eaves Paint
ñas City
PROJECT :
LOCATION :
DEVELOPER :
CIVIL WORKS
1.00 Earthworks
1.01
1.02
1.03
1.04
1.05
Ea
1.06
2.01
3.01
4.01
4.02
Misce
4.03
4.04
Miscel
4.05
4.05
STRUCTURAL WORKS
5.00 Slab-On-Grade
5.01
5.02
5.03
6.01
Fo
6.02
6.03
Fo
7.00 Isolated Footing
7.01
7.02
7.03
Is
8.00 Combined Footing
8.01
Co
8.02
C
8.03
Com
9.00 Mat Footing
9.01
NO. DATE
June 08,2022
June 08,2022
1
June 08,2022
June 08,2022
June 08,2022
1
June 08,2022
June 08,2022
June 08,2022
June 08,2022
June 08,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
2 August 30-31,2022
August 31,2022
August 31,2022
August 31,2022
August 31,2022
August 31,2022
August 31,2022
9.02
9.03
NO. DATE
1 June 07,2022
2 June 07,2022
3 June 07,2022
4 June 07,2022
5 June 07,2022
6 June 07,2022
7 June 07,2022
8 June 07,2022
9 June 07,2022
10 June 07,2022
11
12
13
14
15
Mat Footing - Formworks
10.00 Wall Footing
10.01
10.02
10.03
11.00 Column
11.01
NO. DATE
May 18,2022
1 May 18,2022
May 18,2022
May 18,2022
May 18,2022
2
May 18,2022
May 18,2022
May 18,2022
May 18,2022
3
May 18,2022
May 18,2022
May 20,2022
May 20,2022
4
May 20,2022
May 20,2022
May 20,2022
May 20,2022
5
May 20,2022
May 20,2022
May 20,2022
May 20,2022
6
May 20,2022
May 20,2022
May 21,2022
7 May 21,2022
May 21,2022
May 24,2022
May 24,2022
8
May 24,2022
May 24,2022
June 18,2022
June 18,2022
9
June 18,2022
June 18,2022
June 18,2022
June 18,2022
10
June 18,2022
June 18,2022
June 18,2022
June 18,2022
11
June 18,2022
June 18,2022
June 20,2022
June 20,2022
12
June 20,2022
June 20,2022
June 22,2022
June 22,2022
13
June 22,2022
June 22,2022
June 22,2022
June 22,2022
14
June 22,2022
June 22,2022
June 22,2022
June 22,2022
15
June 22,2022
June 22,2022
June 22,2022
June 22,2022
16
June 22,2022
June 22,2022
June 22,2022
17 June 22,2022
June 22,2022
June 22,2022
18 June 22,2022
June 22,2022
June 24,2022
June 24,2022
19
June 24,2022
June 24,2022
June 24,2022
20
June 24,2022
20
June 24,2022
June 24,2022
June 24,2022
June 24,2022
21
June 24,2022
June 24,2022
June 25,2022
June 25,2022
22
June 25,2022
June 25,2022
June 28,2022
June 28,2022
23
June 28,2022
June 28,2022
June 28,2022
24 June 28,2022
June 28,2022
June 28,2022
25 June 28,2022
June 28,2022
July 8,2022
July 8,2022
26
July 8,2022
July 8,2022
July 8,2022
27 July 8,2022
July 8,2022
July 20,2022
July 20,2022
28
July 20,2022
July 20,2022
July 20,2022
July 20,2022
29
July 20,2022
July 20,2022
July 22,2022
July 22,2022
30
July 22,2022
July 22,2022
July 22,2022
July 22,2022
31
July 22,2022
July 22,2022
July 25,2022
July 25,2022
32
July 25,2022
32
July 25,2022
July 25,2022
July 25,2022
33
July 25,2022
July 25,2022
Aug. 01,2022
34 Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
35
Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
36
Aug. 01,2022
Aug. 01,2022
Aug. 03,2022
37 Aug. 03,2022
Aug. 03,2022
Aug. 03,2022
Aug. 03,2022
38
Aug. 03,2022
Aug. 03,2022
Aug. 04,2022
39 Aug. 04,2022
Aug. 04,2022
Aug. 04,2022
Aug. 04,2022
40
Aug. 04,2022
Aug. 04,2022
Aug. 15,2022
Aug. 15,2022
41
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
42
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
43
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
44
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
45
Aug. 15,2022
45
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
46
Aug. 15,2022
Aug. 15,2022
Aug. 24,2022
47 Aug. 24,2022
Aug. 24,2022
Aug. 24,2022
48 Aug. 24,2022
Aug. 24,2022
Aug. 24,2022
Aug. 24,2022
49
Aug. 24,2022
Aug. 24,2022
Aug. 31,2022
Aug. 31,2022
50
Aug. 31,2022
Aug. 31,2022
Aug. 31,2022
Aug. 31,2022
51
Aug. 31,2022
Aug. 31,2022
Sept. 06,2022
52 Sept. 06,2022
Sept. 06,2022
Sept. 06,2022
53 Sept. 06,2022
Sept. 06,2022
Sept. 06,2022
54 Sept. 06,2022
Sept. 06,2022
Sept. 15,2022
55 Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
56 Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
57
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
58
Sept. 15,2022
58
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
59
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
60 Sept. 15,2022
Sept. 15,2022
Column - Concrete
11.02
11.03
NO. DATE
May 18,2022
May 18,2022
1
May 18,2022
May 18,2022
May 18,2022
May 18,2022
2
May 18,2022
May 18,2022
May 18,2022
May 18,2022
3
May 18,2022
May 18,2022
May 20,2022
May 20,2022
4
May 20,2022
May 20,2022
May 20,2022
May 20,2022
5
May 20,2022
May 20,2022
May 20,2022
May 20,2022
6
May 20,2022
May 20,2022
June 18,2022
June 18,2022
7
June 18,2022
June 18,2022
June 18,2022
June 18,2022
8
June 18,2022
June 18,2022
June 18,2022
June 18,2022
9
June 18,2022
June 18,2022
June 22,2022
June 22,2022
10
June 22,2022
June 22,2022
June 22,2022
June 22,2022
11
June 22,2022
June 22,2022
June 22,2022
June 22,2022
12
June 22,2022
June 22,2022
June 22,2022
June 22,2022
13
June 22,2022
June 22,2022
June 22,2022
June 22,2022
14
June 22,2022
June 22,2022
June 22,2022
June 22,2022
15
June 22,2022
June 22,2022
June 24,2022
June 24,2022
16
June 24,2022
June 24,2022
June 24,2022
June 24,2022
17
June 24,2022
June 24,2022
June 24,2022
June 24,2022
18
June 24,2022
June 24,2022
June 25,2022
June 25,2022
19
June 25,2022
19
June 25,2022
June 28,2022
June 28,2022
20
June 28,2022
June 28,2022
June 28,2022
June 28,2022
21
June 28,2022
June 28,2022
June 28,2022
June 28,2022
22
June 28,2022
June 28,2022
July 07,2022
July 07,2022
23
July 07,2022
July 07,2022
July 07,2022
July 07,2022
24
July 07,2022
July 07,2022
July 19,2022
July 19,2022
25
July 19,2022
July 19,2022
July 19,2022
July 19,2022
26
July 19,2022
July 19,2022
July 21,2022
July 21,2022
27
July 21,2022
July 21,2022
July 21,2022
July 21,2022
28
July 21,2022
July 21,2022
July 25,2022
July 25,2022
29
July 25,2022
July 25,2022
July 25,2022
July 25,2022
30
July 25,2022
July 25,2022
July 31,2022
July 31,2022
31
31
July 31,2022
July 31,2022
July 31,2022
July 31,2022
32
July 31,2022
July 31,2022
July 31,2022
July 31,2022
33
July 31,2022
July 31,2022
August 02,2022
August 02,2022
34
August 02,2022
August 02,2022
August 02,2022
August 02,2022
35
August 02,2022
August 02,2022
August 13,2022
August 13,2022
36
August 13,2022
August 13,2022
August 13,2022
August 13,2022
37
August 13,2022
August 13,2022
August 13,2022
August 13,2022
38
August 13,2022
August 13,2022
August 15,2022
August 15,2022
39
August 15,2022
August 15,2022
August 15,2022
August 15,2022
40
August 15,2022
August 15,2022
August 15,2022
August 15,2022
41
August 15,2022
August 15,2022
August 23,2022
August 23,2022
42
August 23,2022
August 23,2022
August 23,2022
43
August 23,2022
43
August 23,2022
August 23,2022
August 23,2022
August 23,2022
44
August 23,2022
August 23,2022
August 30,2022
August 30,2022
45
August 30,2022
August 30,2022
August 30,2022
August 30,2022
46
August 30,2022
August 30,2022
Sept. 13,2022
Sept. 13,2022
47
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
48
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
49
Sept. 13,2022
Sept. 13,2022
Sept. 14,2022
Sept. 14,2022
50
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
51
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
52
Sept. 14,2022
Sept. 14,2022
Column - Formworks
12.00 Shear Wall
12.01
NO. DATE
NO. DATE
May 24,2022
May 24,2022
1 May 24,2022
May 24,2022
May 24,2022
June 20,2022
June 20,2022
2 June 20,2022
June 20,2022
June 20,2022
June 25,2022
June 25,2022
3 June 25,2022
June 25,2022
June 25,2022
June 30,2022
June 30,2022
4 June 30,2022
June 30,2022
June 30,2022
July 08,2022
July 08,2022
5 July 08,2022
July 08,2022
July 08,2022
July 20,2022
July 20,2022
6 July 20,2022
July 20,2022
July 20,2022
July 21,2022
July 21,2022
7 July 21,2022
July 21,2022
July 21,2022
Aug. 02,2022
Aug. 02,2022
8 Aug. 02,2022
Aug. 02,2022
Aug. 02,2022
Aug. 04,2022
Aug. 04,2022
9 Aug. 04,2022
Aug. 04,2022
Aug. 04,2022
Aug. 06,2022
Aug. 06,2022
10 Aug. 06,2022
Aug. 06,2022
Aug. 06,2022
Aug. 31,2022
Aug. 31,2022
Aug. 31,2022
11 Aug. 31,2022
Aug. 31,2022
12.02
12.03
NO. DATE
May 23,2022
May 23,2022
May 23,2022
1
May 23,2022
May 23,2022
May 23,2022
May 25,2022
May 25,2022
1s
May 25,2022
May 25,2022
June 19,2022
June 19,2022
June 19,2022
June 19,2022
2 June 19,2022
June 19,2022
June 19,2022
June 19,2022
June 19,2022
June 22,2022
June 22,2022
June 22,2022
2s
June 22,2022
June 22,2022
June 22,2022
June 24,2022
June 24,2022
June 24,2022
June 24,2022
3 June 24,2022
June 24,2022
June 24,2022
June 24,2022
June 24,2022
June 27,2022
June 27,2022
June 27,2022
3s
June 27,2022
June 27,2022
June 27,2022
June 29,2022
June 29,2022
June 29,2022
4
June 29,2022
June 29,2022
June 29,2022
July 01,2022
July 01,2022
4s July 01,2022
July 01,2022
July 01,2022
July 07,2022
July 07,2022
5 July 07,2022
July 07,2022
July 07,2022
July 09,2022
July 09,2022
5s
July 09,2022
July 09,2022
July 19,2022
July 19,2022
July 19,2022
6
July 19,2022
July 19,2022
July 19,2022
July 26,2022
July 26,2022
July 26,2022
6s
July 26,2022
July 26,2022
July 26,2022
July 20,2022
July 20,2022
July 20,2022
7
July 20,2022
July 20,2022
July 20,2022
July 27,2022
July 27,2022
July 27,2022
7s
July 27,2022
July 27,2022
July 27,2022
August 02,2022
August 02,2022
August 02,2022
8
August 02,2022
August 02,2022
August 02,2022
August 04,2022
August 04,2022
8s
August 04,2022
August 04,2022
August 04,2022
August 04,2022
August 04,2022
August 04,2022
9
August 04,2022
August 04,2022
August 04,2022
August 04,2022
August 06,2022
August 06,2022
August 06,2022
9s
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 06,2022
10
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 08,2022
August 08,2022
August 08,2022
10s
10s
August 08,2022
August 08,2022
August 08,2022
August 27-31,2022
August 27-31,2022
August 27-31,2022
11
August 27-31,2022
August 27-31,2022
August 27-31,2022
13.01
NO. DATE
1 June 06,2022
1 June 14,2022
2 June 14,2022
3 June 14,2022
4 June 14,2022
5 June 14,2022
6 June 14,2022
7 June 14,2022
8 June 14,2022
9 June 14,2022
10 June 14,2022
11 June 14,2022
1 June 16,2022
2 June 16,2022
3 June 16,2022
4 June 16,2022
5 June 16,2022
6 June 16,2022
7 June 16,2022
8 June 16,2022
1 July 04,2022
2 July 04,2022
3 July 04,2022
4 July 04,2022
5 July 04,2022
6 July 04,2022
7 July 04,2022
1 July 13,2022
2 July 13,2022
3 July 13,2022
4 July 13,2022
5 July 13,2022
6 July 13,2022
7 July 13,2022
8 July 13,2022
9 July 13,2022
10 July 13,2022
1 July 25,2022
2 July 25,2022
3 July 25,2022
4 July 25,2022
5 July 25,2022
6 July 25,2022
7 July 25,2022
8 July 25,2022
1 July 30,2022
2 July 30,2022
3 July 30,2022
4 July 30,2022
5 July 30,2022
6 July 30,2022
7 July 30,2022
8 July 30,2022
1 August 10-11,2022
2 August 10-11,2022
3 August 10-11,2022
4 August 10-11,2022
5 August 10-11,2022
6 August 10-11,2022
7 August 10-11,2022
8 August 10-11,2022
9 August 10-11,2022
10 August 10-11,2022
11 August 10-11,2022
12 August 10-11,2022
13 August 10-11,2022
1 August 18-19,2022
2 August 18-19,2022
3 August 18-19,2022
4 August 18-19,2022
5 August 18-19,2022
6 August 18-19,2022
7 August 18-19,2022
8 August 18-19,2022
9 August 18-19,2022
10 August 18-19,2022
11 August 18-19,2022
12 August 18-19,2022
1 Sept.06-07,2022
2 Sept.06-07,2022
3 Sept.06-07,2022
4 Sept.06-07,2022
5 Sept.06-07,2022
6 Sept.06-07,2022
7 Sept.06-07,2022
8 Sept.06-07,2022
9 Sept.06-07,2022
10 Sept.06-07,2022
11 Sept.06-07,2022
12 Sept.06-07,2022
Suspended Slab - Concrete
13.02
13.03
S
NO. DATE
1 June 04,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
2 June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
2s
June 27-28,2022
June 27-28,2022
June 27-28,2022
2s
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
3
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
3s July 1-2,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
4
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
4s
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
4s
July 14 -15,2022
July 14 -15,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
5 July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
5s July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
6
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
6s
6s
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
7
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
7s
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
8 July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
8s
August 19-20,2022
8s
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
9 August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
10 Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
10s
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Suspended Slab - Formworks
14.00 Ramp Slab
14.01
14.02
14.03
15.01
Bea
NO. DATE
15.02
B
15.03
Beam
NO. DATE
1 June 11-12,2022
2 June 11-12,2022
3 June 11-12,2022
4 June 11-12,2022
5 June 11-12,2022
6 June 11-12,2022
7 June 11-12,2022
8 June 11-12,2022
9 June 11-12,2022
10 June 11-12,2022
11 June 11-12,2022
12 June 11-12,2022
1 June 14-16,2022
2 June 14-16,2022
3 June 14-16,2022
4 June 14-16,2022
5 June 14-16,2022
6 June 14-16,2022
7 June 14-16,2022
8 June 14-16,2022
9 June 14-16,2022
10 June 14-16,2022
1 June 28-June 29,2022
2 June 28-June 29,2022
3 June 28-June 29,2022
4 June 28-June 29,2022
5 June 28-June 29,2022
6 June 28-June 29,2022
7 June 28-June 29,2022
8 June 28-June 29,2022
9 June 28-June 29,2022
10 June 28-June 29,2022
1 July 11-13,2022
2 July 11-13,2022
3 July 11-13,2022
4 July 11-13,2022
5 July 11-13,2022
6 July 11-13,2022
7 July 11-13,2022
8 July 11-13,2022
9 July 11-13,2022
10 July 11-13,2022
11 July 11-13,2022
12 July 11-13,2022
13 July 11-13,2022
14 July 11-13,2022
1 July 19-21,2022
2 July 19-21,2022
3 July 19-21,2022
4 July 19-21,2022
5 July 19-21,2022
6 July 19-21,2022
7 July 19-21,2022
8 July 19-21,2022
9 July 19-21,2022
10 July 19-21,2022
11 July 19-21,2022
12 July 19-21,2022
1 July 26-August 10,2022
2 July 26-August 10,2022
3 July 26-August 10,2022
4 July 26-August 10,2022
5 July 26-August 10,2022
6 July 26-August 10,2022
7 July 26-August 10,2022
8 July 26-August 10,2022
9 July 26-August 10,2022
10 July 26-August 10,2022
11 July 26-August 10,2022
12 July 26-August 10,2022
13 July 26-August 10,2022
1 August 8-18,2022
2 August 8-18,2022
3 August 8-18,2022
4 August 8-18,2022
5 August 8-18,2022
6 August 8-18,2022
7 August 8-18,2022
8 August 8-18,2022
9 August 8-18,2022
10 August 8-18,2022
11 August 8-18,2022
12 August 8-18,2022
1 Aug.17-Sept. 06,2022
2 Aug.17-Sept. 06,2022
3 Aug.17-Sept. 06,2022
4 Aug.17-Sept. 06,2022
5 Aug.17-Sept. 06,2022
6 Aug.17-Sept. 06,2022
7 Aug.17-Sept. 06,2022
8 Aug.17-Sept. 06,2022
9 Aug.17-Sept. 06,2022
10 Aug.17-Sept. 06,2022
11 Aug.17-Sept. 06,2022
12 Aug.17-Sept. 06,2022
13 Aug.17-Sept. 06,2022
Beams and Girders - Formworks
16.00 Ramp Beams and Girders
16.01
Ramp Bea
16.02
Ramp B
16.03
Ramp Beam
17.00 Coupling Beams
17.01
17.02
17.03
C
18.00 Tanks and Pits
18.01
NO. DATE
May 18,2022
May 18,2022
1 May 18,2022
May 18,2022
May 18,2022
May 20,2022
May 20,2022
2 May 20,2022
May 20,2022
May 20,2022
May 21,2022
May 21,2022
3 May 21,2022
May 21,2022
May 21,2022
May 28,2022
May 28,2022
4 May 28,2022
May 28,2022
May 28,2022
May 28,2022
May 28,2022
5 May 28,2022
May 28,2022
May 28,2022
May 31,2022
May 31,2022
6 May 31,2022
May 31,2022
May 31,2022
June 02,2022
June 02,2022
7 June 02,2022
June 02,2022
June 02,2022
June 06,2022
June 06,2022
8 June 06,2022
June 06,2022
June 06,2022
June 22,2022
June 22,2022
9 June 22,2022
June 22,2022
June 22,2022
June 28,2022
June 28,2022
10 June 28,2022
June 28,2022
June 28,2022
June 30,2022
June 30,2022
11 June 30,2022
June 30,2022
June 30,2022
July 03,2022
July 03,2022
12 July 03,2022
July 03,2022
July 03,2022
July 08,2022
July 08,2022
13 July 08,2022
July 08,2022
July 08,2022
July 08,2022
July 08,2022
14 July 08,2022
July 08,2022
July 08,2022
July 18,2022
July 18,2022
15 July 18,2022
July 18,2022
July 18,2022
July 23,2022
July 23,2022
16 July 23,2022
July 23,2022
July 23,2022
July 25,2022
July 25,2022
17
17
July 25,2022
July 25,2022
July 25,2022
July 25,2022
July 25,2022
18 July 25,2022
July 25,2022
July 25,2022
July 25,2022
August 02,2022
August 02,2022
19 August 02,2022
August 02,2022
August 02,2022
August 3,2022
August 3,2022
20 August 3,2022
August 3,2022
August 3,2022
August 3,2022
August 3,2022
21 August 3,2022
August 3,2022
August 3,2022
August 13,2022
August 13,2022
22
August 13,2022
August 13,2022
August 24,2022
August 24,2022
23
August 24,2022
August 24,2022
August 24,2022
August 24,2022
24 August 24,2022
August 24,2022
August 24,2022
August 24,2022
August 24,2022
25 August 24,2022
August 24,2022
August 24,2022
Sept. 06,2022
Sept. 06,2022
26 Sept. 06,2022
Sept. 06,2022
Sept. 06,2022
Sept. 15,2022
Sept. 15,2022
27 Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
Tanks and Pits - Concrete
18.02
18.03
NO. DATE
May 17,2022
May 17,2022
May 17,2022
1
May 17,2022
May 17,2022
May 17,2022
May 19,2022
May 19,2022
2 May 19,2022
May 19,2022
May 19,2022
May 20,2022
May 20,2022
May 20,2022
May 20,2022
3
May 20,2022
May 20,2022
May 20,2022
May 20,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
4
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
5 May 27,2022
May 27,2022
5
May 27,2022
May 30,2022
May 30,2022
May 30,2022
May 30,2022
6
May 30,2022
May 30,2022
May 30,2022
May 30,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
7
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 03,2022
June 03,2022
June 03,2022
7s June 03,2022
June 03,2022
June 03,2022
June 03,2022
June 05,2022
June 05,2022
June 05,2022
June 05,2022
8 June 05,2022
June 05,2022
June 05,2022
June 05,2022
June 05,2022
June 07,2022
June 07,2022
June 07,2022
8s
June 07,2022
June 07,2022
June 07,2022
June 21,2022
June 21,2022
June 21,2022
9 June 21,2022
9
June 21,2022
June 21,2022
June 21,2022
June 22,2022
June 22,2022
9s June 22,2022
June 22,2022
June 22,2022
June 27,2022
June 27,2022
June 27,2022
June 27,2022
10 June 27,2022
June 27,2022
June 27,2022
June 27,2022
June 27,2022
June 28,2022
June 28,2022
June 28,2022
10s June 28,2022
June 28,2022
June 28,2022
June 28,2022
June 29,2022
June 29,2022
June 29,2022
11
June 29,2022
June 29,2022
June 29,2022
June 30,2022
June 30,2022
11s
June 30,2022
June 30,2022
July 02,2022
July 02,2022
July 02,2022
12 July 02,2022
July 02,2022
July 02,2022
July 02,2022
July 03,2022
July 03,2022
July 03,2022
12s
July 03,2022
July 03,2022
July 03,2022
July 07,2022
July 07,2022
13 July 07,2022
July 07,2022
July 07,2022
July 09,2022
July 09,2022
13s
July 09,2022
July 09,2022
July 16,2022
July 16,2022
July 16,2022
14
July 16,2022
July 16,2022
July 16,2022
July 19,2022
July 19,2022
July 19,2022
14s
July 19,2022
July 19,2022
July 19,2022
July 16,2022
July 16,2022
July 16,2022
July 16,2022
July 16,2022
15
July 16,2022
July 16,2022
July 16,2022
July 16,2022
July 16,2022
July 19,2022
July 19,2022
July 19,2022
15s July 19,2022
July 19,2022
July 19,2022
July 19,2022
July 25,2022
July 25,2022
16 July 25,2022
July 25,2022
July 25,2022
July 26,2022
July 26,2022
16s
July 26,2022
July 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
17
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 27,2022
July 27,2022
July 27,2022
17s July 27,2022
July 27,2022
July 27,2022
July 27,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
18 August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 03,2022
August 03,2022
August 03,2022
18s August 03,2022
August 03,2022
August 03,2022
August 03,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
19
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 03,2022
August 03,2022
19s
August 03,2022
19s August 03,2022
August 03,2022
August 03,2022
August 03,2022
August 13,2022
August 13,2022
August 13,2022
20 August 13,2022
August 13,2022
August 13,2022
August 13,2022
August 14,2022
August 14,2022
August 14,2022
20s
August 14,2022
August 14,2022
August 14,2022
August 23,2022
August 23,2022
21
August 23,2022
August 23,2022
August 25,2022
21s August 25,2022
August 25,2022
August 21-22,2022
August 21-22,2022
August 21-22,2022
22
August 21-22,2022
August 21-22,2022
August 21-22,2022
August 25-26,2022
August 25-26,2022
22s
August 25-26,2022
August 25-26,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
23 August 20-24,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
August 26-27,2022
August 26-27,2022
August 26-27,2022
23s
23s August 26-27,2022
August 26-27,2022
August 26-27,2022
August 26-27,2022
Sept. 05-06,2022
Sept. 05-06,2022
Sept. 05-06,2022
24 Sept. 05-06,2022
Sept. 05-06,2022
Sept. 05-06,2022
Sept. 05-06,2022
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
24s
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
19
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
19s Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
19.01
19.02
19.03
20.00 Equipment Pad
20.01
20.02
20.03
E
21.00 Structural Steel
21.01
ARCHITECTURAL WORKS
N, INC.
nnex, Alabang-Zapote Road, Pamplona III, Las Piñas City
g and Grubbing
k Excavation
ural Excavation
ual Trimming
nd Compaction (Local)
ng-out of Soil
ks - Gravel Bedding
Shotcreting Works
s - Soil Poisoning
rmite Reticulation System
s - Damproofing
Barrier/Polyethylene Sheet
ks - Waterstop
ks - Waterstop
n-Grade - Concrete
On-Grade - Rebar
-Grade - Formworks
d Footing - Concrete
ted Footing - Rebar
Footing - Formworks
ooting - Concrete
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
ooting - Concrete
Footing - Rebar
oting - Formworks
n - Concrete
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
-
174.50 152.48 cu.m 1.14
mn - Rebar
- Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
Wall - Concrete
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
-
145.00 120.68 cu.m 1.20
r Wall - Rebar
Wall - Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
Slab - Concrete
p Slab - Rebar
ab - Formworks
-
-
- - #REF!
ms and Girders - Rebar
and Girders - Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
ng Beams - Concrete
ling Beams - Rebar
g Beams - Formworks
Concrete
s - Rebar
Formworks
ment Pad - Concrete
pment Pad - Rebar
ent Pad - Formworks
tructural Steel
REMARKS
MAN-HOUR/cu.m
REMARKS
REMARKS
B5 to B4; TC3(Pumpcrete
Boomtype)
B5 ot B4; C1(Pumpcrete
Boomtype)
B5 ot B4; C2(Pumpcrete
Boomtype)
B5 ot B4; TC3(Pumpcrete
Boomtype)
B5 ot B4; TC3(Pumpcrete
Boomtype)
B5 ot B4; TC3(Pumpcrete
Boomtype)
B5 ot B4; TC3(Pumpcrete
Boomtype)
B5 ot B4; TC2(Pumpcrete
Boomtype)
B5 ot B4; C1(Pumpcrete
Boomtype)
B5 ot B4; C2 (Pumpcrete
Boomtype, With 20mins.
Rectifications)
B5 ot B4; C2 (Pumpcrete
Boomtype)
B4 ot B3; C1(Pumpcrete
Boomtype)
B3 ot B2; TC3(Pumpcrete
Boomtype)
B3 ot B2; TC3(Pumpcrete
Boomtype, with rectification
30mins. Repair of leakage)
B3 ot B2; TC3(Pumpcrete
Boomtype)
B3 ot B2; TC3(Pumpcrete
Boomtype)
B3 ot B2; C1(Pumpcrete
Boomtype)
B3 ot B2; C2 (Pumpcrete
Boomtype, With 20mins.
Rectifications)
B4 to B3; C2 (Pumpcrete
Boomtype)
B3 to B2; C1(Pumpcrete
Boomtype)
B3 to B2; TC3(Pumpcrete
Boomtype)
B3 to B2; TC3(Pumpcrete
Boomtype)
B3 to B2; TC3(Pumpcrete
Boomtype)
B3 to B2; TC3(Pumpcrete
Boomtype)
B3 to B2; C2 (Pumpcrete
Boomtype)
MAN-HOUR/cu.m
REMARKS
B5 TO B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 TO B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 TO B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)
TC6 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 to B4;C1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 to B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC5 (Fabrication,
Installation and Alignment,
including stipping 2hours)
B5 to B4;TC5 (Fabrication,
Installation and Alignment,
including stipping 2hours)
B5 to B4;TC2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;C1 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 to B4;C2 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC2 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 to B4;TC2 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B4 to B3;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B3;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC5 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC6 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B3;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B3;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B3;TC5 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B4 to B3;TC6 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B3;C1 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B5;TC5 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B3 to B2;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B3 ot B2;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B3 ot B2;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B3 ot B2;TC6 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B3 ot B2;C1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B3 ot B2; C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B3 ot B2; C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B5;C1 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B2 to B1;C2 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B2 to B1;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B2 to B1;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B2 to B1;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B2 to B1;C2 (Fabrication,
Installation and Alignment,
including stipping 3hours)
MAN-HOUR/sqm
REMARKS
REMARKS
MAN-HOUR/cu.m
REMARKS
MAN-HOUR/sqm
REMARKS
MAN-HOUR/cu.m
REMARKS
REMARKS
#REF!
REMARKS
MAN-HOUR/sqm
REMARKS
RW2 (Pumpcrete
Boomtype)
RW2(With rectification
about 1 hour)
(Pumpcrete Boomtype)
RW2 (Pumpcrete
Boomtype)
RW2 (Pumpcrete
Boomtype)
RW2 (Pumpcrete
Boomtype)
RW2 (Pumpcrete
Boomtype)
RCW (Pumpcrete
Boomtype)
B4 to B3; RW (Pumpcrete
Boomtype)
B3 to B2; RW (Pumpcrete
Boomtype)
B3 to B2 2nd lift ; RW
(Pumpcrete Boomtype)
STP to B5; WTW
(Pumpcrete Boomtype)
MAN-HOUR/cu.m
REMARKS
13.45mx2.4mxsingle face
(Fabrication, Installation and
alignment)
10mx2.4mxsingle face
(Fabrication, Installation and
alignment)
12mx2.4mxdouble face
(Fabrication, Installation and
alignment)
25.62mx2.4mxdouble face
(Fabrication, Installation and
alignment)
6.2mx2.4mxdouble face
(Fabrication, Installation and
alignment)
6.2mx2.4mxdouble face
(Fabrication, Installation and
alignment)
22.63mx2.4mxdouble face
(Fabrication, Installation and
alignment)
48.5mx2.4mxdouble face
(Fabrication, Installation and
alignment)
48.5mx2.4mxdouble face
(Stripping and Arrangement
of materials)
21mx2.4mxdouble face
(Fabrication, Installation and
alignment)
21mx2.4mxdouble face
(Stripping and Arrangement
of materials)
15mx1.2mxdouble face
(2nd lift) (Fabrication,
Installation and alignment)
15mx1.2mxdouble face
(2nd lift) (Fabrication,
Installation and alignment)
15mx1.2mxdouble face
(2nd lift) (Stripping and
Arrangement of materials)
28.568mx2.4mxdouble face
(Fabrication, Installation and
alignment)
28.568mx2.4mxdouble face
(Stripping and Arrangement
of materials)
8.873mx2.4mxdouble face
(Fabrication, Installation and
alignment)
8.873mx2.4mxdouble face
(Stripping and Arrangement
of materials)
11.67mx1.7mxdouble face
(Fabrication, Installation and
alignment)
11.67mx1.7mxdouble face
(Stripping and Arrangement
of materials)
6.6mx1.3mxdouble face
(Fabrication, Installation and
alignment)
6.6mx1.3mxdouble face
(Stripping and Arrangement
of materials)
16.935mx2.4mxhalf of
length is double face
(Fabrication, Installation and
alignment)
16.935mx2.4mxhalf of
length is double face
(Stripping and Arrangement
of materials)
25.974mx2.4mxdouble face
(Fabrication, Installation
and alignment)
25.974mx2.4mxdouble face
(Stripping and Arrangement
of materials)
5.5mx2.44mxdouble face
(Fabrication, Installation and
alignment)
5.5mx2.44mxdouble face
(Stripping and Arrangement
of materials)
21.54mx2.06mxdouble face
2nd lft (Fabrication,
Installation and alignment)
21.54mx2.06mxdouble face
2nd lft (Stripping and
Arrangement of materials)
16.9mx2.4mxdouble face
(Fabrication, Installation and
alignment)
16.9mx2.4mxdouble face
(Stripping and Arrangement
of materials)
26.2mx2.4mxdouble face
(Fabrication, Installation and
alignment)
26.2mx2.4mxdouble face
(Stripping and Arrangement
of materials)
26.2mx2.4mxdouble face
(Stripping and Arrangement
of materials)
10.5mx1.5mxdouble face
(Fabrication, Installation and
alignment)
10.5mx1.5mxdouble face
(Stripping and Arrangement
of materials)
4.61mx2.44mxdouble face
(Stripping and Arrangement
of materials)
4.61mx2.44mxdouble face
(Stripping and Arrangement
of materials)
B4 to B3;
9.41mx2.4mxdouble face
(Fabrication, Installation and
alignment)
B4 to B3;
9.41mx2.4mxdouble face
(Stripping and Arrangement
of materials)
B3 to B2;
29.28mx2.4mxsingle face
(Fabrication, Installation and
alignment)
B3 to B2;
29.28mx2.4mxsingle face
(Stripping and Arrangement
of materials)
B3 to B2;
29.28mx2.4mxsingle face
(Stripping and Arrangement
of materials)
38.275mx0.75mxsingle face
(Fabrication, Installation
and alignment)
38.275mx0.75mxsingle face
(Stripping and Arrangement
of materials)
24.2mx2.3mxdouble face
(Fabrication, Installation and
alignment)
24.2mx2.3mxdouble face
(Stripping and Arrangement
of materials)
MAN-HOUR/SQM