You are on page 1of 13

Technical Education and Skills Development

Authority
_HYRONS COLLEGE PHILLIPINE INC._
TRAINEE’S RECORD BOOK
Instructions:
This Trainees’ Record Book (TRB) is intended
to serve as record of all
I.D. accomplishment/task/activities while undergoing
training in the industry. It will eventually become
evidence that can be submitted for portfolio
Trainee’s No.tr#1005 assessment and for whatever purpose it will serve
you. It is therefore important that all its contents
are viably entered by both the trainees and
NAME: LEONARD D. TORNITO instructor.
The Trainees’ Record Book contains all the
required competencies in your chosen qualification.
QUALIFICATION: COMPUTER HARDWARE All you have to do is to fill in the column “Task
SERVICING NCII Required” and “Date Accomplished” with all the
activities in accordance with the training program
and to be taken up in the school and with the
guidance of the instructor. The instructor will
TRAINING DURATION: 320 HOURS likewise indicate his/her remarks on the
“Instructors Remarks” column regarding the
outcome of the task accomplished by the trainees.
Be sure that the trainee will personally accomplish
TRAINER: CHERRY N. TORNITO the task and confirmed by the instructor.
It is of great importance that the content
should be written legibly on ink. Avoid any
corrections or erasures and maintain the
cleanliness of this record.
This will be collected by your trainer and
submit the same to the Vocational Instruction
Supervisor (VIS) and shall form part of the
permanent trainee’s document on file.

THANK YOU.
Unit of Competency: 1 INSTALL COMPUTER
SYSTEMS AND NETWORKS
NC Level I (60 HRS) NOTE:

Learning Task/Activity Required Date Instructors


Outcome Accomplished Remarks

1.Plan and  Installation planned April 1- April 2,


prepare for and prepared to 2022
installation ensure that safety
measures, policies
and procedures
followed, and that
work is appropriately
sequenced in
accordance with the
industry standards

 Technical personnel
consulted to ensure
that the work Competent
coordinated
effectively with
others involved on
the worksite

 Computer systems
and network devices
obtained in
accordance with the
established
procedures and to
comply with
requirements

 Location where
devices and systems
to be installed is
determined from job
requirements

 Materials necessary
to complete the
work obtained in
accordance with
established
procedures and
checked against job
requirements
Learning Outcome Task/Activity Required Date Instructors
Learning Outcome Task/Activity Required Accomplished
Date Remarks
Instructors
Accomplished
3. Conduct Test  Occupational health and April 4- April 5, 2022
2.Install safety policies
 Occupational healthandand April 1 - April 2, 2022
Device/System/E procedures
safety policies and for installing
procedures
quipment followed in installing and
computer systems
networksystems
computer devices, followed.
network
 devices,
Circuitsand
andperipherals
systems checked Competent
 Tools,as being isolated and
equipment wheretesting
necessary
 devices
Computerneeded using
systems, specified
to carrynetwork
out the Competent
testingand
devices
installation procedures
peripherals
work obtained in
 accordance
Parts orobtained
installed connections of the
with inestablished
installation
accordance and
procedures or service
with the checked that for
removed
established
correct inprocedures
operation orderandtosafety
conduct
and to
the testwith
comply stored to protect
requirements
 Preparatory work checkedand
against loss or damage to
in accordance with
ensure that no unnecessary
 damageestablished
Appropriate procedures
procedures
has occurred and inthat
 workUnplanned
installing events
computer
complies or
with systems,
conditions
network
requirements responded
devices and to in
accordanceachieve
peripherals with the in industry
requirements
accordance with requirements
 without
Approval obtained
damage in
or distortion
toaccordance with established
the surrounding
Learning Outcome Task/Activity Required
procedures from
environment and services appropriate Date Instructors
personnel before any Accomplished
contingencies
 Variation are
to devices/systems Remarks
implemented
installation carried out in
 Devices/systems
accordance
4. Test Systems  Computer systems with the and/or
and April 6- April 8, 2022
installation
customer/client’stested
networks are tested in to
and Networks terminatedwith
requirements
accordance in accordance
the job
with the industry
Competent
requirements
requirements
 Information are shared from
  one Parts
Unplannedand/or
computer connections
events
to or
another as
removed
conditions for testing
responded
primary requirement in returned
to in
to pre-test
accordance
computer conditions
to in accordance
networking in
 Reportsaccordance
with established withprocedures.
are prepared established
and
procedures
Approval is obtained
completed according to the in
 company
accordance
Final inspections
with established
requirements undertaken
procedures
to ensure thatfromthe appropriate
installed
personnel
devices/systems
before any conforms to
contingencies
requirementsimplemented
 Documents in relation to the
 Ongoing
test forwarded
checks of tothe quality
ofappropriate
the quality personnel
of the work
undertaken
and/or authority
in accordance
in
with
accordance
the established
with
procedures.
requirements.
Leonard Tornito Cherry Tornito
Trainee’s Signature Trainer’s Signature
UNIT OF COMPETENCY : 2 DIAGNOSE AND TROUBLESHOOT COMPUTER SYSTEM

NC Level 1 (100 HRS)

Learning Outcome Task/Activity Required Date Instructors Remarks


Accomplished

1.Plan and prepare  Faults and error of April 8- April 11, 2022
for computer system
diagnosis of properly
faults of determined.
computer  Tools Competent
systems (hardware/software
) identified in
accordance with its
uses and functions.
 Safety precautions
established in
accordance with
workplace
procedures.

Learning Outcome Task/Activity Required Date Instructors


Accomplished Remarks

2.DIAGNOSE  Components or parts April 12- April 14, 2022


FAULTS OF of computer system
COMPUTER clearly identified Competent
SYSTEM  Functions of the
computer systems
explained
 Faults and failures of
the computer
systems diagnosed
base on the job
requirements

Learning Outcome Task/Activity Required Date Instructors Remarks


Accomplished

3. REPAIR DEFECTS  Defective April 15- April 17, 2022


IN COMPUTER components
SYSTEMS AND properly replaced
NETWORKS and corrected
 Error in networks
clearly identified
and repaired in Competent
line with standard
procedures
 Defective
components
identified and
separated to
other components

Learning Outcome Task/Activity Required Date Instructors


Accomplished Remarks

4. TEST SYSTEMS  Computer systems April 18- April 20, 2022


AND NETWORKS and networks are
tested in accordance
with the job
requirements
 Information are
shared from one
computer to another
as primary
requirement in
computer networking
 Reports are prepared
and completed
according to the
company
requirements.

Leonard Tornito Cherry Tornito


Trainee’s Signature Trainer’s Signature

UNIT OF COMPETENCY :3 CONFIGURED COMPUTER SYSTEMS AND NETWORKS


NC Level 1 (100HRS)
Learning Outcome Task/Activity Required Date Instructors
Accomplished Remarks

1. PLAN AND  Configured April 21- April 24, 2022


PREPARE FOR computer systems
CONFIGURATION and networks
identified from the Competent
Job/Service Order
or instructions.
 Planned and
prepared job
requirements.
 Followed OHS
policies and
procedures of job
requirements.
 Checked computer
systems and
networks
configuration with
specified
requirements.
 Checked necessary
tools, equipment
materials

Learning Outcome Task/Activity Required Date Instructors


Accomplished Remarks

2. CONFIGURE  Appropriate Personal April 25-April 28, 2022


COMPUTER Protective Equipment Competent
SYSTEMS AND are used and OHS
NETWORKS policies and
procedures followed
 Normal function of
systems and networks
checked in accordance
with manufacturer’s
instructions
 Fault or problem in the
systems and networks
diagnosed in line with
the standard operating
procedures.
 Computer systems and
networks configured in
line with the standard
operating procedures.

Learning Outcome Task/Activity Required Date Instructors


Accomplished Remarks

3. INSPECT AND  Final inspections April 29- May 3, 2022


TEST CONFIGURED are undertaken to
COMPUTER ensure that the
SYSTEMS AND configuration Competent
NETWORKS done on the
systems and
networks
conforms with the
manufacture’s
instruction/manua
l
 Computer systems
and networks are
checked to ensure
safe operation.
 Report is prepared
and completed
according to
company
requirements.

Leonard Tornito Cherry Tornito


Trainee’s Signature Trainer’s Signature

UNIT OF COMPETENCY : 4 MAINTAIN COMPUTER SYSTEMS AND NETWORK


NC LEVEL 1 (60HRS)

Learning Outcome Task/Activity Required Date Instructors


Accomplished Remarks

1. PLAN AND  Maintenance May 3-May 4, 2022


PREPARE FOR THE planned and
MAINTENANCE OF prepared with
COMPUTER SYSTEMS OHS policies and
AND NETWORKS. procedures. Competent
 The materials,
tools, equipment
and testing
devices obtained
and checked.
 Computer
systems and
networks
checked,
identified and
maintained with
specifications and
requirements to
conform with
manufacturers.

Learning Outcome Task/Activity Required Date Instructors


Accomplished Remarks

2. MAINTAIN 1. The normal functions of May 5- May 7, 2022


COMPUTER computer systems are Competent
SYSTEMS checked and tested.
2. The scheduled/periodic
maintenance and cleaning
are performed.
3. The repairs/replacements
and sudden breakdowns
responded in accordance
with established
procedures.

Learning Outcome Task/Activity Required Date Instructors


Accomplished Remarks

3. MAINTAIN 1. The normal May 7- May 8, 2022


NETWORK SYSTEMS functions of network
systems checked and
tested. Competent
2. The
scheduled/periodic
maintenance and
cleaning performed.
3. The
repairs/replacement
s and sudden
breakdowns
responded in
accordance with
established
procedures.

Learning Outcome Task/Activity Date Instructors


Required Accomplished Remarks

4. INSPECT AND  Computer system May 8-May 10, 2022


TEST and network
CONFIGURED/REPAIRED checked to
COMPUTER SYSTEM ensure safe
Competent
AND NETWORKS operation.
 Final inspection
and testing taken
to conform with
manufacturer
specifications.
 Reports prepared
and completed
to company
regulations.

Leonard Tornito Cherry Tornito


Trainee’s Signature Trainer’s Signature

TRAINEE’S PROGRESS SHEET


Name : LEONARD D. TORNITO Trainer : CHERRY N. TORNITO
Qualification : COMPUTER HARWARE SERVICING NCII Nominal Duration : 320 Hours

Units of Training Activity Training Date Date Ratin Trainee’s Supervisor’s


Competency Duration Started Finished g Initial Initial
 Plan and
prepare for
installation

1.INSTALL Competent
COMPUTER  Install Leonard Tornito Cherry Tornito
60 April April
SYSTEMS AND equipment/
HOURS 1, 8,
NETWORKS device
2022 2022
system

 Conduct
test

 Plan and
prepare for
diagnosis of
faults of
computer
Leonard Tornito Cherry Tornito
systems
Competent
2.DIAGNOSE
 Diagnose 100 April 8, April 20,
AND
TROUBLESHOO faults of HOURS 2022 2022
T COMPUTER computer
SYSTEM systems

 Repair
defects in
computer
systems and
networks

 Test systems
and networks

 Plan and
prepare for
configurati
on

Competent
3.CONFIGURE  Configure
D COMPUTER computer May 03,
SYSTEMS systems 100
2022
AND and HOURS April 21,
Leonard Tornito Cherry Tornito
NETWORKS networks 2022

 Inspect and
test
configured
computer
systems and
networks
 Plan and
prepare for
the
maintenanc
e of
computer
systems
and
networks.
4.MAINTAIN Competent
Leonard Tornito Cherry Tornito
COMPUTER May May
SYSTEMS AND  Maintain 60HOUR 10,2022
computer 03,2022
NETWORKS
systems S

 Maintain
network
systems

 Inspect and
test
configured/r
epaired
computer
system and
networks

You might also like