Projects P.M./ P.I.C. Cost Engr.

Alpine1 Marco Mendoza Alexis De Guzman


Bradbury Eric M. Reyes Alexis De Guzman/ Kristine Garcia
Brenthill Ferdinand Salcedo/Benjamin Poblete Rystine T. Palangeo
Canyonhill Ferdinand Salcedo/Benjamin Poblete Rystine T. Palangeo
GLTaft Phillip A. Lanuza Hannah Kristel A. Alamillo
Hawthorne Michael Bocobo Angeline Rose Caballero
Kizuna Henry Dasco Rovic Legaspi
Morrison Henry Dasco
Pinehill Ferdinand Salcedo/Benjamin Poblete Rystine T. Palangeo
Plumeria Aerrol C. Miñas Renz Angelo Atienza
Pointe Jay M. Galicha Sharmaine R. Penales
Spectrum Grace Q. Bermundo Ma. Theresa Mediola
Suarez Wilfredo Reyes Jessa Mae C. Sacay
Tennyson Eric M. Reyes Shaquilla Dayot
Email E.I.C.

marcoleni.mendoza@mgs.com.ph Jules Manansala


eric.reyes@mgs.com.ph Austin Calangian
ferdinand.salcedo@mgs.com.ph Austin Calangian
ferdinand.salcedo@mgs.com.ph Bart Mojica
phillip.lanuza@mgs.com.ph Bart Mojica
michael.bocobo@mgs.com.ph Bart Mojica
henry.dasco@mgs.com.ph Bart Mojica
henry.dasco@mgs.com.ph Bart Mojica
ferdinand.salcedo@mgs.com.ph Bart Mojica
Aerrol.Minas@mgs.com.ph Austin Calangian
jay.galicha@mgs.com.ph Austin Calangian
carl.diazon@mgs.com.ph Bart Mojica
wilfredo.reyes@mgs.com.ph Bart Mojica
eric.reyes@mgs.com.ph Bart Mojica
MGS CONSTRUCTION, INC.
2nd Floor, Starmall Annex, Alabang-Zapote Road, Pamplona III, Las Piñas City
Tel: 8144600

MONITORING OF PROJECT PRODUCTIVITY RATES

List of Activity Alpine1


Previous Date

CIVIL WORKS
1 Earthworks
1.01 Earth Clearing and Grubbing
1.02 Earth Bulk Excavation
1.03 Earth Structural Excavation
1.04 Earth Manual Trimming
1.05 Earth Backfilling and Compaction (Local)
1.06 Earth Hauling-out of Soil
2 Base Preparation Works
2.01 Base Gravel Bedding
2.02 Base Lean Concrete
3 Soil Protection Works
3.01 Soil P Shotcreting Works
4 Miscellaneous Works
4.01 MisceSoil Poisoning
4.02 MisceAnti-termite Reticulation System
4.03 MisceDamproofing
4.04 MisceVapor Barrier/Polyethylene Sheet
4.05 MisceWaterstop
STRUCTURAL WORKS
5 Slab-On-Grade
5.01 Slab- Slab-On-Grade - Concrete
5.02 Slab- Slab-On-Grade - Rebar
5.03 Slab- Slab-On-Grade - Formworks
6 Footing Tie Beam
6.01 Footi Footing Tie Beam - Concrete
6.02 Footi Footing Tie Beam - Rebar
6.03 Footi Footing Tie Beam - Formworks
7 Isolated Footing
7.01 Isolat Isolated Footing - Concrete
7.02 Isolat Isolated Footing - Rebar
7.03 Isolat Isolated Footing - Formworks
8 Combined Footing
8.01 CombiCombined Footing - Concrete
8.02 CombiCombined Footing - Rebar
8.03 CombiCombined Footing - Formworks
9 Mat Footing
9.01 Mat FMat Footing - Concrete
9.02 Mat FMat Footing - Rebar
9.03 Mat FMat Footing - Formworks
10 Wall Footing
10.01 Wall FWall Footing - Concrete
10.02 Wall FWall Footing - Rebar
10.03 Wall FWall Footing - Formworks
11 Column
11.01 ColumColumn - Concrete
11.02 ColumColumn - Rebar
11.03 ColumColumn - Formworks
12 Shear Wall
12.01 Shear Shear Wall - Concrete
12.02 Shear Shear Wall - Rebar
12.03 Shear Shear Wall - Formworks
13 Suspended Slab
13.01 SuspeSuspended Slab - Concrete
13.02 SuspeSuspended Slab - Rebar
13.03 SuspeSuspended Slab - Formworks
14 Ramp Slab
14.01 Ramp Ramp Slab - Concrete
14.02 Ramp Ramp Slab - Rebar
14.03 Ramp Ramp Slab - Formworks
15 Beams and Girders
15.01 BeamsBeams and Girders - Concrete
15.02 BeamsBeams and Girders - Rebar
15.03 BeamsBeams and Girders - Formworks
16 Ramp Beams and Girders
16.01 Ramp Ramp Beams and Girders - Concrete
16.02 Ramp Ramp Beams and Girders - Rebar
16.03 Ramp Ramp Beams and Girders - Formworks
17 Coupling Beams
17.01 CouplCoupling Beams - Concrete
17.02 CouplCoupling Beams - Rebar
17.03 CouplCoupling Beams - Formworks
18 Tanks and Pits
18.01 Tanks Tanks and Pits - Concrete
18.02 Tanks Tanks and Pits - Rebar
18.03 Tanks Tanks and Pits - Formworks
19 Stairs
19.01 Stairs Stairs - Concrete
19.02 Stairs Stairs - Rebar
19.03 Stairs Stairs - Formworks
20 Equipment Pad
20.01 EquipEquipment Pad - Concrete
20.02 EquipEquipment Pad - Rebar
20.03 EquipEquipment Pad - Formworks
21 Structural Steel
21.01 StructStructural Steel
ARCHITECTURAL WORKS
22 Masonry Works
22.01 MasonCHB 6" (Load Bearing)
22.02 MasonCHB 4" (Load Bearing)
22.03 MasonCHB 6" (Ordinary)
22.04 MasonCHB 4" (Ordinary)
22.05 MasonLintel Beam
22.06 MasonStiffener Column
22.07 MasonZocallo
22.08 MasonCornering
22.09 MasonFicem Dropwall (Below 1.5M)
22.1 MasonFicem Dropwall (Above 1.5M)
22.11 MasonFicem Drywall
23 Wall Finishes
23.01 Wall FOff-Formed / Rubbed Concrete
23.02 Wall FPlain Cement Plastered Finish (Exterior)
23.03 Wall FPlain Cement Plastered Finish (Interior)
23.04 Wall FStucco Finish
24 Floor Finishes
24.01 Floor Smooth Plain Cement Finish
24.02 Floor Concrete Topping
24.03 Floor Concrete Topping with Wire Mesh
24.04 Floor Concrete Floor Sealer
24.05 Floor Smooth Finish with Grooves
25 Tiling Works
25.01 Tiling 600x600mm Homogeneous Tiles
25.02 Tiling 600x300mm Homogeneous Tiles
25.03 Tiling Laminated Wood Floor Finish
26 Ceiling Finishes
26.01 Ceilin Off-Formed / Rubbed Concrete
26.02 Ceilin 9mm thk Fiber Cement Board w/ Frames
26.03 Ceilin 6mm thk Fiber Cement Board w/ Frames
26.04 Ceilin Ceiling Provision for Exhaust Fan
26.05 Ceilin Ceiling Manhole
26.06 Ceilin Ceiling Reveal / Shadow Line
26.07 Ceilin Bulkhead (Below 1.5m)
26.08 Ceilin Bulkhead (Above 1.5m)
27 Painting Works
27.01 Paint Skimcoat
27.02 Paint Flat Latex Paint
27.03 Paint Elastomeric Paint
27.04 Paint Semi-gloss Latex Paint
27.05 Paint WACU Grilles Paint
27.06 Paint Floor-mounted Railings Paint
27.07 Paint Wall-mounted Railings Paint
27.08 Paint Balcony Railings Paint
27.09 Paint Steel Gratings Paint
27.1 Paint Curb Paint
27.11 Paint Wheelstop Paint (2000mm)
27.12 Paint Parking Car Stall (Line Paint)
27.13 Paint Parking Car Stall (Number Paint)
27.14 Paint Column Guard Paint
28 Waterproofing Works
28.01 WaterIntegral Waterproofing
28.02 WaterFlexible Cementitious Waterproofing
28.03 WaterEpoxy Tank Lining
29 Toilet Fixtures
29.01 ToiletSoap Holder
29.02 ToiletTissue Paper Holder
30 Metalworks
30.01 MetalFloor-mounted Railings
30.02 MetalWall-mounted Railings
30.03 MetalBalcony Railings
30.04 MetalStair Nosings
30.05 MetalTrench Gratings (Traffic)
30.06 MetalColumn Guards (Angle Bar)
30.07 MetalManhole Cover (600x600)
30.08 MetalManhole Cover (900x900)
30.09 MetalCatch Basin Cover (450x450)
30.1 MetalCatch Basin Cover (500x500)
30.11 MetalCatch Basin Cover (550x550)
30.12 MetalSteel Plate Cover (600x1000)
30.13 Metal20mm Stainless Steel Ladder Rung
30.14 MetalWACU Grilles
31 Roofing Works
31.01 Roofi CPAC Roof Tiles
31.02 Roofi GI Roofing Sheet
31.03 Roofi Gutter
31.04 Roofi Gutter Paint
32 Miscellaneous
32.01 MisceWACU Concrete Ledge (Top and Bottom)
32.02 MisceACU Cover (Styro)
32.03 MisceCurb
32.04 MisceIsland
32.05 MisceWheelstop (2000mm)
32.06 MisceSeparator Beam
32.07 MisceHoisting Hook (3-ton)
32.08 MisceHoisting Hook (6-ton) and Hoisting Beam
32.09 MisceBaseboard in Varnish Paint Finish
32.1 MisceWindow Sill Moulding A
32.11 MisceWindow Sill Moulding B
32.12 MisceArc Moulding
32.13 MisceFaux Window Shutter Moulding
32.14 MisceStone Wall Cladding Finish
32.15 MisceCorbel
32.16 MisceFascia Board (250mm)
32.17 MisceCeiling Eaves
32.18 MisceMouldings Paint
32.19 MisceFascia Board Paint
32.2 MisceCeiling Eaves Paint
ñas City

Alpine1 Bradbury Brenthill


Current Date Previous Date Current Date Previous Date Current Date
#REF! #REF! #REF!
Canyonhill GLTaft Hawthorne
Previous Date Current Date Previous Date Current Date Previous Date
#REF! #REF!
Total Productivity Rate
Hawthorne Kizuna Morrison
Current Date Previous Date Current Date Previous Date Current Date
#REF! #REF! #REF!
Pinehill Plumeria Pointe
Previous Date Current Date Previous Date Current Date Previous Date
#REF! #REF!
Pointe Spectrum Suarez
Current Date Previous Date Current Date Previous Date Current Date
#REF! #REF! #REF!
Tennyson
Previous Date Current Date
#REF!
MGS CONSTRUCTION, INC.
2nd Floor, Starmall Annex, Alabang-Zapote Road, Pamplona III, Las Piñas City
Tel: 8144600

PROJECT :
LOCATION :
DEVELOPER :

DATE OF UPDATE: : September 16,2022

CIVIL WORKS

1.00 Earthworks

1.01

1.02

1.03

1.04

1.05
Ea
1.06

2.00 Base Preparation Works

2.01

3.00 Soil Protection Works

3.01

4.00 Miscellaneous Works

4.01

4.02
Misce
4.03

4.04
Miscel
4.05
4.05

STRUCTURAL WORKS

5.00 Slab-On-Grade

5.01

5.02

5.03

6.00 Footing Tie Beam

6.01
Fo
6.02

6.03
Fo
7.00 Isolated Footing

7.01

7.02

7.03
Is
8.00 Combined Footing

8.01
Co
8.02
C
8.03
Com
9.00 Mat Footing

9.01
NO. DATE

June 08,2022
June 08,2022

1
June 08,2022
June 08,2022
June 08,2022
1
June 08,2022
June 08,2022
June 08,2022
June 08,2022
June 08,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
August 30-31,2022
2 August 30-31,2022
August 31,2022
August 31,2022
August 31,2022
August 31,2022
August 31,2022
August 31,2022

Mat Footing - Concrete

9.02

9.03
NO. DATE

1 June 07,2022
2 June 07,2022
3 June 07,2022
4 June 07,2022
5 June 07,2022
6 June 07,2022
7 June 07,2022
8 June 07,2022
9 June 07,2022
10 June 07,2022
11
12
13
14
15
Mat Footing - Formworks
10.00 Wall Footing

10.01

10.02

10.03

11.00 Column

11.01
NO. DATE

May 18,2022
1 May 18,2022
May 18,2022
May 18,2022
May 18,2022
2
May 18,2022
May 18,2022
May 18,2022
May 18,2022
3
May 18,2022
May 18,2022
May 20,2022
May 20,2022
4
May 20,2022
May 20,2022
May 20,2022
May 20,2022
5
May 20,2022
May 20,2022
May 20,2022
May 20,2022
6
May 20,2022
May 20,2022
May 21,2022
7 May 21,2022
May 21,2022
May 24,2022
May 24,2022
8
May 24,2022
May 24,2022
June 18,2022
June 18,2022
9
June 18,2022
June 18,2022
June 18,2022
June 18,2022
10
June 18,2022
June 18,2022
June 18,2022
June 18,2022
11
June 18,2022
June 18,2022
June 20,2022
June 20,2022
12
June 20,2022
June 20,2022
June 22,2022
June 22,2022
13
June 22,2022
June 22,2022
June 22,2022
June 22,2022
14
June 22,2022
June 22,2022
June 22,2022
June 22,2022
15
June 22,2022
June 22,2022
June 22,2022
June 22,2022
16
June 22,2022
June 22,2022
June 22,2022
17 June 22,2022
June 22,2022
June 22,2022
18 June 22,2022
June 22,2022
June 24,2022
June 24,2022
19
June 24,2022
June 24,2022
June 24,2022
20
June 24,2022
20
June 24,2022
June 24,2022
June 24,2022
June 24,2022
21
June 24,2022
June 24,2022
June 25,2022
June 25,2022
22
June 25,2022
June 25,2022
June 28,2022
June 28,2022
23
June 28,2022
June 28,2022
June 28,2022
24 June 28,2022
June 28,2022
June 28,2022
25 June 28,2022
June 28,2022
July 8,2022
July 8,2022
26
July 8,2022
July 8,2022
July 8,2022
27 July 8,2022
July 8,2022
July 20,2022
July 20,2022
28
July 20,2022
July 20,2022
July 20,2022
July 20,2022
29
July 20,2022
July 20,2022
July 22,2022
July 22,2022
30
July 22,2022
July 22,2022
July 22,2022
July 22,2022
31
July 22,2022
July 22,2022
July 25,2022
July 25,2022
32
July 25,2022
32

July 25,2022
July 25,2022
July 25,2022
33
July 25,2022
July 25,2022
Aug. 01,2022
34 Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
35
Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
Aug. 01,2022
36
Aug. 01,2022
Aug. 01,2022
Aug. 03,2022
37 Aug. 03,2022
Aug. 03,2022
Aug. 03,2022
Aug. 03,2022
38
Aug. 03,2022
Aug. 03,2022
Aug. 04,2022
39 Aug. 04,2022
Aug. 04,2022
Aug. 04,2022
Aug. 04,2022
40
Aug. 04,2022
Aug. 04,2022
Aug. 15,2022
Aug. 15,2022
41
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
42
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
43
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
44
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
45
Aug. 15,2022
45
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
Aug. 15,2022
46
Aug. 15,2022
Aug. 15,2022
Aug. 24,2022
47 Aug. 24,2022
Aug. 24,2022
Aug. 24,2022
48 Aug. 24,2022
Aug. 24,2022
Aug. 24,2022
Aug. 24,2022
49
Aug. 24,2022
Aug. 24,2022
Aug. 31,2022
Aug. 31,2022
50
Aug. 31,2022
Aug. 31,2022
Aug. 31,2022
Aug. 31,2022
51
Aug. 31,2022
Aug. 31,2022
Sept. 06,2022
52 Sept. 06,2022
Sept. 06,2022
Sept. 06,2022
53 Sept. 06,2022
Sept. 06,2022
Sept. 06,2022
54 Sept. 06,2022
Sept. 06,2022
Sept. 15,2022
55 Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
56 Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
57
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
58
Sept. 15,2022
58

Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
59
Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
60 Sept. 15,2022
Sept. 15,2022

Column - Concrete

11.02

11.03
NO. DATE

May 18,2022
May 18,2022
1
May 18,2022
May 18,2022
May 18,2022
May 18,2022
2
May 18,2022
May 18,2022
May 18,2022
May 18,2022
3
May 18,2022
May 18,2022
May 20,2022
May 20,2022
4
May 20,2022
May 20,2022
May 20,2022
May 20,2022
5
May 20,2022
May 20,2022
May 20,2022
May 20,2022
6
May 20,2022
May 20,2022
June 18,2022
June 18,2022
7
June 18,2022
June 18,2022
June 18,2022
June 18,2022
8
June 18,2022
June 18,2022
June 18,2022
June 18,2022
9
June 18,2022
June 18,2022
June 22,2022
June 22,2022
10
June 22,2022
June 22,2022
June 22,2022
June 22,2022
11
June 22,2022
June 22,2022
June 22,2022
June 22,2022
12
June 22,2022
June 22,2022
June 22,2022
June 22,2022
13
June 22,2022
June 22,2022
June 22,2022
June 22,2022
14
June 22,2022
June 22,2022
June 22,2022
June 22,2022
15
June 22,2022
June 22,2022
June 24,2022
June 24,2022
16
June 24,2022
June 24,2022
June 24,2022
June 24,2022
17
June 24,2022
June 24,2022
June 24,2022
June 24,2022
18
June 24,2022
June 24,2022
June 25,2022
June 25,2022
19
June 25,2022
19

June 25,2022
June 28,2022
June 28,2022
20
June 28,2022
June 28,2022
June 28,2022
June 28,2022
21
June 28,2022
June 28,2022
June 28,2022
June 28,2022
22
June 28,2022
June 28,2022
July 07,2022
July 07,2022
23
July 07,2022
July 07,2022
July 07,2022
July 07,2022
24
July 07,2022
July 07,2022
July 19,2022
July 19,2022
25
July 19,2022
July 19,2022
July 19,2022
July 19,2022
26
July 19,2022
July 19,2022
July 21,2022
July 21,2022
27
July 21,2022
July 21,2022
July 21,2022
July 21,2022
28
July 21,2022
July 21,2022
July 25,2022
July 25,2022
29
July 25,2022
July 25,2022
July 25,2022
July 25,2022
30
July 25,2022
July 25,2022
July 31,2022
July 31,2022
31
31
July 31,2022
July 31,2022
July 31,2022
July 31,2022
32
July 31,2022
July 31,2022
July 31,2022
July 31,2022
33
July 31,2022
July 31,2022
August 02,2022
August 02,2022
34
August 02,2022
August 02,2022
August 02,2022
August 02,2022
35
August 02,2022
August 02,2022
August 13,2022
August 13,2022
36
August 13,2022
August 13,2022
August 13,2022
August 13,2022
37
August 13,2022
August 13,2022
August 13,2022
August 13,2022
38
August 13,2022
August 13,2022
August 15,2022
August 15,2022
39
August 15,2022
August 15,2022
August 15,2022
August 15,2022
40
August 15,2022
August 15,2022
August 15,2022
August 15,2022
41
August 15,2022
August 15,2022
August 23,2022
August 23,2022
42
August 23,2022
August 23,2022
August 23,2022
43
August 23,2022
43
August 23,2022
August 23,2022
August 23,2022
August 23,2022
44
August 23,2022
August 23,2022
August 30,2022
August 30,2022
45
August 30,2022
August 30,2022
August 30,2022
August 30,2022
46
August 30,2022
August 30,2022
Sept. 13,2022
Sept. 13,2022
47
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
48
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
Sept. 13,2022
49
Sept. 13,2022
Sept. 13,2022
Sept. 14,2022
Sept. 14,2022
50
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
51
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
Sept. 14,2022
52
Sept. 14,2022
Sept. 14,2022
Column - Formworks
12.00 Shear Wall

12.01
NO. DATE
NO. DATE

May 24,2022
May 24,2022
1 May 24,2022
May 24,2022
May 24,2022
June 20,2022
June 20,2022
2 June 20,2022
June 20,2022
June 20,2022
June 25,2022
June 25,2022
3 June 25,2022
June 25,2022
June 25,2022
June 30,2022
June 30,2022
4 June 30,2022
June 30,2022
June 30,2022
July 08,2022
July 08,2022
5 July 08,2022
July 08,2022
July 08,2022
July 20,2022
July 20,2022
6 July 20,2022
July 20,2022
July 20,2022
July 21,2022
July 21,2022
7 July 21,2022
July 21,2022
July 21,2022
Aug. 02,2022
Aug. 02,2022
8 Aug. 02,2022
Aug. 02,2022
Aug. 02,2022
Aug. 04,2022
Aug. 04,2022
9 Aug. 04,2022
Aug. 04,2022
Aug. 04,2022
Aug. 06,2022
Aug. 06,2022
10 Aug. 06,2022
Aug. 06,2022
Aug. 06,2022
Aug. 31,2022
Aug. 31,2022
Aug. 31,2022
11 Aug. 31,2022

Aug. 31,2022

Shear Wall - Concrete

12.02

12.03
NO. DATE

May 23,2022
May 23,2022
May 23,2022
1
May 23,2022
May 23,2022
May 23,2022
May 25,2022
May 25,2022
1s
May 25,2022
May 25,2022
June 19,2022
June 19,2022
June 19,2022
June 19,2022
2 June 19,2022
June 19,2022
June 19,2022
June 19,2022
June 19,2022
June 22,2022
June 22,2022
June 22,2022
2s
June 22,2022
June 22,2022
June 22,2022
June 24,2022
June 24,2022
June 24,2022
June 24,2022
3 June 24,2022
June 24,2022
June 24,2022
June 24,2022
June 24,2022
June 27,2022
June 27,2022
June 27,2022
3s
June 27,2022
June 27,2022
June 27,2022
June 29,2022
June 29,2022
June 29,2022
4
June 29,2022
June 29,2022
June 29,2022
July 01,2022
July 01,2022
4s July 01,2022
July 01,2022
July 01,2022
July 07,2022
July 07,2022
5 July 07,2022
July 07,2022
July 07,2022
July 09,2022
July 09,2022
5s
July 09,2022
July 09,2022
July 19,2022
July 19,2022
July 19,2022
6
July 19,2022
July 19,2022
July 19,2022
July 26,2022
July 26,2022
July 26,2022
6s
July 26,2022
July 26,2022
July 26,2022
July 20,2022
July 20,2022
July 20,2022
7
July 20,2022
July 20,2022
July 20,2022
July 27,2022
July 27,2022
July 27,2022
7s
July 27,2022
July 27,2022
July 27,2022
August 02,2022
August 02,2022
August 02,2022
8
August 02,2022
August 02,2022
August 02,2022
August 04,2022
August 04,2022
8s
August 04,2022
August 04,2022
August 04,2022
August 04,2022
August 04,2022
August 04,2022
9
August 04,2022
August 04,2022
August 04,2022
August 04,2022
August 06,2022
August 06,2022
August 06,2022
9s
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 06,2022
10
August 06,2022
August 06,2022
August 06,2022
August 06,2022
August 08,2022
August 08,2022
August 08,2022
10s
10s
August 08,2022
August 08,2022
August 08,2022
August 27-31,2022
August 27-31,2022
August 27-31,2022
11
August 27-31,2022
August 27-31,2022
August 27-31,2022

Shear Wall - Formworks


13.00 Suspended Slab

13.01
NO. DATE

1 June 06,2022
1 June 14,2022
2 June 14,2022
3 June 14,2022
4 June 14,2022
5 June 14,2022
6 June 14,2022
7 June 14,2022
8 June 14,2022
9 June 14,2022
10 June 14,2022
11 June 14,2022
1 June 16,2022
2 June 16,2022
3 June 16,2022
4 June 16,2022
5 June 16,2022
6 June 16,2022
7 June 16,2022
8 June 16,2022
1 July 04,2022
2 July 04,2022
3 July 04,2022
4 July 04,2022
5 July 04,2022
6 July 04,2022
7 July 04,2022
1 July 13,2022
2 July 13,2022
3 July 13,2022
4 July 13,2022
5 July 13,2022
6 July 13,2022
7 July 13,2022
8 July 13,2022
9 July 13,2022
10 July 13,2022
1 July 25,2022
2 July 25,2022
3 July 25,2022
4 July 25,2022
5 July 25,2022
6 July 25,2022
7 July 25,2022
8 July 25,2022
1 July 30,2022
2 July 30,2022
3 July 30,2022
4 July 30,2022
5 July 30,2022
6 July 30,2022
7 July 30,2022
8 July 30,2022
1 August 10-11,2022
2 August 10-11,2022
3 August 10-11,2022
4 August 10-11,2022
5 August 10-11,2022
6 August 10-11,2022
7 August 10-11,2022
8 August 10-11,2022
9 August 10-11,2022
10 August 10-11,2022
11 August 10-11,2022
12 August 10-11,2022
13 August 10-11,2022
1 August 18-19,2022
2 August 18-19,2022
3 August 18-19,2022
4 August 18-19,2022
5 August 18-19,2022
6 August 18-19,2022
7 August 18-19,2022
8 August 18-19,2022
9 August 18-19,2022
10 August 18-19,2022
11 August 18-19,2022
12 August 18-19,2022
1 Sept.06-07,2022
2 Sept.06-07,2022
3 Sept.06-07,2022
4 Sept.06-07,2022
5 Sept.06-07,2022
6 Sept.06-07,2022
7 Sept.06-07,2022
8 Sept.06-07,2022
9 Sept.06-07,2022
10 Sept.06-07,2022
11 Sept.06-07,2022
12 Sept.06-07,2022
Suspended Slab - Concrete

13.02

13.03
S
NO. DATE

1 June 04,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
2 June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 11-13,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022

2s
June 27-28,2022
June 27-28,2022
June 27-28,2022
2s
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 27-28,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
3
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
June 14-15,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
3s July 1-2,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
July 1-2,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
4
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
June 28-June 29,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
4s
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
4s

July 14 -15,2022
July 14 -15,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
5 July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 11-13,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
5s July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 25-26,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
6
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
July 21-23,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
6s
6s
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
August 08-09,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
7
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 28-July 30,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
7s
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 14 -15,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
8 July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
July 26-August 10,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
8s
August 19-20,2022
8s

August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 19-20,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
9 August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
August 8-17,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
10 Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Aug. 17-Sept. 05,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
10s
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Sept. 15-17,2022
Suspended Slab - Formworks
14.00 Ramp Slab

14.01

14.02

14.03

15.00 Beams and Girders

15.01
Bea
NO. DATE

Beams and Girders - Concrete

15.02
B
15.03
Beam
NO. DATE

1 June 11-12,2022
2 June 11-12,2022
3 June 11-12,2022
4 June 11-12,2022
5 June 11-12,2022
6 June 11-12,2022
7 June 11-12,2022
8 June 11-12,2022
9 June 11-12,2022
10 June 11-12,2022
11 June 11-12,2022
12 June 11-12,2022
1 June 14-16,2022
2 June 14-16,2022
3 June 14-16,2022
4 June 14-16,2022
5 June 14-16,2022
6 June 14-16,2022
7 June 14-16,2022
8 June 14-16,2022
9 June 14-16,2022
10 June 14-16,2022
1 June 28-June 29,2022
2 June 28-June 29,2022
3 June 28-June 29,2022
4 June 28-June 29,2022
5 June 28-June 29,2022
6 June 28-June 29,2022
7 June 28-June 29,2022
8 June 28-June 29,2022
9 June 28-June 29,2022
10 June 28-June 29,2022
1 July 11-13,2022
2 July 11-13,2022
3 July 11-13,2022
4 July 11-13,2022
5 July 11-13,2022
6 July 11-13,2022
7 July 11-13,2022
8 July 11-13,2022
9 July 11-13,2022
10 July 11-13,2022
11 July 11-13,2022
12 July 11-13,2022
13 July 11-13,2022
14 July 11-13,2022
1 July 19-21,2022
2 July 19-21,2022
3 July 19-21,2022
4 July 19-21,2022
5 July 19-21,2022
6 July 19-21,2022
7 July 19-21,2022
8 July 19-21,2022
9 July 19-21,2022
10 July 19-21,2022
11 July 19-21,2022
12 July 19-21,2022
1 July 26-August 10,2022
2 July 26-August 10,2022
3 July 26-August 10,2022
4 July 26-August 10,2022
5 July 26-August 10,2022
6 July 26-August 10,2022
7 July 26-August 10,2022
8 July 26-August 10,2022
9 July 26-August 10,2022
10 July 26-August 10,2022
11 July 26-August 10,2022
12 July 26-August 10,2022
13 July 26-August 10,2022
1 August 8-18,2022
2 August 8-18,2022
3 August 8-18,2022
4 August 8-18,2022
5 August 8-18,2022
6 August 8-18,2022
7 August 8-18,2022
8 August 8-18,2022
9 August 8-18,2022
10 August 8-18,2022
11 August 8-18,2022
12 August 8-18,2022
1 Aug.17-Sept. 06,2022
2 Aug.17-Sept. 06,2022
3 Aug.17-Sept. 06,2022
4 Aug.17-Sept. 06,2022
5 Aug.17-Sept. 06,2022
6 Aug.17-Sept. 06,2022
7 Aug.17-Sept. 06,2022
8 Aug.17-Sept. 06,2022
9 Aug.17-Sept. 06,2022
10 Aug.17-Sept. 06,2022
11 Aug.17-Sept. 06,2022
12 Aug.17-Sept. 06,2022
13 Aug.17-Sept. 06,2022
Beams and Girders - Formworks
16.00 Ramp Beams and Girders

16.01
Ramp Bea
16.02
Ramp B
16.03
Ramp Beam
17.00 Coupling Beams

17.01
17.02

17.03
C
18.00 Tanks and Pits

18.01
NO. DATE

May 18,2022
May 18,2022
1 May 18,2022
May 18,2022
May 18,2022
May 20,2022
May 20,2022
2 May 20,2022
May 20,2022
May 20,2022
May 21,2022
May 21,2022
3 May 21,2022
May 21,2022
May 21,2022
May 28,2022
May 28,2022
4 May 28,2022
May 28,2022
May 28,2022
May 28,2022
May 28,2022
5 May 28,2022
May 28,2022
May 28,2022
May 31,2022
May 31,2022
6 May 31,2022
May 31,2022
May 31,2022
June 02,2022
June 02,2022
7 June 02,2022
June 02,2022
June 02,2022
June 06,2022
June 06,2022
8 June 06,2022
June 06,2022
June 06,2022
June 22,2022
June 22,2022
9 June 22,2022
June 22,2022
June 22,2022
June 28,2022
June 28,2022
10 June 28,2022
June 28,2022
June 28,2022
June 30,2022
June 30,2022
11 June 30,2022
June 30,2022
June 30,2022
July 03,2022
July 03,2022
12 July 03,2022
July 03,2022
July 03,2022
July 08,2022
July 08,2022
13 July 08,2022
July 08,2022
July 08,2022
July 08,2022
July 08,2022
14 July 08,2022
July 08,2022
July 08,2022
July 18,2022
July 18,2022
15 July 18,2022
July 18,2022
July 18,2022
July 23,2022
July 23,2022
16 July 23,2022
July 23,2022
July 23,2022
July 25,2022
July 25,2022
17
17
July 25,2022
July 25,2022
July 25,2022
July 25,2022
July 25,2022
18 July 25,2022
July 25,2022
July 25,2022
July 25,2022
August 02,2022
August 02,2022
19 August 02,2022
August 02,2022
August 02,2022
August 3,2022
August 3,2022
20 August 3,2022
August 3,2022
August 3,2022
August 3,2022
August 3,2022
21 August 3,2022
August 3,2022
August 3,2022
August 13,2022
August 13,2022
22
August 13,2022
August 13,2022
August 24,2022
August 24,2022
23
August 24,2022
August 24,2022
August 24,2022
August 24,2022
24 August 24,2022
August 24,2022
August 24,2022
August 24,2022
August 24,2022
25 August 24,2022
August 24,2022
August 24,2022
Sept. 06,2022
Sept. 06,2022
26 Sept. 06,2022
Sept. 06,2022
Sept. 06,2022
Sept. 15,2022
Sept. 15,2022
27 Sept. 15,2022
Sept. 15,2022
Sept. 15,2022
Tanks and Pits - Concrete

18.02

18.03
NO. DATE

May 17,2022
May 17,2022
May 17,2022
1
May 17,2022
May 17,2022
May 17,2022
May 19,2022
May 19,2022
2 May 19,2022
May 19,2022
May 19,2022
May 20,2022
May 20,2022
May 20,2022
May 20,2022
3
May 20,2022
May 20,2022
May 20,2022
May 20,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
4
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
May 27,2022
5 May 27,2022
May 27,2022
5

May 27,2022
May 30,2022
May 30,2022
May 30,2022
May 30,2022
6
May 30,2022
May 30,2022
May 30,2022
May 30,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
7
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 01,2022
June 03,2022
June 03,2022
June 03,2022
7s June 03,2022
June 03,2022
June 03,2022
June 03,2022
June 05,2022
June 05,2022
June 05,2022
June 05,2022
8 June 05,2022
June 05,2022
June 05,2022
June 05,2022
June 05,2022
June 07,2022
June 07,2022
June 07,2022
8s
June 07,2022
June 07,2022
June 07,2022
June 21,2022
June 21,2022
June 21,2022
9 June 21,2022
9
June 21,2022
June 21,2022
June 21,2022
June 22,2022
June 22,2022
9s June 22,2022
June 22,2022
June 22,2022
June 27,2022
June 27,2022
June 27,2022
June 27,2022
10 June 27,2022
June 27,2022
June 27,2022
June 27,2022
June 27,2022
June 28,2022
June 28,2022
June 28,2022
10s June 28,2022
June 28,2022
June 28,2022
June 28,2022
June 29,2022
June 29,2022
June 29,2022
11
June 29,2022
June 29,2022
June 29,2022
June 30,2022
June 30,2022
11s
June 30,2022
June 30,2022
July 02,2022
July 02,2022
July 02,2022
12 July 02,2022
July 02,2022
July 02,2022
July 02,2022
July 03,2022
July 03,2022
July 03,2022
12s
July 03,2022
July 03,2022
July 03,2022
July 07,2022
July 07,2022
13 July 07,2022
July 07,2022
July 07,2022
July 09,2022
July 09,2022
13s
July 09,2022
July 09,2022
July 16,2022
July 16,2022
July 16,2022
14
July 16,2022
July 16,2022
July 16,2022
July 19,2022
July 19,2022
July 19,2022
14s
July 19,2022
July 19,2022
July 19,2022
July 16,2022
July 16,2022
July 16,2022
July 16,2022
July 16,2022
15
July 16,2022
July 16,2022
July 16,2022
July 16,2022
July 16,2022
July 19,2022
July 19,2022
July 19,2022
15s July 19,2022
July 19,2022
July 19,2022
July 19,2022
July 25,2022
July 25,2022
16 July 25,2022
July 25,2022
July 25,2022
July 26,2022
July 26,2022
16s
July 26,2022
July 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
17
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 25 & 26,2022
July 27,2022
July 27,2022
July 27,2022
17s July 27,2022
July 27,2022
July 27,2022
July 27,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
18 August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 03,2022
August 03,2022
August 03,2022
18s August 03,2022
August 03,2022
August 03,2022
August 03,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
19
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 02,2022
August 03,2022
August 03,2022

19s
August 03,2022
19s August 03,2022
August 03,2022
August 03,2022
August 03,2022
August 13,2022
August 13,2022
August 13,2022
20 August 13,2022
August 13,2022
August 13,2022
August 13,2022
August 14,2022
August 14,2022
August 14,2022
20s
August 14,2022
August 14,2022
August 14,2022
August 23,2022
August 23,2022
21
August 23,2022
August 23,2022
August 25,2022
21s August 25,2022
August 25,2022
August 21-22,2022
August 21-22,2022
August 21-22,2022
22
August 21-22,2022
August 21-22,2022
August 21-22,2022
August 25-26,2022
August 25-26,2022
22s
August 25-26,2022
August 25-26,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
23 August 20-24,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
August 20-24,2022
August 26-27,2022
August 26-27,2022
August 26-27,2022
23s
23s August 26-27,2022
August 26-27,2022
August 26-27,2022
August 26-27,2022
Sept. 05-06,2022
Sept. 05-06,2022
Sept. 05-06,2022
24 Sept. 05-06,2022
Sept. 05-06,2022
Sept. 05-06,2022
Sept. 05-06,2022
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
24s
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
19
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 13-15,2022
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
19s Sept. 16,2022
Sept. 16,2022
Sept. 16,2022
Sept. 16,2022

Tanks and Pits - Formworks


19.00 Stairs

19.01

19.02

19.03
20.00 Equipment Pad

20.01

20.02

20.03
E
21.00 Structural Steel

21.01

ARCHITECTURAL WORKS
N, INC.
nnex, Alabang-Zapote Road, Pamplona III, Las Piñas City

Earthworks - Clearing and Grubbing


Earthworks - Bulk Excavation
Earthworks - Structural Excavation
Earthworks - Manual Trimming
Earthworks - Backfilling and Compaction (L
Earthworks - Hauling-out of Soil

Base Preparation Works - Gravel Beddin

Soil Protection Works - Shotcreting Wor

Miscellaneous Works - Soil Poisoning


Miscellaneous Works - Anti-termite Reticulatio
Miscellaneous Works - Damproofing
Miscellaneous Works - Vapor Barrier/Polyethyle
Miscellaneous Works - Waterstop
Miscellaneous Works - Waterstop

Slab-On-Grade - Slab-On-Grade - Concre


Slab-On-Grade - Slab-On-Grade - Reba
Slab-On-Grade - Slab-On-Grade - Formwo

Footing Tie Beam - Footing Tie Beam - Conc


Footing Tie Beam - Footing Tie Beam - Re
Footing Tie Beam - Footing Tie Beam - Form

Isolated Footing - Isolated Footing - Concr


Isolated Footing - Isolated Footing - Reb
Isolated Footing - Isolated Footing - Formw

Combined Footing - Combined Footing - Con


Combined Footing - Combined Footing - Re
Combined Footing - Combined Footing - Form

Mat Footing - Mat Footing - Concrete


NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Andy asiado Subcon 1 12 1 6


Robert distor Subcon 1 12 1 6
Nestor vellianueva Subcon 1 12 1 6
Patrick arnello Subcon 1 12 1 6
Arman do pedroso Subcon 1 12 1 6
Arnel reyes Subcon 1 12 1 6
Aljo recto Subcon 1 12 1 6
Edgardo esplana Subcon 1 12 1 6
Jerome lomosco Subcon 1 12 1 6
Arnel villas Subcon 1 12 1 6
Maceda, Mark Subcon 0 8 2 12
Cuba, Rey Subcon 0 8 2 12
Brizuela, Rodolfo Subcon 0 8 2 12
Mayrong, Dennis Subcon 0 8 2 12
Enriquez, Roquito Subcon 0 8 2 12
Junio, Jonathan Subcon 0 8 2 12
Pardo, Rosalino Subcon 0 8 2 12
Bragat, Benjamin Subcon 8 12
Bragat, Juanito Subcon 8 12
Gabin, Bernard Subcon 8 12
Gabin, Christian Subcon 8 12
Labrador, Anthony Subcon 8 12
Roluna, Crispin Subcon 8 12

Mat Footing - Concrete Total


Mat Footing - Mat Footing - Rebar
Mat Footing - Mat Footing - Formwork
NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Andy asiado Subcon 8 12 1 8


Robert distor Subcon 8 12 1 8
Nestor vellianueva Subcon 8 12 1 8
Patrick arnello Subcon 8 12 1 8
Arman do pedroso Subcon 8 12 1 8
Arnel reyes Subcon 8 12 1 8
Aljo recto Subcon 8 12 1 8
Edgardo esplana Subcon 8 12 1 8
Jerome lomosco Subcon 8 12 1 8
Arnel villas Subcon 8 12 1 8
Mat Footing - Formworks Total

Wall Footing - Wall Footing - Concrete


Wall Footing - Wall Footing - Rebar
Wall Footing - Wall Footing - Formwork

Column - Column - Concrete


NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

America, Mac Lawrence Subcon 6 6.5


Bragat, Benjamin Subcon 6 6.5
Maceda, Mark Duven Subcon 6 6.5
Maceda, Mark Duven Subcon 7 7.5
Ramirez, Frederico Subcon 7 7.5
Rodriguez, John Andrew Subcon 7 7.5
Gabin, Bernard Subcon 7 7.5
Maceda, Mark Duven Subcon 8.5 9.5
Ramirez, Frederico Subcon 8.5 9.5
Rodriguez, John Andrew Subcon 8.5 9.5
Gabin, Bernard Subcon 8.5 9.5
Maceda, Mark Duven Subcon 7 7.5
Ramirez, Frederico Subcon 7 7.5
Rodriguez, John Andrew Subcon 7 7.5
Gabin, Bernard Subcon 7 7.5
Maceda, Mark Duven Subcon 7.5 8
Ramirez, Frederico Subcon 7.5 8
Rodriguez, John Andrew Subcon 7.5 8
Gabin, Bernard Subcon 7.5 8
Maceda, Mark Duven Subcon 8.5 9.5
Ramirez, Frederico Subcon 8.5 9.5
Rodriguez, John Andrew Subcon 8.5 9.5
Gabin, Bernard Subcon 8.5 9.5
Maceda, Mark Duven Subcon 9 9.5
Ramirez, Frederico Subcon 9 9.5
Rodriguez, John Andrew Subcon 9 9.5
Maceda, Mark Duven Subcon 10 10.5
Ramirez, Frederico Subcon 10 10.5
Rodriguez, John Andrew Subcon 10 10.5
Gabin, Bernard Subcon 10 10.5
Maceda, Mark Duven Subcon 6 6.5
Ramirez, Frederico Subcon 6 6.5
Rodriguez, John Andrew Subcon 6 6.5
Gabin, Bernard Subcon 6 6.5
Maceda, Mark Duven Subcon 7 7.5
Ramirez, Frederico Subcon 7 7.5
Rodriguez, John Andrew Subcon 7 7.5
Gabin, Bernard Subcon 7 7.5
Maceda, Mark Duven Subcon 9 9.5
Ramirez, Frederico Subcon 9 9.5
Rodriguez, John Andrew Subcon 9 9.5
Gabin, Bernard Subcon 9 9.5
Maceda, Mark Duven Subcon 9.5 10
Ramirez, Frederico Subcon 9.5 10
Rodriguez, John Andrew Subcon 9.5 10
Gabin, Bernard Subcon 9.5 10
Maceda, Mark Duven Subcon 10 11
Ramirez, Frederico Subcon 10 11
Rodriguez, John Andrew Subcon 10 11
Gabin, Bernard Subcon 10 11
Maceda, Mark Duven Subcon 10 11
Ramirez, Frederico Subcon 10 11
Rodriguez, John Andrew Subcon 10 11
Gabin, Bernard Subcon 10 11
Maceda, Mark Duven Subcon 11 11.5
Ramirez, Frederico Subcon 11 11.5
Rodriguez, John Andrew Subcon 11 11.5
Gabin, Bernard Subcon 11 11.5
Maceda, Mark Duven Subcon 11 11.5
Ramirez, Frederico Subcon 11 11.5
Rodriguez, John Andrew Subcon 11 11.5
Gabin, Bernard Subcon 11 11.5
Maceda, Mark Duven Subcon 11.5 12
Ugay, Joseph Subcon 11.5 12
Vasquez, Randy Subcon 11.5 12
Maceda, Mark Duven Subcon 11.5 12
Ugay, Joseph Subcon 11.5 12
Vasquez, Randy Subcon 11.5 12
Maceda, Mark Duven Subcon 7 7.5
Yape, Jeffrey Subcon 7 7.5
Ramirez, Frederico Subcon 7 7.5
Ugay, Joseph Subcon 7 7.5
Maceda, Mark Duven Subcon 8 8.5
Yape, Jeffrey Subcon 8 8.5
Ramirez, Frederico Subcon 8 8.5
Ugay, Joseph Subcon 8 8.5
Maceda, Mark Duven Subcon 9 9.5
Yape, Jeffrey Subcon 9 9.5
Ramirez, Frederico Subcon 9 9.5
Ugay, Joseph Subcon 9 9.5
Maceda, Mark Duven Subcon 9 9.5
Yape, Jeffrey Subcon 9 9.5
Ramirez, Frederico Subcon 9 9.5
Ugay, Joseph Subcon 9 9.5
Maceda, Mark Duven Subcon 6 6.5
Yape, Jeffrey Subcon 6 6.5
Ramirez, Frederico Subcon 6 6.5
Ugay, Joseph Subcon 6 6.5
Maceda, Mark Duven Subcon 9 9.5
Yape, Jeffrey Subcon 9 9.5
Ramirez, Frederico Subcon 9 9.5
Maceda, Mark Duven Subcon 10 11
Yape, Jeffrey Subcon 10 11
Ramirez, Frederico Subcon 10 11
Maceda, Mark Duven Subcon 11 11.5
Ramirez, Frederico Subcon 11 11.5
Rodriguez, John Andrew Subcon 11 11.5
Gabin, Bernard Subcon 11 11.5
Maceda, Mark Duven Subcon 10 10.5
Yape, Jeffrey Subcon 10 10.5
Ramirez, Frederico Subcon 10 10.5
Maceda, Mark Duven Subcon 7 7.5
Yape, Jeffrey Subcon 7 7.5
Ramirez, Frederico Subcon 7 7.5
Ugay, Joseph Subcon 7 7.5
Maceda, Mark Duven Subcon 8 8.5
Yape, Jeffrey Subcon 8 8.5
Ramirez, Frederico Subcon 8 8.5
Ugay, Joseph Subcon 8 8.5
Maceda, Mark Duven Subcon 7 8.5
Yape, Jeffrey Subcon 7 8.5
Ramirez, Frederico Subcon 7 8.5
Ugay, Joseph Subcon 7 8.5
Maceda, Mark Duven Subcon 8.5 10
Yape, Jeffrey Subcon 8.5 10
Ramirez, Frederico Subcon 8.5 10
Ugay, Joseph Subcon 8.5 10
Maceda, Mark Duven Subcon 8 9
Ramirez, Frederico Subcon 8 9
Rodriguez, John Andrew Subcon 8 9
Gabin, Bernard Subcon 8 9
Maceda, Mark Duven Subcon 9.5 10
Ramirez, Frederico Subcon 9.5 10
Rodriguez, John Andrew Subcon 9.5 10
Gabin, Bernard Subcon 9.5 10
Maceda, Mark Duven Subcon 5 6.5
Ramirez, Frederico Subcon 5 6.5
Rodriguez, John Andrew Subcon 5 6.5
Maceda, Mark Duven Subcon 7 8.5
Ramirez, Frederico Subcon 7 8.5
Rodriguez, John Andrew Subcon 7 8.5
Gabin, Bernard Subcon 7 8.5
Maceda, Mark Duven Subcon 8.5 10
Ramirez, Frederico Subcon 8.5 10
Rodriguez, John Andrew Subcon 8.5 10
Gabin, Bernard Subcon 8.5 10
Maceda, Mark Duven Subcon 8 8.5
Ugay, Joseph Subcon 8 8.5
Vasquez, Randy Subcon 8 8.5
Maceda, Mark Duven Subcon 9 10
Ramirez, Frederico Subcon 9 10
Rodriguez, John Andrew Subcon 9 10
Gabin, Bernard Subcon 9 10
Maceda, Mark Duven Subcon 6 7.5
Ugay, Joseph Subcon 6 7.5
Vasquez, Randy Subcon 6 7.5
Maceda, Mark Duven Subcon 8 10
Ramirez, Frederico Subcon 8 10
Rodriguez, John Andrew Subcon 8 10
Gabin, Bernard Subcon 8 10
Maceda, Mark Duven Subcon 5 6.5
Ramirez, Frederico Subcon 5 6.5
Rodriguez, John Andrew Subcon 5 6.5
Gabin, Bernard Subcon 5 6.5
Maceda, Mark Duven Subcon 6.5 7.5
Ramirez, Frederico Subcon 6.5 7.5
Rodriguez, John Andrew Subcon 6.5 7.5
Gabin, Bernard Subcon 6.5 7.5
Maceda, Mark Duven Subcon 7.5 8.5
Yape, Jeffrey Subcon 7.5 8.5
Ramirez, Frederico Subcon 7.5 8.5
Ugay, Joseph Subcon 7.5 8.5
Maceda, Mark Duven Subcon 8.5 10
Yape, Jeffrey Subcon 8.5 10
Ramirez, Frederico Subcon 8.5 10
Ugay, Joseph Subcon 8.5 10
Maceda, Mark Duven Subcon 9.5 10.5
Yape, Jeffrey Subcon 9.5 10.5
Ramirez, Frederico Subcon 9.5 10.5
Ugay, Joseph Subcon 9.5 10.5
Maceda, Mark Duven Subcon 10 11
Ramirez, Frederico Subcon 10 11
Rodriguez, John Andrew Subcon 10 11
Gabin, Bernard Subcon 10 11
Maceda, Mark Duven Subcon 4 4.5
Yape, Jeffrey Subcon 4 4.5
Ramirez, Frederico Subcon 4 4.5
Maceda, Mark Duven Subcon 4.5 5
Yape, Jeffrey Subcon 4.5 5
Ramirez, Frederico Subcon 4.5 5
Maceda, Mark Duven Subcon 5 6
Yape, Jeffrey Subcon 5 6
Ramirez, Frederico Subcon 5 6
Ugay, Joseph Subcon 5 6
Maceda, Mark Duven Subcon 6 7
Ramirez, Frederico Subcon 6 7
Rodriguez, John Andrew Subcon 6 7
Gabin, Bernard Subcon 6 7
Maceda, Mark Duven Subcon 7.5 8.5
Yape, Jeffrey Subcon 7.5 8.5
Ramirez, Frederico Subcon 7.5 8.5
Ugay, Joseph Subcon 7.5 8.5
Bragat, Juanito Subcon 4.5 5
Gabin, Bernard Subcon 4.5 5
Gabin, Christian Subcon 4.5 5
Bragat, Juanito Subcon 5 5.5
Gabin, Bernard Subcon 5 5.5
Gabin, Christian Subcon 5 5.5
Bragat, Juanito Subcon 5.5 6
Gabin, Bernard Subcon 5.5 6
Gabin, Christian Subcon 5.5 6
Maceda, Mark Duven Subcon 7 7.5
Ramirez, Frederico Subcon 7 7.5
Rodriguez, John Andrew Subcon 7 7.5
Maceda, Mark Duven Subcon 7 7.5
Ugay, Joseph Subcon 7 7.5
Vasquez, Randy Subcon 7 7.5
Maceda, Mark Duven Subcon 7.5 8
Yape, Jeffrey Subcon 7.5 8
Ramirez, Frederico Subcon 7.5 8
Ugay, Joseph Subcon 7.5 8
Maceda, Mark Duven Subcon 7.5 8
Yape, Jeffrey Subcon 7.5 8
Ramirez, Frederico Subcon 7.5 8
Ugay, Joseph Subcon 7.5 8
Maceda, Mark Duven Subcon 8 8.5
Yape, Jeffrey Subcon 8 8.5
Ramirez, Frederico Subcon 8 8.5
Ugay, Joseph Subcon 8 8.5
Maceda, Mark Duven Subcon 8 8.5
Ramirez, Frederico Subcon 8 8.5
Rodriguez, John Andrew Subcon 8 8.5

Column - Concrete Total


Column - Column - Rebar
Column - Column - Formworks
NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Bejoc, Richard Subcon 8 12 1 7


Bejoc, Reynaldo Jr. Subcon 8 12 1 7
Junio, Jonathan Subcon 8 12 1 7
Candingilan, Jerome Subcon 8 12 1 7
Bejoc, Reynante Subcon 8 12 1 7
Brizuela, Rodolfo Subcon 8 12 1 7
Cuba, Rey Jr. Subcon 8 12 1 7
Doctor, Jomart Subcon 8 12 1 7
Enriquez, Roquito Subcon 8 12 1 3.5
Ventura, Lito Subcon 8 12 1 3.5
Maceda, Mark Duven Subcon 8 12 1 3.5
Mayrong, Dennis Subcon 8 12 1 3.5
Natividad, Albert Subcon 8 12 1 7
Pardo, Rosalino Subcon 8 12 1 7
Ventura, Lito Subcon 8 12 1 7
Yape, Jeffrey Subcon 8 12 1 7
Nebres, Damian Subcon 8 12 1 7
Perez, Christopher Subcon 8 12 1 7
Villarito, Joseph Subcon 8 12 1 7
Cuba, Rey Jr. Subcon 8 12 1 7
Enriquez, Roquito Subcon 8 12 1 7
Enriquez, Roquito Subcon 8 12 1 7
Maceda, Mark Duven Subcon 8 12 1 7
Mayrong, Dennis Subcon 8 12 1 7
Bejoc, Richard Subcon 8 12 1 7
Bejoc, Reynaldo Jr. Subcon 8 12 1 7
Junio, Jonathan Subcon 8 12 1 7
Candingilan, Jerome Subcon 8 12 1 7
Bejoc, Reynante Subcon 8 12 1 7
Brizuela, Rodolfo Subcon 8 12 1 7
Cuba, Rey Jr. Subcon 8 12 1 7
Doctor, Jomart Subcon 8 12 1 7
Enriquez, Roquito Subcon 8 12 1 7
Ventura, Lito Subcon 8 12 1 7
Maceda, Mark Duven Subcon 8 12 1 7
Mayrong, Dennis Subcon 8 12 1 7
Natividad, Albert Subcon 8 12 1 6
Pardo, Rosalino Subcon 8 12 1 6
Ventura, Lito Subcon 8 12 1 6
Yape, Jeffrey Subcon 8 12 1 6
Enriquez, Roquito Subcon 8 12 1 6.5
Ventura, Lito Subcon 8 12 1 6.5
Maceda, Mark Duven Subcon 8 12 1 6.5
Mayrong, Dennis Subcon 8 12 1 6.5
Natividad, Albert Subcon 8 12 1 6
Pardo, Rosalino Subcon 8 12 1 6
Ventura, Lito Subcon 8 12 1 6
Yape, Jeffrey Subcon 8 12 1 6
Nebres, Damian Subcon 8 12 1 7
Perez, Christopher Subcon 8 12 1 7
Villarito, Joseph Subcon 8 12 1 7
Cuba, Rey Jr. Subcon 8 12 1 7
Enriquez, Roquito Subcon 8 12 1 3.5
Ventura, Lito Subcon 8 12 1 3.5
Maceda, Mark Duven Subcon 8 12 1 3.5
Mayrong, Dennis Subcon 8 12 1 3.5
Bejoc, Richard Subcon 1 7.5
Bejoc, Reynaldo Jr. Subcon 1 7.5
Junio, Jonathan Subcon 1 7.5
Candingilan, Jerome Subcon 1 7.5
Bejoc, Reynante Subcon 1 8
Brizuela, Rodolfo Subcon 1 8
Cuba, Rey Jr. Subcon 1 8
Doctor, Jomart Subcon 1 8
Bejoc, Richard Subcon 1 7.5
Bejoc, Reynaldo Jr. Subcon 1 7.5
Junio, Jonathan Subcon 1 7.5
Candingilan, Jerome Subcon 1 7.5
Bejoc, Reynante Subcon 1 7.5
Brizuela, Rodolfo Subcon 1 7.5
Cuba, Rey Jr. Subcon 1 7.5
Doctor, Jomart Subcon 1 7.5
Natividad, Albert Subcon 8 12 1 7.5
Pardo, Rosalino Subcon 8 12 1 7.5
Ventura, Lito Subcon 8 12 1 7.5
Yape, Jeffrey Subcon 8 12 1 7.5
Bejoc, Richard Subcon 8 12 1 6
Bejoc, Reynaldo Jr. Subcon 8 12 1 6
Junio, Jonathan Subcon 8 12 1 6
Candingilan, Jerome Subcon 8 12 1 6
Enriquez, Roquito Subcon 8 12 1 4
Ventura, Lito Subcon 8 12 1 4
Maceda, Mark Duven Subcon 8 12 1 4
Mayrong, Dennis Subcon 8 12 1 4
Natividad, Albert Subcon 1 8
Pardo, Rosalino Subcon 1 8
Ventura, Lito Subcon 1 8
Yape, Jeffrey Subcon 1 8
Nebres, Damian Subcon 8 12 1 7.5
Perez, Christopher Subcon 8 12 1 7.5
Villarito, Joseph Subcon 8 12 1 7.5
Cuba, Rey Jr. Subcon 8 12 1 7.5
Natividad, Albert Subcon 10 12 1 5.5
Pardo, Rosalino Subcon 10 12 1 5.5
Ventura, Lito Subcon 10 12 1 5.5
Yape, Jeffrey Subcon 10 12 1 5.5
Natividad, Albert Subcon 8 12 1 7
Pardo, Rosalino Subcon 8 12 1 7
Ventura, Lito Subcon 8 12 1 7
Yape, Jeffrey Subcon 8 12 1 7
Nebres, Damian Subcon 8 12 1 7
Perez, Christopher Subcon 8 12 1 7
Villarito, Joseph Subcon 8 12 1 7
Cuba, Rey Jr. Subcon 8 12 1 7
Bejoc, Richard Subcon 8 12 1 3.5
Bejoc, Reynaldo Jr. Subcon 8 12 1 3.5
Junio, Jonathan Subcon 8 12 1 3.5
Candingilan, Jerome Subcon 8 12 1 3.5
Nebres, Damian Subcon 2 8.5
Perez, Christopher Subcon 2 8.5
Villarito, Joseph Subcon 2 8.5
Cuba, Rey Jr. Subcon 2 8.5
Enriquez, Roquito Subcon 10 12 1 8
Ventura, Lito Subcon 10 12 1 8
Maceda, Mark Duven Subcon 10 12 1 8
Mayrong, Dennis Subcon 10 12 1 8
Natividad, Albert Subcon 10 12 1 8
Pardo, Rosalino Subcon 10 12 1 8
Ventura, Lito Subcon 10 12 1 8
Yape, Jeffrey Subcon 10 12 1 8
Bejoc, Richard Subcon 9 12 1 4.5
Bejoc, Reynaldo Jr. Subcon 9 12 1 4.5
Junio, Jonathan Subcon 9 12 1 4.5
Candingilan, Jerome Subcon 9 12 1 4.5
Enriquez, Roquito Subcon 8 12 1 7
Ventura, Lito Subcon 8 12 1 7
Maceda, Mark Duven Subcon 8 12 1 7
Mayrong, Dennis Subcon 8 12 1 7
Natividad, Albert Subcon 8 12 1 6.5
Pardo, Rosalino Subcon 8 12 1 6.5
Ventura, Lito Subcon 8 12 1 6.5
Yape, Jeffrey Subcon 8 12 1 6.5
Enriquez, Roquito Subcon 8 12 1 4
Ventura, Lito Subcon 8 12 1 4
Maceda, Mark Duven Subcon 8 12 1 4
Mayrong, Dennis Subcon 8 12 1 4
Nebres, Damian Subcon 8 12 1 6
Perez, Christopher Subcon 8 12 1 6
Villarito, Joseph Subcon 8 12 1 6
Cuba, Rey Jr. Subcon 8 12 1 6
Nebres, Damian Subcon 10 11 1 8
Perez, Christopher Subcon 10 11 1 8
Villarito, Joseph Subcon 10 11 1 8
Cuba, Rey Jr. Subcon 10 11 1 8
Enriquez, Roquito Subcon 8 12 1 6
Ventura, Lito Subcon 8 12 1 6
Maceda, Mark Duven Subcon 8 12 1 6
Mayrong, Dennis Subcon 8 12 1 6
Bejoc, Reynante Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Cuba, Rey Jr. Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Bejoc, Reynante Subcon 10 11 1 8.5
Brizuela, Rodolfo Subcon 10 11 1 8.5
Cuba, Rey Jr. Subcon 10 11 1 8.5
Doctor, Jomart Subcon 10 11 1 8.5
Bejoc, Reynante Subcon 10 11 1 8.5
Brizuela, Rodolfo Subcon 10 11 1 8.5
Cuba, Rey Jr. Subcon 10 11 1 8.5
Doctor, Jomart Subcon 10 11 1 8.5
Natividad, Albert Subcon 8 12 1 6
Pardo, Rosalino Subcon 8 12 1 6
Ventura, Lito Subcon 8 12 1 6
Yape, Jeffrey Subcon 8 12 1 6
Enriquez, Roquito Subcon 8 12 1 3.5
Ventura, Lito Subcon 8 12 1 3.5
Maceda, Mark Duven Subcon 8 12 1 3.5
Mayrong, Dennis Subcon 8 12 1 3.5
Bejoc, Richard Subcon 8 12 1 3.5
Bejoc, Reynaldo Jr. Subcon 8 12 1 3.5
Junio, Jonathan Subcon 8 12 1 3.5
Candingilan, Jerome Subcon 8 12 1 3.5
Nebres, Damian Subcon 8 12 1 6
Perez, Christopher Subcon 8 12 1 6
Villarito, Joseph Subcon 8 12 1 6
Cuba, Rey Jr. Subcon 8 12 1 6
Nebres, Damian Subcon 8 12 1 7.5
Perez, Christopher Subcon 8 12 1 7.5
Villarito, Joseph Subcon 8 12 1 7.5
Cuba, Rey Jr. Subcon 8 12 1 7.5
Natividad, Albert Subcon 8 12 1 7.5
Pardo, Rosalino Subcon 8 12 1 7.5
Ventura, Lito Subcon 8 12 1 7.5
Yape, Jeffrey Subcon 8 12 1 7.5
Enriquez, Roquito Subcon 8 12 1 5
Ventura, Lito Subcon 8 12 1 5
Maceda, Mark Duven Subcon 8 12 1 5
Mayrong, Dennis Subcon 8 12 1 5
Natividad, Albert Subcon 8 12 1 4
Pardo, Rosalino Subcon 8 12 1 4
Ventura, Lito Subcon 8 12 1 4
Yape, Jeffrey Subcon 8 12 1 4
Bejoc, Reynante Subcon 1 8
Brizuela, Rodolfo Subcon 1 8
Cuba, Rey Jr. Subcon 1 8
Doctor, Jomart Subcon 1 8
Bejoc, Richard Subcon 8 12 1 5
Bejoc, Reynaldo Jr. Subcon 8 12 1 5
Junio, Jonathan Subcon 8 12 1 5
Candingilan, Jerome Subcon 8 12 1 5
Bejoc, Reynante Subcon 8 12 1 5
Brizuela, Rodolfo Subcon 8 12 1 5
Cuba, Rey Jr. Subcon 8 12 1 5
Doctor, Jomart Subcon 8 12 1 5
Natividad, Albert Subcon 1 8
Pardo, Rosalino Subcon 1 8
Ventura, Lito Subcon 1 8
Yape, Jeffrey Subcon 1 8
Column - Formworks Total

Shear Wall - Shear Wall - Concrete


NAME OF WORKER WORKER AM PM
CLASSIFICATION
NAME OF WORKER WORKER
CLASSIFICATION
In Out In Out

Maceda, Mark Duven 6 9


Yape, Jeffrey 6 9
Ramirez, Frederico 6 9
Ugay, Joseph 6 9
Vasquez, Randy 6 9
Maceda, Mark Duven 7 10
Yape, Jeffrey 7 10
Ramirez, Frederico 7 10
Ugay, Joseph 7 10
Vasquez, Randy 7 10
Maceda, Mark Duven 7 9.5
Yape, Jeffrey 7 9.5
Ramirez, Frederico 7 9.5
Ugay, Joseph 7 9.5
Vasquez, Randy 7 9.5
Maceda, Mark Duven 8 9.5
Yape, Jeffrey 8 9.5
Ramirez, Frederico 8 9.5
Ugay, Joseph 8 9.5
Vasquez, Randy 8 9.5
Maceda, Mark Duven 8 9
Yape, Jeffrey 8 9
Ramirez, Frederico 8 9
Ugay, Joseph 8 9
Vasquez, Randy 8 9
Maceda, Mark Duven 8 10
Yape, Jeffrey 8 10
Ramirez, Frederico 8 10
Ugay, Joseph 8 10
Vasquez, Randy 8 10
Maceda, Mark Duven 7 10
Yape, Jeffrey 7 10
Ramirez, Frederico 7 10
Ugay, Joseph 7 10
Vasquez, Randy 7 10
Maceda, Mark Duven 6 7.5
Yape, Jeffrey 6 7.5
Ramirez, Frederico 6 7.5
Ugay, Joseph 6 7.5
Vasquez, Randy 6 7.5
Maceda, Mark Duven 5 10
Yape, Jeffrey 5 10
Ramirez, Frederico 5 10
Ugay, Joseph 5 10
Vasquez, Randy 5 10
Maceda, Mark Duven 6 10
Yape, Jeffrey 6 10
Ramirez, Frederico 6 10
Ugay, Joseph 6 10
Vasquez, Randy 6 10
Maceda, Mark Duven 8 10.5
Yape, Jeffrey 8 10.5
Ramirez, Frederico 8 10.5
Ugay, Joseph 8 10.5

Vasquez, Randy 8 10.5

Shear Wall - Concrete Total


Shear Wall - Shear Wall - Rebar
Shear Wall - Shear Wall - Formworks
NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Maceda, Mark Duven 8 12 1 10


Yape, Jeffrey 8 12 1 10
Ramirez, Frederico 8 12 1 10
Ugay, Joseph 8 12 1 10
Vasquez, Randy 8 12 1 10
Rodriguez, John Andrew 8 12 1 10
Maceda, Mark Duven 8 12 1 5
Yape, Jeffrey 8 12 1 5
Ramirez, Frederico 8 12 1 5
Ugay, Joseph 8 12 1 5
Maceda, Mark Duven 6 12 1 12
Yape, Jeffrey 6 12 1 12
Ramirez, Frederico 6 12 1 12
Ugay, Joseph 6 12 1 12
Vasquez, Randy 6 12 1 12
Rodriguez, John Andrew 6 12 1 12
Villarito, Joseph 6 12 1 12
Bragat, Benjamin 6 12 1 12
Labrador, Anthony 6 12 1 12
Maceda, Mark Duven 8 12 1 5
Yape, Jeffrey 8 12 1 5
Ramirez, Frederico 8 12 1 5
Ugay, Joseph 8 12 1 5
Vasquez, Randy 8 12 1 5
Rodriguez, John Andrew 8 12 1 5
Maceda, Mark Duven 8 12 1 12
Yape, Jeffrey 8 12 1 12
Ramirez, Frederico 8 12 1 12
Ugay, Joseph 8 12 1 12
Vasquez, Randy 8 12 1 12
Rodriguez, John Andrew 8 12 1 12
Villarito, Joseph 8 12 1 12
Bragat, Benjamin 8 12 1 12
Labrador, Anthony 8 12 1 12
Maceda, Mark Duven 8 12 1 5
Yape, Jeffrey 8 12 1 5
Ramirez, Frederico 8 12 1 5
Ugay, Joseph 8 12 1 5
Vasquez, Randy 8 12 1 5
Rodriguez, John Andrew 8 12 1 5
Maceda, Mark Duven 8 12 1 10
Yape, Jeffrey 8 12 1 10
Ramirez, Frederico 8 12 1 10
Ugay, Joseph 8 12 1 10
Vasquez, Randy 8 12 1 10
Rodriguez, John Andrew 8 12 1 10
Maceda, Mark Duven 8 12 1 5
Yape, Jeffrey 8 12 1 5
Ramirez, Frederico 8 12 1 5
Ugay, Joseph 8 12 1 5
Vasquez, Randy 8 12 1 5
Maceda, Mark Duven 8 12 1 6
Yape, Jeffrey 8 12 1 6
Ramirez, Frederico 8 12 1 6
Ugay, Joseph 8 12 1 6
Vasquez, Randy 8 12 1 6
Maceda, Mark Duven 8 12 1 3.5
Yape, Jeffrey 8 12 1 3.5
Ramirez, Frederico 8 12 1 3.5
Ugay, Joseph 8 12 1 3.5
Maceda, Mark Duven 8 12 1 10
Yape, Jeffrey 8 12 1 10
Ramirez, Frederico 8 12 1 10
Ugay, Joseph 8 12 1 10
Vasquez, Randy 8 12 1 10
Rodriguez, John Andrew 8 12 1 10
Maceda, Mark Duven 10 12 1 5
Yape, Jeffrey 10 12 1 5
Ramirez, Frederico 10 12 1 5
Ugay, Joseph 10 12 1 5
Vasquez, Randy 10 12 1 5
Rodriguez, John Andrew 10 12 1 5
Maceda, Mark Duven 8 12 1 10
Yape, Jeffrey 8 12 1 10
Ramirez, Frederico 8 12 1 10
Ugay, Joseph 8 12 1 10
Vasquez, Randy 8 12 1 10
Rodriguez, John Andrew 8 12 1 10
Maceda, Mark Duven 8 12 1 2.5
Yape, Jeffrey 8 12 1 2.5
Ramirez, Frederico 8 12 1 2.5
Ugay, Joseph 8 12 1 2.5
Vasquez, Randy 8 12 1 2.5
Rodriguez, John Andrew 8 12 1 2.5
Maceda, Mark Duven 8 12 1 6
Yape, Jeffrey 8 12 1 6
Ramirez, Frederico 8 12 1 6
Ugay, Joseph 8 12 1 6
Ramirez, Frederico 8 12 1 6
Vasquez, Randy 8 12 1 6
Maceda, Mark Duven 8 12 1 3.5
Yape, Jeffrey 8 12 1 3.5
Ramirez, Frederico 8 12 1 3.5
Ugay, Joseph 8 12 1 3.5
Maceda, Mark Duven 8 12 1 11
Yape, Jeffrey 8 12 1 11
Ramirez, Frederico 8 12 1 11
Ugay, Joseph 8 12 1 11
Vasquez, Randy 8 12 1 11
Vasquez, Rolly 8 12 1 11
Vasquez, Rolly 8 12 1 11
Rodriguez, John Andrew 8 12 1 11
Maceda, Mark Duven 8 12 1 2.5
Yape, Jeffrey 8 12 1 2.5
Ramirez, Frederico 8 12 1 2.5
Ugay, Joseph 8 12 1 2.5
Vasquez, Randy 8 12 1 2.5
Rodriguez, John Andrew 8 12 1 2.5
Maceda, Mark Duven 8 12 1 11
Yape, Jeffrey 8 12 1 11
Ramirez, Frederico 8 12 1 11
Ugay, Joseph 8 12 1 11
Vasquez, Randy 8 12 1 11
Vasquez, Rolly 8 12 1 11
Vasquez, Rolly 8 12 1 11
Rodriguez, John Andrew 8 12 1 11
Maceda, Mark Duven 10 12 1 5
Yape, Jeffrey 10 12 1 5
Ramirez, Frederico 10 12 1 5
Ugay, Joseph 10 12 1 5
Vasquez, Randy 10 12 1 5
Rodriguez, John Andrew 10 12 1 5
Maceda, Mark Duven 8 12 1 8
Yape, Jeffrey 8 12 1 8
Ramirez, Frederico 8 12 1 8
Ugay, Joseph 8 12 1 8
Ramirez, Frederico 8 12 1 8
Vasquez, Randy 8 12 1 8

Shear Wall - Formworks Total

Suspended Slab - Suspended Slab - Concr


NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Ventura, Lito Subcon 6 7


America, Mac Lawrence Subcon 0 12 1 10.5
Bragat, Benjamin Subcon 0 12 1 10.5
Bragat, Juanito Subcon 0 12 1 10.5
Gabin, Bernard Subcon 0 12 1 10.5
Gabin, Christian Subcon 0 12 1 10.5
Labrador, Anthony Subcon 0 12 1 10.5
Roluna, Crispin Subcon 0 12 1 10.5
Ramirez, Frederico Subcon 0 12 1 10.5
Rodriguez, John Andrew Subcon 0 12 1 10.5
Ugay, Joseph Subcon 0 12 1 10.5
Vasquez, Randy Subcon 0 12 1 10.5
America, Mac Lawrence Subcon 21 24 0 11
Bragat, Benjamin Subcon 21 24 0 11
Bragat, Juanito Subcon 21 24 0 11
Rodriguez, John Andrew Subcon 21 24 0 11
Ugay, Joseph Subcon 21 24 0 11
Vasquez, Randy Subcon 21 24 0 11
Roluna, Crispin Subcon 21 24 0 11
Ramirez, Frederico Subcon 21 24 0 11
Bragat, Benjamin Subcon 21 24 0 11
Bragat, Juanito Subcon 21 24 0 11
Rodriguez, John Andrew Subcon 21 24 0 11
Ugay, Joseph Subcon 21 24 0 11
Vasquez, Randy Subcon 21 24 0 11
Roluna, Crispin Subcon 21 24 0 11
Ramirez, Frederico Subcon 21 24 0 11
Bragat, Benjamin Subcon 16 24 0 12
Bragat, Juanito Subcon 16 24 0 12
Rodriguez, John Andrew Subcon 16 24 0 12
Ugay, Joseph Subcon 16 24 0 12
Vasquez, Randy Subcon 16 24 0 12
Roluna, Crispin Subcon 16 24 0 12
Ramirez, Frederico Subcon 16 24 0 12
Gabin, Bernard Subcon 16 24 0 12
Gabin, Christian Subcon 16 24 0 12
Labrador, Anthony Subcon 16 24 0 12
America, Mac Lawrence Subcon 18 24 0 8
Bragat, Benjamin Subcon 18 24 0 8
Bragat, Juanito Subcon 18 24 0 8
Rodriguez, John Andrew Subcon 18 24 0 8
Ugay, Joseph Subcon 18 24 0 8
Vasquez, Randy Subcon 18 24 0 8
Roluna, Crispin Subcon 18 24 0 8
Ramirez, Frederico Subcon 18 24 0 8
America, Mac Lawrence Subcon 18 24 0 5
Bragat, Benjamin Subcon 18 24 0 5
Bragat, Juanito Subcon 18 24 0 5
Rodriguez, John Andrew Subcon 18 24 0 5
Ugay, Joseph Subcon 18 24 0 5
Vasquez, Randy Subcon 18 24 0 5
Roluna, Crispin Subcon 18 24 0 5
Ramirez, Frederico Subcon 18 24 0 5
Bragat, Benjamin Subcon 16 24 0 9
Bragat, Juanito Subcon 16 24 0 9
Rodriguez, John Andrew Subcon 16 24 0 9
Ugay, Joseph Subcon 16 24 0 9
Vasquez, Randy Subcon 16 24 0 9
Roluna, Crispin Subcon 16 24 0 9
Ramirez, Frederico Subcon 16 24 0 9
Gabin, Bernard Subcon 16 24 0 9
Gabin, Christian Subcon 16 24 0 9
Labrador, Anthony Subcon 16 24 0 9
Vasquez, Randy Subcon 16 24 0 9
Maceda, Mark Subcon 16 24 0 9
Ramirez, Frederico Subcon 16 24 0 9
Bragat, Benjamin Subcon 18 24 0 10
Bragat, Juanito Subcon 18 24 0 10
Rodriguez, John Andrew Subcon 18 24 0 10
Ugay, Joseph Subcon 18 24 0 10
Vasquez, Randy Subcon 18 24 0 10
Roluna, Crispin Subcon 18 24 0 10
Ramirez, Frederico Subcon 18 24 0 10
Gabin, Bernard Subcon 18 24 0 10
Gabin, Christian Subcon 18 24 0 10
Labrador, Anthony Subcon 18 24 0 10
Vasquez, Randy Subcon 18 24 0 10
Maceda, Mark Subcon 18 24 0 10
Bragat, Benjamin Subcon 16 24 0 9.5
Bragat, Juanito Subcon 16 24 0 9.5
Rodriguez, John Andrew Subcon 16 24 0 9.5
Ugay, Joseph Subcon 16 24 0 9.5
Vasquez, Randy Subcon 16 24 0 9.5
Roluna, Crispin Subcon 16 24 0 9.5
Ramirez, Frederico Subcon 16 24 0 9.5
Gabin, Bernard Subcon 16 24 0 9.5
Gabin, Christian Subcon 16 24 0 9.5
Labrador, Anthony Subcon 16 24 0 9.5
Vasquez, Randy Subcon 16 24 0 9.5
Maceda, Mark Subcon 16 24 0 9.5
Suspended Slab - Concrete Total
Suspended Slab - Suspended Slab - Reba
Suspended Slab - Suspended Slab - Formw
NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Maceda, Mark Duven Subcon 8 12


Albios, Edwin Subcon 8 12 1 7
Bejoc, Reynaldo Jr. Subcon 8 12 1 7
Bejoc, Reynante Subcon 8 12 1 7
Bejoc, Richard Subcon 8 12 1 7
Brizuela, Rodolfo Subcon 8 12 1 7
Candingilan, Jerome Subcon 8 12 1 7
Cuba, Rey Jr. Subcon 8 12 1 7
Dadang, Arman Subcon 8 12 1 7
Doctor, Jomart Subcon 8 12 1 7
Enriquez, Roquito Subcon 8 12 1 7
Junio, Jonathan Subcon 8 12 1 7
Maceda, Mark Duven Subcon 8 12 1 7
Mayrong, Dennis Subcon 8 12 1 7
Nebres, Damian Subcon 8 12 1 7
Pardo, Rosalino Subcon 8 12 1 7
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Bejoc, Reynante Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Brizuela, Rodolfo Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Cuba, Rey Jr. Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Doctor, Jomart Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Mayrong, Dennis Subcon 8 12 1 10
Nebres, Damian Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 7
Bejoc, Reynaldo Jr. Subcon 8 12 1 7
Bejoc, Reynante Subcon 8 12 1 7
Bejoc, Richard Subcon 8 12 1 7
Brizuela, Rodolfo Subcon 8 12 1 7
Dadang, Arman Subcon 8 12 1 7
Doctor, Jomart Subcon 8 12 1 7
Mayrong, Dennis Subcon 8 12 1 7
Nebres, Damian Subcon 8 12 1 7
Maceda, Mark Duven Subcon 8 12 1 7
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 7
Bejoc, Reynaldo Jr. Subcon 8 12 1 7
Bejoc, Reynante Subcon 8 12 1 7
Bejoc, Richard Subcon 8 12 1 7
Brizuela, Rodolfo Subcon 8 12 1 7
Dadang, Arman Subcon 8 12 1 7
Doctor, Jomart Subcon 8 12 1 7
Mayrong, Dennis Subcon 8 12 1 7
Nebres, Damian Subcon 8 12 1 7
Maceda, Mark Duven Subcon 8 12 1 7
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Bejoc, Reynante Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Brizuela, Rodolfo Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Cuba, Rey Jr. Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Doctor, Jomart Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Mayrong, Dennis Subcon 8 12 1 10
Nebres, Damian Subcon 8 12 1 10
Pardo, Rosalino Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Bejoc, Reynante Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Brizuela, Rodolfo Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Cuba, Rey Jr. Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Doctor, Jomart Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Mayrong, Dennis Subcon 8 12 1 10
Nebres, Damian Subcon 8 12 1 10
Pardo, Rosalino Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 7.5
Bejoc, Reynaldo Jr. Subcon 8 12 1 7.5
Bejoc, Reynante Subcon 8 12 1 7.5
Bejoc, Richard Subcon 8 12 1 7.5
Brizuela, Rodolfo Subcon 8 12 1 7.5
Dadang, Arman Subcon 8 12 1 7.5
Doctor, Jomart Subcon 8 12 1 7.5
Mayrong, Dennis Subcon 8 12 1 7.5
Nebres, Damian Subcon 8 12 1 7.5
Maceda, Mark Duven Subcon 8 12 1 7.5
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 7
Bejoc, Reynaldo Jr. Subcon 8 12 1 7
Bejoc, Reynante Subcon 8 12 1 7
Bejoc, Richard Subcon 8 12 1 7
Brizuela, Rodolfo Subcon 8 12 1 7
Dadang, Arman Subcon 8 12 1 7
Doctor, Jomart Subcon 8 12 1 7
Mayrong, Dennis Subcon 8 12 1 7
Nebres, Damian Subcon 8 12 1 7
Maceda, Mark Duven Subcon 8 12 1 7
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Bejoc, Reynante Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Brizuela, Rodolfo Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Cuba, Rey Jr. Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Doctor, Jomart Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Mayrong, Dennis Subcon 8 12 1 10
Nebres, Damian Subcon 8 12 1 10
Pardo, Rosalino Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Bejoc, Reynante Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Brizuela, Rodolfo Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Cuba, Rey Jr. Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Doctor, Jomart Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Cuba, Rey Jr. Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Cuba, Rey Jr. Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 5
Bejoc, Reynaldo Jr. Subcon 8 12 1 5
Bejoc, Reynante Subcon 8 12 1 5
Bejoc, Richard Subcon 8 12 1 5
Brizuela, Rodolfo Subcon 8 12 1 5
Candingilan, Jerome Subcon 8 12 1 5
Cuba, Rey Jr. Subcon 8 12 1 5
Dadang, Arman Subcon 8 12 1 5
Doctor, Jomart Subcon 8 12 1 5
Enriquez, Roquito Subcon 8 12 1 5
Junio, Jonathan Subcon 8 12 1 5
Maceda, Mark Duven Subcon 8 12 1 5
Suspended Slab - Formworks Total

Ramp Slab - Ramp Slab - Concrete


Ramp Slab - Ramp Slab - Rebar
Ramp Slab - Ramp Slab - Formworks

Beams and Girders - Beams and Girders - Co


NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Beams and Girders - Concrete Total


Beams and Girders - Beams and Girders - R
Beams and Girders - Beams and Girders - Form
NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Maceda, Mark Duven Subcon 8 12 1 8


Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Cuba, Rey Jr. Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Cuba, Rey Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Brizuela, Rodolfo Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Doctor, Jomart Subcon 8 12 1 8
Mayrong, Dennis Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Bejoc, Reynante Subcon 8 12 1 8
Beams and Girders - Formworks Total

Ramp Beams and Girders - Ramp Beams and Girde


Ramp Beams and Girders - Ramp Beams and Gird
Ramp Beams and Girders - Ramp Beams and Girders

Coupling Beams - Coupling Beams - Concr


Coupling Beams - Coupling Beams - Reb
Coupling Beams - Coupling Beams - Formw

Tanks and Pits - Tanks and Pits - Concret


NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Maceda, Mark Subcon 8 10.5


Cuba, Rey Subcon 8 10.5
Brizuela, Rodolfo Subcon 8 10.5
Mayrong, Dennis Subcon 8 10.5
Pardo, Rosalino Subcon 8 10.5
Maceda, Mark Subcon 8 10
Cuba, Rey Subcon 8 10
Brizuela, Rodolfo Subcon 8 10
Mayrong, Dennis Subcon 8 10
Pardo, Rosalino Subcon 8 10
Maceda, Mark Subcon 8 10.5
Cuba, Rey Subcon 8 10.5
Brizuela, Rodolfo Subcon 8 10.5
Mayrong, Dennis Subcon 8 10.5
Pardo, Rosalino Subcon 8 10.5
Maceda, Mark Subcon 8 10
Cuba, Rey Subcon 8 10
Brizuela, Rodolfo Subcon 8 10
Mayrong, Dennis Subcon 8 10
Pardo, Rosalino Subcon 8 10
Maceda, Mark Subcon 8 9
Cuba, Rey Subcon 8 9
Brizuela, Rodolfo Subcon 8 9
Mayrong, Dennis Subcon 8 9
Pardo, Rosalino Subcon 8 9
Maceda, Mark Subcon 8 10
Cuba, Rey Subcon 8 10
Brizuela, Rodolfo Subcon 8 10
Mayrong, Dennis Subcon 8 10
Pardo, Rosalino Subcon 8 10
Maceda, Mark Subcon 6.5 12
Cuba, Rey Subcon 6.5 12
Brizuela, Rodolfo Subcon 6.5 12
Mayrong, Dennis Subcon 6.5 12
Pardo, Rosalino Subcon 6.5 12
Maceda, Mark Subcon 8 10
Cuba, Rey Subcon 8 10
Brizuela, Rodolfo Subcon 8 10
Mayrong, Dennis Subcon 8 10
Pardo, Rosalino Subcon 8 10
Maceda, Mark Subcon 8 9.5
Cuba, Rey Subcon 8 9.5
Brizuela, Rodolfo Subcon 8 9.5
Mayrong, Dennis Subcon 8 9.5
Pardo, Rosalino Subcon 8 9.5
Maceda, Mark Subcon 8 9.5
Cuba, Rey Subcon 8 9.5
Brizuela, Rodolfo Subcon 8 9.5
Mayrong, Dennis Subcon 8 9.5
Pardo, Rosalino Subcon 8 9.5
Maceda, Mark Subcon 8 9.5
Cuba, Rey Subcon 8 9.5
Brizuela, Rodolfo Subcon 8 9.5
Mayrong, Dennis Subcon 8 9.5
Pardo, Rosalino Subcon 8 9.5
Maceda, Mark Subcon 8 10
Cuba, Rey Subcon 8 10
Brizuela, Rodolfo Subcon 8 10
Mayrong, Dennis Subcon 8 10
Pardo, Rosalino Subcon 8 10
Maceda, Mark Subcon 8 9.5
Cuba, Rey Subcon 8 9.5
Brizuela, Rodolfo Subcon 8 9.5
Mayrong, Dennis Subcon 8 9.5
Pardo, Rosalino Subcon 8 9.5
Maceda, Mark Subcon 8 9.5
Cuba, Rey Subcon 8 9.5
Brizuela, Rodolfo Subcon 8 9.5
Mayrong, Dennis Subcon 8 9.5
Pardo, Rosalino Subcon 8 9.5
Maceda, Mark Subcon 6 9
Cuba, Rey Subcon 6 9
Brizuela, Rodolfo Subcon 6 9
Mayrong, Dennis Subcon 6 9
Pardo, Rosalino Subcon 6 9
Maceda, Mark Subcon 7 10
Cuba, Rey Subcon 7 10
Brizuela, Rodolfo Subcon 7 10
Mayrong, Dennis Subcon 7 10
Pardo, Rosalino Subcon 7 10
Maceda, Mark Subcon 9.5 11.5
Cuba, Rey Subcon 9.5 11.5
Brizuela, Rodolfo Subcon 9.5 11.5
Mayrong, Dennis Subcon 9.5 11.5
Maceda, Mark Subcon 6 9
Cuba, Rey Subcon 6 9
Brizuela, Rodolfo Subcon 6 9
Mayrong, Dennis Subcon 6 9
Enriquez, Roquito Subcon 6 9
Junio, Jonathan Subcon 6 9
Pardo, Rosalino Subcon 6 9
Maceda, Mark Subcon 6.5 11
Cuba, Rey Subcon 6.5 11
Brizuela, Rodolfo Subcon 6.5 11
Mayrong, Dennis Subcon 6.5 11
Pardo, Rosalino Subcon 6.5 11
Maceda, Mark Subcon 6 8.5
Cuba, Rey Subcon 6 8.5
Brizuela, Rodolfo Subcon 6 8.5
Mayrong, Dennis Subcon 6 8.5
Pardo, Rosalino Subcon 6 8.5
Maceda, Mark Subcon 9 11
Cuba, Rey Subcon 9 11
Brizuela, Rodolfo Subcon 9 11
Mayrong, Dennis Subcon 9 11
Pardo, Rosalino Subcon 9 11
Maceda, Mark Subcon 6 9
Cuba, Rey Subcon 6 9
Brizuela, Rodolfo Subcon 6 9
Mayrong, Dennis Subcon 6 9
Maceda, Mark Subcon 9.5 10
Cuba, Rey Subcon 9.5 10
Brizuela, Rodolfo Subcon 9.5 10
Mayrong, Dennis Subcon 9.5 10
Maceda, Mark Subcon 8.5 9.5
Cuba, Rey Subcon 8.5 9.5
Brizuela, Rodolfo Subcon 8.5 9.5
Mayrong, Dennis Subcon 8.5 9.5
Pardo, Rosalino Subcon 8.5 9.5
Maceda, Mark Subcon 5.5 8.5
Cuba, Rey Subcon 5.5 8.5
Brizuela, Rodolfo Subcon 5.5 8.5
Mayrong, Dennis Subcon 5.5 8.5
Pardo, Rosalino Subcon 5.5 8.5
Bragat, Benjamin Subcon 6 8.5
Bragat, Juanito Subcon 6 8.5
Rodriguez, John Andrew Subcon 6 8.5
Ugay, Joseph Subcon 6 8.5
Vasquez, Randy Subcon 6 8.5
Maceda, Mark Subcon 5 6.5
Cuba, Rey Subcon 5 6.5
Brizuela, Rodolfo Subcon 5 6.5
Mayrong, Dennis Subcon 5 6.5
Pardo, Rosalino Subcon 5 6.5
Tanks and Pits - Concrete Total
Tanks and Pits - Tanks and Pits - Rebar
Tanks and Pits - Tanks and Pits - Formwo
NAME OF WORKER WORKER AM PM
CLASSIFICATION
In Out In Out

Albios, Edwin Subcon 8 12 1 9


Bejoc, Reynaldo Jr. Subcon 8 12 1 9
Candingilan, Jerome Subcon 8 12 1 9
Dadang, Arman Subcon 8 12 1 9
Maceda, Mark Duven Subcon 8 12 1 9
Pardo, Rosalino Subcon 8 12 1 9
Bejoc, Richard Subcon 8 12 1 7
Cuba, Rey Jr. Subcon 8 12 1 7
Enriquez, Roquito Subcon 8 12 1 7
Junio, Jonathan Subcon 8 12 1 7
Nebres, Damian Subcon 8 12 1 7
Albios, Edwin Subcon 8 12 1 11
Bejoc, Reynaldo Jr. Subcon 8 12 1 11
Candingilan, Jerome Subcon 8 12 1 11
Dadang, Arman Subcon 8 12 1 11
Maceda, Mark Duven Subcon 8 12 1 11
Enriquez, Roquito Subcon 8 12 1 11
Junio, Jonathan Subcon 8 12 1 11
Nebres, Damian Subcon 8 12 1 11
Albios, Edwin Subcon 8 12 1 12
Bejoc, Reynaldo Jr. Subcon 8 12 1 12
Candingilan, Jerome Subcon 8 12 1 12
Dadang, Arman Subcon 8 12 1 12
Maceda, Mark Duven Subcon 8 12 1 12
Enriquez, Roquito Subcon 8 12 1 12
Junio, Jonathan Subcon 8 12 1 12
Nebres, Damian Subcon 8 12 1 12
Pardo, Rosalino Subcon 8 12 1 12
Bejoc, Richard Subcon 8 12 1 12
Bejoc, Richard Subcon 8 12 1 10
Cuba, Rey Jr. Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Nebres, Damian Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Nebres, Damian Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 11
Bejoc, Reynaldo Jr. Subcon 8 12 1 11
Candingilan, Jerome Subcon 8 12 1 11
Dadang, Arman Subcon 8 12 1 11
Maceda, Mark Duven Subcon 8 12 1 11
Enriquez, Roquito Subcon 8 12 1 11
Junio, Jonathan Subcon 8 12 1 11
Nebres, Damian Subcon 8 12 1 11
Pardo, Rosalino Subcon 8 12 1 11
Bejoc, Richard Subcon 8 12 1 11
Villarito, Joseph Subcon 8 12 1 11
Perez, Christopher Subcon 8 12 1 11
Albios, Edwin Subcon 8 12 1 6
Bejoc, Reynaldo Jr. Subcon 8 12 1 6
Candingilan, Jerome Subcon 8 12 1 6
Dadang, Arman Subcon 8 12 1 6
Maceda, Mark Duven Subcon 8 12 1 6
Enriquez, Roquito Subcon 8 12 1 6
Junio, Jonathan Subcon 8 12 1 6
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Villarito, Joseph Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 3
Bejoc, Reynaldo Jr. Subcon 8 12 1 3
Candingilan, Jerome Subcon 8 12 1 3
Dadang, Arman Subcon 8 12 1 3
Maceda, Mark Duven Subcon 8 12 1 3
Enriquez, Roquito Subcon 8 12 1 3
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 3
Bejoc, Reynaldo Jr. Subcon 8 12 1 3
Candingilan, Jerome Subcon 8 12 1 3
Dadang, Arman Subcon 8 12 1 3
Maceda, Mark Duven Subcon 8 12 1 3
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Villarito, Joseph Subcon 8 12 1 10
Pardo, Rosalino Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Villarito, Joseph Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 5
Bejoc, Reynaldo Jr. Subcon 8 12 1 5
Candingilan, Jerome Subcon 8 12 1 5
Dadang, Arman Subcon 8 12 1 5
Albios, Edwin Subcon 8 12 1 9
Bejoc, Reynaldo Jr. Subcon 8 12 1 9
Candingilan, Jerome Subcon 8 12 1 9
Dadang, Arman Subcon 8 12 1 9
Maceda, Mark Duven Subcon 8 12 1 9
Enriquez, Roquito Subcon 8 12 1 9
Junio, Jonathan Subcon 8 12 1 9
Albios, Edwin Subcon 8 12 1 2.5
Bejoc, Reynaldo Jr. Subcon 8 12 1 2.5
Candingilan, Jerome Subcon 8 12 1 2.5
Dadang, Arman Subcon 8 12 1 2.5
Maceda, Mark Duven Subcon 8 12 1 2.5
Enriquez, Roquito Subcon 8 12 1 2.5
Bejoc, Richard Subcon 8 12 1 5
Cuba, Rey Jr. Subcon 8 12 1 5
Enriquez, Roquito Subcon 8 12 1 5
Junio, Jonathan Subcon 8 12 1 5
Nebres, Damian Subcon 8 12 1 5
Bejoc, Richard Subcon 8 12
Cuba, Rey Jr. Subcon 8 12
Enriquez, Roquito Subcon 8 12
Junio, Jonathan Subcon 8 12
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Pardo, Rosalino Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 2
Bejoc, Reynaldo Jr. Subcon 8 12 1 2
Candingilan, Jerome Subcon 8 12 1 2
Dadang, Arman Subcon 8 12 1 2
Maceda, Mark Duven Subcon 8 12 1 2
Pardo, Rosalino Subcon 8 12 1 2
Albios, Edwin Subcon 8 12 1 12
Bejoc, Reynaldo Jr. Subcon 8 12 1 12
Candingilan, Jerome Subcon 8 12 1 12
Dadang, Arman Subcon 8 12 1 12
Maceda, Mark Duven Subcon 8 12 1 12
Enriquez, Roquito Subcon 8 12 1 12
Junio, Jonathan Subcon 8 12 1 12
Nebres, Damian Subcon 8 12 1 12
Pardo, Rosalino Subcon 8 12 1 12
Bejoc, Richard Subcon 8 12 1 12
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 10
Cuba, Rey Jr. Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Nebres, Damian Subcon 8 12 1 10
Bejoc, Richard Subcon 8 12 1 2
Cuba, Rey Jr. Subcon 8 12 1 2
Enriquez, Roquito Subcon 8 12 1 2
Junio, Jonathan Subcon 8 12 1 2
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Villarito, Joseph Subcon 8 12 1 8
Perez, Christopher Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 12
Bejoc, Reynaldo Jr. Subcon 8 12 1 12
Candingilan, Jerome Subcon 8 12 1 12
Dadang, Arman Subcon 8 12 1 12
Maceda, Mark Duven Subcon 8 12 1 12
Enriquez, Roquito Subcon 8 12 1 12
Junio, Jonathan Subcon 8 12 1 12
Nebres, Damian Subcon 8 12 1 12
Pardo, Rosalino Subcon 8 12 1 12
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 12
Bejoc, Reynaldo Jr. Subcon 8 12 1 12
Candingilan, Jerome Subcon 8 12 1 12
Dadang, Arman Subcon 8 12 1 12
Maceda, Mark Duven Subcon 8 12 1 12
Enriquez, Roquito Subcon 8 12 1 12
Perez, Christopher Subcon 8 12 1 12
Junio, Jonathan Subcon 8 12 1 12
Nebres, Damian Subcon 8 12 1 12
Pardo, Rosalino Subcon 8 12 1 12
Albios, Edwin Subcon 8 12 1 10
Bejoc, Reynaldo Jr. Subcon 8 12 1 10
Candingilan, Jerome Subcon 8 12 1 10
Dadang, Arman Subcon 8 12 1 10
Maceda, Mark Duven Subcon 8 12 1 10
Enriquez, Roquito Subcon 8 12 1 10
Junio, Jonathan Subcon 8 12 1 10
Albios, Edwin Subcon 8 12 1 9
Bejoc, Reynaldo Jr. Subcon 8 12 1 9
Candingilan, Jerome Subcon 8 12 1 9
Dadang, Arman Subcon 8 12 1 9
Maceda, Mark Duven Subcon 8 12 1 9
Enriquez, Roquito Subcon 8 12 1 9
Junio, Jonathan Subcon 8 12 1 9
Albios, Edwin Subcon 8 12 1 2.5
Bejoc, Reynaldo Jr. Subcon 8 12 1 2.5
Candingilan, Jerome Subcon 8 12 1 2.5
Dadang, Arman Subcon 8 12 1 2.5
Maceda, Mark Duven Subcon 8 12 1 2.5
Enriquez, Roquito Subcon 8 12 1 2.5
Bejoc, Richard Subcon 8 12 1 4
Cuba, Rey Jr. Subcon 8 12 1 4
Enriquez, Roquito Subcon 8 12 1 4
Junio, Jonathan Subcon 8 12 1 4
Bejoc, Richard Subcon 10 12 1 3.5
Enriquez, Roquito Subcon 10 12 1 3.5
Junio, Jonathan Subcon 10 12 1 3.5
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Villarito, Joseph Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 2
Bejoc, Reynaldo Jr. Subcon 8 12 1 2
Candingilan, Jerome Subcon 8 12 1 2
Dadang, Arman Subcon 8 12 1 2
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Bejoc, Richard Subcon 8 12 1 8
Villarito, Joseph Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 3
Bejoc, Reynaldo Jr. Subcon 8 12 1 3
Candingilan, Jerome Subcon 8 12 1 3
Dadang, Arman Subcon 8 12 1 3
Maceda, Mark Duven Subcon 8 12 1 3
Enriquez, Roquito Subcon 8 12 1 3
Bejoc, Richard Subcon 8 12 1 3
Albios, Edwin Subcon 8 12 1 3.5
Bejoc, Reynaldo Jr. Subcon 8 12 1 3.5
Candingilan, Jerome Subcon 8 12 1 3.5
Dadang, Arman Subcon 8 12 1 3.5
Maceda, Mark Duven Subcon 8 12 1 3.5
Enriquez, Roquito Subcon 8 12 1 3.5
Junio, Jonathan Subcon 8 12 1 3.5
Albios, Edwin Subcon 8 12 1 2.5
Bejoc, Reynaldo Jr. Subcon 8 12 1 2.5
Candingilan, Jerome Subcon 8 12 1 2.5
Dadang, Arman Subcon 8 12 1 2.5
Maceda, Mark Duven Subcon 8 12 1 2.5
Enriquez, Roquito Subcon 8 12 1 2.5
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Perez, Christopher Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8
Nebres, Damian Subcon 8 12 1 8
Pardo, Rosalino Subcon 8 12 1 8
Albios, Edwin Subcon 8 12 1 8
Bejoc, Reynaldo Jr. Subcon 8 12 1 8
Candingilan, Jerome Subcon 8 12 1 8
Dadang, Arman Subcon 8 12 1 8
Maceda, Mark Duven Subcon 8 12 1 8
Enriquez, Roquito Subcon 8 12 1 8
Junio, Jonathan Subcon 8 12 1 8

Tanks and Pits - Formworks Total

Stairs - Stairs - Concrete


Stairs - Stairs - Rebar
Stairs - Stairs - Formworks
Equipment Pad - Equipment Pad - Concre
Equipment Pad - Equipment Pad - Reba
Equipment Pad - Equipment Pad - Formwo

Structural Steel - Structural Steel


*Note Please add activity that was not listed

g and Grubbing
k Excavation
ural Excavation
ual Trimming
nd Compaction (Local)
ng-out of Soil

ks - Gravel Bedding

Shotcreting Works

s - Soil Poisoning
rmite Reticulation System
s - Damproofing
Barrier/Polyethylene Sheet
ks - Waterstop
ks - Waterstop

n-Grade - Concrete
On-Grade - Rebar
-Grade - Formworks

g Tie Beam - Concrete


ng Tie Beam - Rebar
Tie Beam - Formworks

d Footing - Concrete
ted Footing - Rebar
Footing - Formworks

ned Footing - Concrete


bined Footing - Rebar
ed Footing - Formworks

ooting - Concrete
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

16.00 59.00 cu.m 0.27


16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
16.00 59.00 cu.m 0.27
18.00 51.46 cu.m 0.35
18.00 51.46 cu.m 0.35
18.00 51.46 cu.m 0.35
18.00 51.46 cu.m 0.35
18.00 51.46 cu.m 0.35
18.00 51.46 cu.m 0.35
18.00 51.46 cu.m 0.35
4.00 51.46 cu.m 0.08
4.00 51.46 cu.m 0.08
4.00 51.46 cu.m 0.08
4.00 51.46 cu.m 0.08
4.00 51.46 cu.m 0.08
4.00 51.46 cu.m 0.08
-
-
-
-
-
310.00 1,259.00 cu.m 0.25
Footing - Rebar
oting - Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

11.00 7.97 sqm 1.38


11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
11.00 7.97 sqm 1.38
-
-
-
-
-
110.00 79.71 sqm 1.38

ooting - Concrete
Footing - Rebar
oting - Formworks

n - Concrete
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

0.50 0.48 cu.m 1.04


0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
1.00 0.87 cu.m 1.16
1.00 0.87 cu.m 1.16
1.00 0.87 cu.m 1.16
1.00 0.87 cu.m 1.16
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
0.50 0.87 cu.m 0.58
1.00 0.87 cu.m 1.16
1.00 0.87 cu.m 1.16
1.00 0.87 cu.m 1.16
1.00 0.87 cu.m 1.16
0.50 0.36 cu.m 1.39
0.50 0.36 cu.m 1.39
0.50 0.36 cu.m 1.39
0.50 0.76 cu.m 0.66
0.50 0.76 cu.m 0.66
0.50 0.76 cu.m 0.66
0.50 0.76 cu.m 0.66
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
1.00 0.48 cu.m 2.08
1.00 0.48 cu.m 2.08
1.00 0.48 cu.m 2.08
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
0.50 0.51 cu.m 0.99
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
1.50 0.36 cu.m 4.17
1.50 0.36 cu.m 4.17
1.50 0.36 cu.m 4.17
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
1.50 0.88 cu.m 1.71
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
1.00 0.77 cu.m 1.30
1.00 0.77 cu.m 1.30
1.00 0.77 cu.m 1.30
1.00 0.77 cu.m 1.30
1.50 0.48 cu.m 3.13
1.50 0.48 cu.m 3.13
1.50 0.48 cu.m 3.13
2.00 0.77 cu.m 2.61
2.00 0.77 cu.m 2.61
2.00 0.77 cu.m 2.61
2.00 0.77 cu.m 2.61
1.50 0.77 cu.m 1.95
1.50 0.77 cu.m 1.95
1.50 0.77 cu.m 1.95
1.50 0.77 cu.m 1.95
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.54 cu.m 1.87
1.00 0.54 cu.m 1.87
1.00 0.54 cu.m 1.87
1.00 0.54 cu.m 1.87
1.50 0.54 cu.m 2.80
1.50 0.54 cu.m 2.80
1.50 0.54 cu.m 2.80
1.50 0.54 cu.m 2.80
1.00 0.54 cu.m 1.87
1.00 0.54 cu.m 1.87
1.00 0.54 cu.m 1.87
1.00 0.54 cu.m 1.87
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
0.50 0.59 cu.m 0.85
0.50 0.59 cu.m 0.85
0.50 0.59 cu.m 0.85
0.50 0.49 cu.m 1.03
0.50 0.49 cu.m 1.03
0.50 0.49 cu.m 1.03
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.88 cu.m 1.14
1.00 0.77 cu.m 1.30
1.00 0.77 cu.m 1.30
1.00 0.77 cu.m 1.30
1.00 0.77 cu.m 1.30
1.00 0.51 cu.m 1.98
1.00 0.51 cu.m 1.98
1.00 0.51 cu.m 1.98
1.00 0.51 cu.m 1.98
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.88 cu.m 0.57
0.50 0.93 cu.m 0.54
0.50 0.93 cu.m 0.54
0.50 0.93 cu.m 0.54
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.77 cu.m 0.65
0.50 0.36 cu.m 1.39
0.50 0.36 cu.m 1.39
0.50 0.36 cu.m 1.39
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.48 cu.m 1.04
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.54 cu.m 0.93
0.50 0.36 cu.m 1.39
0.50 0.36 cu.m 1.39
0.50 0.36 cu.m 1.39

-
174.50 152.48 cu.m 1.14
mn - Rebar
- Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

10.00 3.12 sqm 3.21


10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
6.50 2.04 sqm 3.19
6.50 2.04 sqm 3.19
6.50 2.04 sqm 3.19
6.50 2.04 sqm 3.19
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.12 sqm 3.21
10.00 3.46 sqm 2.89
10.00 3.46 sqm 2.89
10.00 3.46 sqm 2.89
10.00 3.02 sqm 3.31
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.50 3.17 sqm 2.99
9.50 3.17 sqm 2.99
9.50 3.17 sqm 2.99
9.50 3.17 sqm 2.99
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
7.00 1.95 sqm 3.59
7.00 1.95 sqm 3.59
7.00 1.95 sqm 3.59
7.00 1.95 sqm 3.59
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
6.50 1.95 sqm 3.33
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
10.00 3.17 sqm 3.15
9.50 3.17 sqm 2.99
9.50 3.17 sqm 2.99
9.50 3.17 sqm 2.99
9.50 3.17 sqm 2.99
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
8.00 3.17 sqm 2.52
8.00 3.17 sqm 2.52
8.00 3.17 sqm 2.52
8.00 3.17 sqm 2.52
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
11.00 3.17 sqm 3.47
11.00 3.17 sqm 3.47
11.00 3.17 sqm 3.47
11.00 3.17 sqm 3.47
8.50 3.17 sqm 2.68
8.50 3.17 sqm 2.68
8.50 3.17 sqm 2.68
8.50 3.17 sqm 2.68
8.50 3.17 sqm 2.68
8.50 3.17 sqm 2.68
8.50 3.17 sqm 2.68
8.50 3.17 sqm 2.68
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
6.50 2.08 sqm 3.13
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
9.00 3.17 sqm 2.84
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
10.50 3.17 sqm 3.31
8.00 2.08 sqm 3.86
8.00 2.08 sqm 3.86
8.00 2.08 sqm 3.86
8.00 2.08 sqm 3.86
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 1.95 sqm 3.59
7.00 1.95 sqm 3.59
7.00 1.95 sqm 3.59
7.00 1.95 sqm 3.59
8.00 1.95 sqm 4.10
8.00 1.95 sqm 4.10
8.00 1.95 sqm 4.10
8.00 1.95 sqm 4.10
8.00 1.95 sqm 4.10
8.00 1.95 sqm 4.10
8.00 1.95 sqm 4.10
8.00 1.95 sqm 4.10
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
7.00 2.08 sqm 3.37
1,770.00 563.42 sqm 3.14

Wall - Concrete
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

3.00 1.70 cu.m 1.76


3.00 1.70 cu.m 1.76
3.00 1.70 cu.m 1.76
3.00 1.70 cu.m 1.76
3.00 1.70 cu.m 1.76
3.00 3.48 cu.m 0.86
3.00 3.48 cu.m 0.86
3.00 3.48 cu.m 0.86
3.00 3.48 cu.m 0.86
3.00 3.48 cu.m 0.86
2.50 3.48 cu.m 0.72
2.50 3.48 cu.m 0.72
2.50 3.48 cu.m 0.72
2.50 3.48 cu.m 0.72
2.50 3.48 cu.m 0.72
1.50 1.70 cu.m 0.88
1.50 1.70 cu.m 0.88
1.50 1.70 cu.m 0.88
1.50 1.70 cu.m 0.88
1.50 1.70 cu.m 0.88
1.00 0.92 cu.m 1.08
1.00 0.92 cu.m 1.08
1.00 0.92 cu.m 1.08
1.00 0.92 cu.m 1.08
1.00 0.92 cu.m 1.08
2.00 1.50 cu.m 1.33
2.00 1.50 cu.m 1.33
2.00 1.50 cu.m 1.33
2.00 1.50 cu.m 1.33
2.00 1.50 cu.m 1.33
3.00 1.50 cu.m 2.00
3.00 1.50 cu.m 2.00
3.00 1.50 cu.m 2.00
3.00 1.50 cu.m 2.00
3.00 1.50 cu.m 2.00
1.50 1.73 cu.m 0.87
1.50 1.73 cu.m 0.87
1.50 1.73 cu.m 0.87
1.50 1.73 cu.m 0.87
1.50 1.73 cu.m 0.87
5.00 3.48 cu.m 1.44
5.00 3.48 cu.m 1.44
5.00 3.48 cu.m 1.44
5.00 3.48 cu.m 1.44
5.00 3.48 cu.m 1.44
4.00 3.14 cu.m 1.27
4.00 3.14 cu.m 1.27
4.00 3.14 cu.m 1.27
4.00 3.14 cu.m 1.27
4.00 3.14 cu.m 1.27
2.50 1.49 cu.m 1.68
2.50 1.49 cu.m 1.68
2.50 1.49 cu.m 1.68
2.50 1.49 cu.m 1.68

2.50 1.49 cu.m 1.68

-
145.00 120.68 cu.m 1.20
r Wall - Rebar
Wall - Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

13.00 5.96 sqm 2.18


13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
8.00 8.95 sqm 0.89
8.00 8.95 sqm 0.89
8.00 8.95 sqm 0.89
8.00 8.95 sqm 0.89
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
17.00 6.31 sqm 2.70
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
15.00 6.31 sqm 2.38
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
8.00 9.46 sqm 0.85
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
13.00 5.96 sqm 2.18
8.00 7.16 sqm 1.12
8.00 7.16 sqm 1.12
8.00 7.16 sqm 1.12
8.00 7.16 sqm 1.12
8.00 7.16 sqm 1.12
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
6.50 4.85 sqm 1.34
6.50 4.85 sqm 1.34
6.50 4.85 sqm 1.34
6.50 4.85 sqm 1.34
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
6.00 4.65 sqm 1.29
6.00 4.65 sqm 1.29
6.00 4.65 sqm 1.29
6.00 4.65 sqm 1.29
6.00 4.65 sqm 1.29
6.00 4.65 sqm 1.29
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
13.00 4.65 sqm 2.79
5.50 4.65 sqm 1.18
5.50 4.65 sqm 1.18
5.50 4.65 sqm 1.18
5.50 4.65 sqm 1.18
5.50 4.65 sqm 1.18
5.50 4.65 sqm 1.18
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
9.00 3.23 sqm 2.79
6.50 4.85 sqm 1.34
6.50 4.85 sqm 1.34
6.50 4.85 sqm 1.34
6.50 4.85 sqm 1.34
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
5.50 9.30 sqm 0.59
5.50 9.30 sqm 0.59
5.50 9.30 sqm 0.59
5.50 9.30 sqm 0.59
5.50 9.30 sqm 0.59
5.50 9.30 sqm 0.59
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
14.00 6.40 sqm 2.19
6.00 9.30 sqm 0.64
6.00 9.30 sqm 0.64
6.00 9.30 sqm 0.64
6.00 9.30 sqm 0.64
6.00 9.30 sqm 0.64
6.00 9.30 sqm 0.64
22.00 5.96 sqm 3.69
22.00 5.96 sqm 3.69
22.00 5.96 sqm 3.69
22.00 5.96 sqm 3.69
22.00 5.96 sqm 3.69
22.00 5.96 sqm 3.69
-
-
-
-
1,413.00 805.82 sqm 1.75

nded Slab - Concrete


TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

1.00 1.32 cu.m 0.76


21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
21.50 4.73 cu.m 4.55
14.00 3.23 cu.m 4.34
14.00 3.23 cu.m 4.34
14.00 3.23 cu.m 4.34
14.00 3.23 cu.m 4.34
14.00 3.23 cu.m 4.34
14.00 3.23 cu.m 4.34
14.00 3.23 cu.m 4.34
14.00 3.23 cu.m 4.34
14.00 2.95 cu.m 4.74
14.00 2.95 cu.m 4.74
14.00 2.95 cu.m 4.74
14.00 2.95 cu.m 4.74
14.00 2.95 cu.m 4.74
14.00 2.95 cu.m 4.74
14.00 2.95 cu.m 4.74
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
20.00 5.14 cu.m 3.89
14.00 3.50 cu.m 4.00
14.00 3.50 cu.m 4.00
14.00 3.50 cu.m 4.00
14.00 3.50 cu.m 4.00
14.00 3.50 cu.m 4.00
14.00 3.50 cu.m 4.00
14.00 3.50 cu.m 4.00
14.00 3.50 cu.m 4.00
11.00 3.50 cu.m 3.14
11.00 3.50 cu.m 3.14
11.00 3.50 cu.m 3.14
11.00 3.50 cu.m 3.14
11.00 3.50 cu.m 3.14
11.00 3.50 cu.m 3.14
11.00 3.50 cu.m 3.14
11.00 3.50 cu.m 3.14
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
17.00 5.96 cu.m 2.85
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
16.00 5.05 cu.m 3.17
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
17.50 5.58 cu.m 3.13
1,470.50 412.20 cu.m 3.57
ended Slab - Rebar
ded Slab - Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

4.00 4.00 sqm 1.00


35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
35.00 12.73 sqm 2.75
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
26.00 13.64 sqm 1.91
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
35.00 10.20 sqm 3.43
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
22.00 11.33 sqm 1.94
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
35.00 10.80 sqm 3.24
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
45.50 14.67 sqm 3.10
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
26.00 14.67 sqm 1.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
36.75 9.75 sqm 3.77
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
22.00 10.80 sqm 2.04
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
35.00 12.50 sqm 2.80
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
22.00 12.50 sqm 1.76
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
52.00 17.33 sqm 3.00
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
26.00 21.67 sqm 1.20
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
44.00 13.00 sqm 3.38
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
55.00 14.80 sqm 3.72
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
24.00 21.67 sqm 1.11
-
-
7,106.00 2,898.49 sqm 2.45

Slab - Concrete
p Slab - Rebar
ab - Formworks

and Girders - Concrete


TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

-
-
- - #REF!
ms and Girders - Rebar
and Girders - Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

22.00 4.67 sqm 4.71


22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 4.67 sqm 4.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
22.00 3.85 sqm 5.71
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
16.50 4.16 sqm 3.97
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
33.00 8.95 sqm 3.69
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
22.00 4.88 sqm 4.51
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
77.00 15.39 sqm 5.00
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
55.00 12.75 sqm 4.31
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
88.00 13.08 sqm 6.73
4,180.00 843.20 sqm 4.96

Beams and Girders - Concrete


p Beams and Girders - Rebar
eams and Girders - Formworks

ng Beams - Concrete
ling Beams - Rebar
g Beams - Formworks

and Pits - Concrete


TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

2.50 5.25 cu.m 0.48


2.50 5.25 cu.m 0.48
2.50 5.25 cu.m 0.48
2.50 5.25 cu.m 0.48
2.50 5.25 cu.m 0.48
2.00 2.20 cu.m 0.91
2.00 2.20 cu.m 0.91
2.00 2.20 cu.m 0.91
2.00 2.20 cu.m 0.91
2.00 2.20 cu.m 0.91
2.50 5.28 cu.m 0.47
2.50 5.28 cu.m 0.47
2.50 5.28 cu.m 0.47
2.50 5.28 cu.m 0.47
2.50 5.28 cu.m 0.47
2.00 3.69 cu.m 0.54
2.00 3.69 cu.m 0.54
2.00 3.69 cu.m 0.54
2.00 3.69 cu.m 0.54
2.00 3.69 cu.m 0.54
1.00 1.49 cu.m 0.67
1.00 1.49 cu.m 0.67
1.00 1.49 cu.m 0.67
1.00 1.49 cu.m 0.67
1.00 1.49 cu.m 0.67
2.00 3.26 cu.m 0.61
2.00 3.26 cu.m 0.61
2.00 3.26 cu.m 0.61
2.00 3.26 cu.m 0.61
2.00 3.26 cu.m 0.61
5.50 6.98 cu.m 0.79
5.50 6.98 cu.m 0.79
5.50 6.98 cu.m 0.79
5.50 6.98 cu.m 0.79
5.50 6.98 cu.m 0.79
2.00 3.02 cu.m 0.66
2.00 3.02 cu.m 0.66
2.00 3.02 cu.m 0.66
2.00 3.02 cu.m 0.66
2.00 3.02 cu.m 0.66
1.50 2.53 cu.m 0.59
1.50 2.53 cu.m 0.59
1.50 2.53 cu.m 0.59
1.50 2.53 cu.m 0.59
1.50 2.53 cu.m 0.59
1.50 2.06 cu.m 0.73
1.50 2.06 cu.m 0.73
1.50 2.06 cu.m 0.73
1.50 2.06 cu.m 0.73
1.50 2.06 cu.m 0.73
1.50 2.13 cu.m 0.70
1.50 2.13 cu.m 0.70
1.50 2.13 cu.m 0.70
1.50 2.13 cu.m 0.70
1.50 2.13 cu.m 0.70
2.00 1.80 cu.m 1.11
2.00 1.80 cu.m 1.11
2.00 1.80 cu.m 1.11
2.00 1.80 cu.m 1.11
2.00 1.80 cu.m 1.11
1.50 1.20 cu.m 1.25
1.50 1.20 cu.m 1.25
1.50 1.20 cu.m 1.25
1.50 1.20 cu.m 1.25
1.50 1.20 cu.m 1.25
1.50 1.82 cu.m 0.82
1.50 1.82 cu.m 0.82
1.50 1.82 cu.m 0.82
1.50 1.82 cu.m 0.82
1.50 1.82 cu.m 0.82
3.00 5.22 cu.m 0.57
3.00 5.22 cu.m 0.57
3.00 5.22 cu.m 0.57
3.00 5.22 cu.m 0.57
3.00 5.22 cu.m 0.57
3.00 1.02 cu.m 2.93
3.00 1.02 cu.m 2.93
3.00 1.02 cu.m 2.93
3.00 1.02 cu.m 2.93
3.00 1.02 cu.m 2.93
2.00 1.01 cu.m 1.99
2.00 1.01 cu.m 1.99
2.00 1.01 cu.m 1.99
2.00 1.01 cu.m 1.99
3.00 4.00 cu.m 0.75
3.00 4.00 cu.m 0.75
3.00 4.00 cu.m 0.75
3.00 4.00 cu.m 0.75
3.00 4.00 cu.m 0.75
3.00 4.00 cu.m 0.75
3.00 4.00 cu.m 0.75
4.50 4.20 cu.m 1.07
4.50 4.20 cu.m 1.07
4.50 4.20 cu.m 1.07
4.50 4.20 cu.m 1.07
4.50 4.20 cu.m 1.07
2.50 3.11 cu.m 0.80
2.50 3.11 cu.m 0.80
2.50 3.11 cu.m 0.80
2.50 3.11 cu.m 0.80
2.50 3.11 cu.m 0.80
2.00 2.38 cu.m 0.84
2.00 3.11 cu.m 0.64
2.00 3.11 cu.m 0.64
2.00 3.11 cu.m 0.64
2.00 3.11 cu.m 0.64
3.00 1.53 cu.m 1.96
3.00 1.53 cu.m 1.96
3.00 1.53 cu.m 1.96
3.00 1.53 cu.m 1.96
0.50 0.75 cu.m 0.67
0.50 0.75 cu.m 0.67
0.50 0.75 cu.m 0.67
0.50 0.75 cu.m 0.67
1.00 2.07 cu.m 0.48
1.00 2.07 cu.m 0.48
1.00 2.07 cu.m 0.48
1.00 2.07 cu.m 0.48
1.00 2.07 cu.m 0.48
3.00 6.15 cu.m 0.49
3.00 6.15 cu.m 0.49
3.00 6.15 cu.m 0.49
3.00 6.15 cu.m 0.49
3.00 6.15 cu.m 0.49
2.50 2.87 cu.m 0.87
2.50 2.87 cu.m 0.87
2.50 2.87 cu.m 0.87
2.50 2.87 cu.m 0.87
2.50 2.87 cu.m 0.87
1.50 4.18 cu.m 0.36
1.50 4.18 cu.m 0.36
1.50 4.18 cu.m 0.36
1.50 4.18 cu.m 0.36
1.50 4.18 cu.m 0.36
303.00 413.60 cu.m 0.73
s and Pits - Rebar
nd Pits - Formworks
TOTAL MAN-HOUR ACCOMPLISHMENT UoM PRODUCTIVITY RATE

12.00 4.93 SQM 2.43


12.00 4.93 SQM 2.43
12.00 4.93 SQM 2.43
12.00 4.93 SQM 2.43
12.00 4.93 SQM 2.43
12.00 4.93 SQM 2.43
10.00 4.40 SQM 2.27
10.00 4.40 SQM 2.27
10.00 4.40 SQM 2.27
10.00 4.40 SQM 2.27
10.00 4.40 SQM 2.27
14.00 6.60 SQM 2.12
14.00 6.60 SQM 2.12
14.00 6.60 SQM 2.12
14.00 6.60 SQM 2.12
14.00 6.60 SQM 2.12
14.00 6.60 SQM 2.12
14.00 6.60 SQM 2.12
14.00 6.60 SQM 2.12
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
30.00 12.30 SQM 2.44
13.00 5.95 SQM 2.18
13.00 5.95 SQM 2.18
13.00 5.95 SQM 2.18
13.00 5.95 SQM 2.18
13.00 5.95 SQM 2.18
26.00 13.58 SQM 1.91
26.00 13.58 SQM 1.91
26.00 13.58 SQM 1.91
26.00 13.58 SQM 1.91
26.00 13.58 SQM 1.91
26.00 13.58 SQM 1.91
26.00 13.58 SQM 1.91
26.00 13.58 SQM 1.91
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
42.00 19.40 SQM 2.16
27.00 33.26 SQM 0.81
27.00 33.26 SQM 0.81
27.00 33.26 SQM 0.81
27.00 33.26 SQM 0.81
27.00 33.26 SQM 0.81
27.00 33.26 SQM 0.81
27.00 33.26 SQM 0.81
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
22.00 11.20 SQM 1.96
12.00 16.80 SQM 0.71
12.00 16.80 SQM 0.71
12.00 16.80 SQM 0.71
12.00 16.80 SQM 0.71
12.00 16.80 SQM 0.71
12.00 16.80 SQM 0.71
11.00 5.14 SQM 2.14
11.00 5.14 SQM 2.14
11.00 5.14 SQM 2.14
11.00 5.14 SQM 2.14
11.00 5.14 SQM 2.14
11.00 5.14 SQM 2.14
11.00 5.14 SQM 2.14
6.00 7.20 SQM 0.83
6.00 7.20 SQM 0.83
6.00 7.20 SQM 0.83
6.00 7.20 SQM 0.83
6.00 7.20 SQM 0.83
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
26.00 15.24 SQM 1.71
13.00 19.59 SQM 0.66
13.00 19.59 SQM 0.66
13.00 19.59 SQM 0.66
13.00 19.59 SQM 0.66
13.00 19.59 SQM 0.66
13.00 19.59 SQM 0.66
13.00 19.59 SQM 0.66
13.00 7.10 SQM 1.83
13.00 7.10 SQM 1.83
13.00 7.10 SQM 1.83
13.00 7.10 SQM 1.83
13.00 7.10 SQM 1.83
13.00 7.10 SQM 1.83
8.00 10.65 SQM 0.75
8.00 10.65 SQM 0.75
8.00 10.65 SQM 0.75
8.00 10.65 SQM 0.75
12.00 5.67 SQM 2.12
12.00 5.67 SQM 2.12
12.00 5.67 SQM 2.12
12.00 5.67 SQM 2.12
12.00 5.67 SQM 2.12
12.00 5.67 SQM 2.12
12.00 5.67 SQM 2.12
5.50 6.61 SQM 0.83
5.50 6.61 SQM 0.83
5.50 6.61 SQM 0.83
5.50 6.61 SQM 0.83
5.50 6.61 SQM 0.83
5.50 6.61 SQM 0.83
8.00 3.43 SQM 2.34
8.00 3.43 SQM 2.34
8.00 3.43 SQM 2.34
8.00 3.43 SQM 2.34
8.00 3.43 SQM 2.34
4.00 4.28 SQM 0.93
4.00 4.28 SQM 0.93
4.00 4.28 SQM 0.93
4.00 4.28 SQM 0.93
13.00 4.23 SQM 3.07
13.00 4.23 SQM 3.07
13.00 4.23 SQM 3.07
13.00 4.23 SQM 3.07
13.00 4.23 SQM 3.07
13.00 4.23 SQM 3.07
5.00 4.23 SQM 1.18
5.00 4.23 SQM 1.18
5.00 4.23 SQM 1.18
5.00 4.23 SQM 1.18
5.00 4.23 SQM 1.18
5.00 4.23 SQM 1.18
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
30.00 12.47 SQM 2.41
13.00 17.81 SQM 0.73
13.00 17.81 SQM 0.73
13.00 17.81 SQM 0.73
13.00 17.81 SQM 0.73
13.00 17.81 SQM 0.73
13.00 17.81 SQM 0.73
13.00 17.81 SQM 0.73
13.00 5.37 SQM 2.42
13.00 5.37 SQM 2.42
13.00 5.37 SQM 2.42
13.00 5.37 SQM 2.42
13.00 5.37 SQM 2.42
5.00 6.71 SQM 0.75
5.00 6.71 SQM 0.75
5.00 6.71 SQM 0.75
5.00 6.71 SQM 0.75
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
22.00 7.39 SQM 2.98
11.00 12.66 SQM 0.87
11.00 12.66 SQM 0.87
11.00 12.66 SQM 0.87
11.00 12.66 SQM 0.87
11.00 12.66 SQM 0.87
11.00 12.66 SQM 0.87
11.00 12.66 SQM 0.87
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
30.00 9.01 SQM 3.33
13.00 11.59 SQM 1.12
13.00 11.59 SQM 1.12
13.00 11.59 SQM 1.12
13.00 11.59 SQM 1.12
13.00 11.59 SQM 1.12
13.00 11.59 SQM 1.12
13.00 11.59 SQM 1.12
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
30.00 12.58 SQM 2.39
13.00 17.97 SQM 0.72
13.00 17.97 SQM 0.72
13.00 17.97 SQM 0.72
13.00 17.97 SQM 0.72
13.00 17.97 SQM 0.72
13.00 17.97 SQM 0.72
13.00 17.97 SQM 0.72
12.00 4.50 SQM 2.67
12.00 4.50 SQM 2.67
12.00 4.50 SQM 2.67
12.00 4.50 SQM 2.67
12.00 4.50 SQM 2.67
12.00 4.50 SQM 2.67
12.00 4.50 SQM 2.67
5.50 4.50 SQM 1.22
5.50 4.50 SQM 1.22
5.50 4.50 SQM 1.22
5.50 4.50 SQM 1.22
5.50 4.50 SQM 1.22
5.50 4.50 SQM 1.22
7.00 5.62 SQM 1.24
7.00 5.62 SQM 1.24
7.00 5.62 SQM 1.24
7.00 5.62 SQM 1.24
4.50 5.62 SQM 0.80
4.50 5.62 SQM 0.80
4.50 5.62 SQM 0.80
11.00 5.65 SQM 1.95
11.00 5.65 SQM 1.95
11.00 5.65 SQM 1.95
11.00 5.65 SQM 1.95
11.00 5.65 SQM 1.95
11.00 5.65 SQM 1.95
5.00 5.65 SQM 0.89
5.00 5.65 SQM 0.89
5.00 5.65 SQM 0.89
5.00 5.65 SQM 0.89
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
22.00 7.81 SQM 2.82
12.00 7.81 SQM 1.54
12.00 7.81 SQM 1.54
12.00 7.81 SQM 1.54
12.00 7.81 SQM 1.54
12.00 7.81 SQM 1.54
12.00 7.81 SQM 1.54
12.00 7.81 SQM 1.54
13.00 4.10 SQM 3.17
13.00 4.10 SQM 3.17
13.00 4.10 SQM 3.17
13.00 4.10 SQM 3.17
13.00 4.10 SQM 3.17
13.00 4.10 SQM 3.17
13.00 4.10 SQM 3.17
5.50 4.78 SQM 1.15
5.50 4.78 SQM 1.15
5.50 4.78 SQM 1.15
5.50 4.78 SQM 1.15
5.50 4.78 SQM 1.15
5.50 4.78 SQM 1.15
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
33.00 11.13 SQM 2.96
11.00 15.90 SQM 0.69
11.00 15.90 SQM 0.69
11.00 15.90 SQM 0.69
11.00 15.90 SQM 0.69
11.00 15.90 SQM 0.69
11.00 15.90 SQM 0.69
11.00 15.90 SQM 0.69
- SQM
- SQM
- SQM
5,219.50 3,082.17 SQM 1.69

Concrete
s - Rebar
Formworks
ment Pad - Concrete
pment Pad - Rebar
ent Pad - Formworks

tructural Steel
REMARKS

Total Volume of 590 cu.m


(Including Rough Finishing,
Pumpcrete Boomtype)
Total Volume of 590 cu.m
(Including Rough Finishing,
Pumpcrete Boomtype)

Total Volume of 669 cu.m


Pumpcrete Boomtype)

Total Volume of 669 cu.m


(Rough Finishing)

MAN-HOUR/cu.m

REMARKS

Fabrication and Installation


of Footing Construction
Joint
MAN-HOUR/sqm

REMARKS

STP LVL to B5; C1


(Pumpcrete Boomtype)

STP LVL to B5; TC3


(Pumpcrete Boomtype)

STP LVL to B5; TC3 (With


20mins Rectifications)
(Pumpcrete Boomtype)

STP LVL to B5; TC3


(Pumpcrete Boomtype)

STP LVL to B5; TC6


(Pumpcrete Boomtype)

STP LVL to B5; TC5 (With


30mins. Rectifications)
(Pumpcrete Boomtype)

STP LVL to B5; C2


(Pumpcrete Boomtype)
STP LVL to B5;
TC1(Pumpcrete Boomtype)

B5 to B4; TC3(Pumpcrete
Boomtype)

B5 to B4; TC3 (Pumpcrete


Boomtype)

B5 to B4; TC3 (Pumpcrete


Boomtype)

STP LVL to B5; TC2


(Pumpcrete Boomtype)

STP LVL to B5; TC2 (With


20mins. Rectifications)
(Pumpcrete Boomtype)

STP LVL to B5; TC5 (With


20mins. Rectifications)
(Pumpcrete Boomtype)

B5 ot B4; TC6 (Pumpcrete


Boomtype)

B5 ot B4; TC1 (Pumpcrete


Boomtype)

B5 ot B4; C1(Pumpcrete
Boomtype)

B5 ot B4; C2(Pumpcrete
Boomtype)

B5 ot B4; TC3(Pumpcrete
Boomtype)

B5 ot B4; TC3(Pumpcrete
Boomtype)
B5 ot B4; TC3(Pumpcrete
Boomtype)

B5 ot B4; TC3(Pumpcrete
Boomtype)

B5 ot B4; TC2(Pumpcrete
Boomtype)

B5 ot B4; TC2 (With 30mins.


Rectifications)
(Pumpcrete Boomtype)

B5 ot B4; C1(Pumpcrete
Boomtype)

B5 ot B4; C2 (Pumpcrete
Boomtype, With 20mins.
Rectifications)

B5 ot B4; TC1 (Pumpcrete


Boomtype)

B5 ot B4; C2 (Pumpcrete
Boomtype)

B5 ot B4; TC2 (Pumpcrete


Boomtype)

B5 ot B4; TC2 (Pumpcrete


Boomtype)

B4 ot B3; TC3 (Crane and


Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m)

B4 ot B3; TC3 (Crane and


Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m)

B5 ot B4; TC5 (With 20mins.


Idle time due to delay of
truck mixer)
(Pumpcrete Boomtype)
B5 ot B4; TC5 (With 20mins.
Idle time due to delay of
truck mixer)
(Pumpcrete Boomtype)

B5 ot B4; TC6 (Pumpcrete


Boomtype)

B4 ot B3; C2 (Crane and


Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m)

B4 ot B3; TC5 (Crane and


Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m)

B4 ot B3; TC6 (Crane and


Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m)

B4 ot B3; C1(Pumpcrete
Boomtype)

B5 ot B4; TC1 (Pumpcrete


Boomtype)

B4 ot B3; C2(Crane and


Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m)

B5 ot B4; TC1 (Crane and


Bucket; 10mins per lift,
Capacity of bucket 0.5cu.m)

B5 ot B4; TC1 (Pumpcrete


Boomtype, with rectification
30mins. Repair of leakage)

B4 ot B3; TC5 (Pumpcrete


Boomtype)

B3 ot B2; TC3(Pumpcrete
Boomtype)

B3 ot B2; TC3(Pumpcrete
Boomtype, with rectification
30mins. Repair of leakage)

B3 ot B2; TC3(Pumpcrete
Boomtype)
B3 ot B2; TC3(Pumpcrete
Boomtype)

B3 ot B2; TC6 (Pumpcrete


Boomtype)

B3 ot B2; C1(Pumpcrete
Boomtype)

B3 ot B2; C2 (Pumpcrete
Boomtype, With 20mins.
Rectifications)

B4 ot B3; TC2 (Pumpcrete


Boomtype)

B4 ot B3; TC1 (Pumpcrete


Boomtype)

B4 ot B3; TC2 (Pumpcrete


Boomtype)

B2; C2, TC1 & TC5 2nd


lift(Pumpcrete Boomtype)

B2; C1, TC3 &TC3 2nd lift


(Pumpcrete Boomtype)

B2; TC3 & TC6 (Pumpcrete


Boomtype)

B4 to B3; C2 (Pumpcrete
Boomtype)

B3 to B2; C1(Pumpcrete
Boomtype)

B3 to B2; TC3(Pumpcrete
Boomtype)

B3 to B2; TC3(Pumpcrete
Boomtype)
B3 to B2; TC3(Pumpcrete
Boomtype)

B3 to B2; TC3(Pumpcrete
Boomtype)

B3 to B2; C2 (Pumpcrete
Boomtype)

MAN-HOUR/cu.m

REMARKS

STP LVL TO B5;TC3


(Fabrication, Installation and
Alignment, including
stipping 3hours)

STP LVL TO B5;TC3


(Fabrication, Installation and
Alignment, including
stipping 3hours)

STP LVL TO B5;C1


(Fabrication, Installation and
Alignment, including
stipping 2hours)

STP LVL TO B5;TC3


(Fabrication, Installation and
Alignment, including
stipping 3hours)

STP LVL TO B5;TC6


(Fabrication, Installation and
Alignment, including
stipping 3hours)

STP LVL TO B5;TC5


(Fabrication, Installation and
Alignment, including
stipping 3hours)

B5 TO B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)
B5 TO B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B5 TO B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)

STP LVL TO B5;TC2


(Fabrication, Installation and
Alignment, including
stipping 2.5hours)

STP LVL TO B5;TC5


(Fabrication, Installation and
Alignment, including
stipping 3hours)

TC6 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B5 to B4;C1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B5 to B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC5 (Fabrication,
Installation and Alignment,
including stipping 2hours)
B5 to B4;TC5 (Fabrication,
Installation and Alignment,
including stipping 2hours)

B5 to B4;TC2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;C1 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B5 to B4;C2 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC2 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B5 to B4;TC2 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B4 to B3;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B4 to B3;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC5 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC6 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B4 to B3;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B4 to B3;C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B4 to B3;TC5 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B4 to B3;TC6 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B4 to B3;C1 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B5 to B4;TC1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B4 to B5;TC5 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B3 to B2;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B3 ot B2;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B3 ot B2;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B3 ot B2;TC6 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B3 ot B2;C1 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B3 ot B2; C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)
B3 ot B2; C2 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B4 ot B3; TC2 (Fabrication,


Installation and Alignment,
including stipping 3hours)

B4 ot B3; TC1 (Fabrication,


Installation and Alignment,
including stipping 2.5hours)

B4 ot B3; TC2 (Fabrication,


Installation and Alignment,
including stipping 3hours)

B4 to B5;C1 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B2 to B1;C2 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B2 to B1;TC3 (Fabrication,
Installation and Alignment,
including stipping 3hours)

B2 to B1;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B2 to B1;TC3 (Fabrication,
Installation and Alignment,
including stipping 2.5hours)

B2 to B1;C2 (Fabrication,
Installation and Alignment,
including stipping 3hours)

MAN-HOUR/sqm

REMARKS
REMARKS

STP LVL TO B5; SW4


(40mins. delay due to
stoppage of barangay,
Pumpcrete Boomtype)

STP LVL TO B5;SW2 (With


rectification, Pumpcrete
Boomtype)

STP LVL TO B5;SW1


(Pumpcrete Boomtype)

B5 TO B4; SW4 (Pumpcrete


Boomtype, 2nd lift 1.2m
height)

B5 TO B4; SW4 (Pumpcrete


Boomtype, 2nd lift 1.2m
height)

STP LVL TO B5;


SW2(Pumpcrete Boomtype,
2nd lift 1.2m height)

STP LVL TO B5;SW2(2nd lift


1.2m height), Crane and
Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m

B4 TO B3; SW4 (Pumpcrete


Boomtype)

B5 TO B4; SW1 (Crane And


Bucket), Crane and Bucket;
12mins per lift, Capacity of
bucket 0.5cu.m, With
20mins. Rectification
B5 TO B4; SW2 (Crane And
Bucket), Crane and Bucket;
12mins per lift, Capacity of
bucket 0.5cu.m

B3 TO B2; SW4 (Crane &


Bucket);Crane and Bucket;
12mins per lift, Capacity of
bucket 0.5cu.m; with
30mins rectification

MAN-HOUR/cu.m

REMARKS

STP LVL TO B5; SW4 1st lift


2.4m height(Fabrication,
Installation and Alignment
only), Excluding hauling,
Conventional Formworks

STP LVL TO B5; SW4 1st lift


2.4m height (Stripping and
Arrangement of materials)

STP LVL TO B5;SW2 1st lift


2.4m height(Fabrication,
Installation and Alignment
only), 2 hours rectification
due to alignment of
formworks, Excluding
hauling., Conventional
Formworks

STP LVL TO B5;SW2 1st lift


2.4m height (Stripping and
Arrangement of materials)
STP LVL TO B5;SW1 1st lift
2.4m height(Fabrication,
Installation and Alignment
only), 2hours rectification
due to alignment of
formworks, Excluding
hauling,Conventional
Formworks

STP LVL TO B5;SW1 1st lift


2.4m height (Stripping and
Arrangement of materials)
Formworks

B5 TO B4; SW4 1st lift 2.4m


height(Fabrication,
Installation and Alignment
only), Excluding hauling,
Conventional Formworks

B5 TO B4; SW4 1st lift 2.4m


height (Stripping and
Arrangement of materials)

B5 TO B4; SW4 2nd lift 1.2m


height (Fabrication,
Installation and Alignment
only), Excluding hauling,
Conventional Formworks

B5 TO B4; SW4 2nd lift 1.2m


height (Stripping and
Arrangement of materials)

STP LVL TO B5; SW2 2nd lift


1.2m height(Fabrication,
Installation and Alignment
only), Excluding hauling,
Conventional Formworks

STP LVL TO B5; SW2 2nd lift


1.2m height (Stripping and
Arrangement of materials)
STP LVL TO B5;SW1 2nd lift
1.2m height(Fabrication,
Installation and Alignment
only), Excluding hauling,
Conventional Formworks

STP LVL TO B5;SW1 2nd lift


1.2m height (Stripping and
Arrangement of materials)

B4 TO B3; SW4 2nd lift 1.2m


height (Fabrication,
Installation and Alignment
only), Excluding hauling,
Conventional Formworks

B4 TO B3; SW4 2nd lift 1.2m


height (Stripping and
Arrangement of materials)

B5 TO B4; SW1 (Fabrication,


Installation and Alignment
only), Excluding hauling,
Conventional Formworks

B5 TO B4; SW1 (Stripping


and Arrangement of
materials)

B5 TO B4; SW2 (Fabrication,


Installation and Alignment
only), Excluding hauling,
Conventional Formworks

B5 TO B4; SW2 (Stripping


and Arrangement of
materials)
B5 TO B4; SW2 (Stripping
and Arrangement of
materials)

B3 TO B2; SW4 2nd lift 1.2m


height (Fabrication,
Installation and Alignment
only), Excluding hauling,
Conventional Formworks;
Including re-alignment due
to erection of Tower Crane

MAN-HOUR/sqm

REMARKS

Grase tank slab

Slab Basement 5 Zone 1


Area 1 &2 (incuding Straight
to Finish), 14 hours pouring
only, 5 hours finishing, With
Rectification

Slab Basement 5 Zone 1


Area 3 (incuding Straight to
Finish), 8 hours Pouring, 4
hours finishing, With
rectification

Slab Basement 5 Zone 2


Area 1 (incuding Straight to
Finish), 7 hours pouring,
5hours finishing
Slab Basement 5 Zone 2
Area 1 (incuding Straight to
Finish), 7 hours pouring,
5hours finishing

Slab Basement 4 Zone 1


(incuding Straight to Finish),
7hours pouring, 6hours
finishing

Slab Basement 5 Zone 1


Area 3 (incuding Straight to
Finish), 8 hours Pouring, 4
hours finishing, With
rectification

Slab Basement 5 Zone 2


Area 2 (incuding Straight to
Finish), 6 hours Pouring, 5
hours finishing, With
rectification

Slab Basement 3 Zone 1


(incuding Straight to Finish),
10hours pouring, 6hours
finishing

Slab Basement 4 Zone 2


(incuding Straight to Finish),
10hours pouring, 6hours
finishing, With 2 hours
Rectification of leakage at
shearwall
Slab Basement 4 Zone 2
(incuding Straight to Finish),
10hours pouring, 6hours
finishing, With 2 hours
Rectification of leakage at
shearwall

Slab Basement 2 Zone 1


(incuding Straight to Finish),
10hours pouring, 6hours
finishing

MAN-HOUR/cu.m

REMARKS

Grase tank slab

Slab Basement 5 Zone 1


Area 1 &2 (Including
Erection of scaffolds,
Fabrication and Installation
only)

Slab Basement 5 Zone 1


Area 1 &2 (Stripping and
Slab Basement 5 Zone 1
Area 1 &2 (Stripping and
Arrangement of materials)

Slab Basement 5 Zone 1


Area 3 (Including Erection of
scaffolds, Fabrication and
Installation only)

Slab Basement 5 Zone 1


Area 3 (Stripping and
Arrangement of materials)

Slab Basement 5 Zone 1


Area 1 &2 (Including
Erection of scaffolds,
Fabrication and Installation
only)

Slab Basement 5 Zone 1


Area 1 &2 (Stripping and
Arrangement of materials)
Slab Basement 5 Zone 1
Area 1 &2 (Stripping and
Arrangement of materials)

Slab Basement 5 Zone 1


Area 1 &2 (Including
Erection of scaffolds,
Fabrication and Installation
only)

Slab Basement 5 Zone 1


Area 1 &2 (Stripping and
Arrangement of materials)

Slab Basement 4 Zone 1


Area 3 (Including Erection of
scaffolds, Fabrication and
Installation only)

Slab Basement 4 Zone 1


Area 1 &2 (Stripping and
Arrangement of materials)
Slab Basement 4 Zone 1
Area 1 &2 (Stripping and
Arrangement of materials)

Slab Basement 5 Zone 1


Area 1 &2 (Including
Erection of scaffolds,
Fabrication and Installation
only)

Slab Basement 5 Zone 1


Area 1 &2 (Stripping and
Arrangement of materials)

Slab Basement 3 Zone 1


Area 1,2 &3 (Including
Erection of scaffolds,
Fabrication and Installation
only)

Slab Basement 3 Zone 1


Area 1,2&3 (Stripping and
Arrangement of materials)
Slab Basement 3 Zone 1
Area 1,2&3 (Stripping and
Arrangement of materials)

Slab Basement 4 Zone 2


(Including Erection of
scaffolds, Fabrication and
Installation only)

Slab Basement 3 Zone 1


Area 1,2 &3 (Including
Erection of scaffolds,
Fabrication and Installation
only)

Slab Basement 2 Zone 1


Area 1,2&3 (Stripping and
Arrangement of materials)
MAN-HOUR/sqm

REMARKS

#REF!

REMARKS

Slab Basement 5 Zone 1


Area 1 &2 (Including
erection of scaffold,
installation, fabrication and
Shoring)

Slab Basement 5 Zone 1


Area 3(Including erection of
scaffold, installation,
fabrication and Shoring)
Slab Basement 5 Zone 1
Area 3(Including erection of
scaffold, installation,
fabrication and Shoring)

Slab Basement 5 Zone 1


Area 1 &2(Including erection
of scaffold, installation,
fabrication and Shoring)

Slab Basement 4 Zone 1


Area 1(Including erection of
scaffold, installation,
fabrication and Shoring)

Slab Basement 4 Zone 1


Area 3(Including erection of
scaffold, installation,
fabrication and Shoring)

Slab Basement 3 Zone 1


Area 1 &2(Including erection
of scaffold, installation,
fabrication and Shoring)
Slab Basement 3 Zone 1
Area 1 &2(Including erection
of scaffold, installation,
fabrication and Shoring)

Slab Basement 4 Zone


2(Including erection of
scaffold, installation,
fabrication and Shoring)

Slab Basement 2 Zone


1(Including erection of
scaffold, installation,
fabrication and Shoring,
Delay due to lack of
manpower)

MAN-HOUR/sqm
REMARKS

RW2 (Pumpcrete
Boomtype)

RW2(With rectification
about 1 hour)
(Pumpcrete Boomtype)

RW2 (Pumpcrete
Boomtype)

STP WALL (Pumpcrete


Boomtype)

RW2 (With rectification


about 30mins.) (Pumpcrete
Boomtype)

RW2 (Pumpcrete
Boomtype)

STP WALL (With


rectification about 30mins.)
(Pumpcrete Boomtype)
STP WALL (Pumpcrete
Boomtype)

STP WALL (Pumpcrete


Boomtype)

STP WALL (Pumpcrete


Boomtype)

STP WALL (Pumpcrete


Boomtype)

RW2 (With rectification


about 1 hour) (Pumpcrete
Boomtype)

RW2 (With rectification


about 30mins.) (Pumpcrete
Boomtype)

RW2 (Pumpcrete
Boomtype)

RW2 (With rectification


about 40mins.) (Pumpcrete
Boomtype)

STP WALL (Crane and


Bucket; 12mins per lift,
Capacity of bucket 0.5cu.m)

STP WALL (Pumpcrete


Boomtype, with
Rectification about 40mins)
STP WALL (Pumpcrete
Boomtype, with
Rectification about 40mins)

RW2 (With rectification


about 20mins.) (Pumpcrete
Boomtype)

STP WALL (Pumpcrete


Boomtype)

RW2 (Pumpcrete
Boomtype)

RCW (Pumpcrete
Boomtype)

RCW (Crane And Bucket)

B4 to B3; RCW (Crane And


Bucket)

B4 to B3; RW (Pumpcrete
Boomtype)

B3 to B2; RW (Pumpcrete
Boomtype)

B3 to B2 2nd lift ; RW
(Pumpcrete Boomtype)
STP to B5; WTW
(Pumpcrete Boomtype)

MAN-HOUR/cu.m

REMARKS

13.45mx2.4mxsingle face
(Fabrication, Installation and
alignment)

10mx2.4mxsingle face
(Fabrication, Installation and
alignment)

12mx2.4mxdouble face
(Fabrication, Installation and
alignment)

25.62mx2.4mxdouble face
(Fabrication, Installation and
alignment)

6.2mx2.4mxdouble face
(Fabrication, Installation and
alignment)
6.2mx2.4mxdouble face
(Fabrication, Installation and
alignment)

22.63mx2.4mxdouble face
(Fabrication, Installation and
alignment)

48.5mx2.4mxdouble face
(Fabrication, Installation and
alignment)

48.5mx2.4mxdouble face
(Stripping and Arrangement
of materials)

21mx2.4mxdouble face
(Fabrication, Installation and
alignment)

21mx2.4mxdouble face
(Stripping and Arrangement
of materials)

15mx1.2mxdouble face
(2nd lift) (Fabrication,
Installation and alignment)
15mx1.2mxdouble face
(2nd lift) (Fabrication,
Installation and alignment)

15mx1.2mxdouble face
(2nd lift) (Stripping and
Arrangement of materials)

28.568mx2.4mxdouble face
(Fabrication, Installation and
alignment)

28.568mx2.4mxdouble face
(Stripping and Arrangement
of materials)

8.873mx2.4mxdouble face
(Fabrication, Installation and
alignment)

8.873mx2.4mxdouble face
(Stripping and Arrangement
of materials)

11.67mx1.7mxdouble face
(Fabrication, Installation and
alignment)

11.67mx1.7mxdouble face
(Stripping and Arrangement
of materials)
6.6mx1.3mxdouble face
(Fabrication, Installation and
alignment)

6.6mx1.3mxdouble face
(Stripping and Arrangement
of materials)

16.935mx2.4mxhalf of
length is double face
(Fabrication, Installation and
alignment)

16.935mx2.4mxhalf of
length is double face
(Stripping and Arrangement
of materials)

25.974mx2.4mxdouble face
(Fabrication, Installation
and alignment)

25.974mx2.4mxdouble face
(Stripping and Arrangement
of materials)

5.5mx2.44mxdouble face
(Fabrication, Installation and
alignment)

5.5mx2.44mxdouble face
(Stripping and Arrangement
of materials)
21.54mx2.06mxdouble face
2nd lft (Fabrication,
Installation and alignment)

21.54mx2.06mxdouble face
2nd lft (Stripping and
Arrangement of materials)

16.9mx2.4mxdouble face
(Fabrication, Installation and
alignment)

16.9mx2.4mxdouble face
(Stripping and Arrangement
of materials)

26.2mx2.4mxdouble face
(Fabrication, Installation and
alignment)

26.2mx2.4mxdouble face
(Stripping and Arrangement
of materials)
26.2mx2.4mxdouble face
(Stripping and Arrangement
of materials)

10.5mx1.5mxdouble face
(Fabrication, Installation and
alignment)

10.5mx1.5mxdouble face
(Stripping and Arrangement
of materials)

4.61mx2.44mxdouble face
(Stripping and Arrangement
of materials)

4.61mx2.44mxdouble face
(Stripping and Arrangement
of materials)

B4 to B3;
9.41mx2.4mxdouble face
(Fabrication, Installation and
alignment)

B4 to B3;
9.41mx2.4mxdouble face
(Stripping and Arrangement
of materials)

B3 to B2;
29.28mx2.4mxsingle face
(Fabrication, Installation and
alignment)

B3 to B2;
29.28mx2.4mxsingle face
(Stripping and Arrangement
of materials)
B3 to B2;
29.28mx2.4mxsingle face
(Stripping and Arrangement
of materials)

38.275mx0.75mxsingle face
(Fabrication, Installation
and alignment)

38.275mx0.75mxsingle face
(Stripping and Arrangement
of materials)

24.2mx2.3mxdouble face
(Fabrication, Installation and
alignment)

24.2mx2.3mxdouble face
(Stripping and Arrangement
of materials)

MAN-HOUR/SQM