The level of re-testing necessary when a fault is found will depend upon the nature of the fault.
If the fault is due to documentation errors, then no re-testing is required but a copy of the
revised section of the respective documents must be attached to the PQ before it is closed.
When all FAT PQs have been successfully re-tested, the tester shall sign and date, Stage 1
section of the record below.
STAGE 1 TESTING
COMMENTS:
Tester
ABB Date:
Signature:
Witness
GEMS Date:
Signature:
Witness
MARAFIQ Date:
Signature:
I NS -A B -DS - 219 RE V: 0
Follow the below steps for successful completion of system grouding checks.
AC Safety Ground (Non-Isolated)
This test will include:
o Verification of minimum resistance between all equipment grounding
connections and the AC Safety Ground.
o Verification that the AC Safety Ground is suitably identified.
Instrument Circuit Ground (Isolated)
This test will include:
o Verification of minimum resistance between all equipment and the Instrument
Circuit Ground (Isolated).
o Verification that the Instrument Circuit Ground (Isolated) is suitably
identified.
o Verification of isolation between Instrument Circuit Ground and AC Safety
Ground.