Professional Documents
Culture Documents
Monitoring Punch List Pm5 (Salman)
Monitoring Punch List Pm5 (Salman)
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
1 Housing Type S1 S1.06 C Bathroom - (P3) Gap between frame and floor A KEY/Subcon OPEN WME/BJP 0
2 Housing Type S1 S1.06 C Bathroom - (P3) Sealant is untidy C KEY/Subcon OPEN WME/BJP
3 Housing Type S1 S1.06 C Bathroom - (P3) Dirty on the frame C KEY/Subcon OPEN WME/BJP
4 Housing Type S1 S1.06 C Bathroom - (P3) Gap between frames B KEY/Subcon OPEN WME/BJP
5 Housing Type S1 S1.06 C Bathroom - (P3) Hole in the frame C KEY/Subcon OPEN WME/BJP
6 Housing Type S1 S1.06 C Bathroom - (P3) Defect on HPL surface C KEY/Subcon OPEN WME/BJP
7 Housing Type S1 S1.06 C Bathroom - (P3) Lattice on the door installation is not proper C KEY/Subcon OPEN
8 Housing Type S1 S1.06 C Bathroom - (P3) Finishing lattice on the door is untidy C KEY/Subcon OPEN
9 Housing Type S1 S1.06 C Bathroom - (P3) Lattice on the door surface is rugged KEY/Subcon OPEN
10 Housing Type S1 S1.06 C Bathroom - Installation of the lock case is not proper KEY/Subcon OPEN
11 Housing Type S1 S1.06 C Bathroom - Sealant in the tempered glass is untidy C KEY/Subcon OPEN
12 Housing Type S1 S1.06 C Bathroom - Sealant between the tempered glass is untidy C KEY/Subcon OPEN
13 Housing Type S1 S1.06 C Bathroom - Scratch on tempered glass accessories C KEY/Subcon OPEN
14 Housing Type S1 S1.06 C Bathroom - (BV1) Finishing opening not yet C KEY/Subcon OPEN
16 Housing Type S1 S1.06 C Bathroom - (BV1) Gap between frames C KEY/Subcon OPEN
17 Housing Type S1 S1.06 C Bathroom - (BV1) Bouvenlight is not smooth when opened/closed C KEY/Subcon OPEN
18 Housing Type S1 S1.06 C Bathroom - Gap on shower faucet to wall tile C KEY/Subcon OPEN
19 Housing Type S1 S1.06 C Bathroom - Gap on granite table to wall tile A KEY/Subcon OPEN
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
20 Housing Type S1 S1.06 C Bathroom - Gap between granite in the wastafel table C KEY/Subcon OPEN
21 Housing Type S1 S1.06 C Bathroom - Scratch on the hinges of drawer A KEY/Subcon OPEN
22 Housing Type S1 S1.06 C Bathroom - Sealant in the bottom wastafel is untidy C KEY/Subcon OPEN
23 Housing Type S1 S1.06 C Bathroom - Sealant in the mirror is untidy C KEY/Subcon OPEN
24 Housing Type S1 S1.06 C Bathroom - Gap on granite bathtub to wall tile C KEY/Subcon OPEN
26 Housing Type S1 S1.06 C Bathroom - Scratch on the bathtub surface KEY/Subcon OPEN
27 Housing Type S1 S1.06 C Bathroom - Shower hose can't return C KEY/Subcon OPEN
29 Housing Type S1 S1.06 C Bathroom - (J4) Gap between jointing frame KEY/Subcon OPEN
30 Housing Type S1 S1.06 C Bathroom - (J4) Scratch on the frame C KEY/Subcon OPEN
31 Housing Type S1 S1.06 C Bathroom - (J4) There is friction in the window when closed KEY/Subcon OPEN
32 Housing Type S1 S1.06 C Bathroom - The towel bar installation is not perfect C KEY/Subcon OPEN
33 Housing Type S1 S1.06 C Bathroom - Gap on switch to wall tile B KEY/Subcon OPEN
34 Housing Type S1 S1.06 C Bathroom - Gap on power outlet to wall tiles C KEY/Subcon OPEN
35 Housing Type S1 S1.06 C Bathroom - Suggest to add of door stopper C KEY/Subcon OPEN
36 Housing Type S1 S1.06 C Bathroom - Double roob hook is not installed C KEY/Subcon OPEN
37 Housing Type S1 S1.06 C Bathroom - Painting in the shadow line is untidy C KEY/Subcon OPEN
38 Housing Type S1 S1.06 C Bathroom - Painting in the ceiling is untidy C KEY/Subcon OPEN
- There are 50 floor tiles & 189 wall tiles that porous
39 Housing Type S1 S1.06 C Bathroom KEY/Subcon OPEN
and grout is untidy
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
Walk In
40 Housing Type S1 S1.06 C - (P4) Defect in the HPL surface A KEY/Subcon OPEN
Closet
Walk In
41 Housing Type S1 S1.06 C - (P4) Scratch on HPL surface C KEY/Subcon OPEN
Closet
Walk In
42 Housing Type S1 S1.06 C - (P4) Dirty in the door surface C KEY/Subcon OPEN
Closet
Walk In
43 Housing Type S1 S1.06 C - (P4) Scratch on the curtain rail surface C KEY/Subcon OPEN
Closet
Walk In
44 Housing Type S1 S1.06 C - Power outlet installation is untidy KEY/Subcon OPEN
Closet
Walk In
45 Housing Type S1 S1.06 C - Uneven surface & painting of the wall B KEY/Subcon OPEN
Closet
Walk In
46 Housing Type S1 S1.06 C - Gap on wardrobe to the wall C KEY/Subcon OPEN
Closet
Walk In
47 Housing Type S1 S1.06 C - Defect on HPL surface in the wardrobe (some places) B KEY/Subcon OPEN
Closet
Walk In
48 Housing Type S1 S1.06 C - There is a gap between the HPL wardrobe C KEY/Subcon OPEN
Closet
Walk In
49 Housing Type S1 S1.06 C - Painting in the shadow line is untidy KEY/Subcon OPEN
Closet
Walk In
50 Housing Type S1 S1.06 C - Painting in the ceiling is untidy C KEY/Subcon OPEN
Closet
Walk In
51 Housing Type S1 S1.06 C - Cleaning downlight inbow lamp C KEY/Subcon OPEN
Closet
Walk In
52 Housing Type S1 S1.06 C - Gap on wardrobe to floor tiles B KEY/Subcon OPEN
Closet
Walk In
53 Housing Type S1 S1.06 C - There are 28 floor tiles and plint that porous A KEY/Subcon OPEN
Closet
55 Housing Type S1 S1.06 C Bedroom - Spacing between switches not same KEY/Subcon OPEN
56 Housing Type S1 S1.06 C Bedroom - Gap on power outlet to the wall B KEY/Subcon OPEN
57 Housing Type S1 S1.06 C Bedroom - Gap in the TV cabinet to the wall C KEY/Subcon OPEN
58 Housing Type S1 S1.06 C Bedroom - Defect on HPL surface in the TV Cabinet C KEY/Subcon OPEN
59 Housing Type S1 S1.06 C Bedroom - Curtain not installed yet KEY/Subcon OPEN
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
60 Housing Type S1 S1.06 C Bedroom - Gap between cover curtain and the wall C KEY/Subcon OPEN
61 Housing Type S1 S1.06 C Bedroom - (PG2) The sealant is untidy C KEY/Subcon OPEN
62 Housing Type S1 S1.06 C Bedroom - (PG2) Gap between jointing frame A KEY/Subcon OPEN
63 Housing Type S1 S1.06 C Bedroom - (PG2) Scratch on the frame C KEY/Subcon OPEN
66 Housing Type S1 S1.06 C Bedroom - Flush bolt cover not install yet C KEY/Subcon OPEN
67 Housing Type S1 S1.06 C Bedroom - (PG2) Gap on frame to floor tiles A KEY/Subcon OPEN
68 Housing Type S1 S1.06 C Bedroom - (PG2) Cleaning the rails A KEY/Subcon OPEN
69 Housing Type S1 S1.06 C Bedroom - (PG2) Rubber seal not installed yet A KEY/Subcon OPEN
71 Housing Type S1 S1.06 C Bedroom - (P2) The sealant is untidy C KEY/Subcon OPEN
72 Housing Type S1 S1.06 C Bedroom - (P2) Gap between frame and floor tile A KEY/Subcon OPEN
73 Housing Type S1 S1.06 C Bedroom - (P2) Gap between jointing frame C KEY/Subcon OPEN
74 Housing Type S1 S1.06 C Bedroom - (P2) Rubber in the door not install yet C KEY/Subcon OPEN
75 Housing Type S1 S1.06 C Bedroom - (P2) Scratch in the frame B KEY/Subcon OPEN
77 Housing Type S1 S1.06 C Bedroom - The ceiling painting is uneven C KEY/Subcon OPEN
- There are 89 floor tiles & plint that porous and grout
78 Housing Type S1 S1.06 C Bedroom C KEY/Subcon OPEN
is untidy
Living
79 Housing Type S1 S1.06 C - (P1) Gap the frame to wall B KEY/Subcon OPEN
room
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
Living
80 Housing Type S1 S1.06 C - (P1) The door finishing is untidy KEY/Subcon OPEN
room
Living
81 Housing Type S1 S1.06 C - (P1) The door surface is cracked KEY/Subcon OPEN
room
Living
82 Housing Type S1 S1.06 C - Gap on switch to wall KEY/Subcon OPEN
room
Living
83 Housing Type S1 S1.06 C - Spacing between the switches is not same C KEY/Subcon OPEN
room
Living
84 Housing Type S1 S1.06 C - Gap on power outlet to the wall A KEY/Subcon OPEN
room
Living
85 Housing Type S1 S1.06 C - Gap on shoe rack to the wall B KEY/Subcon OPEN
room
Living
86 Housing Type S1 S1.06 C - (J1) Sealant is untidy B KEY/Subcon OPEN
room
Living
87 Housing Type S1 S1.06 C - (J1) Gap between jointng frame B KEY/Subcon OPEN
room
Living
88 Housing Type S1 S1.06 C - (J1) Scratch in the frame C KEY/Subcon OPEN
room
Living
89 Housing Type S1 S1.06 C - (J1) Painting in the opening is untidy C KEY/Subcon OPEN
room
Living
90 Housing Type S1 S1.06 C - Loss screw on curtain hook C KEY/Subcon OPEN
room
Living
91 Housing Type S1 S1.06 C - The curtain has not been installed KEY/Subcon OPEN
room
Living
92 Housing Type S1 S1.06 C - Gap between cover curtain and ceiling KEY/Subcon OPEN
room
Living
93 Housing Type S1 S1.06 C - Gap between cover curtain and wall C KEY/Subcon OPEN
room
Living
94 Housing Type S1 S1.06 C - (J1) Sealant is untidy C KEY/Subcon OPEN
room
Living
95 Housing Type S1 S1.06 C - (J2) Gap between frames C KEY/Subcon OPEN
room
Living
96 Housing Type S1 S1.06 C - (J2) Defect in the frame surface C KEY/Subcon OPEN
room
Living
97 Housing Type S1 S1.06 C - (J2) Painting in the opening is untidy KEY/Subcon OPEN
room
Living
98 Housing Type S1 S1.06 C - (J2) The window is not smooth when opened/closed C KEY/Subcon OPEN
room
Living
99 Housing Type S1 S1.06 C - Gap on shelf TV Cabinet to the wall C KEY/Subcon OPEN
room
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
Living
100 Housing Type S1 S1.06 C - Gap between shelves in the TV Cabinet C KEY/Subcon OPEN
room
Living
101 Housing Type S1 S1.06 C - Defect on drawer surface of TV cabinet KEY/Subcon OPEN
room
Living
102 Housing Type S1 S1.06 C - Sealant in the TV cabinet is untidy C KEY/Subcon OPEN
room
Living
103 Housing Type S1 S1.06 C - Gap between rak shelves and wall C KEY/Subcon OPEN
room
Living
104 Housing Type S1 S1.06 C - (PG1) Gap between frame and wall C KEY/Subcon OPEN
room
Living
105 Housing Type S1 S1.06 C - (PG1) Gap between jointing frames C KEY/Subcon OPEN
room
Living
106 Housing Type S1 S1.06 C - (PG1) Sealant is untidy A KEY/Subcon OPEN
room
Living
107 Housing Type S1 S1.06 C - (PG1) Scratch on the frame C KEY/Subcon OPEN
room
Living
108 Housing Type S1 S1.06 C - (PG1) Cracked in the opening C KEY/Subcon OPEN
room
Living
109 Housing Type S1 S1.06 C - (PG1) Rain splash cover not install yet A KEY/Subcon OPEN
room
Living
110 Housing Type S1 S1.06 C - (PG1) Lock case not installed yet C KEY/Subcon OPEN
room
Living
111 Housing Type S1 S1.06 C - (PG1) Cleaning rail curtain C KEY/Subcon OPEN
room
112 Housing Type S1 S1.06 C Pantry - Sealant in the kitchen set is untidy C KEY/Subcon OPEN
113 Housing Type S1 S1.06 C Pantry - Hole in the HPL surface (some places) KEY/Subcon OPEN
114 Housing Type S1 S1.06 C Pantry - Gap between HPL surface in the kitchen set C KEY/Subcon OPEN
115 Housing Type S1 S1.06 C Pantry - Gap on top kitchen set to bottom drop ceiling C KEY/Subcon OPEN
116 Housing Type S1 S1.06 C Pantry - Dirty around kitchen sink KEY/Subcon OPEN
- There are 25 wall tiles that porous and not fully grout
117 Housing Type S1 S1.06 C Pantry C KEY/Subcon OPEN
in the pantry
118 Housing Type S1 S1.06 C Pantry - (J3) Sealant not installed C KEY/Subcon OPEN
119 Housing Type S1 S1.06 C Pantry - (J3) Hard to lock the rambuncis A KEY/Subcon OPEN
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
120 Housing Type S1 S1.06 C Pantry - (J3) Gap between jointing frames C KEY/Subcon OPEN
121 Housing Type S1 S1.06 C Pantry - (J3) There is a hole in the frame KEY/Subcon OPEN
122 Housing Type S1 S1.06 C Pantry - (J3) Scratched in the frame C KEY/Subcon OPEN
Living
123 Housing Type S1 S1.06 C - Uneven wall painting C KEY/Subcon OPEN
room
Living
124 Housing Type S1 S1.06 C - Painting in the shadowline is untidy A KEY/Subcon OPEN
room
Living
125 Housing Type S1 S1.06 C - Uneven ceiling painting KEY/Subcon OPEN
room
Living
126 Housing Type S1 S1.06 C - Gap on downlight inbow lamp C KEY/Subcon OPEN
room
Living
127 Housing Type S1 S1.06 C - Cleaning armature lamp C KEY/Subcon OPEN
room
Living
128 Housing Type S1 S1.06 C - Uneven painting in the drop ceiling A KEY/Subcon OPEN
room
Living
129 Housing Type S1 S1.06 C - Finishing in the manhole area is untidy A KEY/Subcon OPEN
room
Living - There are 131 floor tiles & plint that porous and grout
130 Housing Type S1 S1.06 C C KEY/Subcon OPEN
room is untidy
131 Housing Type S1 S1.06 C Entrance - Uneven wall painting C KEY/Subcon OPEN
132 Housing Type S1 S1.06 C Entrance - Cracked in the beside opening P1 C KEY/Subcon OPEN
133 Housing Type S1 S1.06 C Entrance - Painting the column is untidy A KEY/Subcon OPEN
134 Housing Type S1 S1.06 C Entrance - Uneven painting in the exposed ceiling C KEY/Subcon OPEN
135 Housing Type S1 S1.06 C Entrance - Cleaning lamp fixtures in the column C KEY/Subcon OPEN
136 Housing Type S1 S1.06 C Entrance - Uneven exposed ceiling surface C KEY/Subcon OPEN
137 Housing Type S1 S1.06 C Entrance - There are 52 floor tiles and plint that porous C KEY/Subcon OPEN
Paras
138 Housing Type S1 S1.06 C Jogja - Crack on top Paras Jogja surface A KEY/Subcon OPEN
Fence
Paras
139 Housing Type S1 S1.06 C Jogja - There are 162 paras jogja that porous C KEY/Subcon OPEN
Fence
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
Gas
140 Housing Type S1 S1.06 C - Uneven painting on all sides A KEY/Subcon OPEN
storage
Gas
141 Housing Type S1 S1.06 C - Bottom base of gas cylinder not installed yet A KEY/Subcon OPEN
storage
Gas
142 Housing Type S1 S1.06 C - JL1 not installed yet A KEY/Subcon OPEN
storage
Gas
143 Housing Type S1 S1.06 C - There are 209 paras jogja that porous (outside WIC) KEY/Subcon OPEN
storage
Outside
144 Housing Type S1 S1.06 C - Uneven painting in the bottom embossed wall C KEY/Subcon OPEN
Bathroom
Outside
145 Housing Type S1 S1.06 C - Crack on the bottom embossed wall C KEY/Subcon OPEN
Bathroom
Outside
146 Housing Type S1 S1.06 C - Uneven wall painting KEY/Subcon OPEN
Bathroom
Outside
147 Housing Type S1 S1.06 C - Cracked in the opening BV1 (outside) KEY/Subcon OPEN
Bathroom
Outside
148 Housing Type S1 S1.06 C - Uneven canopy painting C KEY/Subcon OPEN
Bathroom
Outside
149 Housing Type S1 S1.06 C - Crack on the canopy surface C KEY/Subcon OPEN
Bathroom
Outside
150 Housing Type S1 S1.06 C - Cracks on the wall surface C KEY/Subcon OPEN
Bathroom
Outside
151 Housing Type S1 S1.06 C - Uneven painting in the top roof dike KEY/Subcon OPEN
Bathroom
Outside
152 Housing Type S1 S1.06 C - Cracked & chipped in the top roof dike surface C KEY/Subcon OPEN
Bathroom
Left side
153 Housing Type S1 S1.06 C - Porous the wall surface C KEY/Subcon OPEN
view
Left side
154 Housing Type S1 S1.06 C - Uneven surface & painting in the wall C KEY/Subcon OPEN
view
Back view
155 Housing Type S1 S1.06 C of - Screw in the frame of lattice is not installed yet KEY/Subcon OPEN
bathroom
Back view
156 Housing Type S1 S1.06 C of - Uneven painting & porous the wall A KEY/Subcon OPEN
bathroom
Back view
157 Housing Type S1 S1.06 C of - (J4) Opening is untidy C KEY/Subcon OPEN
bathroom
Back view
158 Housing Type S1 S1.06 C of - The exposed ceiling painting is uneven C KEY/Subcon OPEN
bathroom
Terrace
159 Housing Type S1 S1.06 C - Uneven wall painting C KEY/Subcon OPEN
bedroom
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
Terrace
160 Housing Type S1 S1.06 C - (PG2) Opening is untidy C KEY/Subcon OPEN
bedroom
Terrace
161 Housing Type S1 S1.06 C - Chipped exposed ceiling C KEY/Subcon OPEN
bedroom
Terrace
162 Housing Type S1 S1.06 C - Painting the column surface is untidy C KEY/Subcon OPEN
bedroom
Terrace - There are 34 floor tiles and plint that porous & grout
163 Housing Type S1 S1.06 C C KEY/Subcon OPEN
bedroom is untidy
Terrace
164 Housing Type S1 S1.06 C living - Uneven wall painting (outside pantry) KEY/Subcon OPEN
room
Terrace
165 Housing Type S1 S1.06 C living - (J3) Opening is untidy C KEY/Subcon OPEN
room
Terrace
166 Housing Type S1 S1.06 C living - Uneven painting in the canopy C KEY/Subcon OPEN
room
Terrace
167 Housing Type S1 S1.06 C living - Crack on canopy surface A KEY/Subcon OPEN
room
Terrace
168 Housing Type S1 S1.06 C living - Uneven painting in the ceiling A KEY/Subcon OPEN
room
Terrace
169 Housing Type S1 S1.06 C living - Painting in the shadowline is untidy C KEY/Subcon OPEN
room
Terrace
170 Housing Type S1 S1.06 C living - Uneven painting in the exposed ceiling C KEY/Subcon OPEN
room
Terrace
171 Housing Type S1 S1.06 C living - Painting in the column surface is untidy C KEY/Subcon OPEN
room
Terrace
172 Housing Type S1 S1.06 C living - Cleaning armature lamp fixtures A KEY/Subcon OPEN
room
Terrace
173 Housing Type S1 S1.06 C living - Cracks on the exposed ceiling surface C KEY/Subcon OPEN
room
Terrace
174 Housing Type S1 S1.06 C living - There are 188 paras jogja that porous A KEY/Subcon OPEN
room
Terrace
- There are 50 floor tils & plint that porous and grout
175 Housing Type S1 S1.06 C living A KEY/Subcon OPEN
is untidy
room
Right-side
176 Housing Type S1 S1.06 C - (J2) Uneven in the opening C KEY/Subcon OPEN
view
Right-side
177 Housing Type S1 S1.06 C - Uneven wall painting A KEY/Subcon OPEN
view
Right-side
178 Housing Type S1 S1.06 C - There are 242 paras jogja that porous A KEY/Subcon OPEN
view
179 Housing Type S1 S1.06 C Roof deck - All of wall surface is uneven C KEY/Subcon OPEN
BJP HOUSING PUNCH LIST - MASTER
189
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec 21-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party
No.
180 Housing Type S1 S1.06 C Roof deck - Gap between shadowline and the wall C KEY/Subcon OPEN
181 Housing Type S1 S1.06 C Roof deck - Painting in the parapet wall is untidy C KEY/Subcon OPEN
182 Housing Type S1 S1.06 C Roof deck - Uneven painting in the all of ceiling surface C KEY/Subcon OPEN
183 Housing Type S1 S1.06 C Roof deck - Crack on fascia board surface A KEY/Subcon OPEN
184 Housing Type S1 S1.06 C Roof deck - Crack on ridge and roof tiles A KEY/Subcon OPEN
185 Housing Type S1 S1.06 C Roof deck - Crack on top side of canopy A KEY/Subcon OPEN
186 Housing Type S1 S1.06 C Roof deck - Finishing around exhaust grill surface C KEY/Subcon OPEN
Roof Deck
187 Housing Type S1 S1.06 C - Uneven wall surface in the water heater area C KEY/Subcon OPEN
Bathroom
Roof Deck
188 Housing Type S1 S1.06 C - Chipped out in the roof dike C KEY/Subcon OPEN
Bathroom
Roof Deck
189 Housing Type S1 S1.06 C - Cleaning, repainting, and finishing all of roof tiles C KEY/Subcon OPEN
Bathroom
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
PROGRESS KONSTRUKSI
0 0
22-Dec 23-Dec 24-Dec 25-Dec System Description (Title RFI)
Date of DOC. TRANSMITTALL STATUS SUBMITT DATE
Issue (RFI) NO.
CIVIL/ TOTAL
NO. ME DESCRIPTION PUNCHLIST D E S E M
9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec
A. CIVIL (CV)
1 CIVIL Housing Type S2 - 01
Qty (Item) #NAME? Item 0 0 0 0 0 0 0 0 0
Percentage (%) 100 % #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Sub-Total Qty (Item) : #NAME? Item #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Sub-Total Percentage (%) : 100 % #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
2 ME Housing Type S2 - 02
Qty (Item) 0 Item 0 0 0 0 0 0 0 0 0
Percentage (%) 100 % #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
3 ME Housing Type S2 - 03
Qty (Item) 0 Item 0 0 0 0 0 0 0 0 0
Percentage (%) 100 % #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
4 ME Housing Type S2 - 04
Qty (Item) #REF! Item #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Percentage (%) 100 % #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
5 ME Housing Type S2 - 05
Qty (Item) #REF! Item #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Percentage (%) 100 % #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Sub-Total Qty (Item) : #REF! Item #REF! Item
Sub-Total Percentage (%) : #REF! % #REF! %
GRAND TOTAL QTY (ITEM) #NAME? Item #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
GRAND TOTAL PERCENTAGE (%) 100 % #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PROGRESS KILL
KILLING
D E S E M B E R 2 0 2 0
18-Dec 19-Dec 20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
PROGRESS KILLING PUNCHLIST
0 0 0 0 0 4 0 0 0 0 0 0 0 0 0
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 0 0 0 0 0
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
A N U A R I 2 0 2 1
17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
ACCUMULASI BALANCE REMARKS
0 Item 0 Item
#DIV/0! % #DIV/0! %
0 Item 0 Item
#DIV/0! % #DIV/0! %
0 Item 0 Item
#DIV/0! % #DIV/0! %
1 Housing Type S2 S2.01 C Bedroom - (P1) Sealant is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 4%
2 Housing Type S2 S2.01 C - (P1) Dirty on frame C KEY/Subcon OPEN DO BJS WME/BJP 0
3 Housing Type S2 S2.01 C - (P1) Opening painting is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.4 0.4
4 Housing Type S2 S2.01 C - (P1) Gap between door leaves and stoper B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
`
5 Housing Type S2 S2.01 C - (P1) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
6 Housing Type S2 S2.01 C - (P1) Crack and chipped on opening B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
7 Housing Type S2 S2.01 C - (P1) Dirty on handle C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
8 Housing Type S2 S2.01 C - PJ1 frame opening is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
9 Housing Type S2 S2.01 C - Crack on the wall B KEY/Subcon CLOSE WA BJS WME/BJP 1 1 Not Actifity
10 Housing Type S2 S2.01 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.3 0.1 0.6
11 Housing Type S2 S2.01 C - Receptacle installation is inclined B KEY/Subcon OPEN WA BJS WME/BJP 0
12 Housing Type S2 S2.01 C - Finishing around receptacle is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Proses
13 Housing Type S2 S2.01 C - Hole on the wall B KEY/Subcon CLOSE WA BJS WME/BJP 0.2 0.3 0.5 1 Not Actifity
14 Housing Type S2 S2.01 C - (PG2) Gap between frame and wall B KEY/Subcon OPEN DO BJS WME/BJP 0
15 Housing Type S2 S2.01 C - (PG2) Gap on frame joint B KEY/Subcon OPEN DO BJS WME/BJP 0
17 Housing Type S2 S2.01 C - (PG2) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
21 Housing Type S2 S2.01 C - (Wardrobe) Dirty on HPL C KEY/Subcon OPEN FU BJS WME/BJP 0
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
24 Housing Type S2 S2.01 C - (Wardrobe) Gap on jointing panel B KEY/Subcon OPEN FU BJS WME/BJP 0
26 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
27 Housing Type S2 S2.01 C - Remove blue tape on AC indoor unit C KEY/Subcon OPEN EC1 BJS WME/BJP 0 Not Actifity
29 Housing Type S2 S2.01 C Bathroom 2 - (P2) Door leaves is not install yet B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
30 Housing Type S2 S2.01 C - (P2) Opening surface finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
31 Housing Type S2 S2.01 C - (P2) Sealant painting is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
32 Housing Type S2 S2.01 C - (P2) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
33 Housing Type S2 S2.01 C - (P2) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
34 Housing Type S2 S2.01 C - (P2) Markers on the frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
36 Housing Type S2 S2.01 C - Gap on the switch B KEY/Subcon OPEN CR BJS WME/BJP 0 Not Actifity
37 Housing Type S2 S2.01 C - (Lavatory) Gap on sink drain B KEY/Subcon OPEN SA BJS WME/BJP 0
38 Housing Type S2 S2.01 C - (Lavatory) Sealant on sink is untidy B KEY/Subcon OPEN SA BJS WME/BJP 0
41 Housing Type S2 S2.01 C - (Lavatory) Pen mark on HPL surface C KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
48 Housing Type S2 S2.01 C - (Glass Cubicle) Sealant is untidy B KEY/Subcon OPEN SA BJS WME/BJP 0
50 Housing Type S2 S2.01 C - Glass shelf installation is not proper B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
51 Housing Type S2 S2.01 C - (BV1) Dirty on frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
52 Housing Type S2 S2.01 C - (BV1) Sealant is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
53 Housing Type S2 S2.01 C - (BV1) Opening painting is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.2
54 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0
55 Housing Type S2 S2.01 C - (Ceiling) Gap on exhaust fan B KEY/Subcon OPEN DO BJS WME/BJP 0
57 Housing Type S2 S2.01 C - (PJ1) Remove seal on floor hinge C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
58 Housing Type S2 S2.01 C - (PJ1) Hole on alumunium frame (capping) B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
59 Housing Type S2 S2.01 C - (PJ1) Gap between frame and wall B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
60 Housing Type S2 S2.01 C - (PJ1) The glass is not sealing yet B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
61 Housing Type S2 S2.01 C - (PJ1) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
63 Housing Type S2 S2.01 C - (PJ1) Remove seal frame C KEY/Subcon OPEN BJS WME/BJP 0 Not Actifity
65 Housing Type S2 S2.01 C - (PJ1) Joint frame is not aligned B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
66 Housing Type S2 S2.01 C - (PJ1) Sealant is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
68 Housing Type S2 S2.01 C - (PJ1) Bottom side of opening is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
71 Housing Type S2 S2.01 C - (Shoe Rack) Hole on panels cabinet B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
73 Housing Type S2 S2.01 C - (Shoe Rack) Dirty on HPL surface C KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
74 Housing Type S2 S2.01 C - (PJ2) Sealant is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
75 Housing Type S2 S2.01 C - (PJ2) Defect on the frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
76 Housing Type S2 S2.01 C - (PJ2) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
77 Housing Type S2 S2.01 C - (PJ2) Gap on jointing frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
78 Housing Type S2 S2.01 C - (PJ2) Adhesive marks on frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
79 Housing Type S2 S2.01 C - (PJ2) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
80 Housing Type S2 S2.01 C - (PJ2) Wall surface finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
81 Housing Type S2 S2.01 C - (PJ2) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
82 Housing Type S2 S2.01 C - (Shelf) Sealant is untidy B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
84 Housing Type S2 S2.01 C - (Shelf) Shadow line is not closed yet B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
85 Housing Type S2 S2.01 C - (Shelf) Wall surface finishing is not unti B KEY/Subcon OPEN FU BJS WME/BJP 0.2 0.3 0.5 Not Actifity
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
87 Housing Type S2 S2.01 C - Gap between TV Cabinet and the wall B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
90 Housing Type S2 S2.01 C - Wal surface finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
94 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
95 Housing Type S2 S2.01 C - (Ceiling) Hole former lamp is not closed y B KEY/Subcon CLOSE CI BJS WME/BJP 1 1 Not Actifity
96 Housing Type S2 S2.01 C - (Ceiling) Manhole is not closed yet B KEY/Subcon CLOSE CI BJS WME/BJP 1 1 Not Actifity
97 Housing Type S2 S2.01 C - (Ceiling) Gap on AC Cassette B KEY/Subcon CLOSE FU BJS WME/BJP 1 1 Not Actifity
98 Housing Type S2 S2.01 C - All of ceiling painting is uneven B KEY/Subcon OPEN FU BJS WME/BJP 0.2 0.2 Not Actifity
99 Housing Type S2 S2.01 C Pantry - Bottom kitchen set is not sealing yet B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
103 Housing Type S2 S2.01 C - (Kitchen Set) Dirty on HPL surface C KEY/Subcon OPEN FU BJS WME/BJP 0
106 Housing Type S2 S2.01 C - (Kitchen Set) Defect on HPL surface B KEY/Subcon OPEN FU BJS WME/BJP 0
109 Housing Type S2 S2.01 C - (Kitchen Set) Hole on HPL surface B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
112 Housing Type S2 S2.01 C - Drop ceiling surface finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
113 Housing Type S2 S2.01 C - Gap on receptacle B KEY/Subcon OPEN DO BJS WME/BJP 0
115 Housing Type S2 S2.01 C - (P2) Opening finishing is untidy & crack B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
116 Housing Type S2 S2.01 C - (P2) Sealant is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
117 Housing Type S2 S2.01 C - (P2) Dirty on sealant C KEY/Subcon OPEN DO BJS WME/BJP 0
118 Housing Type S2 S2.01 C - (P2) Dirty on frame C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
119 Housing Type S2 S2.01 C - (P2) Remove seal frame C KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
120 Housing Type S2 S2.01 C - (P2) Scratch on frame B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
122 Housing Type S2 S2.01 C - Sealant of glass cubicle is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
124 Housing Type S2 S2.01 C - Suggest to add stopper for door glass B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
125 Housing Type S2 S2.01 C - (Lavatory) Sealant of sink is untidy B KEY/Subcon OPEN EC1 BJS WME/BJP 0 Not Actifity
127 Housing Type S2 S2.01 C - (Lavatory) Switch installation is inclined B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
128 Housing Type S2 S2.01 C - (Lavatory) Mirror is not sealing yet B KEY/Subcon OPEN DO BJS WME/BJP 0
129 Housing Type S2 S2.01 C - Corner of wall tiles finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0
131 Housing Type S2 S2.01 C - (Bathtub) Gap between bathtub and granite B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
132 Housing Type S2 S2.01 C - (Bathtub) Dirty on bathtub C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
133 Housing Type S2 S2.01 C - (Window) Gap on jointing frame B KEY/Subcon OPEN CR BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
134 Housing Type S2 S2.01 C - (Window) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
135 Housing Type S2 S2.01 C Hall Way - (P3) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
137 Housing Type S2 S2.01 C - (P3) Door leaves rubbing to the floor tile B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
138 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
139 Housing Type S2 S2.01 C - There are 31 ceramic floor tiles that poro A KEY/Subcon OPEN CI BJS WME/BJP 0
Walk In
140 Housing Type S2 S2.01 C - Remove door frame C KEY/Subcon OPEN FU BJS WME/BJP 0
Closet
141 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.3 0.5 Not Actifity
142 Housing Type S2 S2.01 C - There are 24 ceramic floor tiles that poro A KEY/Subcon OPEN DO BJS WME/BJP 0
143 Housing Type S2 S2.01 C - Wardrobe leaves hit each other B KEY/Subcon OPEN CR BJS WME/BJP 0 Not Actifity
144 Housing Type S2 S2.01 C - Door leaves of wardrobe heavy to open B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
145 Housing Type S2 S2.01 C - Dirty on door leaves surface C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
146 Housing Type S2 S2.01 C - Dirty on stainless hanger C KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
Master
147 Housing Type S2 S2.01 C - Wall surface is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
Bedroom
148 Housing Type S2 S2.01 C - (P1) Opening surface finishing is untidy B KEY/Subcon OPEN CR BJS WME/BJP 0.2 0.2 Not Actifity
149 Housing Type S2 S2.01 C - (P1) Dirty on frame C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
150 Housing Type S2 S2.01 C - (P1) Scratch on frame B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
151 Housing Type S2 S2.01 C - (P1) Remove seal frame C KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
153 Housing Type S2 S2.01 C - (P1) Dirty on handle C KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
154 Housing Type S2 S2.01 C - (J1) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
155 Housing Type S2 S2.01 C - (J1) Gap on jointing frame B KEY/Subcon OPEN PJ BJS WME/BJP 0 Not Actifity
156 Housing Type S2 S2.01 C - (J1) Sealant and painting is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
157 Housing Type S2 S2.01 C - (J1) Opening surface finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
158 Housing Type S2 S2.01 C - (PG1) Sealant and painting is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
159 Housing Type S2 S2.01 C - (PG1) Dirty on rail C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
160 Housing Type S2 S2.01 C - (PG1) Remove seal frame C KEY/Subcon OPEN PJ BJS WME/BJP 0 Not Actifity
161 Housing Type S2 S2.01 C - (PG1) Door accessories is not install yet B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
162 Housing Type S2 S2.01 C - (PG1) Curtain hook is not install yet B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
164 Housing Type S2 S2.01 C - (PG1) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
165 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
167 Housing Type S2 S2.01 C - (PJ1) Adhesive marks on frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
168 Housing Type S2 S2.01 C - (PJ1) Wall surface finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
169 Housing Type S2 S2.01 C - (PJ1) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
170 Housing Type S2 S2.01 C - (PJ1) Dirty on glass C KEY/Subcon OPEN PJ BJS WME/BJP 0 Not Actifity
171 Housing Type S2 S2.01 C - (PJ1) Gap on jointing frame B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
172 Housing Type S2 S2.01 C - (PJ1) Jointing frame is not aligned B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
173 Housing Type S2 S2.01 C - (PJ1) The glass is not sealing yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
174 Housing Type S2 S2.01 C - (PJ1) Scratch on frame B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
177 Housing Type S2 S2.01 C - Whole surface of all column is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
178 Housing Type S2 S2.01 C - Dirty on lamp fixtures C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
179 Housing Type S2 S2.01 C - Exposed ceiling surface finishing is untid B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
180 Housing Type S2 S2.01 C - Whole surface of planter box is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
186 Housing Type S2 S2.01 C - Scratch on frame (master bedroom area) B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
187 Housing Type S2 S2.01 C - Remove seal frame(master bedroom area) C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
Service
188 Housing Type S2 S2.01 C - Remove seal frame C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
Room
189 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
190 Housing Type S2 S2.01 C - There are 19 ceramic floor tiles that poro A KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
191 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
192 Housing Type S2 S2.01 C - Adhesive mark on frame C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
Facade -
193 Housing Type S2 S2.01 C - Wall surrface finishing is untidy B KEY/Subcon OPEN CR BJS WME/BJP 0 Not Actifity
Right Side
194 Housing Type S2 S2.01 C - Faucet not install yet B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
195 Housing Type S2 S2.01 C - Crack on wall B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
196 Housing Type S2 S2.01 C - Wall painting is uneven B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
Facade -
197 Housing Type S2 S2.01 C - Wall finishing is untidy (bedroom area) B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
Back Side
198 Housing Type S2 S2.01 C - There are 19 ceramic floor tiles that poro A KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
199 Housing Type S2 S2.01 C - Ceiling finishing is untidy (bedroom area) B KEY/Subcon OPEN EL2 BJS WME/BJP 0 Not Actifity
200 Housing Type S2 S2.01 C - (PG2) Remove seal frame C KEY/Subcon OPEN PJ BJS WME/BJP 0 Not Actifity
201 Housing Type S2 S2.01 C - (PG2) Jointing frame is not aligned B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
202 Housing Type S2 S2.01 C - Whole surface of planter box is untidy B KEY/Subcon OPEN CR BJS WME/BJP 0 Not Actifity
203 Housing Type S2 S2.01 C - Whole surface of all column is untidy B KEY/Subcon OPEN EL2 BJS WME/BJP 0 Not Actifity
204 Housing Type S2 S2.01 C - Dirty on lamp fixtures surface C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
206 Housing Type S2 S2.01 C - Dirty on wall C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
207 Housing Type S2 S2.01 C - Faucet not install yet B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
209 Housing Type S2 S2.01 C - Receptacle installation is not proper B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
210 Housing Type S2 S2.01 C - Exposed ceiling finishhing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
211 Housing Type S2 S2.01 C - (PJ2) Opening painting is not finished yet B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
212 Housing Type S2 S2.01 C - (PJ2) Opening surface finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
213 Housing Type S2 S2.01 C - (PJ2) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
214 Housing Type S2 S2.01 C - (PJ2) Remove seal frame C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
216 Housing Type S2 S2.01 C - (PJ2) Sealant application is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
218 Housing Type S2 S2.01 C - Remove seal frame on lattice and J2 window C KEY/Subcon OPEN CR BJS WME/BJP 0 Not Actifity
219 Housing Type S2 S2.01 C - Suggest to add slot for lattice B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
223 Housing Type S2 S2.01 C - Dirty on skirting (terrace master bedroom) C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
225 Housing Type S2 S2.01 C - (PG1) Scratch on frame B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
226 Housing Type S2 S2.01 C - (PG1) Remove seal frame C KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
227 Housing Type S2 S2.01 C - (PG1) Jointing frame is not aligned B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
Facade -
228 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
Left Side
229 Housing Type S2 S2.01 C - Wall painting is uneven B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
231 Housing Type S2 S2.01 C - Roof drain is clogged B KEY/Subcon OPEN PP BJS WME/BJP 0 Not Actifity
232 Housing Type S2 S2.01 C - Cast iron for roof drain is not install ye B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
233 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN EC1 BJS WME/BJP 0 Not Actifity
234 Housing Type S2 S2.01 C - The wall is not painting yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
235 Housing Type S2 S2.01 C - Wall finishing around exhaust hood is unti B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
237 Housing Type S2 S2.01 C - AC drain pipe should be piped to the botto B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
238 Housing Type S2 S2.01 C - Coring former should be closed by grouting B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
239 Housing Type S2 S2.01 C - There is no plate for outdoor AC unit B KEY/Subcon OPEN PJ BJS WME/BJP 0 Not Actifity
240 Housing Type S2 S2.01 C - Crack on the roof deck surface B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
242 Housing Type S2 S2.01 C - Crack on fascia board B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
243 Housing Type S2 S2.01 C - Fascia board finishing surface is untidy B KEY/Subcon OPEN PJ BJS WME/BJP 0 Not Actifity
245 Housing Type S2 S2.01 C - Paras Jogja stone is not install yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
246 Housing Type S2 S2.01 C - Outer ceiling surface finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
247 Housing Type S2 S2.01 C - Roof tiles arrangement is not aligned B KEY/Subcon OPEN PP BJS WME/BJP 0 Not Actifity
248 Housing Type S2 S2.01 C - There is rubbish on roof deck C KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
253 Housing Type S2 S2.01 C - Remove unused pipe C KEY/Subcon OPEN PP BJS WME/BJP 0 Not Actifity
257 Housing Type S2 S2.01 C - Fascia board surface finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
259 Housing Type S2 S2.01 C - Roof drain is clogged B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
261 Housing Type S2 S2.01 C - Cast iron for roof drain not install yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
268 Housing Type S2 S2.01 C - Remove unused reinforcement bar C KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
269 Housing Type S2 S2.01 C - Outer ceiling painting is uneven B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
Concrete
271 Housing Type S2 S2.01 C - Roof tiles arrangement is not align B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
Roof Tile
272 Housing Type S2 S2.01 C - Roof tile not painting yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 5
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
1 Housing Type S2 S2.02 C Bedroom - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.3 0.5 8% Not Actifity
2 Housing Type S2 S2.02 C - Gap on the switch receptacle B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
3 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
4 Housing Type S2 S2.02 C - Crack on the wall B KEY/Subcon CLOSE WA BJS WME/BJP 1 1 Not Actifity
5 Housing Type S2 S2.02 C - Hole on the wall B KEY/Subcon CLOSE CI BJS WME/BJP 1 1 Not Actifity
6 Housing Type S2 S2.02 C - Ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
7 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
8 Housing Type S2 S2.02 C - PJ1 frame opening is untidy B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
9 Housing Type S2 S2.02 C - Joint ceiling finishing is untidy B KEY/Subcon OPEN FU BJS WME/BJP 0.2 0.2 Not Actifity
10 Housing Type S2 S2.02 C - Sealant finishing on wardrobe is untidy B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
12 Housing Type S2 S2.02 C - There is no sealant on bottom wardrobe B KEY/Subcon OPEN WA BJS WME/BJP 0
14 Housing Type S2 S2.02 C - (P1) Opening finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
15 Housing Type S2 S2.02 C - (P1) Handle on P1 is not function B KEY/Subcon OPEN DO BJS WME/BJP 0
16 Housing Type S2 S2.02 C - (P1) Sealant on frame is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
17 Housing Type S2 S2.02 C - (P1) Gap on door leaves B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
18 Housing Type S2 S2.02 C - (P1) Scratch and chipped on door leaves B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
19 Housing Type S2 S2.02 C - (P1) Door opening is cracked B KEY/Subcon OPEN DO BJS WME/BJP 0
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
20 Housing Type S2 S2.02 C - (P1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
21 Housing Type S2 S2.02 C - (P1) Defect on the frame B KEY/Subcon OPEN WA BJS WME/BJP 0
22 Housing Type S2 S2.02 C - (PG2) Scratch on frame B KEY/Subcon OPEN WA BJS WME/BJP 0
23 Housing Type S2 S2.02 C - (PG2) Opening finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
24 Housing Type S2 S2.02 C - (PG2) Gap between frame and wall B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
25 Housing Type S2 S2.02 C - (PG2) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
26 Housing Type S2 S2.02 C - (PG2) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
27 Housing Type S2 S2.02 C - (PG2) Gap between jointing frame B KEY/Subcon OPEN DO BJS WME/BJP 0
29 Housing Type S2 S2.02 C - (PG2) Sliding door is not function B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
30 Housing Type S2 S2.02 C - Curtain is not installed yet B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
32 Housing Type S2 S2.02 C - Curtain hook is not installed yet B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
34 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.3 0.5 Not Actifity
35 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.3 0.5 Not Actifity
36 Housing Type S2 S2.02 C - Ceiling finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.3 0.3 Not Actifity
37 Housing Type S2 S2.02 C - Exposed ceiling finishing is untidy B KEY/Subcon OPEN CR BJS WME/BJP 0.3 0.3 Not Actifity
38 Housing Type S2 S2.02 C - (PG2) Top surface skirting is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
40 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN EL2 BJS WME/BJP 0.2 0.3 0.5 Not Actifity
41 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN FU BJS WME/BJP 0.2 0.3 0.5 Not Actifity
42 Housing Type S2 S2.02 C - Gap on the receptacle and lamp swicth B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
43 Housing Type S2 S2.02 C - Dirty on power outlet B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
44 Housing Type S2 S2.02 C - Wall shelf of TV cabinet is inclined B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.3 0.5 Not Actifity
45 Housing Type S2 S2.02 C - Gap between the wall shelves and wall B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
46 Housing Type S2 S2.02 C - Gap between TV Cabinet and wall B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
47 Housing Type S2 S2.02 C - Gap between curtain cover with ceiling B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
48 Housing Type S2 S2.02 C - Ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
50 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
51 Housing Type S2 S2.02 C - Hole in the ceiling B KEY/Subcon CLOSE WA BJS WME/BJP 1 1 Not Actifity
52 Housing Type S2 S2.02 C - Ceiling painting is uneven B KEY/Subcon OPEN FU BJS WME/BJP 0.2 0.2 Not Actifity
53 Housing Type S2 S2.02 C - Manhole not cover yet (cornice) B KEY/Subcon OPEN EC1 BJS WME/BJP 0 Not Actifity
54 Housing Type S2 S2.02 C - Hole on the wall B KEY/Subcon CLOSE CI BJS WME/BJP 1 1 Not Actifity
56 Housing Type S2 S2.02 C - Dirt on the AC cassette unit C KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
57 Housing Type S2 S2.02 C - Dirt on the downlight fixtures B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
58 Housing Type S2 S2.02 C - Drop ceiling finishing is untidy B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
59 Housing Type S2 S2.02 C - Gap on the switch lamp B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
60 Housing Type S2 S2.02 C - Dirt on the shoe rack C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
61 Housing Type S2 S2.02 C - Gap between shoe rack and wall B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
63 Housing Type S2 S2.02 C - Finishing around switch lamp is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
64 Housing Type S2 S2.02 C - Porous the wall B KEY/Subcon CLOSE DO BJS WME/BJP 1 1 Not Actifity
66 Housing Type S2 S2.02 C - (PJ2) Window leaves is hard to close B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
67 Housing Type S2 S2.02 C - (PJ2) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
68 Housing Type S2 S2.02 C - (PJ2) Dirt on the handle C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
69 Housing Type S2 S2.02 C - (PJ2) Opening surface is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
70 Housing Type S2 S2.02 C - (PJ2) Scratch and defect on frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
71 Housing Type S2 S2.02 C - (PJ2) Gap on the frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
72 Housing Type S2 S2.02 C - (PJ2) Scratch on door leaves B KEY/Subcon OPEN CR BJS WME/BJP 0 Not Actifity
73 Housing Type S2 S2.02 C - (PJ2) Porous on opening PJ2 B KEY/Subcon OPEN FU BJS WME/BJP 0.2 0.2 Not Actifity
74 Housing Type S2 S2.02 C - (PJ2) Dirt on the glass of PJ2 B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
75 Housing Type S2 S2.02 C - (PJ2) There is no sealant on bottom frame B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
78 Housing Type S2 S2.02 C - Hole on the kitchen set (above) B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
79 Housing Type S2 S2.02 C - Exposed screw on the kitchen set (above) B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
80 Housing Type S2 S2.02 C - Gap between kitchen set and drop ceiling B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
81 Housing Type S2 S2.02 C - Stove is not installed yet A KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
82 Housing Type S2 S2.02 C - Dent on the kitchen set (below section) B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
83 Housing Type S2 S2.02 C - Granite table installation is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
84 Housing Type S2 S2.02 C - Dirt on kitchen set (above) C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
87 Housing Type S2 S2.02 C - (PJ1) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
88 Housing Type S2 S2.02 C - (PJ1) Opening surface is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
89 Housing Type S2 S2.02 C - (PJ1) Door leaves is not installed yet A KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
90 Housing Type S2 S2.02 C - (PJ1) Gap between jointing frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
91 Housing Type S2 S2.02 C - (PJ1) Sealant application is untidy B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
92 Housing Type S2 S2.02 C - (PJ1) Window leaves is hard to close B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
93 Housing Type S2 S2.02 C - (PJ1) The glass of PJ1 is not sealing yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
94 Housing Type S2 S2.02 C - (PJ1) Frame installation is not align B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
95 Housing Type S2 S2.02 C Roof Deck - Crack on roof deck surface B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
96 Housing Type S2 S2.02 C - Crack on parapet wall B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
97 Housing Type S2 S2.02 C - Cracked on ridge B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
98 Housing Type S2 S2.02 C - Outside wall finishing untidy B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
99 Housing Type S2 S2.02 C Roof Tile - Roof tile is chipped out B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
100 Housing Type S2 S2.02 C - Dirt on roof tile C KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
101 Housing Type S2 S2.02 C - Crack on fascia board B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
103 Housing Type S2 S2.02 C - Crack on the ceiling jointing B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
104 Housing Type S2 S2.02 C - Refrigerator hole is not finished yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
105 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP 0.2 0.3 0.5 Not Actifity
106 Housing Type S2 S2.02 C - Fascia board installation is not align B KEY/Subcon OPEN EC1 BJS WME/BJP 0 Not Actifity
107 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
108 Housing Type S2 S2.02 C - There is no roof drain on the roof deck ba A KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
109 Housing Type S2 S2.02 C - Outside wall finishing is untidy (bathroom B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
110 Housing Type S2 S2.02 C - There is an hose on the roof deck C KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
111 Housing Type S2 S2.02 C - Leaks on the outer ceiling A KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
112 Housing Type S2 S2.02 C - Crack on the parapet wall B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
114 Housing Type S2 S2.02 C - Dirt on the roof tile C KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
115 Housing Type S2 S2.02 C - Finishing around exhaust hood is untidy B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
116 Housing Type S2 S2.02 C - Wall painting is not finished yet B KEY/Subcon OPEN RO BJS WME/BJP 0.2 0.3 0.5 Not Actifity
117 Housing Type S2 S2.02 C - Crack on the fascia board B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
118 Housing Type S2 S2.02 C - Crack on the parapet surface B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
119 Housing Type S2 S2.02 C - Roof tile is chipped out B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
120 Housing Type S2 S2.02 C - Roof drain cover is corossion B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
121 Housing Type S2 S2.02 C - Wall finishing is not finished yet B KEY/Subcon OPEN RO BJS WME/BJP 0 Not Actifity
122 Housing Type S2 S2.02 C - Roof drain is clogged A KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
123 Housing Type S2 S2.02 C - Crack on top of canopy surface B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
124 Housing Type S2 S2.02 C - Roof drain cover can't be open B KEY/Subcon OPEN FU BJS WME/BJP 0 Not Actifity
125 Housing Type S2 S2.02 C - Crack on roof tile B KEY/Subcon OPEN EC1 BJS WME/BJP 0 Not Actifity
126 Housing Type S2 S2.02 C - Parapet wall finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
Master
127 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.5 0.5 Not Actifity
Bedroom
128 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN DO BJS WME/BJP 0.2 0.3 0.5 Not Actifity
130 Housing Type S2 S2.02 C - AC split cover is not installed yet B KEY/Subcon OPEN WA BJS WME/BJP 0
131 Housing Type S2 S2.02 C - Rambuncis on J1 window is not installed ye A KEY/Subcon OPEN DO BJS WME/BJP 0
133 Housing Type S2 S2.02 C - Wall finishing is not finished yet B KEY/Subcon OPEN CR BJS WME/BJP 0.3 0.3 Not Actifity
134 Housing Type S2 S2.02 C - (J1) Gap between jointing frame B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
135 Housing Type S2 S2.02 C - (J1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
136 Housing Type S2 S2.02 C - (J1) Opening finishing is untidy B KEY/Subcon CLOSE DO BJS WME/BJP 1 1 Not Actifity
137 Housing Type S2 S2.02 C - (J1) Dirty on the window C KEY/Subcon OPEN DO BJS WME/BJP 0 Not Actifity
138 Housing Type S2 S2.02 C - (J1) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP 0
140 Housing Type S2 S2.02 C - (PG1) Scratch and defect on frame of door B KEY/Subcon OPEN FU BJS WME/BJP 0
141 Housing Type S2 S2.02 C - (PG1) Gap between frame and wall B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
144 Housing Type S2 S2.02 C - (PG1) Gap between jointing frame B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
145 Housing Type S2 S2.02 C - Ceiling jointing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
146 Housing Type S2 S2.02 C - Gap between TV cabinet & wall B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
147 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.1 0.1 Not Actifity
150 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0.2 0.3 0.5
151 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP 0.2 0.3 0.5 Not Actifity
152 Housing Type S2 S2.02 C - Concrete ceiling around lamp finishing is B KEY/Subcon OPEN CI BJS WME/BJP 0
153 Housing Type S2 S2.02 C - (PG1) Opening finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP 0 Not Actifity
155 Housing Type S2 S2.02 C - Column finishing is untidy B KEY/Subcon OPEN PJ BJS WME/BJP 0
157 Housing Type S2 S2.02 C - Concrete ceiling finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
158 Housing Type S2 S2.02 C - Dirt on concrete ceiling C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
159 Housing Type S2 S2.02 C - Shadow line surface is untidy C KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
160 Housing Type S2 S2.02 C - (PJ2) Dirt on the frame B KEY/Subcon OPEN PJ BJS WME/BJP 0 Not Actifity
161 Housing Type S2 S2.02 C - Bottom of Paras Jogja finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
Back Side
162 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0
Facade
163 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP 0
164 Housing Type S2 S2.02 C - Embeded wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0
Front Side
165 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
Facade
167 Housing Type S2 S2.02 C - Embeded wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP 0 Not Actifity
169 Housing Type S2 S2.02 C - Whole surface of planter box finishing is B KEY/Subcon OPEN DO BJS WME/BJP 0
170 Housing Type S2 S2.02 C - Cracks on the wall B OPEN DO BJS WME/BJP 0 Not Actifity
171 Housing Type S2 S2.02 C - Embeded exposed is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
172 Housing Type S2 S2.02 C - (J2) Gap between jointing frame B OPEN WA BJS WME/BJP 0 Not Actifity
173 Housing Type S2 S2.02 C - Embeded wall is not finished yet B OPEN DO BJS WME/BJP 0
Master
174 Housing Type S2 S2.02 C - (P2) Door leaves surface is uneven B OPEN DO BJS WME/BJP 0 Not Actifity
Bathroom
175 Housing Type S2 S2.02 C - (P2) Dirt on door leaves C OPEN DO BJS WME/BJP 0 Not Actifity
176 Housing Type S2 S2.02 C - (P2) Dirt on door handle C OPEN DO BJS WME/BJP 0 Not Actifity
177 Housing Type S2 S2.02 C - (P2) Scratch on door leaves B OPEN SA BJS WME/BJP 0 Not Actifity
178 Housing Type S2 S2.02 C - (P2) Opening surface is untidy B OPEN BJS WME/BJP 0
179 Housing Type S2 S2.02 C - (P2) Lattice surface is rugged B OPEN SA BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
180 Housing Type S2 S2.02 C - (P2) Sealant application is untidy C OPEN SA BJS WME/BJP 0 Not Actifity
181 Housing Type S2 S2.02 C - (P2) Dirty on sealant C OPEN SA BJS WME/BJP 0 Not Actifity
182 Housing Type S2 S2.02 C - (P2) Markers on frame C OPEN SA BJS WME/BJP 0 Not Actifity
185 Housing Type S2 S2.02 C - (Glass cubicle) Dirty on sealant C OPEN DO BJS WME/BJP 0 Not Actifity
186 Housing Type S2 S2.02 C - (Glass cubicle) Dirty on the glass C OPEN DO BJS WME/BJP 0 Not Actifity
187 Housing Type S2 S2.02 C - Sealant application on the soap holder is C OPEN DO BJS WME/BJP 0 Not Actifity
189 Housing Type S2 S2.02 C - Gap between bathtub and granite slab B OPEN DO BJS WME/BJP 0 Not Actifity
190 Housing Type S2 S2.02 C - Scratch on the bathtub B OPEN SA BJS WME/BJP 0 Not Actifity
191 Housing Type S2 S2.02 C - (J2) Sealant application is untidy C OPEN FU BJS WME/BJP 0
192 Housing Type S2 S2.02 C - (J2) Dirty on sealant C OPEN FU BJS WME/BJP 0 Not Actifity
193 Housing Type S2 S2.02 C - (J2) Gap on jointing frame B OPEN FU BJS WME/BJP 0 Not Actifity
194 Housing Type S2 S2.02 C - (J2) The window is not smoothly when close B OPEN FU BJS WME/BJP 0 Not Actifity
195 Housing Type S2 S2.02 C - (J2) Scratch on frame B OPEN FU BJS WME/BJP 0
196 Housing Type S2 S2.02 C - There is no sealant on bottom mirror B OPEN FU BJS WME/BJP 0 Not Actifity
197 Housing Type S2 S2.02 C - Sealant application on bottom wastafel is C OPEN SA BJS WME/BJP 0 Not Actifity
198 Housing Type S2 S2.02 C - Sealant application on granite table is un C OPEN SA BJS WME/BJP 0 Not Actifity
199 Housing Type S2 S2.02 C - Hinge of drawer has been corrosion B OPEN CR BJS WME/BJP 0
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
200 Housing Type S2 S2.02 C - Gap between sink table and wall B OPEN SA BJS WME/BJP 0 Not Actifity
201 Housing Type S2 S2.02 C - Dirt on drawer surface C OPEN CR BJS WME/BJP 0 Not Actifity
202 Housing Type S2 S2.02 C - Defect on HPL surface C OPEN DO BJS WME/BJP 0 Not Actifity
203 Housing Type S2 S2.02 C - (Glass cubicle) Scratch on the glass B OPEN DO BJS WME/BJP 0 Not Actifity
206 Housing Type S2 S2.02 C - Sealant application on bottom closet is un C OPEN DO BJS WME/BJP 0 Not Actifity
208 Housing Type S2 S2.02 C Hall Way - (P1) Sealant application is untidy C OPEN DO BJS WME/BJP 0
209 Housing Type S2 S2.02 C - (P1) Dirty on sealant C OPEN DO BJS WME/BJP 0 Not Actifity
210 Housing Type S2 S2.02 C - (P1) Opening surface is untidy C OPEN CR BJS WME/BJP 0 Not Actifity
211 Housing Type S2 S2.02 C - (P1) Scratch on frame B OPEN WA BJS WME/BJP 0
212 Housing Type S2 S2.02 C - (P1) The door is not tightly when closed B OPEN WA BJS WME/BJP 0 Not Actifity
213 Housing Type S2 S2.02 C - (P1) Scratch on handle B OPEN CI BJS WME/BJP 0 Not Actifity
214 Housing Type S2 S2.02 C - (P1) Dirty on hinge of the door C OPEN CI BJS WME/BJP 0 Not Actifity
215 Housing Type S2 S2.02 C - (P1) Defect on door leaves B OPEN CI BJS WME/BJP 0 Not Actifity
217 Housing Type S2 S2.02 C - Wall surface is uneven B OPEN WA BJS WME/BJP 0.2 0.2
218 Housing Type S2 S2.02 C - Wall painting is untidy B OPEN DO BJS WME/BJP 0.2 0.2
219 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN DO BJS WME/BJP 0.2 0.2
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
220 Housing Type S2 S2.02 C - Ceiling painting is untidy B OPEN WA BJS WME/BJP 0.2 0.2
221 Housing Type S2 S2.02 C - Ceiling surface is uneven B OPEN DO BJS WME/BJP 0.2 0.2
222 Housing Type S2 S2.02 C - The corner of wall finishing is untidy B OPEN DO BJS WME/BJP 0.2 0.2
223 Housing Type S2 S2.02 C - Gap in the switch B OPEN DO BJS WME/BJP 0 Not Actifity
224 Housing Type S2 S2.02 C - (P2) Crack on the opening B OPEN DO BJS WME/BJP 0 Not Actifity
225 Housing Type S2 S2.02 C - (P2) Sealant application is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
226 Housing Type S2 S2.02 C - (P2) Dirty on sealant C OPEN DO BJS WME/BJP 0
227 Housing Type S2 S2.02 C - (P2) Opening surface is uneven B OPEN DO BJS WME/BJP 0 Not Actifity
228 Housing Type S2 S2.02 C - (P2) Scratch on frame B OPEN DO BJS WME/BJP 0 Not Actifity
229 Housing Type S2 S2.02 C - (P2) Scratch on door leaves (HPL surface) B OPEN DO BJS WME/BJP 0 Not Actifity
230 Housing Type S2 S2.02 C - (P2) Scratch on door handle B OPEN DO BJS WME/BJP 0 Not Actifity
231 Housing Type S2 S2.02 C - (P2) Lattice installation is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
232 Housing Type S2 S2.02 C - (P2) Lattice finishing is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
233 Housing Type S2 S2.02 C - (P2) The frame of lattice is rugged B OPEN WA BJS WME/BJP 0 Not Actifity
234 Housing Type S2 S2.02 C - (P2) Gap on cylinder cover B OPEN CR BJS WME/BJP 0
236 Housing Type S2 S2.02 C - (P2) Scratch on the bottom of frame B OPEN DO BJS WME/BJP 0 Not Actifity
237 Housing Type S2 S2.02 C - Adhesive mark on the frame C OPEN DO BJS WME/BJP 0 Not Actifity
238 Housing Type S2 S2.02 C - Scratch on the lockcase & handle B OPEN DO BJS WME/BJP 0 Not Actifity
240 Housing Type S2 S2.02 C - (P1) Opening surface finishing is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
241 Housing Type S2 S2.02 C - Ceramic plint tile is not fully grout B OPEN DO BJS WME/BJP 0 Not Actifity
Walk In
242 Housing Type S2 S2.02 C - (P3) Opening surfce is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
Closet
243 Housing Type S2 S2.02 C - (P3) Sealant application is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
244 Housing Type S2 S2.02 C - (P3) Dirty on sealant of frame B OPEN EL2 BJS WME/BJP 0
245 Housing Type S2 S2.02 C - (P3) There is no sealant on bottom frame B OPEN WA BJS WME/BJP 0 Not Actifity
246 Housing Type S2 S2.02 C - (P3) Defect on the frame B OPEN CI BJS WME/BJP 0 Not Actifity
247 Housing Type S2 S2.02 C - (P3) Dirt on the frame C OPEN CI BJS WME/BJP 0 Not Actifity
248 Housing Type S2 S2.02 C - (P3) There is no sealant on top of frame B OPEN CI BJS WME/BJP 0 Not Actifity
249 Housing Type S2 S2.02 C - (P3) Defect on the door leaves B OPEN CR BJS WME/BJP 0 Not Actifity
250 Housing Type S2 S2.02 C - (P3) Scratch on the rail B OPEN FU BJS WME/BJP 0 Not Actifity
251 Housing Type S2 S2.02 C - Dirt on power outlet C OPEN FU BJS WME/BJP 0 Not Actifity
252 Housing Type S2 S2.02 C - The corner of wall is untidy B OPEN FU BJS WME/BJP 0.3 0.3 Not Actifity
253 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN FU BJS WME/BJP 0.3 0.3 Not Actifity
254 Housing Type S2 S2.02 C - Ceiling painting is untidy B OPEN FU BJS WME/BJP 0.3 0.3 Not Actifity
255 Housing Type S2 S2.02 C - Chipped on drop ceiling C CLOSE FU BJS WME/BJP 1 1 Not Actifity
258 Housing Type S2 S2.02 C - Gap between wardrobe and wall B OPEN WA BJS WME/BJP 0 Not Actifity
259 Housing Type S2 S2.02 C - Dirt on stainless hanger C OPEN DO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
260 Housing Type S2 S2.02 C - Exposed screw in the wardrobe C OPEN DO BJS WME/BJP 0 Not Actifity
261 Housing Type S2 S2.02 C - Dirt on drawer surface C OPEN DO BJS WME/BJP 0 Not Actifity
263 Housing Type S2 S2.02 C - Hole on panel surface of wardrobe C OPEN DO BJS WME/BJP 0 Not Actifity
265 Housing Type S2 S2.02 C - The door of wardrobe finishing is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
266 Housing Type S2 S2.02 C Service Room - (P2) Opening surface is untidy B CLOSE DO BJS WME/BJP 1 1 Not Actifity
267 Housing Type S2 S2.02 C - (P2) Gap between frame and wall B OPEN DO BJS WME/BJP 0 Not Actifity
268 Housing Type S2 S2.02 C - (P2) Sealant application is untidy B OPEN DO BJS WME/BJP 0 Not Actifity
269 Housing Type S2 S2.02 C - (P2) Dirty on sealant C OPEN DO BJS WME/BJP 0 Not Actifity
271 Housing Type S2 S2.02 C - (P2) Water rope finishing is untidy B OPEN BJS WME/BJP 0 Not Actifity
273 Housing Type S2 S2.02 C - (P2) Lattice surface is rugged B OPEN CR BJS WME/BJP 0 Not Actifity
274 Housing Type S2 S2.02 C - (P2) The door is not tightly when closed B OPEN WA BJS WME/BJP 0 Not Actifity
275 Housing Type S2 S2.02 C - (P2) Scratch on the frame B OPEN WA BJS WME/BJP 0 Not Actifity
276 Housing Type S2 S2.02 C - (P2) Defect on the door leaves surface B OPEN WA BJS WME/BJP 0 Not Actifity
278 Housing Type S2 S2.02 C - (P2) Markers on the frame C OPEN WA BJS WME/BJP 0 Not Actifity
280 Housing Type S2 S2.02 C - (P2) Scratch on the door handle B OPEN CI BJS WME/BJP 0 Not Actifity
282 Housing Type S2 S2.02 C - Wall surface is uneven B OPEN WA BJS WME/BJP 0.3 0.3 Not Actifity
283 Housing Type S2 S2.02 C - Porous on the wall B CLOSE DO BJS WME/BJP 1 1 Not Actifity
284 Housing Type S2 S2.02 C - Wall painting is untidy B OPEN DO BJS WME/BJP 0.2 0.2 Not Actifity
285 Housing Type S2 S2.02 C - The corner of the wall is untidy B OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
286 Housing Type S2 S2.02 C - Dirty on the wall C OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
287 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
290 Housing Type S2 S2.02 C Entrance - (PJ1) Opening surface is chipped out B CLOSE CI BJS WME/BJP 1 1 Not Actifity
291 Housing Type S2 S2.02 C - (PJ1) Sealant application is untidy B OPEN WA BJS WME/BJP 0 Not Actifity
292 Housing Type S2 S2.02 C - (PJ1) Gap on jointing frame B OPEN WA BJS WME/BJP 0 Not Actifity
293 Housing Type S2 S2.02 C - Wall painting is untidy B OPEN EL2 BJS WME/BJP 0.2 0.2 Not Actifity
294 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN CR BJS WME/BJP 0.2 0.2 Not Actifity
295 Housing Type S2 S2.02 C - Ceiling surface is uneven B OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
296 Housing Type S2 S2.02 C - Dirty on ceiling C OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
297 Housing Type S2 S2.02 C - Exposed ceiling surface is uneven B OPEN WA BJS WME/BJP 0 Not Actifity
299 Housing Type S2 S2.02 C - Whole of column painting is untidy B OPEN WA BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 10
312
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 9-Dec 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
300 Housing Type S2 S2.02 C - Column surface is chipped B OPEN PJ BJS WME/BJP 0 Not Actifity
301 Housing Type S2 S2.02 C - Dirty on lamp fixtures C OPEN RO BJS WME/BJP 0 Not Actifity
303 Housing Type S2 S2.02 C - Whole of planter box surface is defect B OPEN PJ BJS WME/BJP 0 Not Actifity
304 Housing Type S2 S2.02 C - Dirty on planter box surface C OPEN WA BJS WME/BJP 0 Not Actifity
305 Housing Type S2 S2.02 C - (Koral Sikat) installation is untidy B OPEN WA BJS WME/BJP 0 Not Actifity
306 Housing Type S2 S2.02 C - Crack on edge of (koral sikat) B OPEN WA BJS WME/BJP 0 Not Actifity
307 Housing Type S2 S2.02 C - (Koral sikat) painting is untidy B OPEN WA BJS WME/BJP 0 Not Actifity
309 Housing Type S2 S2.02 C - Roof deck plank painting is untidy B OPEN RO BJS WME/BJP 0 Not Actifity
PROGRESS KILLING
Punch Item CODE of ITEM HAND OVER VENDOR Description Responsible STATUS
No No. WORK BUILDING Unit No. PACKAGE NAME Civil / ME SECTION (Incomplete/ Unsatisfactory Works) .Cat. A/B/C Party
PUNCH BY CLOSE DATE REMAINING CLOSE / OPEN KENDALA
CONSTRUCTION
Page 56 of 261
ACTION PLAN TARGET SELESAI
Page 57 of 261
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
2 Housing Type S2 S2.03 C - Untidy finishing on concrete ceiling OPEN CI BJS WME/BJP 0
4 Housing Type S2 S2.03 C - Column finishing is untidy OPEN WA BJS WME/BJP 0 Not Actifity
6 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP 0
7 Housing Type S2 S2.03 C - PJ1 door leaves is not installed yet OPEN DO BJS WME/BJP 0 Not Actifity
8 Housing Type S2 S2.03 C - PJ1 frame opening is untidy OPEN DO BJS WME/BJP 0
9 Housing Type S2 S2.03 C - Gap on the PJ1 frame OPEN DO BJS WME/BJP 0
10 Housing Type S2 S2.03 C - Gap between PJ1 frame with opening OPEN DO BJS WME/BJP 0 Not Actifity
11 Housing Type S2 S2.03 C - Scratched on the PJ1 frame OPEN DO BJS WME/BJP 0 Not Actifity
12 Housing Type S2 S2.03 C - PJ1 window leaves frame is unclean OPEN DO BJS WME/BJP 0 Not Actifity
14 Housing Type S2 S2.03 C - Untidy wall finishing OPEN WA BJS WME/BJP 0 Not Actifity
16 Housing Type S2 S2.03 C - Uneven painting on the bottom roof deck OPEN CI BJS WME/BJP 0
17 Housing Type S2 S2.03 C - Finishing bottom roof deck is untidy OPEN CI BJS WME/BJP 0 Not Actifity
18 Housing Type S2 S2.03 C - Planter box painting is untidy & uneven OPEN WA BJS WME/BJP 0 Not Actifity
19 Housing Type S2 S2.03 C - Crack on the concrete planter OPEN WA BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
21 Housing Type S2 S2.03 C - Embeded wall is unpainted yet OPEN WA BJS WME/BJP 0
22 Housing Type S2 S2.03 C - Pebble stone no application yet OPEN PJ BJS WME/BJP 0
23 Housing Type S2 S2.03 C Living Room - Porous ceramic tile (124 section) OPEN CR BJS WME/BJP 0
24 Housing Type S2 S2.03 C - Wall finishing is untidy OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
25 Housing Type S2 S2.03 C - Wall finishing is uneven OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
26 Housing Type S2 S2.03 C - Porous ceramic wall (12 section) OPEN CR BJS WME/BJP 0 Not Actifity
27 Housing Type S2 S2.03 C - Stove is not installed yet OPEN FU BJS WME/BJP 0 Not Actifity
33 Housing Type S2 S2.03 C - Drop ceiling finishing is untidy OPEN CI BJS WME/BJP 0 Not Actifity
34 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
35 Housing Type S2 S2.03 C - Curtain is not installed yet (PJ1 & PJ2) OPEN FU BJS WME/BJP 0 Not Actifity
36 Housing Type S2 S2.03 C - Switch lamp is not installed yet OPEN EL2 BJS WME/BJP 0 Not Actifity
37 Housing Type S2 S2.03 C - Gap on the PJ2 frame OPEN DO BJS WME/BJP 0 Not Actifity
38 Housing Type S2 S2.03 C - PJ2 opening is untidy (finishing) CLOSE WA BJS WME/BJP 1 1 Not Actifity
39 Housing Type S2 S2.03 C - Scratches on PJ2 frame OPEN DO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
40 Housing Type S2 S2.03 C - PJ2 frame is unclean OPEN DO BJS WME/BJP 0 Not Actifity
41 Housing Type S2 S2.03 C - PJ2 door handle is unclean OPEN DO BJS WME/BJP 0
45 Housing Type S2 S2.03 C - Gap between TV Cabinet with wall OPEN FU BJS WME/BJP 0
47 Housing Type S2 S2.03 C - Wall shelves unclean OPEN FU BJS WME/BJP 0 Not Actifity
48 Housing Type S2 S2.03 C - TV Cabinet drawer is unclean OPEN FU BJS WME/BJP 0 Not Actifity
49 Housing Type S2 S2.03 C - Shoe rack sealant application is untidy OPEN FU BJS WME/BJP 0 Not Actifity
55 Housing Type S2 S2.03 C - Lavatory drawer unclean OPEN FU BJS WME/BJP 0 Not Actifity
56 Housing Type S2 S2.03 C - Mirror installation is not sealing yet OPEN SA BJS WME/BJP 0
61 Housing Type S2 S2.03 C - Sealant application on BV is untidy OPEN DO BJS WME/BJP 0 Not Actifity
62 Housing Type S2 S2.03 C - BV frame is unclean OPEN DO BJS WME/BJP 0 Not Actifity
63 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP 0 Not Actifity
64 Housing Type S2 S2.03 C - Exhaust fan unclean OPEN EL2 BJS WME/BJP 0 Not Actifity
65 Housing Type S2 S2.03 C - Scratched on P2 door leaves OPEN DO BJS WME/BJP 0 Not Actifity
66 Housing Type S2 S2.03 C - Ceiling finishing is untidy OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
69 Housing Type S2 S2.03 C - P2 opening finishing is untidy OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
70 Housing Type S2 S2.03 C - P2 hinge loss screw OPEN DO BJS WME/BJP 0 Not Actifity
71 Housing Type S2 S2.03 C - Hole on the P2 frame OPEN DO BJS WME/BJP 0 Not Actifity
72 Housing Type S2 S2.03 C - Shower installation is not proper OPEN SA BJS WME/BJP 0
73 Housing Type S2 S2.03 C - P2 finishing is untidy OPEN DO BJS WME/BJP 0 Not Actifity
74 Housing Type S2 S2.03 C Bedroom II - Wall finishing is untidy & unclean OPEN WA BJS WME/BJP 0 Not Actifity
76 Housing Type S2 S2.03 C - Wardrobe section is not closed with HPL OPEN FU BJS WME/BJP 0 Not Actifity
77 Housing Type S2 S2.03 C - Crack on the wall surface OPEN WA BJS WME/BJP 0 Not Actifity
78 Housing Type S2 S2.03 C - P1 door leaves unclean OPEN DO BJS WME/BJP 0 Not Actifity
79 Housing Type S2 S2.03 C - P1 opening is untidy OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
80 Housing Type S2 S2.03 C - P1 frame is unclean OPEN DO BJS WME/BJP 0 Not Actifity
81 Housing Type S2 S2.03 C - Scratched on P1 door leaves OPEN DO BJS WME/BJP 0 Not Actifity
82 Housing Type S2 S2.03 C - P1 handle is unclean OPEN DO BJS WME/BJP 0 Not Actifity
84 Housing Type S2 S2.03 C - Gap between PG2 frame & opening OPEN DO BJS WME/BJP 0 Not Actifity
86 Housing Type S2 S2.03 C - Gap on the PG2 frame OPEN DO BJS WME/BJP 0 Not Actifity
87 Housing Type S2 S2.03 C - Curtain is not installed yet OPEN FU BJS WME/BJP 0 Not Actifity
88 Housing Type S2 S2.03 C - PG2 rail is unclean OPEN DO BJS WME/BJP 0 Not Actifity
89 Housing Type S2 S2.03 C - Crack on the PG2 opening OPEN WA BJS WME/BJP 0 Not Actifity
90 Housing Type S2 S2.03 C - PG2 frame unclean OPEN DO BJS WME/BJP 0 Not Actifity
91 Housing Type S2 S2.03 C - PG2 frame (bottom) is not sealing yet OPEN DO BJS WME/BJP 0 Not Actifity
92 Housing Type S2 S2.03 C - Downlight fixtures is unclean OPEN EL2 BJS WME/BJP 0 Not Actifity
93 Housing Type S2 S2.03 C - Switch lamp is not covered OPEN EL2 BJS WME/BJP 0 Not Actifity
94 Housing Type S2 S2.03 C - Untidy finishing on the shadow line OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
95 Housing Type S2 S2.03 C - Dirt on the ceiling OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
96 Housing Type S2 S2.03 C - Ceiling finishing is untidy OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
97 Housing Type S2 S2.03 C - Water splash in the PG2 (need to cover) OPEN DO BJS WME/BJP 0
99 Housing Type S2 S2.03 C - Ceramic tile chipped out OPEN CR BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
Walk In
100 Housing Type S2 S2.03 C - Wall finishing is untidy OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
Closet
101 Housing Type S2 S2.03 C - Wall painting is uneven OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
102 Housing Type S2 S2.03 C - P3 handle accessories is not installed yet OPEN DO BJS WME/BJP 0
103 Housing Type S2 S2.03 C - Porous ceramic tile (52 section) OPEN CR BJS WME/BJP 0 Not Actifity
104 Housing Type S2 S2.03 C - P3 door not smooth when closed OPEN DO BJS WME/BJP 0
105 Housing Type S2 S2.03 C - Gap on the wardrobe door OPEN FU BJS WME/BJP 0 Not Actifity
106 Housing Type S2 S2.03 C - Wardrobe door unclean OPEN FU BJS WME/BJP 0 Not Actifity
107 Housing Type S2 S2.03 C - Wardrobe drawer can't be open OPEN FU BJS WME/BJP 0
108 Housing Type S2 S2.03 C - Dirt on the wall OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
109 Housing Type S2 S2.03 C - Gap between wardrobe & drop ceiling OPEN FU BJS WME/BJP 0 Not Actifity
110 Housing Type S2 S2.03 C - Wardrobe can't be open OPEN FU BJS WME/BJP 0 Not Actifity
111 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
112 Housing Type S2 S2.03 C - Drop ceiling finishing is untidy OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
113 Housing Type S2 S2.03 C - Screw exposed on the wardrobe OPEN FU BJS WME/BJP 0 Not Actifity
114 Housing Type S2 S2.03 C - Dent on P3 frame OPEN DO BJS WME/BJP 0 Not Actifity
115 Housing Type S2 S2.03 C - Untidy finishing on P3 opening OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
116 Housing Type S2 S2.03 C - P1 opening finishing is untidy OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
119 Housing Type S2 S2.03 C - Untidy wall finishing OPEN WA BJS WME/BJP 0.3 0.3 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
120 Housing Type S2 S2.03 C - Curtain is not installed yet (PG1 & J1) OPEN FU BJS WME/BJP 0 Not Actifity
121 Housing Type S2 S2.03 C - P1 opening is untidy OPEN WA BJS WME/BJP 0.3 0.3 Not Actifity
122 Housing Type S2 S2.03 C - P1 door leaves unclean OPEN DO BJS WME/BJP 0 Not Actifity
123 Housing Type S2 S2.03 C - P1 frame is unclean OPEN DO BJS WME/BJP 0 Not Actifity
124 Housing Type S2 S2.03 C - Sealant application on P1 frame is untidy OPEN DO BJS WME/BJP 0 Not Actifity
125 Housing Type S2 S2.03 C - Gap on the J1 frame OPEN DO BJS WME/BJP 0
126 Housing Type S2 S2.03 C - Dent on J1 frame OPEN DO BJS WME/BJP 0 Not Actifity
127 Housing Type S2 S2.03 C - J1 glass unclean OPEN DO BJS WME/BJP 0 Not Actifity
128 Housing Type S2 S2.03 C - Sealant application on J1 frame untidy OPEN DO BJS WME/BJP 0 Not Actifity
129 Housing Type S2 S2.03 C - J1 opening is untidy (finishing) OPEN WA BJS WME/BJP 0.3 0.3
130 Housing Type S2 S2.03 C - Wall unfinished OPEN WA BJS WME/BJP 0 Not Actifity
131 Housing Type S2 S2.03 C - Hole on the wall CLOSE WA BJS WME/BJP 1 1 Not Actifity
132 Housing Type S2 S2.03 C - Uneven wall painting OPEN WA BJS WME/BJP 0.2 0.3 0.5 Not Actifity
133 Housing Type S2 S2.03 C - TV cabinet is not installation yet OPEN FU BJS WME/BJP 0 Not Actifity
134 Housing Type S2 S2.03 C - PG1 door accessories is not installed yet OPEN DO BJS WME/BJP 0 Not Actifity
135 Housing Type S2 S2.03 C - PG1 opening is untidy OPEN WA BJS WME/BJP 0 Not Actifity
136 Housing Type S2 S2.03 C - Scratched on PG1 frame OPEN DO BJS WME/BJP 0 Not Actifity
137 Housing Type S2 S2.03 C - Gap between PG1 frame and PG1 opening OPEN WA BJS WME/BJP 0 Not Actifity
138 Housing Type S2 S2.03 C - PG1 frame is unclean OPEN WA BJS WME/BJP 0 Not Actifity
139 Housing Type S2 S2.03 C - Wall around PG1 is unclean OPEN WA BJS WME/BJP 0.2 0.2 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
140 Housing Type S2 S2.03 C - Gap on the PG1 frame OPEN DO BJS WME/BJP 0 Not Actifity
141 Housing Type S2 S2.03 C - Ceiling is unclean OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
142 Housing Type S2 S2.03 C - Hole on the ceiling OPEN CI BJS WME/BJP 0 Not Actifity
143 Housing Type S2 S2.03 C - Water splash on the PG1 (need to cover) OPEN DO BJS WME/BJP 0 Not Actifity
144 Housing Type S2 S2.03 C - Gap between curtain cover with wall OPEN FU BJS WME/BJP 0
145 Housing Type S2 S2.03 C - Ceiling finishing is untidy OPEN CI BJS WME/BJP 0.2 0.2
Roof -
146 Housing Type S2 S2.03 C - Parapet wall is cracked OPEN RO BJS WME/BJP 0
Entrance
147 Housing Type S2 S2.03 C - Finishing parapet wall in untidy OPEN RO BJS WME/BJP 0 Not Actifity
148 Housing Type S2 S2.03 C - Roof drain cover can't be open OPEN RO BJS WME/BJP 0 Not Actifity
149 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO BJS WME/BJP 0 Not Actifity
150 Housing Type S2 S2.03 C - Chipped on roof tile OPEN RO BJS WME/BJP 0 Not Actifity
151 Housing Type S2 S2.03 C - Cracked on fascia board OPEN RO BJS WME/BJP 0 Not Actifity
152 Housing Type S2 S2.03 C - Embeded wall has not painted yet OPEN RO BJS WME/BJP 0 Not Actifity
153 Housing Type S2 S2.03 C - Cracked on roof deck surface OPEN RO BJS WME/BJP 0 Not Actifity
154 Housing Type S2 S2.03 C - Crack on the ridge OPEN RO BJS WME/BJP 0 Not Actifity
155 Housing Type S2 S2.03 C - Roof tile unclean OPEN RO BJS WME/BJP 0 Not Actifity
156 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO BJS WME/BJP 0 Not Actifity
157 Housing Type S2 S2.03 C - Roof tile installation is not align OPEN RO BJS WME/BJP 0 Not Actifity
Roof - Roof
deck
158 Housing Type S2 S2.03 C - Parapet wall cracked OPEN RO BJS WME/BJP 0 Not Actifity
bathroom &
bedroom
159 Housing Type S2 S2.03 C - Wall unfinished OPEN RO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
160 Housing Type S2 S2.03 C - Roof drain cover can't be installed properly OPEN RO BJS WME/BJP 0 Not Actifity
161 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO BJS WME/BJP 0 Not Actifity
162 Housing Type S2 S2.03 C - Hole on the wall OPEN RO BJS WME/BJP 0 Not Actifity
163 Housing Type S2 S2.03 C - Parapet wall chipped out OPEN RO BJS WME/BJP 0 Not Actifity
164 Housing Type S2 S2.03 C - Fascia board cracked OPEN RO BJS WME/BJP 0 Not Actifity
165 Housing Type S2 S2.03 C - Dirt on wall OPEN RO BJS WME/BJP 0 Not Actifity
166 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO BJS WME/BJP 0 Not Actifity
167 Housing Type S2 S2.03 C - Crack on the roof deck surface OPEN RO BJS WME/BJP 0 Not Actifity
168 Housing Type S2 S2.03 C - Parapet wall finishing is untidy OPEN RO BJS WME/BJP 0 Not Actifity
169 Housing Type S2 S2.03 C - Concrete canopy is cracked OPEN RO BJS WME/BJP 0 Not Actifity
Roof - Roof
170 Housing Type S2 S2.03 C deck Terrace - Cracks on the ridge OPEN RO BJS WME/BJP 0 Not Actifity
Living Room
171 Housing Type S2 S2.03 C - Cracks on the parapet wall OPEN RO BJS WME/BJP 0 Not Actifity
172 Housing Type S2 S2.03 C - Wall unfinished yet OPEN RO BJS WME/BJP 0 Not Actifity
173 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO BJS WME/BJP 0 Not Actifity
174 Housing Type S2 S2.03 C - Parapet wall chipped out OPEN RO BJS WME/BJP 0 Not Actifity
175 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO BJS WME/BJP 0 Not Actifity
176 Housing Type S2 S2.03 C - Roof drain cover by mortar OPEN RO BJS WME/BJP 0 Not Actifity
177 Housing Type S2 S2.03 C - Roof drain cover can't be open OPEN RO BJS WME/BJP 0 Not Actifity
178 Housing Type S2 S2.03 C - Fascia board is cracked OPEN RO BJS WME/BJP 0 Not Actifity
Roof - Roof
Deck Master
179 Housing Type S2 S2.03 C - No roof drain cover OPEN RO BJS WME/BJP 0 Not Actifity
Bedroom &
Bathroom
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
180 Housing Type S2 S2.03 C - Cracks on the parapet wall OPEN RO BJS WME/BJP 0 Not Actifity
181 Housing Type S2 S2.03 C - Parapet wall finishing is untidy OPEN RO BJS WME/BJP 0 Not Actifity
182 Housing Type S2 S2.03 C - Crack on ridge OPEN RO BJS WME/BJP 0 Not Actifity
183 Housing Type S2 S2.03 C - Wall unfinished (not painted yet) OPEN RO BJS WME/BJP 0 Not Actifity
184 Housing Type S2 S2.03 C - Crack on the fascia board OPEN RO BJS WME/BJP 0 Not Actifity
185 Housing Type S2 S2.03 C - Roof drain cover can't be open OPEN RO BJS WME/BJP 0 Not Actifity
186 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO BJS WME/BJP 0 Not Actifity
187 Housing Type S2 S2.03 C - Rebar exposed OPEN RO BJS WME/BJP 0 Not Actifity
188 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO BJS WME/BJP 0 Not Actifity
189 Housing Type S2 S2.03 C - Fascia board unclean OPEN RO BJS WME/BJP 0 Not Actifity
190 Housing Type S2 S2.03 C - Roof tile unclean OPEN RO BJS WME/BJP 0 Not Actifity
191 Housing Type S2 S2.03 C - Concrete canopy is cracked OPEN RO BJS WME/BJP 0 Not Actifity
192 Housing Type S2 S2.03 C Service area - Sealant P2 is untidy OPEN DO BJS WME/BJP 0 Not Actifity
193 Housing Type S2 S2.03 C - Sealant P2 still dirty OPEN DO BJS WME/BJP 0 Not Actifity
194 Housing Type S2 S2.03 C - Gap between frames P2 OPEN DO BJS WME/BJP 0 Not Actifity
195 Housing Type S2 S2.03 C - Gap between P2 and floor OPEN DO BJS WME/BJP 0 Not Actifity
196 Housing Type S2 S2.03 C - Scratch on the P2 HPL surface OPEN DO BJS WME/BJP 0 Not Actifity
197 Housing Type S2 S2.03 C - Lattice installed untidy OPEN DO BJS WME/BJP 0 Not Actifity
198 Housing Type S2 S2.03 C - Lattice surface P2 is not smooth OPEN DO BJS WME/BJP 0 Not Actifity
199 Housing Type S2 S2.03 C - Door frame P2 still dirty OPEN DO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
200 Housing Type S2 S2.03 C - Scratch on the door frame P2 OPEN DO BJS WME/BJP 0 Not Actifity
201 Housing Type S2 S2.03 C - Rubber door P2 is less long OPEN DO BJS WME/BJP 0 Not Actifity
202 Housing Type S2 S2.03 C - Hinge door has benn corrosion OPEN DO BJS WME/BJP 0 Not Actifity
203 Housing Type S2 S2.03 C - Opening surface P2 is uneven OPEN WA BJS WME/BJP 0 Not Actifity
204 Housing Type S2 S2.03 C - Crack on the opening P2 OPEN WA BJS WME/BJP 0 Not Actifity
205 Housing Type S2 S2.03 C - Defect in the frame P2 OPEN DO BJS WME/BJP 0 Not Actifity
206 Housing Type S2 S2.03 C - Defect in the HPL surface P2 OPEN DO BJS WME/BJP 0 Not Actifity
207 Housing Type S2 S2.03 C - P2 door is not smooth when opeed/closed OPEN DO BJS WME/BJP 0 Not Actifity
208 Housing Type S2 S2.03 C - There are 19 of unfilled ceramics and plint OPEN CR BJS WME/BJP 0 Not Actifity
209 Housing Type S2 S2.03 C - Gap on power outlet receptacle OPEN EL2 BJS WME/BJP 0 Not Actifity
210 Housing Type S2 S2.03 C - Gap on switch lamp OPEN EL2 BJS WME/BJP 0 Not Actifity
211 Housing Type S2 S2.03 C - Wall surface is uneven OPEN WA BJS WME/BJP 0 Not Actifity
212 Housing Type S2 S2.03 C - Wall painting is uneven OPEN WA BJS WME/BJP 0 Not Actifity
213 Housing Type S2 S2.03 C - Shadow line painting is untidy OPEN CI BJS WME/BJP 0 Not Actifity
214 Housing Type S2 S2.03 C - Ceiling surface is uneven OPEN CI BJS WME/BJP 0 Not Actifity
215 Housing Type S2 S2.03 C - Scratch on the ceiling surface OPEN CI BJS WME/BJP 0 Not Actifity
216 Housing Type S2 S2.03 C - Manhole area painting is untidy OPEN CI BJS WME/BJP 0 Not Actifity
218 Housing Type S2 S2.03 C - Porous on the wall OPEN WA BJS WME/BJP 0 Not Actifity
Terrace -
219 Housing Type S2 S2.03 C Master - Defect on the planter box surface OPEN WA BJS WME/BJP 0 Not Actifity
Bedroom
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
220 Housing Type S2 S2.03 C - Crack on the plante box surface OPEN WA BJS WME/BJP 0 Not Actifity
221 Housing Type S2 S2.03 C - Planter box unfinished OPEN WA BJS WME/BJP 0 Not Actifity
222 Housing Type S2 S2.03 C - Uneven wall surface OPEN WA BJS WME/BJP 0 Not Actifity
223 Housing Type S2 S2.03 C - Crack on wall surface OPEN WA BJS WME/BJP 0 Not Actifity
224 Housing Type S2 S2.03 C - Uneven wall painting OPEN WA BJS WME/BJP 0 Not Actifity
225 Housing Type S2 S2.03 C - Gap between frames J1 OPEN DO BJS WME/BJP 0 Not Actifity
226 Housing Type S2 S2.03 C - Sealant J1 is untidy OPEN DO BJS WME/BJP 0 Not Actifity
227 Housing Type S2 S2.03 C - Scratch on frame J1 OPEN DO BJS WME/BJP 0 Not Actifity
228 Housing Type S2 S2.03 C - Opening J1 is untidy OPEN WA BJS WME/BJP 0 Not Actifity
229 Housing Type S2 S2.03 C - J1 still dirty OPEN DO BJS WME/BJP 0 Not Actifity
230 Housing Type S2 S2.03 C - Deffect on top canopy surface OPEN RO BJS WME/BJP 0 Not Actifity
231 Housing Type S2 S2.03 C - Uneven painting on roof dike OPEN RO BJS WME/BJP 0 Not Actifity
232 Housing Type S2 S2.03 C - Crack on top roof dike OPEN RO BJS WME/BJP 0 Not Actifity
233 Housing Type S2 S2.03 C - Deffect on top roof dike OPEN RO BJS WME/BJP 0 Not Actifity
234 Housing Type S2 S2.03 C - Scratch on frame PG1 OPEN DO BJS WME/BJP 0 Not Actifity
235 Housing Type S2 S2.03 C - Gap between frames PG1 OPEN DO BJS WME/BJP 0 Not Actifity
236 Housing Type S2 S2.03 C - Deffect on the PG1 frame OPEN DO BJS WME/BJP 0 Not Actifity
237 Housing Type S2 S2.03 C - Sealant PG1 is untidy OPEN DO BJS WME/BJP 0 Not Actifity
238 Housing Type S2 S2.03 C - Uneven opening surface PG1 OPEN WA BJS WME/BJP 0 Not Actifity
239 Housing Type S2 S2.03 C - Untidy shadow line paint OPEN CI BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
240 Housing Type S2 S2.03 C - Uneven surface & painting of ceiling OPEN CI BJS WME/BJP 0 Not Actifity
241 Housing Type S2 S2.03 C - Uneven wall surface OPEN WA BJS WME/BJP 0 Not Actifity
243 Housing Type S2 S2.03 C - Grout ceramics floor and grout is untidy OPEN CR BJS WME/BJP 0 Not Actifity
244 Housing Type S2 S2.03 C - Uneven surface & painting of canopy OPEN WA BJS WME/BJP 0 Not Actifity
245 Housing Type S2 S2.03 C - Crack on canopy surface OPEN RO BJS WME/BJP 0 Not Actifity
246 Housing Type S2 S2.03 C - Crack on top roof dike OPEN RO BJS WME/BJP 0 Not Actifity
247 Housing Type S2 S2.03 C - Uneven surface & painting of top roof dike OPEN RO BJS WME/BJP 0 Not Actifity
Facade -
248 Housing Type S2 S2.03 C - Finishing bottom embossed walk OPEN WA BJS WME/BJP 0 Not Actifity
Left Side
249 Housing Type S2 S2.03 C - Deffect on bottom embossed wall surface OPEN WA BJS WME/BJP 0 Not Actifity
250 Housing Type S2 S2.03 C - Crack on bottom embossed wall surface OPEN WA BJS WME/BJP 0 Not Actifity
251 Housing Type S2 S2.03 C - Uneven surface & painting of wall OPEN WA BJS WME/BJP 0 Not Actifity
252 Housing Type S2 S2.03 C - Crack & uneven painting of roof deck OPEN RO BJS WME/BJP 0 Not Actifity
255 Housing Type S2 S2.03 C - Finishing bottom embossed wall OPEN WA BJS WME/BJP 0 Not Actifity
256 Housing Type S2 S2.03 C - Crack on planter box surface OPEN WA BJS WME/BJP 0 Not Actifity
257 Housing Type S2 S2.03 C - Uneven planter box surface OPEN WA BJS WME/BJP 0 Not Actifity
258 Housing Type S2 S2.03 C - Deffect on the planter box surface OPEN WA BJS WME/BJP 0 Not Actifity
259 Housing Type S2 S2.03 C - Uneven planter box painting OPEN WA BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
260 Housing Type S2 S2.03 C - Uneven opening surface J2 OPEN WA BJS WME/BJP 0 Not Actifity
261 Housing Type S2 S2.03 C - Crack on opening J2 OPEN WA BJS WME/BJP 0 Not Actifity
262 Housing Type S2 S2.03 C - Gap between frames J2 OPEN DO BJS WME/BJP 0 Not Actifity
263 Housing Type S2 S2.03 C - Sealant in the J2 is untidy OPEN DO BJS WME/BJP 0 Not Actifity
264 Housing Type S2 S2.03 C - Scratch in the frame J2 OPEN DO BJS WME/BJP 0 Not Actifity
265 Housing Type S2 S2.03 C - Check verticality corner in the J2 OPEN DO BJS WME/BJP 0 Not Actifity
266 Housing Type S2 S2.03 C - Uneven surface & painting of canopy OPEN RO BJS WME/BJP 0 Not Actifity
267 Housing Type S2 S2.03 C - Defect on the top canopy surface OPEN RO BJS WME/BJP 0 Not Actifity
268 Housing Type S2 S2.03 C - Defect on the top deck surface OPEN RO BJS WME/BJP 0 Not Actifity
269 Housing Type S2 S2.03 C - Uneven surface & painting on top roof dike OPEN RO BJS WME/BJP 0 Not Actifity
270 Housing Type S2 S2.03 C - Frame of J2 is not installed yet OPEN DO BJS WME/BJP 0 Not Actifity
Terrace -
271 Housing Type S2 S2.03 C - Uneven opening PJ2 surface OPEN WA BJS WME/BJP 0 Not Actifity
Living Room
272 Housing Type S2 S2.03 C - Sealant PJ2 is untidy OPEN DO BJS WME/BJP 0 Not Actifity
273 Housing Type S2 S2.03 C - Gap between frames PJ2 OPEN DO BJS WME/BJP 0 Not Actifity
274 Housing Type S2 S2.03 C - Scratch on the frame PJ2 OPEN DO BJS WME/BJP 0 Not Actifity
275 Housing Type S2 S2.03 C - Rubber window PJ2 less in length OPEN DO BJS WME/BJP 0 Not Actifity
276 Housing Type S2 S2.03 C - Installation of door handle is not proper OPEN DO BJS WME/BJP 0 Not Actifity
277 Housing Type S2 S2.03 C - Door accessories surface have been corrosion OPEN DO BJS WME/BJP 0 Not Actifity
278 Housing Type S2 S2.03 C - Sealant PJ2 not finished OPEN DO BJS WME/BJP 0 Not Actifity
279 Housing Type S2 S2.03 C - Uneven surface & painting on wall OPEN WA BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
280 Housing Type S2 S2.03 C - Untidy finishing on the shadow line OPEN CI BJS WME/BJP 0 Not Actifity
281 Housing Type S2 S2.03 C - Uneven ceiling surface OPEN CI BJS WME/BJP 0 Not Actifity
282 Housing Type S2 S2.03 C - Uneven surface & painting on ceiling exposed OPEN CI BJS WME/BJP 0 Not Actifity
283 Housing Type S2 S2.03 C - Cleaning outbow lamp OPEN EL2 BJS WME/BJP 0 Not Actifity
284 Housing Type S2 S2.03 C - Defect on the ceiling exposed surface OPEN CI BJS WME/BJP 0 Not Actifity
285 Housing Type S2 S2.03 C - Untidy painting & uneven surface on column OPEN WA BJS WME/BJP 0 Not Actifity
286 Housing Type S2 S2.03 C - Gap on pillar lamp OPEN WA BJS WME/BJP 0 Not Actifity
287 Housing Type S2 S2.03 C - Cleaning pillar lamp OPEN WA BJS WME/BJP 0 Not Actifity
288 Housing Type S2 S2.03 C - Gap on power outlet OPEN EL2 BJS WME/BJP 0 Not Actifity
289 Housing Type S2 S2.03 C - Uneven surface & painting on top floor dike OPEN WA BJS WME/BJP 0 Not Actifity
290 Housing Type S2 S2.03 C - Finishing verticality of Paras Jogja OPEN PJ BJS WME/BJP 0 Not Actifity
291 Housing Type S2 S2.03 C - Porous 63 floor tiles & plint OPEN CR BJS WME/BJP 0 Not Actifity
292 Housing Type S2 S2.03 C - Finishing bottom concrete floor dike OPEN WA BJS WME/BJP 0 Not Actifity
293 Housing Type S2 S2.03 C - Crack on bottom floor dike OPEN CR BJS WME/BJP 0 Not Actifity
294 Housing Type S2 S2.03 C - Floor tiles & grout plint is untidy OPEN CR BJS WME/BJP 0 Not Actifity
Terrace -
295 Housing Type S2 S2.03 C - Uneven surface & painting on PG2 opening OPEN WA BJS WME/BJP 0 Not Actifity
Bedroom II
296 Housing Type S2 S2.03 C - Sealant on frame PG2 is untidy OPEN DO BJS WME/BJP 0 Not Actifity
297 Housing Type S2 S2.03 C - Gap between frames PG2 OPEN DO BJS WME/BJP 0 Not Actifity
298 Housing Type S2 S2.03 C - Gap between frame PG2 and floor OPEN DO BJS WME/BJP 0 Not Actifity
299 Housing Type S2 S2.03 C - Scratch on PG2 frame OPEN DO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
300 Housing Type S2 S2.03 C - Crack on wall surface around PG2 OPEN WA BJS WME/BJP 0 Not Actifity
301 Housing Type S2 S2.03 C - Uneven surface & painting on the wall OPEN WA BJS WME/BJP 0 Not Actifity
302 Housing Type S2 S2.03 C - Shadow line painting is untidy OPEN CI BJS WME/BJP 0 Not Actifity
303 Housing Type S2 S2.03 C - Uneven surface & painting in the ceiling OPEN CI BJS WME/BJP 0 Not Actifity
304 Housing Type S2 S2.03 C - Crack on canopy surface OPEN RO BJS WME/BJP 0 Not Actifity
305 Housing Type S2 S2.03 C - Uneven surface & painting on the canopy OPEN RO BJS WME/BJP 0 Not Actifity
306 Housing Type S2 S2.03 C - Defect on top canopy surface OPEN RO BJS WME/BJP 0 Not Actifity
307 Housing Type S2 S2.03 C - Uneven surface & painting on top roof dike OPEN RO BJS WME/BJP 0 Not Actifity
308 Housing Type S2 S2.03 C - Crack on top & bottom roof dike OPEN RO BJS WME/BJP 0 Not Actifity
309 Housing Type S2 S2.03 C - Bottom roof dike unfinished OPEN WA BJS WME/BJP 0 Not Actifity
310 Housing Type S2 S2.03 C - Crack on planter box OPEN WA BJS WME/BJP 0 Not Actifity
311 Housing Type S2 S2.03 C - Finishing planter box is untidy OPEN WA BJS WME/BJP 0 Not Actifity
312 Housing Type S2 S2.03 C - Porous 25 floor tiles & plint OPEN CR BJS WME/BJP 0 Not Actifity
313 Housing Type S2 S2.03 C - Grout and plint on the floor is untidy OPEN CR BJS WME/BJP 0 Not Actifity
314 Housing Type S2 S2.03 C - Clean water faucet not installed OPEN PP BJS WME/BJP 0 Not Actifity
Facade -
315 Housing Type S2 S2.03 C - Bottom embossed wall unfinished OPEN WA BJS WME/BJP 0 Not Actifity
Right side
317 Housing Type S2 S2.03 C - Uneven surface & painting in the wall OPEN WA BJS WME/BJP 0 Not Actifity
318 Housing Type S2 S2.03 C - Crack on the wall surface OPEN WA BJS WME/BJP 0 Not Actifity
319 Housing Type S2 S2.03 C - Uneven top roof dike surface OPEN RO BJS WME/BJP 0 Not Actifity
BJP HOUSING KILLING PUNCH LIST 3
356
Punch
Unit Description .Cat. Responsible Item of
Control Item Building
No.
Civil / ME Section
(Incomplete/ Unsatisfactory Works) A/B/C Party
Status
Work
Implementer Closed By 24-Dec 6-Jan 7-Jan TOTAL PROGRESS REMARKS
No.
320 Housing Type S2 S2.03 C - Uneven opening bouvenlight OPEN WA BJS WME/BJP 0 Not Actifity
321 Housing Type S2 S2.03 C - Gap on frames BV OPEN DO BJS WME/BJP 0 Not Actifity
322 Housing Type S2 S2.03 C - Scratch on BV frame OPEN DO BJS WME/BJP 0 Not Actifity
323 Housing Type S2 S2.03 C - Sealant in the bouvenlight is untidy OPEN DO BJS WME/BJP 0 Not Actifity
324 Housing Type S2 S2.03 C - Uneven surface & painting on canopy surface OPEN RO BJS WME/BJP 0 Not Actifity
325 Housing Type S2 S2.03 C - Defect on the canopy surface OPEN RO BJS WME/BJP 0 Not Actifity
326 Housing Type S2 S2.03 C - Defect on the top deck surface OPEN RO BJS WME/BJP 0 Not Actifity
327 Housing Type S2 S2.03 C - Uneven wall surface in the exhaust area OPEN WA BJS WME/BJP 0 Not Actifity
Master
328 Housing Type S2 S2.03 C - Gap between P2 frame and floor OPEN DO BJS WME/BJP 0 Not Actifity
Bathroom
329 Housing Type S2 S2.03 C - Sealant P2 is untidy & dirty OPEN DO BJS WME/BJP 0 Not Actifity
330 Housing Type S2 S2.03 C - Scratch on P2 frame OPEN DO BJS WME/BJP 0 Not Actifity
331 Housing Type S2 S2.03 C - Scratch on door leaves P2 (HPL surface) OPEN DO BJS WME/BJP 0 Not Actifity
332 Housing Type S2 S2.03 C - Defect on P2 frame OPEN DO BJS WME/BJP 0 Not Actifity
333 Housing Type S2 S2.03 C - Installation the door P2 is not proper OPEN DO BJS WME/BJP 0 Not Actifity
334 Housing Type S2 S2.03 C - Opening lattice of door is untidy & rugged OPEN WA BJS WME/BJP 0 Not Actifity
340 Housing Type S2 S2.03 C - Scratch on bathtub surface OPEN SA BJS WME/BJP 0 Not Actifity
341 Housing Type S2 S2.03 C - Sealant in the J2 is untidy OPEN DO BJS WME/BJP 0 Not Actifity
342 Housing Type S2 S2.03 C - Gap between J2 frame OPEN DO BJS WME/BJP 0 Not Actifity
343 Housing Type S2 S2.03 C - Scratch on J2 frame & rambuncis OPEN DO BJS WME/BJP 0 Not Actifity
345 Housing Type S2 S2.03 C - Defect on HPL drawer surface OPEN FU BJS WME/BJP 0 Not Actifity
347 Housing Type S2 S2.03 C - Gap on lavatory accessories OPEN FU BJS WME/BJP 0 Not Actifity
348 Housing Type S2 S2.03 C - CWP & WWP is not connected OPEN PP BJS WME/BJP 0 Not Actifity
349 Housing Type S2 S2.03 C - Gap between lavatory and floor OPEN SA BJS WME/BJP 0 Not Actifity
350 Housing Type S2 S2.03 C - Double roob hook not installed yet OPEN FU BJS WME/BJP 0 Not Actifity
351 Housing Type S2 S2.03 C - Shadow line painting is untidy OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
352 Housing Type S2 S2.03 C - Uneven surface & painting in the ceiling OPEN CI BJS WME/BJP 0.2 0.2 Not Actifity
353 Housing Type S2 S2.03 C - Gap on exhaust fan to ceiling OPEN EC1 BJS WME/BJP 0 Not Actifity
354 Housing Type S2 S2.03 C - Porous 94 floor tiles & grout untidy OPEN CR BJS WME/BJP 0 Not Actifity
355 Housing Type S2 S2.03 C - Porous 220 wall tiles & grout untidy OPEN CR BJS WME/BJP 0 Not Actifity
356 Housing Type S2 S2.03 C - Defect on the wall tiles OPEN CR BJS WME/BJP 0 Not Actifity
2 1.5 6.5 10
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
1 Housing Type S2 S2.01 C Bedroom - (P1) Sealant application is untidy B KEY/Subcon OPEN WA BJS WME/BJP
2 Housing Type S2 S2.01 C - (P1) Dirty on frame C KEY/Subcon OPEN DO BJS WME/BJP
3 Housing Type S2 S2.01 C - (P1) Opening painting is untidy B KEY/Subcon OPEN WA BJS WME/BJP
4 Housing Type S2 S2.01 C - (P1) Gap between door leaves and stoper B KEY/Subcon OPEN DO BJS WME/BJP
`
5 Housing Type S2 S2.01 C - (P1) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP
6 Housing Type S2 S2.01 C - (P1) Crack and chipped on opening B KEY/Subcon OPEN DO BJS WME/BJP
7 Housing Type S2 S2.01 C - (P1) Dirty on handle C KEY/Subcon OPEN DO BJS WME/BJP
8 Housing Type S2 S2.01 C - The corner of wall surface finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
9 Housing Type S2 S2.01 C - Crack on the wall B KEY/Subcon OPEN WA BJS WME/BJP
10 Housing Type S2 S2.01 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
11 Housing Type S2 S2.01 C - Receptacle installation is inclined B KEY/Subcon OPEN WA BJS WME/BJP
12 Housing Type S2 S2.01 C - Finishing around receptacle is untidy B KEY/Subcon OPEN WA BJS WME/BJP
13 Housing Type S2 S2.01 C - Hole on the wall B KEY/Subcon OPEN WA BJS WME/BJP
14 Housing Type S2 S2.01 C - (PG2) Gap between frame and wall B KEY/Subcon OPEN DO BJS WME/BJP
15 Housing Type S2 S2.01 C - (PG2) Gap on frame joint B KEY/Subcon OPEN DO BJS WME/BJP
16 Housing Type S2 S2.01 C - (PG2) Door accessories is not installed yet B KEY/Subcon OPEN DO BJS WME/BJP
17 Housing Type S2 S2.01 C - (PG2) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP
18 Housing Type S2 S2.01 C - (PG2) Flush bolt hole cover is not install yet B KEY/Subcon OPEN DO BJS WME/BJP
19 Housing Type S2 S2.01 C - (Wardrobe) Wardrobe panel is not covering by HPL B KEY/Subcon OPEN FU BJS WME/BJP
20 Housing Type S2 S2.01 C - (Wardrobe) HPL surface finishing is untidy B KEY/Subcon OPEN FU BJS WME/BJP
21 Housing Type S2 S2.01 C - (Wardrobe) Dirty on HPL surface C KEY/Subcon OPEN FU BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
23 Housing Type S2 S2.01 C - (Wardrobe) Adhesive mark on stainless hanger C KEY/Subcon OPEN FU BJS WME/BJP
24 Housing Type S2 S2.01 C - (Wardrobe) Gap on jointing panel B KEY/Subcon OPEN FU BJS WME/BJP
26 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
27 Housing Type S2 S2.01 C - Remove blue tape on AC indoor unit C KEY/Subcon OPEN EC1 BJS WME/BJP
29 Housing Type S2 S2.01 C Bathroom 2 - (P2) Door leaves is not install yet B KEY/Subcon OPEN DO BJS WME/BJP
30 Housing Type S2 S2.01 C - (P2) Opening surface finishing is untidy B KEY/Subcon OPEN DO BJS WME/BJP
31 Housing Type S2 S2.01 C - (P2) Sealant painting is untidy B KEY/Subcon OPEN DO BJS WME/BJP
32 Housing Type S2 S2.01 C - (P2) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP
33 Housing Type S2 S2.01 C - (P2) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP
34 Housing Type S2 S2.01 C - (P2) Markers on the frame C KEY/Subcon OPEN DO BJS WME/BJP
36 Housing Type S2 S2.01 C - Gap on the switch (Change the ceramic tile) B KEY/Subcon OPEN CR BJS WME/BJP
37 Housing Type S2 S2.01 C - (Lavatory) Gap on sink drain B KEY/Subcon OPEN SA BJS WME/BJP
38 Housing Type S2 S2.01 C - (Lavatory) Sealant on sink is untidy B KEY/Subcon OPEN SA BJS WME/BJP
40 Housing Type S2 S2.01 C - (Lavatory) Adhesive attached on granite table B KEY/Subcon OPEN FU BJS WME/BJP
41 Housing Type S2 S2.01 C - (Lavatory) Pen mark on HPL surface C KEY/Subcon OPEN FU BJS WME/BJP
42 Housing Type S2 S2.01 C - (Lavatory) Gap between sink desk and wall B KEY/Subcon OPEN FU BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
43 Housing Type S2 S2.01 C - (Lavatory) There is no sealant on bottom mirror B KEY/Subcon OPEN SA BJS WME/BJP
46 Housing Type S2 S2.01 C - (Closet) The hose of closet is not short B KEY/Subcon OPEN SA BJS WME/BJP
47 Housing Type S2 S2.01 C - (Glass Cubicle) Sealant is untidy B KEY/Subcon OPEN SA BJS WME/BJP
49 Housing Type S2 S2.01 C - Glass shelf installation is not tight B KEY/Subcon OPEN SA BJS WME/BJP
50 Housing Type S2 S2.01 C - (BV1) Dirty on frame C KEY/Subcon OPEN DO BJS WME/BJP
51 Housing Type S2 S2.01 C - (BV1) Sealant is untidy B KEY/Subcon OPEN DO BJS WME/BJP
52 Housing Type S2 S2.01 C - (BV1) Opening painting is untidy B KEY/Subcon OPEN DO BJS WME/BJP
53 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
54 Housing Type S2 S2.01 C - (Ceiling) Gap on exhaust fan B KEY/Subcon OPEN CI BJS WME/BJP
56 Housing Type S2 S2.01 C - (PJ1) Remove seal on floor hinge C KEY/Subcon OPEN DO BJS WME/BJP
57 Housing Type S2 S2.01 C - (PJ1) Hole on alumunium frame (capping) B KEY/Subcon OPEN DO BJS WME/BJP
58 Housing Type S2 S2.01 C - (PJ1) Gap between frame and wall B KEY/Subcon OPEN DO BJS WME/BJP
59 Housing Type S2 S2.01 C - (PJ1) The glass is not sealing yet B KEY/Subcon OPEN DO BJS WME/BJP
60 Housing Type S2 S2.01 C - (PJ1) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP
62 Housing Type S2 S2.01 C - (PJ1) Remove seal frame C KEY/Subcon OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
63 Housing Type S2 S2.01 C - (PJ1) Glass stopper frame is not install yet B KEY/Subcon OPEN DO BJS 0
64 Housing Type S2 S2.01 C - (PJ1) Joint frame is not aligned B KEY/Subcon OPEN DO BJS 0
66 Housing Type S2 S2.01 C - (PJ1) Opening surface finishing is untidy B KEY/Subcon OPEN DO BJS 0
67 Housing Type S2 S2.01 C - (PJ1) Bottom side of opening is untidy B KEY/Subcon OPEN DO BJS 0
70 Housing Type S2 S2.01 C - (Shoe Rack) Hole on panels cabinet B KEY/Subcon OPEN FU BJS 0
72 Housing Type S2 S2.01 C - (Shoe Rack) Dirty on HPL surface C KEY/Subcon OPEN FU BJS 0
74 Housing Type S2 S2.01 C - (PJ2) Dent on the frame B KEY/Subcon OPEN DO BJS 0
75 Housing Type S2 S2.01 C - (PJ2) Remove seal frame C KEY/Subcon OPEN DO BJS 0
76 Housing Type S2 S2.01 C - (PJ2) Gap on jointing frame B KEY/Subcon OPEN DO BJS 0
77 Housing Type S2 S2.01 C - (PJ2) Adhesive marks on frame C KEY/Subcon OPEN DO BJS 0
79 Housing Type S2 S2.01 C - (PJ2) Wall surface finishing is untidy B KEY/Subcon OPEN DO BJS 0
80 Housing Type S2 S2.01 C - (PJ2) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS 0
82 Housing Type S2 S2.01 C - (Shelf) Gap on rack shelves is not sealing yet B KEY/Subcon OPEN FU BJS 0
83 Housing Type S2 S2.01 C - (Shelf) Shadow line is not closed yet B KEY/Subcon OPEN FU BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
84 Housing Type S2 S2.01 C - (Shelf) Wall surface finishing is not untidy B KEY/Subcon OPEN FU BJS 0
86 Housing Type S2 S2.01 C - Gap between TV Cabinet and the wall B KEY/Subcon OPEN FU BJS 0
87 Housing Type S2 S2.01 C - (TV Cabinet) The drawer leaves hit to the wall B KEY/Subcon OPEN FU BJS 0
89 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN WA BJS 0
91 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS 0
92 Housing Type S2 S2.01 C - (Ceiling) Hole former lamp is not closed yet B KEY/Subcon OPEN CI BJS 0
93 Housing Type S2 S2.01 C - (Ceiling) Manhole is not closed yet B KEY/Subcon OPEN CI BJS 0
95 Housing Type S2 S2.01 C - All of ceiling painting is uneven B KEY/Subcon OPEN CI BJS 0
96 Housing Type S2 S2.01 C Pantry - Bottom kitchen set is not sealing yet B KEY/Subcon OPEN FU BJS 0
97 Housing Type S2 S2.01 C - (Kitchen Set) Wash basin is not sealing yet B KEY/Subcon OPEN FU BJS 0
100 Housing Type S2 S2.01 C - (Kitchen Set) Dirty on HPL surface C KEY/Subcon OPEN FU BJS 0
102 Housing Type S2 S2.01 C - (Kitchen Set) Defect on HPL surface B KEY/Subcon OPEN FU BJS 0
104 Housing Type S2 S2.01 C - (Kitchen Set) Jointing cabinet panel is untidy B KEY/Subcon OPEN FU BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
105 Housing Type S2 S2.01 C - (Kitchen Set) Hole on HPL surface B KEY/Subcon OPEN FU BJS 0
107 Housing Type S2 S2.01 C - The edge of kitchen set finishing is untidy B KEY/Subcon OPEN FU BJS 0
108 Housing Type S2 S2.01 C - Drop ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS 0
111 Housing Type S2 S2.01 C - (P2) Opening finishing is untidy & crack B KEY/Subcon OPEN WA BJS 0
112 Housing Type S2 S2.01 C - (P2) Sealant is untidy B KEY/Subcon OPEN DO BJS 0
113 Housing Type S2 S2.01 C - (P2) Dirty on sealant C KEY/Subcon OPEN DO BJS 0
114 Housing Type S2 S2.01 C - (P2) Dirty on frame C KEY/Subcon OPEN DO BJS 0
115 Housing Type S2 S2.01 C - (P2) Remove seal frame C KEY/Subcon OPEN DO BJS 0
116 Housing Type S2 S2.01 C - (P2) Scratch on frame B KEY/Subcon OPEN DO BJS 0
117 Housing Type S2 S2.01 C - Sealant of glass cubicle is untidy B KEY/Subcon OPEN WA BJS 0
118 Housing Type S2 S2.01 C - Suggest to add stopper for door glass B KEY/Subcon OPEN RO BJS 0
119 Housing Type S2 S2.01 C - (Lavatory) Sealant of sink is untidy B KEY/Subcon OPEN RO BJS 0
120 Housing Type S2 S2.01 C - Hole on the receptacle (change ceramic tile) B KEY/Subcon OPEN WA BJS 0
121 Housing Type S2 S2.01 C - (Lavatory) Hole on the Switch (change ceramic tile B KEY/Subcon OPEN WA BJS 0
122 Housing Type S2 S2.01 C - (Lavatory) Mirror is not sealing yet B KEY/Subcon OPEN WA BJS 0
123 Housing Type S2 S2.01 C - Corner of wall tiles finishing is untidy B KEY/Subcon OPEN FU BJS 0
124 Housing Type S2 S2.01 C - (Bathtub) Gap between bathtub and granite B KEY/Subcon OPEN EC1 BJS 0
125 Housing Type S2 S2.01 C - (Bathtub) Dirty on bathtub C KEY/Subcon OPEN DO BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
126 Housing Type S2 S2.01 C - (Window) Gap on jointing frame B KEY/Subcon OPEN WA BJS 0
127 Housing Type S2 S2.01 C - (Window) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS 0
128 Housing Type S2 S2.01 C Hall Way - (P3) Remove seal frame C KEY/Subcon OPEN DO BJS 0
130 Housing Type S2 S2.01 C - (P3) Door leaves rubbing to the floor tile B KEY/Subcon OPEN DO BJS 0
131 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN DO BJS 0
132 Housing Type S2 S2.01 C - There are 31 ceramic floor tiles that porous A KEY/Subcon OPEN CR BJS 0
133 Housing Type S2 S2.01 C - Ceiling finishing surface is untidy B KEY/Subcon OPEN DO BJS 0
Walk In
134 Housing Type S2 S2.01 C - Remove seal frame C KEY/Subcon OPEN DO BJS 0
Closet
135 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN DO BJS 0
136 Housing Type S2 S2.01 C - There are 24 ceramic floor tiles that porous A KEY/Subcon OPEN DO BJS 0
137 Housing Type S2 S2.01 C - Wardrobe leaves hit each other B KEY/Subcon OPEN DO BJS 0
138 Housing Type S2 S2.01 C - Door leaves of wardrobe heavy to open B KEY/Subcon OPEN CI BJS 0
139 Housing Type S2 S2.01 C - Dirty on door leaves surface C KEY/Subcon OPEN FU BJS 0
140 Housing Type S2 S2.01 C - Dirty on stainless hanger C KEY/Subcon OPEN CI BJS 0
Master
141 Housing Type S2 S2.01 C - Wall surface is untidy B KEY/Subcon OPEN DO BJS 0
Bedroom
142 Housing Type S2 S2.01 C - (P1) Opening surface finishing is untidy B KEY/Subcon OPEN CR BJS 0
143 Housing Type S2 S2.01 C - (P1) Dirty on frame C KEY/Subcon OPEN WA BJS 0
144 Housing Type S2 S2.01 C - (P1) Scratch on frame B KEY/Subcon OPEN WA BJS 0
145 Housing Type S2 S2.01 C - (P1) Remove seal frame C KEY/Subcon OPEN CI BJS 0
147 Housing Type S2 S2.01 C - (P1) Dirty on handle C KEY/Subcon OPEN CR BJS 0
148 Housing Type S2 S2.01 C - (J1) Jointing frame is not aligned B KEY/Subcon OPEN WA BJS 0
149 Housing Type S2 S2.01 C - (J1) Gap on jointing frame B KEY/Subcon OPEN WA BJS 0
150 Housing Type S2 S2.01 C - (J1) Sealant and painting is untidy B KEY/Subcon OPEN CI BJS 0
151 Housing Type S2 S2.01 C - (J1) Opening surface finishing is untidy B KEY/Subcon OPEN CI BJS 0
152 Housing Type S2 S2.01 C - (PG1) Sealant and painting is untidy B KEY/Subcon OPEN CI BJS 0
153 Housing Type S2 S2.01 C - (PG1) Dirty on rail C KEY/Subcon OPEN DO BJS 0
154 Housing Type S2 S2.01 C - (PG1) Remove seal frame C KEY/Subcon OPEN PJ BJS 0
155 Housing Type S2 S2.01 C - (PG1) Door accessories is not install yet B KEY/Subcon OPEN WA BJS 0
156 Housing Type S2 S2.01 C - (PG1) Curtain hook is not install yet B KEY/Subcon OPEN WA BJS 0
158 Housing Type S2 S2.01 C - (PG1) Scratch on frame B KEY/Subcon OPEN WA BJS 0
159 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN PJ BJS 0
161 Housing Type S2 S2.01 C - (PJ1) Adhesive marks on frame C KEY/Subcon OPEN WA BJS 0
162 Housing Type S2 S2.01 C - (PJ1) Wall surface finishing is untidy B KEY/Subcon OPEN WA BJS 0
163 Housing Type S2 S2.01 C - (PJ1) Remove seal frame C KEY/Subcon OPEN DO BJS 0
164 Housing Type S2 S2.01 C - (PJ1) Dirty on glass C KEY/Subcon OPEN DO BJS 0
165 Housing Type S2 S2.01 C - (PJ1) Gap on jointing frame B KEY/Subcon OPEN DO BJS 0
166 Housing Type S2 S2.01 C - (PJ1) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS 0
167 Housing Type S2 S2.01 C - (PJ1) The glass is not sealing yet B KEY/Subcon OPEN DO BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
168 Housing Type S2 S2.01 C - (PJ1) Scratch on frame B KEY/Subcon OPEN DO BJS 0
169 Housing Type S2 S2.01 C - All of paras jogja that porous and not cohesive A KEY/Subcon OPEN PJ BJS 0
171 Housing Type S2 S2.01 C - Whole surface of all column is untidy B KEY/Subcon OPEN WA BJS 0
172 Housing Type S2 S2.01 C - Dirty on lamp fixtures C KEY/Subcon OPEN RO BJS 0
173 Housing Type S2 S2.01 C - Exposed ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS 0
174 Housing Type S2 S2.01 C - Whole surface of planter box is untidy B KEY/Subcon OPEN WA BJS 0
179 Housing Type S2 S2.01 C - Adhesive marks on frame (master bedroom area) C KEY/Subcon OPEN DO BJS 0
180 Housing Type S2 S2.01 C - Scratch on frame (master bedroom area) B KEY/Subcon OPEN DO BJS 0
181 Housing Type S2 S2.01 C - Remove seal frame(master bedroom area) C KEY/Subcon OPEN DO BJS 0
182 Housing Type S2 S2.01 C Service Room - Remove seal frame C KEY/Subcon OPEN DO BJS 0
183 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN WA BJS 0
184 Housing Type S2 S2.01 C - There are 19 ceramic floor tiles that porous A KEY/Subcon OPEN CR BJS 0
185 Housing Type S2 S2.01 C - Ceiling surface finishing is untidy B KEY/Subcon OPEN CI BJS 0
186 Housing Type S2 S2.01 C - Adhesive mark on frame C KEY/Subcon OPEN DO BJS 0
Facade -
187 Housing Type S2 S2.01 C - Wall surrface finishing is untidy B KEY/Subcon OPEN WA BJS 0
Right Side
188 Housing Type S2 S2.01 C - Faucet not install yet B KEY/Subcon OPEN WA BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
190 Housing Type S2 S2.01 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS 0
Facade - Back
191 Housing Type S2 S2.01 C - Wall finishing is untidy (bedroom area) B KEY/Subcon OPEN WA BJS 0
Side
192 Housing Type S2 S2.01 C - There are 19 ceramic floor tiles that porous A KEY/Subcon OPEN CR BJS 0
193 Housing Type S2 S2.01 C - Ceiling finishing is untidy (bedroom area) B KEY/Subcon OPEN CI BJS 0
194 Housing Type S2 S2.01 C - (PG2) Remove seal frame C KEY/Subcon OPEN DO BJS 0
195 Housing Type S2 S2.01 C - (PG2) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS 0
196 Housing Type S2 S2.01 C - Whole surface of planter box is untidy B KEY/Subcon OPEN WA BJS 0
197 Housing Type S2 S2.01 C - Whole surface of all column is untidy B KEY/Subcon OPEN WA BJS 0
198 Housing Type S2 S2.01 C - Dirty on lamp fixtures surface C KEY/Subcon OPEN EL2 BJS 0
202 Housing Type S2 S2.01 C - Receptacle installation is not proper B KEY/Subcon OPEN EL2 BJS 0
203 Housing Type S2 S2.01 C - Exposed ceiling finishhing is untidy and painting B KEY/Subcon OPEN WA BJS 0
204 Housing Type S2 S2.01 C - (PJ2) Opening painting is not finished yet B KEY/Subcon OPEN WA BJS 0
205 Housing Type S2 S2.01 C - (PJ2) Opening surface finishing is untidy B KEY/Subcon OPEN WA BJS 0
206 Housing Type S2 S2.01 C - (PJ2) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS 0
207 Housing Type S2 S2.01 C - (PJ2) Remove seal frame C KEY/Subcon OPEN DO BJS 0
209 Housing Type S2 S2.01 C - (PJ2) Sealant application is untidy B KEY/Subcon OPEN DO BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
210 Housing Type S2 S2.01 C - Wall finishing is untidy (master bathroom area) B KEY/Subcon OPEN WA BJS 0
211 Housing Type S2 S2.01 C - Remove seal frame on lattice and J2 window C KEY/Subcon OPEN DO BJS 0
212 Housing Type S2 S2.01 C - Suggest to add slot for lattice B KEY/Subcon OPEN DO BJS 0
213 Housing Type S2 S2.01 C - Gap on lattice and wall (master bathroom area) B KEY/Subcon OPEN WA BJS 0
216 Housing Type S2 S2.01 C - Dirty on skirting (terrace master bedroom) C KEY/Subcon OPEN CR BJS 0
218 Housing Type S2 S2.01 C - (PG1) Scratch on frame B KEY/Subcon OPEN DO BJS 0
219 Housing Type S2 S2.01 C - (PG1) Remove seal frame C KEY/Subcon OPEN DO BJS 0
220 Housing Type S2 S2.01 C - (PG1) Jointing frame is not aligned B KEY/Subcon OPEN DO BJS 0
Facade - Left
221 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN WA BJS 0
Side
222 Housing Type S2 S2.01 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS 0
224 Housing Type S2 S2.01 C - Roof drain is clogged B KEY/Subcon OPEN RO BJS 0
225 Housing Type S2 S2.01 C - Cast iron for roof drain is not install yet B KEY/Subcon OPEN RO BJS 0
226 Housing Type S2 S2.01 C - Wall surface finishing is untidy B KEY/Subcon OPEN RO BJS 0
227 Housing Type S2 S2.01 C - The wall is not painting yet B KEY/Subcon OPEN RO BJS 0
228 Housing Type S2 S2.01 C - Wall finishing around exhaust hood is untidy B KEY/Subcon OPEN RO BJS 0
230 Housing Type S2 S2.01 C - AC drain pipe should be piped to the bottom B KEY/Subcon OPEN PP BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
231 Housing Type S2 S2.01 C - Coring former should be closed by grouting B KEY/Subcon OPEN RO BJS 0
232 Housing Type S2 S2.01 C - There is no footing for outdoor AC unit B KEY/Subcon OPEN EC1 BJS 0
233 Housing Type S2 S2.01 C - Crack on the roof deck surface B KEY/Subcon OPEN RO BJS 0
235 Housing Type S2 S2.01 C - Crack on fascia board B KEY/Subcon OPEN RO BJS 0
236 Housing Type S2 S2.01 C - Fascia board finishing surface is untidy B KEY/Subcon OPEN RO BJS 0
238 Housing Type S2 S2.01 C - Paras Jogja stone is not install yet B KEY/Subcon OPEN PJ BJS 0
239 Housing Type S2 S2.01 C - Outer ceiling surface finishing is untidy B KEY/Subcon OPEN RO BJS 0
240 Housing Type S2 S2.01 C - Roof tiles arrangement is not aligned B KEY/Subcon OPEN RO BJS 0
241 Housing Type S2 S2.01 C - There is rubbish on roof deck C KEY/Subcon OPEN RO BJS 0
Roof Top -
243 Housing Type S2 S2.01 C - Cable installation for IT instrument is untidy B KEY/Subcon OPEN EL2 BJS 0
West Side
246 Housing Type S2 S2.01 C - Remove unused pipe C KEY/Subcon OPEN PP BJS 0
247 Housing Type S2 S2.01 C - Crack on the roof deck surface (chipped as well) B KEY/Subcon OPEN RO BJS 0
250 Housing Type S2 S2.01 C - Fascia board surface finishing is untidy B KEY/Subcon OPEN RO BJS 0
252 Housing Type S2 S2.01 C - Roof drain is clogged B KEY/Subcon OPEN PP BJS 0
254 Housing Type S2 S2.01 C - Cast iron for roof drain not install yet B KEY/Subcon OPEN RO BJS 0
261 Housing Type S2 S2.01 C - Remove unused reinforcement bar C KEY/Subcon OPEN RO BJS 0
262 Housing Type S2 S2.01 C - Outer ceiling painting is uneven B KEY/Subcon OPEN RO BJS 0
Concrete Roof
264 Housing Type S2 S2.01 C - Roof tiles arrangement is not align B KEY/Subcon OPEN RO BJS 0
Tile
265 Housing Type S2 S2.01 C - Roof tile not painting yet B KEY/Subcon OPEN RO BJS 0
BJP HOUSING KILLING PUNCH LIST 0
265
Punch Unit Description .Cat. Responsible Item of
Control Item Building Civil / ME Section Status Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec 20-Dec
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 0%
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Proses
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
21-Dec 22-Dec 23-Dec 24-Dec 25-Dec TOTAL PROGRESS REMARKS
0
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
1 Housing Type S2 S2.02 C Bedroom - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
2 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
3 Housing Type S2 S2.02 C - Crack on the wall B KEY/Subcon OPEN WA BJS WME/BJP
4 Housing Type S2 S2.02 C - Hole on the wall B KEY/Subcon OPEN WA BJS WME/BJP
5 Housing Type S2 S2.02 C - Ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
6 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
7 Housing Type S2 S2.02 C - Joint ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
8 Housing Type S2 S2.02 C - Sealant finishing on wardrobe is untidy B KEY/Subcon OPEN FU BJS WME/BJP
10 Housing Type S2 S2.02 C - There is no sealant on bottom wardrobe B KEY/Subcon OPEN FU BJS WME/BJP
12 Housing Type S2 S2.02 C - (P1) Opening finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
13 Housing Type S2 S2.02 C - (P1) Handle on P1 is not function B KEY/Subcon OPEN DO BJS WME/BJP
14 Housing Type S2 S2.02 C - (P1) Sealant on frame is untidy B KEY/Subcon OPEN DO BJS WME/BJP
15 Housing Type S2 S2.02 C - (P1) Gap on door leaves B KEY/Subcon OPEN DO BJS WME/BJP
16 Housing Type S2 S2.02 C - (P1) Scratch and chipped on door leaves B KEY/Subcon OPEN DO BJS WME/BJP
17 Housing Type S2 S2.02 C - (P1) Door opening is cracked B KEY/Subcon OPEN WA BJS WME/BJP
18 Housing Type S2 S2.02 C - (P1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
19 Housing Type S2 S2.02 C - (P1) Defect on the frame B KEY/Subcon OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
20 Housing Type S2 S2.02 C - (PG2) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP
21 Housing Type S2 S2.02 C - (PG2) Opening finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
22 Housing Type S2 S2.02 C - (PG2) Gap between frame and wall B KEY/Subcon OPEN WA BJS WME/BJP
23 Housing Type S2 S2.02 C - (PG2) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
24 Housing Type S2 S2.02 C - (PG2) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP
25 Housing Type S2 S2.02 C - (PG2) Gap between jointing frame B KEY/Subcon OPEN DO BJS WME/BJP
27 Housing Type S2 S2.02 C - (PG2) Sliding door is not function B KEY/Subcon OPEN DO BJS WME/BJP
28 Housing Type S2 S2.02 C - Curtain is not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
30 Housing Type S2 S2.02 C - Curtain hook is not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
32 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
33 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
34 Housing Type S2 S2.02 C - Ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
35 Housing Type S2 S2.02 C - Exposed ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
36 Housing Type S2 S2.02 C - (PG2) Top surface skirting is untidy B KEY/Subcon OPEN WA BJS WME/BJP
38 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
39 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
40 Housing Type S2 S2.02 C - Dirty on power outlet B KEY/Subcon OPEN EL2 BJS WME/BJP
41 Housing Type S2 S2.02 C - Wall shelf of TV cabinet is inclined B KEY/Subcon OPEN FU BJS WME/BJP
42 Housing Type S2 S2.02 C - Gap between the wall shelves and wall B KEY/Subcon OPEN FU BJS WME/BJP
43 Housing Type S2 S2.02 C - Gap between TV Cabinet and wall B KEY/Subcon OPEN FU BJS WME/BJP
44 Housing Type S2 S2.02 C - Gap between curtain cover with ceiling B KEY/Subcon OPEN CI BJS WME/BJP
45 Housing Type S2 S2.02 C - Ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
47 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
48 Housing Type S2 S2.02 C - Hole in the ceiling B KEY/Subcon OPEN CI BJS WME/BJP
49 Housing Type S2 S2.02 C - Ceiling painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP
50 Housing Type S2 S2.02 C - Manhole not cover yet (cornice) B KEY/Subcon OPEN CI BJS WME/BJP
51 Housing Type S2 S2.02 C - Hole on the wall B KEY/Subcon OPEN WA BJS WME/BJP
53 Housing Type S2 S2.02 C - Dirt on the AC cassette unit C KEY/Subcon OPEN EC1 BJS WME/BJP
54 Housing Type S2 S2.02 C - Dirt on the downlight fixtures B KEY/Subcon OPEN CI BJS WME/BJP
55 Housing Type S2 S2.02 C - Drop ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
56 Housing Type S2 S2.02 C - Dirt on the shoe rack C KEY/Subcon OPEN FU BJS WME/BJP
57 Housing Type S2 S2.02 C - Gap between shoe rack and wall B KEY/Subcon OPEN FU BJS WME/BJP
59 Housing Type S2 S2.02 C - Finishing around switch lamp is untidy B KEY/Subcon OPEN WA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
60 Housing Type S2 S2.02 C - Porous the wall B KEY/Subcon OPEN WA BJS WME/BJP
62 Housing Type S2 S2.02 C - (PJ2) Window leaves is hard to close B KEY/Subcon OPEN DO BJS WME/BJP
63 Housing Type S2 S2.02 C - (PJ2) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
64 Housing Type S2 S2.02 C - (PJ2) Dirt on the handle C KEY/Subcon OPEN DO BJS WME/BJP
65 Housing Type S2 S2.02 C - (PJ2) Opening surface is untidy B KEY/Subcon OPEN WA BJS WME/BJP
66 Housing Type S2 S2.02 C - (PJ2) Scratch and defect on frame B KEY/Subcon OPEN DO BJS WME/BJP
67 Housing Type S2 S2.02 C - (PJ2) Gap on the frame B KEY/Subcon OPEN DO BJS WME/BJP
68 Housing Type S2 S2.02 C - (PJ2) Scratch on door leaves B KEY/Subcon OPEN DO BJS WME/BJP
69 Housing Type S2 S2.02 C - (PJ2) Porous on opening PJ2 B KEY/Subcon OPEN WA BJS WME/BJP
70 Housing Type S2 S2.02 C - (PJ2) Dirt on the glass of PJ2 B KEY/Subcon OPEN DO BJS WME/BJP
71 Housing Type S2 S2.02 C - (PJ2) There is no sealant on bottom frame B KEY/Subcon OPEN DO BJS WME/BJP
74 Housing Type S2 S2.02 C - Hole on the kitchen set (above) B KEY/Subcon OPEN FU BJS WME/BJP
75 Housing Type S2 S2.02 C - Exposed screw on the kitchen set (above) B KEY/Subcon OPEN FU BJS WME/BJP
76 Housing Type S2 S2.02 C - Gap between kitchen set and drop ceiling B KEY/Subcon OPEN FU BJS WME/BJP
77 Housing Type S2 S2.02 C - Stove is not installed yet A KEY/Subcon OPEN FU BJS WME/BJP
78 Housing Type S2 S2.02 C - Dent on the kitchen set (below section) B KEY/Subcon OPEN FU BJS WME/BJP
79 Housing Type S2 S2.02 C - Granite table installation is untidy B KEY/Subcon OPEN FU BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
80 Housing Type S2 S2.02 C - Dirt on kitchen set (above) C KEY/Subcon OPEN FU BJS WME/BJP
83 Housing Type S2 S2.02 C - (PJ1) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP
84 Housing Type S2 S2.02 C - (PJ1) Opening surface is untidy B KEY/Subcon OPEN WA BJS WME/BJP
85 Housing Type S2 S2.02 C - (PJ1) Door leaves is not installed yet A KEY/Subcon OPEN DO BJS WME/BJP
86 Housing Type S2 S2.02 C - (PJ1) Gap between jointing frame B KEY/Subcon OPEN DO BJS WME/BJP
87 Housing Type S2 S2.02 C - (PJ1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
88 Housing Type S2 S2.02 C - (PJ1) Window leaves is hard to close B KEY/Subcon OPEN DO BJS WME/BJP
89 Housing Type S2 S2.02 C - (PJ1) The glass of PJ1 is not sealing yet B KEY/Subcon OPEN DO BJS WME/BJP
90 Housing Type S2 S2.02 C - (PJ1) Frame installation is not align B KEY/Subcon OPEN DO BJS WME/BJP
91 Housing Type S2 S2.02 C Roof Deck - Crack on roof deck surface B KEY/Subcon OPEN RO BJS WME/BJP
92 Housing Type S2 S2.02 C - Crack on parapet wall B KEY/Subcon OPEN RO BJS WME/BJP
94 Housing Type S2 S2.02 C - Outside wall finishing untidy B KEY/Subcon OPEN RO BJS WME/BJP
95 Housing Type S2 S2.02 C Roof Tile - Roof tile is chipped out B KEY/Subcon OPEN RO BJS WME/BJP
96 Housing Type S2 S2.02 C - Dirt on roof tile C KEY/Subcon OPEN RO BJS WME/BJP
97 Housing Type S2 S2.02 C - Crack on fascia board B KEY/Subcon OPEN RO BJS WME/BJP
99 Housing Type S2 S2.02 C - Crack on the ceiling jointing B KEY/Subcon OPEN RO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
100 Housing Type S2 S2.02 C - Refrigerator hole is not finished yet B KEY/Subcon OPEN RO BJS WME/BJP
101 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP
102 Housing Type S2 S2.02 C - Fascia board installation is not align B KEY/Subcon OPEN RO BJS WME/BJP
103 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP
104 Housing Type S2 S2.02 C - There is no roof drain on the roof deck ba A KEY/Subcon OPEN RO BJS WME/BJP
105 Housing Type S2 S2.02 C - Outside wall finishing is untidy (bathroom B KEY/Subcon OPEN RO BJS WME/BJP
106 Housing Type S2 S2.02 C - There is an hose on the roof deck C KEY/Subcon OPEN EC1 BJS WME/BJP
107 Housing Type S2 S2.02 C - Leaks on the outer ceiling A KEY/Subcon OPEN RO BJS WME/BJP
108 Housing Type S2 S2.02 C - Crack on the parapet wall B KEY/Subcon OPEN RO BJS WME/BJP
110 Housing Type S2 S2.02 C - Dirt on the roof tile C KEY/Subcon OPEN RO BJS WME/BJP
111 Housing Type S2 S2.02 C - Finishing around exhaust hood is untidy B KEY/Subcon OPEN RO BJS WME/BJP
112 Housing Type S2 S2.02 C - Wall painting is not finished yet B KEY/Subcon OPEN RO BJS WME/BJP
113 Housing Type S2 S2.02 C - Crack on the fascia board B KEY/Subcon OPEN RO BJS WME/BJP
114 Housing Type S2 S2.02 C - Crack on the parapet surface B KEY/Subcon OPEN RO BJS WME/BJP
115 Housing Type S2 S2.02 C - Roof tile is chipped out B KEY/Subcon OPEN RO BJS WME/BJP
116 Housing Type S2 S2.02 C - Wall finishing is not finished yet B KEY/Subcon OPEN RO BJS WME/BJP
117 Housing Type S2 S2.02 C - Roof drain is clogged A KEY/Subcon OPEN RO BJS WME/BJP
118 Housing Type S2 S2.02 C - Crack on top of canopy surface B KEY/Subcon OPEN RO BJS WME/BJP
119 Housing Type S2 S2.02 C - Roof drain cover can't be open B KEY/Subcon OPEN RO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
120 Housing Type S2 S2.02 C - Crack on roof tile B KEY/Subcon OPEN RO BJS WME/BJP
121 Housing Type S2 S2.02 C - Parapet wall finishing is untidy B KEY/Subcon OPEN RO BJS WME/BJP
Master
122 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
Bedroom
123 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
125 Housing Type S2 S2.02 C - AC split cover is not installed yet B KEY/Subcon OPEN EC1 BJS WME/BJP
126 Housing Type S2 S2.02 C - Rambuncis on J1 window is not installed ye A KEY/Subcon OPEN DO BJS WME/BJP
127 Housing Type S2 S2.02 C - Wall finishing is not finished yet B KEY/Subcon OPEN WA BJS WME/BJP
128 Housing Type S2 S2.02 C - (J1) Gap between jointing frame B KEY/Subcon OPEN DO BJS WME/BJP
129 Housing Type S2 S2.02 C - (J1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
130 Housing Type S2 S2.02 C - (J1) Opening finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
131 Housing Type S2 S2.02 C - (J1) Dirty on the window C KEY/Subcon OPEN DO BJS WME/BJP
132 Housing Type S2 S2.02 C - (J1) Scratch on frame B KEY/Subcon OPEN DO BJS WME/BJP
134 Housing Type S2 S2.02 C - (PG1) Scratch and defect on frame of door B KEY/Subcon OPEN DO BJS WME/BJP
135 Housing Type S2 S2.02 C - (PG1) Gap between frame and wall B KEY/Subcon OPEN DO BJS WME/BJP
138 Housing Type S2 S2.02 C - (PG1) Gap between jointing frame B KEY/Subcon OPEN DO BJS WME/BJP
139 Housing Type S2 S2.02 C - Ceiling jointing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
140 Housing Type S2 S2.02 C - Gap between TV cabinet & wall B KEY/Subcon OPEN FU BJS WME/BJP
141 Housing Type S2 S2.02 C - Shadow line finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
144 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
145 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
146 Housing Type S2 S2.02 C - Concrete ceiling around lamp finishing is B KEY/Subcon OPEN CI BJS WME/BJP
147 Housing Type S2 S2.02 C - (PG1) Opening finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
149 Housing Type S2 S2.02 C - Column finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
151 Housing Type S2 S2.02 C - Concrete ceiling finishing is untidy B KEY/Subcon OPEN CI BJS WME/BJP
152 Housing Type S2 S2.02 C - Dirt on concrete ceiling C KEY/Subcon OPEN CI BJS WME/BJP
153 Housing Type S2 S2.02 C - Shadow line surface is untidy C KEY/Subcon OPEN CI BJS WME/BJP
154 Housing Type S2 S2.02 C - (PJ2) Dirt on the frame B KEY/Subcon OPEN DO BJS WME/BJP
155 Housing Type S2 S2.02 C - Bottom of Paras Jogja finishing is untidy B KEY/Subcon OPEN PJ BJS WME/BJP
Back Side
156 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
Facade
157 Housing Type S2 S2.02 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
158 Housing Type S2 S2.02 C - Embeded wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
Front Side
159 Housing Type S2 S2.02 C - Wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
Facade
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
161 Housing Type S2 S2.02 C - Embeded wall finishing is untidy B KEY/Subcon OPEN WA BJS WME/BJP
163 Housing Type S2 S2.02 C - Whole surface of planter box finishing is B KEY/Subcon OPEN WA BJS WME/BJP
164 Housing Type S2 S2.02 C - Cracks on the wall B OPEN WA BJS WME/BJP
165 Housing Type S2 S2.02 C - Embeded exposed is untidy B OPEN WA BJS WME/BJP
166 Housing Type S2 S2.02 C - (J2) Gap between jointing frame B OPEN DO BJS WME/BJP
167 Housing Type S2 S2.02 C - Embeded wall is not finished yet B OPEN WA BJS WME/BJP
Master
168 Housing Type S2 S2.02 C - (P2) Door leaves surface is uneven B OPEN DO BJS WME/BJP
Bathroom
169 Housing Type S2 S2.02 C - (P2) Dirt on door leaves C OPEN DO BJS WME/BJP
170 Housing Type S2 S2.02 C - (P2) Dirt on door handle C OPEN DO BJS WME/BJP
171 Housing Type S2 S2.02 C - (P2) Scratch on door leaves B OPEN DO BJS WME/BJP
172 Housing Type S2 S2.02 C - (P2) Opening surface is untidy B OPEN WA BJS WME/BJP
173 Housing Type S2 S2.02 C - (P2) Lattice surface is rugged B OPEN DO BJS WME/BJP
174 Housing Type S2 S2.02 C - (P2) Sealant application is untidy C OPEN DO BJS WME/BJP
175 Housing Type S2 S2.02 C - (P2) Dirty on sealant C OPEN DO BJS WME/BJP
176 Housing Type S2 S2.02 C - (P2) Markers on frame C OPEN DO BJS WME/BJP
178 Housing Type S2 S2.02 C - (Glass cubicle) Dirty on sealant C OPEN SA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
179 Housing Type S2 S2.02 C - (Glass cubicle) Dirty on the glass C OPEN SA BJS WME/BJP
180 Housing Type S2 S2.02 C - Sealant application on the soap holder is C OPEN SA BJS WME/BJP
182 Housing Type S2 S2.02 C - Gap between bathtub and granite slab B OPEN SA BJS WME/BJP
183 Housing Type S2 S2.02 C - Scratch on the bathtub B OPEN SA BJS WME/BJP
184 Housing Type S2 S2.02 C - (J2) Sealant application is untidy C OPEN DO BJS WME/BJP
185 Housing Type S2 S2.02 C - (J2) Dirty on sealant C OPEN DO BJS WME/BJP
186 Housing Type S2 S2.02 C - (J2) Gap on jointing frame B OPEN DO BJS WME/BJP
187 Housing Type S2 S2.02 C - (J2) The window is not smoothly when close B OPEN DO BJS WME/BJP
188 Housing Type S2 S2.02 C - (J2) Scratch on frame B OPEN DO BJS WME/BJP
189 Housing Type S2 S2.02 C - There is no sealant on bottom mirror B OPEN SA BJS WME/BJP
190 Housing Type S2 S2.02 C - Sealant application on bottom wastafel is C OPEN FU BJS WME/BJP
191 Housing Type S2 S2.02 C - Sealant application on granite table is un C OPEN FU BJS WME/BJP
192 Housing Type S2 S2.02 C - Hinge of drawer has been corrosion B OPEN FU BJS WME/BJP
193 Housing Type S2 S2.02 C - Gap between sink table and wall B OPEN FU BJS WME/BJP
194 Housing Type S2 S2.02 C - Dirt on drawer surface C OPEN FU BJS WME/BJP
195 Housing Type S2 S2.02 C - Defect on HPL surface C OPEN FU BJS WME/BJP
196 Housing Type S2 S2.02 C - (Glass cubicle) Scratch on the glass B OPEN SA BJS WME/BJP
199 Housing Type S2 S2.02 C - Sealant application on bottom closet is un C OPEN SA BJS WME/BJP
201 Housing Type S2 S2.02 C Hall Way - (P1) Sealant application is untidy C OPEN DO BJS WME/BJP
202 Housing Type S2 S2.02 C - (P1) Dirty on sealant C OPEN DO BJS WME/BJP
203 Housing Type S2 S2.02 C - (P1) Opening surface is untidy C OPEN WA BJS WME/BJP
204 Housing Type S2 S2.02 C - (P1) Scratch on frame B OPEN DO BJS WME/BJP
205 Housing Type S2 S2.02 C - (P1) The door is not tightly when closed B OPEN DO BJS WME/BJP
206 Housing Type S2 S2.02 C - (P1) Scratch on handle B OPEN DO BJS WME/BJP
207 Housing Type S2 S2.02 C - (P1) Dirty on hinge of the door C OPEN DO BJS WME/BJP
208 Housing Type S2 S2.02 C - (P1) Defect on door leaves B OPEN DO BJS WME/BJP
210 Housing Type S2 S2.02 C - Wall surface is uneven B OPEN WA BJS WME/BJP
211 Housing Type S2 S2.02 C - Wall painting is untidy B OPEN WA BJS WME/BJP
212 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN CI BJS WME/BJP
213 Housing Type S2 S2.02 C - Ceiling painting is untidy B OPEN CI BJS WME/BJP
214 Housing Type S2 S2.02 C - Ceiling surface is uneven B OPEN CI BJS WME/BJP
215 Housing Type S2 S2.02 C - The corner of wall finishing is untidy B OPEN WA BJS WME/BJP
216 Housing Type S2 S2.02 C - (P2) Crack on the opening B OPEN WA BJS WME/BJP
217 Housing Type S2 S2.02 C - (P2) Sealant application is untidy B OPEN DO BJS WME/BJP
218 Housing Type S2 S2.02 C - (P2) Dirty on sealant C OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
219 Housing Type S2 S2.02 C - (P2) Opening surface is uneven B OPEN WA BJS WME/BJP
220 Housing Type S2 S2.02 C - (P2) Scratch on frame B OPEN DO BJS WME/BJP
221 Housing Type S2 S2.02 C - (P2) Scratch on door leaves (HPL surface) B OPEN DO BJS WME/BJP
222 Housing Type S2 S2.02 C - (P2) Scratch on door handle B OPEN DO BJS WME/BJP
223 Housing Type S2 S2.02 C - (P2) Lattice installation is untidy B OPEN DO BJS WME/BJP
224 Housing Type S2 S2.02 C - (P2) Lattice finishing is untidy B OPEN DO BJS WME/BJP
225 Housing Type S2 S2.02 C - (P2) The frame of lattice is rugged B OPEN DO BJS WME/BJP
226 Housing Type S2 S2.02 C - (P2) Gap on cylinder cover B OPEN DO BJS WME/BJP
228 Housing Type S2 S2.02 C - (P2) Scratch on the bottom of frame B OPEN DO BJS WME/BJP
229 Housing Type S2 S2.02 C - Adhesive mark on the frame C OPEN DO BJS WME/BJP
230 Housing Type S2 S2.02 C - Scratch on the lockcase & handle B OPEN DO BJS WME/BJP
232 Housing Type S2 S2.02 C - (P1) Opening surface finishing is untidy B OPEN WA BJS WME/BJP
233 Housing Type S2 S2.02 C - Ceramic plint tile is not fully grout B OPEN CR BJS WME/BJP
Walk In
234 Housing Type S2 S2.02 C - (P3) Opening surfce is untidy B OPEN WA BJS WME/BJP
Closet
235 Housing Type S2 S2.02 C - (P3) Sealant application is untidy B OPEN DO BJS WME/BJP
236 Housing Type S2 S2.02 C - (P3) Dirty on sealant of frame B OPEN DO BJS WME/BJP
237 Housing Type S2 S2.02 C - (P3) There is no sealant on bottom frame B OPEN DO BJS WME/BJP
238 Housing Type S2 S2.02 C - (P3) Defect on the frame B OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
239 Housing Type S2 S2.02 C - (P3) Dirt on the frame C OPEN DO BJS WME/BJP
240 Housing Type S2 S2.02 C - (P3) There is no sealant on top of frame B OPEN DO BJS WME/BJP
241 Housing Type S2 S2.02 C - (P3) Defect on the door leaves B OPEN DO BJS WME/BJP
242 Housing Type S2 S2.02 C - (P3) Scratch on the rail B OPEN DO BJS WME/BJP
243 Housing Type S2 S2.02 C - Dirt on power outlet C OPEN EL2 BJS WME/BJP
244 Housing Type S2 S2.02 C - The corner of wall is untidy B OPEN WA BJS WME/BJP
245 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN CI BJS WME/BJP
246 Housing Type S2 S2.02 C - Ceiling painting is untidy B OPEN CI BJS WME/BJP
247 Housing Type S2 S2.02 C - Chipped on drop ceiling C OPEN CI BJS WME/BJP
249 Housing Type S2 S2.02 C - Gap between wardrobe and wall B OPEN FU BJS WME/BJP
250 Housing Type S2 S2.02 C - Dirt on stainless hanger C OPEN FU BJS WME/BJP
251 Housing Type S2 S2.02 C - Exposed screw in the wardrobe C OPEN FU BJS WME/BJP
252 Housing Type S2 S2.02 C - Dirt on drawer surface C OPEN FU BJS WME/BJP
254 Housing Type S2 S2.02 C - Hole on panel surface of wardrobe C OPEN FU BJS WME/BJP
256 Housing Type S2 S2.02 C - The door of wardrobe finishing is untidy B OPEN FU BJS WME/BJP
257 Housing Type S2 S2.02 C Service Room - (P2) Opening surface is untidy B OPEN WA BJS WME/BJP
258 Housing Type S2 S2.02 C - (P2) Gap between frame and wall B OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
259 Housing Type S2 S2.02 C - (P2) Sealant application is untidy B OPEN DO BJS WME/BJP
260 Housing Type S2 S2.02 C - (P2) Dirty on sealant C OPEN DO BJS WME/BJP
262 Housing Type S2 S2.02 C - (P2) Water rope finishing is untidy B OPEN DO BJS WME/BJP
264 Housing Type S2 S2.02 C - (P2) Lattice surface is rugged B OPEN DO BJS WME/BJP
265 Housing Type S2 S2.02 C - (P2) The door is not tightly when closed B OPEN DO BJS WME/BJP
266 Housing Type S2 S2.02 C - (P2) Scratch on the frame B OPEN DO BJS WME/BJP
267 Housing Type S2 S2.02 C - (P2) Defect on the door leaves surface B OPEN DO BJS WME/BJP
269 Housing Type S2 S2.02 C - (P2) Markers on the frame C OPEN DO BJS WME/BJP
270 Housing Type S2 S2.02 C - (P2) Scratch on the door handle B OPEN DO BJS WME/BJP
272 Housing Type S2 S2.02 C - Wall surface is uneven B OPEN WA BJS WME/BJP
273 Housing Type S2 S2.02 C - Porous on the wall B OPEN WA BJS WME/BJP
274 Housing Type S2 S2.02 C - Wall painting is untidy B OPEN WA BJS WME/BJP
275 Housing Type S2 S2.02 C - The corner of the wall is untidy B OPEN WA BJS WME/BJP
276 Housing Type S2 S2.02 C - Dirty on the wall C OPEN WA BJS WME/BJP
277 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN CI BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
280 Housing Type S2 S2.02 C Entrance - (PJ1) Opening surface is chipped out B OPEN WA BJS WME/BJP
281 Housing Type S2 S2.02 C - (PJ1) Sealant application is untidy B OPEN DO BJS WME/BJP
282 Housing Type S2 S2.02 C - (PJ1) Gap on jointing frame B OPEN DO BJS WME/BJP
283 Housing Type S2 S2.02 C - Wall painting is untidy B OPEN WA BJS WME/BJP
284 Housing Type S2 S2.02 C - Shadow line painting is untidy B OPEN CI BJS WME/BJP
285 Housing Type S2 S2.02 C - Ceiling surface is uneven B OPEN CI BJS WME/BJP
287 Housing Type S2 S2.02 C - Exposed ceiling surface is uneven B OPEN CI BJS WME/BJP
289 Housing Type S2 S2.02 C - Whole of column painting is untidy B OPEN WA BJS WME/BJP
290 Housing Type S2 S2.02 C - Column surface is chipped B OPEN WA BJS WME/BJP
291 Housing Type S2 S2.02 C - Dirty on lamp fixtures C OPEN EL2 BJS WME/BJP
293 Housing Type S2 S2.02 C - Whole of planter box surface is defect B OPEN WA BJS WME/BJP
294 Housing Type S2 S2.02 C - Dirty on planter box surface C OPEN WA BJS WME/BJP
295 Housing Type S2 S2.02 C - (Koral Sikat) installation is untidy B OPEN WA BJS WME/BJP
296 Housing Type S2 S2.02 C - Crack on edge of (koral sikat) B OPEN WA BJS WME/BJP
297 Housing Type S2 S2.02 C - (Koral sikat) painting is untidy B OPEN WA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
301
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
299 Housing Type S2 S2.02 C - Roof deck plank painting is untidy B OPEN RO BJS WME/BJP
0 0% Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
2 Housing Type S2 S2.03 C - Untidy finishing on concrete ceiling OPEN CI BJS WME/BJP
6 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP
7 Housing Type S2 S2.03 C - PJ1 door leaves is not installed yet OPEN DO BJS WME/BJP
8 Housing Type S2 S2.03 C - PJ1 frame opening is untidy OPEN DO BJS WME/BJP
9 Housing Type S2 S2.03 C - Gap on the PJ1 frame OPEN DO BJS WME/BJP
10 Housing Type S2 S2.03 C - Gap between PJ1 frame with opening OPEN DO BJS WME/BJP
11 Housing Type S2 S2.03 C - Scratched on the PJ1 frame OPEN DO BJS WME/BJP
12 Housing Type S2 S2.03 C - PJ1 window leaves frame is unclean OPEN DO BJS WME/BJP
16 Housing Type S2 S2.03 C - Uneven painting on the bottom roof deck OPEN CI BJS WME/BJP
17 Housing Type S2 S2.03 C - Finishing bottom roof deck is untidy OPEN CI BJS WME/BJP
18 Housing Type S2 S2.03 C - Planter box painting is untidy & uneven OPEN WA BJS WME/BJP
19 Housing Type S2 S2.03 C - Crack on the concrete planter OPEN WA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
21 Housing Type S2 S2.03 C - Embeded wall is unpainted yet OPEN WA BJS WME/BJP
22 Housing Type S2 S2.03 C - Pebble stone no application yet OPEN PJ BJS WME/BJP
23 Housing Type S2 S2.03 C Living Room - Porous ceramic tile (124 section) OPEN CR BJS WME/BJP
26 Housing Type S2 S2.03 C - Porous ceramic wall (12 section) OPEN CR BJS WME/BJP
27 Housing Type S2 S2.03 C - Stove is not installed yet OPEN FU BJS WME/BJP
33 Housing Type S2 S2.03 C - Drop ceiling finishing is untidy OPEN CI BJS WME/BJP
34 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP
35 Housing Type S2 S2.03 C - Curtain is not installed yet (PJ1 & PJ2) OPEN FU BJS WME/BJP
36 Housing Type S2 S2.03 C - Switch lamp is not installed yet OPEN EL2 BJS WME/BJP
37 Housing Type S2 S2.03 C - Gap on the PJ2 frame OPEN DO BJS WME/BJP
38 Housing Type S2 S2.03 C - PJ2 opening is untidy (finishing) OPEN WA BJS WME/BJP
41 Housing Type S2 S2.03 C - PJ2 door handle is unclean OPEN DO BJS WME/BJP
45 Housing Type S2 S2.03 C - Gap between TV Cabinet with wall OPEN FU BJS WME/BJP
49 Housing Type S2 S2.03 C - Shoe rack sealant application is untidy OPEN FU BJS WME/BJP
56 Housing Type S2 S2.03 C - Mirror installation is not sealing yet OPEN SA BJS WME/BJP
63 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP
64 Housing Type S2 S2.03 C - Exhaust fan unclean OPEN EL2 BJS WME/BJP
72 Housing Type S2 S2.03 C - Shower installation is not proper OPEN SA BJS WME/BJP
74 Housing Type S2 S2.03 C Bedroom II - Wall finishing is untidy & unclean OPEN WA BJS WME/BJP
76 Housing Type S2 S2.03 C - Wardrobe section is not closed with HPL OPEN FU BJS WME/BJP
77 Housing Type S2 S2.03 C - Crack on the wall surface OPEN WA BJS WME/BJP
84 Housing Type S2 S2.03 C - Gap between PG2 frame & opening OPEN DO BJS WME/BJP
86 Housing Type S2 S2.03 C - Gap on the PG2 frame OPEN DO BJS WME/BJP
87 Housing Type S2 S2.03 C - Curtain is not installed yet OPEN FU BJS WME/BJP
89 Housing Type S2 S2.03 C - Crack on the PG2 opening OPEN WA BJS WME/BJP
91 Housing Type S2 S2.03 C - PG2 frame (bottom) is not sealing yet OPEN DO BJS WME/BJP
92 Housing Type S2 S2.03 C - Downlight fixtures is unclean OPEN EL2 BJS WME/BJP
93 Housing Type S2 S2.03 C - Switch lamp is not covered OPEN EL2 BJS WME/BJP
94 Housing Type S2 S2.03 C - Untidy finishing on the shadow line OPEN CI BJS WME/BJP
97 Housing Type S2 S2.03 C - Water splash in the PG2 (need to cover) OPEN DO BJS WME/BJP
99 Housing Type S2 S2.03 C - Ceramic tile chipped out OPEN CR BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
Walk In
100 Housing Type S2 S2.03 C - Wall finishing is untidy OPEN WA BJS WME/BJP
Closet
101 Housing Type S2 S2.03 C - Wall painting is uneven OPEN WA BJS WME/BJP
102 Housing Type S2 S2.03 C - P3 handle accessories is not installed yet OPEN DO BJS WME/BJP
103 Housing Type S2 S2.03 C - Porous ceramic tile (52 section) OPEN CR BJS WME/BJP
104 Housing Type S2 S2.03 C - P3 door not smooth when closed OPEN DO BJS WME/BJP
105 Housing Type S2 S2.03 C - Gap on the wardrobe door OPEN FU BJS WME/BJP
106 Housing Type S2 S2.03 C - Wardrobe door unclean OPEN FU BJS WME/BJP
107 Housing Type S2 S2.03 C - Wardrobe drawer can't be open OPEN FU BJS WME/BJP
108 Housing Type S2 S2.03 C - Dirt on the wall OPEN WA BJS WME/BJP
109 Housing Type S2 S2.03 C - Gap between wardrobe & drop ceiling OPEN FU BJS WME/BJP
110 Housing Type S2 S2.03 C - Wardrobe can't be open OPEN FU BJS WME/BJP
111 Housing Type S2 S2.03 C - Shadow line finishing is untidy OPEN CI BJS WME/BJP
112 Housing Type S2 S2.03 C - Drop ceiling finishing is untidy OPEN CI BJS WME/BJP
113 Housing Type S2 S2.03 C - Screw exposed on the wardrobe OPEN FU BJS WME/BJP
115 Housing Type S2 S2.03 C - Untidy finishing on P3 opening OPEN WA BJS WME/BJP
116 Housing Type S2 S2.03 C - P1 opening finishing is untidy OPEN WA BJS WME/BJP
120 Housing Type S2 S2.03 C - Curtain is not installed yet (PG1 & J1) OPEN FU RO WME/BJP
124 Housing Type S2 S2.03 C - Sealant application on P1 frame is untidy OPEN DO FU WME/BJP
125 Housing Type S2 S2.03 C - Gap on the J1 frame OPEN DO EC1 WME/BJP
128 Housing Type S2 S2.03 C - Sealant application on J1 frame untidy OPEN DO DO WME/BJP
133 Housing Type S2 S2.03 C - TV cabinet is not installation yet OPEN FU CR WME/BJP
134 Housing Type S2 S2.03 C - PG1 door accessories is not installed yet OPEN DO DO WME/BJP
137 Housing Type S2 S2.03 C - Gap between PG1 frame and PG1 opening OPEN WA DO WME/BJP
139 Housing Type S2 S2.03 C - Wall around PG1 is unclean OPEN WA CI WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
140 Housing Type S2 S2.03 C - Gap on the PG1 frame OPEN DO FU WME/BJP
143 Housing Type S2 S2.03 C - Water splash on the PG1 (need to cover) OPEN DO CR WME/BJP
144 Housing Type S2 S2.03 C - Gap between curtain cover with wall OPEN FU WA WME/BJP
Roof -
146 Housing Type S2 S2.03 C - Parapet wall is cracked OPEN RO CI WME/BJP
Entrance
147 Housing Type S2 S2.03 C - Finishing parapet wall in untidy OPEN RO WA WME/BJP
148 Housing Type S2 S2.03 C - Roof drain cover can't be open OPEN RO CR WME/BJP
149 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO WA WME/BJP
152 Housing Type S2 S2.03 C - Embeded wall has not painted yet OPEN RO CI WME/BJP
153 Housing Type S2 S2.03 C - Cracked on roof deck surface OPEN RO CI WME/BJP
156 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO WA WME/BJP
157 Housing Type S2 S2.03 C - Roof tile installation is not align OPEN RO WA WME/BJP
Roof -
Roof deck
158 Housing Type S2 S2.03 C - Parapet wall cracked OPEN RO WA WME/BJP
bathroom &
bedroom
159 Housing Type S2 S2.03 C - Wall unfinished OPEN RO WA WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
160 Housing Type S2 S2.03 C - Roof drain cover can't be installed properly OPEN RO PJ WME/BJP
161 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO WA WME/BJP
163 Housing Type S2 S2.03 C - Parapet wall chipped out OPEN RO BJS WME/BJP
164 Housing Type S2 S2.03 C - Fascia board cracked OPEN RO BJS WME/BJP
166 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO BJS WME/BJP
167 Housing Type S2 S2.03 C - Crack on the roof deck surface OPEN RO BJS WME/BJP
168 Housing Type S2 S2.03 C - Parapet wall finishing is untidy OPEN RO BJS WME/BJP
169 Housing Type S2 S2.03 C - Concrete canopy is cracked OPEN RO BJS WME/BJP
Roof -
Roof deck
170 Housing Type S2 S2.03 C Terrace - Cracks on the ridge OPEN RO BJS WME/BJP
Living
Room
171 Housing Type S2 S2.03 C - Cracks on the parapet wall OPEN RO BJS WME/BJP
172 Housing Type S2 S2.03 C - Wall unfinished yet OPEN RO BJS WME/BJP
173 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO BJS WME/BJP
174 Housing Type S2 S2.03 C - Parapet wall chipped out OPEN RO BJS WME/BJP
175 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO BJS WME/BJP
176 Housing Type S2 S2.03 C - Roof drain cover by mortar OPEN RO BJS WME/BJP
177 Housing Type S2 S2.03 C - Roof drain cover can't be open OPEN RO BJS WME/BJP
178 Housing Type S2 S2.03 C - Fascia board is cracked OPEN RO BJS WME/BJP
Roof -
Roof Deck
179 Housing Type S2 S2.03 C Master - No roof drain cover OPEN RO BJS WME/BJP
Bedroom &
Bathroom
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
180 Housing Type S2 S2.03 C - Cracks on the parapet wall OPEN RO BJS WME/BJP
181 Housing Type S2 S2.03 C - Parapet wall finishing is untidy OPEN RO BJS WME/BJP
183 Housing Type S2 S2.03 C - Wall unfinished (not painted yet) OPEN RO BJS WME/BJP
184 Housing Type S2 S2.03 C - Crack on the fascia board OPEN RO BJS WME/BJP
185 Housing Type S2 S2.03 C - Roof drain cover can't be open OPEN RO BJS WME/BJP
186 Housing Type S2 S2.03 C - Roof tile is not repainted yet OPEN RO BJS WME/BJP
188 Housing Type S2 S2.03 C - Roof drain cover is corossion OPEN RO BJS WME/BJP
189 Housing Type S2 S2.03 C - Fascia board unclean OPEN RO BJS WME/BJP
190 Housing Type S2 S2.03 C - Roof tile unclean OPEN RO BJS WME/BJP
191 Housing Type S2 S2.03 C - Concrete canopy is cracked OPEN RO BJS WME/BJP
Service
192 Housing Type S2 S2.03 C - Sealant P2 is untidy OPEN DO BJS WME/BJP
area
193 Housing Type S2 S2.03 C - Sealant P2 still dirty OPEN DO BJS WME/BJP
194 Housing Type S2 S2.03 C - Gap between frames P2 OPEN DO BJS WME/BJP
195 Housing Type S2 S2.03 C - Gap between P2 and floor OPEN DO BJS WME/BJP
196 Housing Type S2 S2.03 C - Scratch on the P2 HPL surface OPEN DO BJS WME/BJP
197 Housing Type S2 S2.03 C - Lattice installed untidy OPEN DO BJS WME/BJP
198 Housing Type S2 S2.03 C - Lattice surface P2 is not smooth OPEN DO BJS WME/BJP
199 Housing Type S2 S2.03 C - Door frame P2 still dirty OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
200 Housing Type S2 S2.03 C - Scratch on the door frame P2 OPEN DO BJS WME/BJP
201 Housing Type S2 S2.03 C - Rubber door P2 is less long OPEN DO BJS WME/BJP
202 Housing Type S2 S2.03 C - Hinge door has benn corrosion OPEN DO BJS WME/BJP
203 Housing Type S2 S2.03 C - Opening surface P2 is uneven OPEN WA BJS WME/BJP
204 Housing Type S2 S2.03 C - Crack on the opening P2 OPEN WA BJS WME/BJP
205 Housing Type S2 S2.03 C - Defect in the frame P2 OPEN DO BJS WME/BJP
206 Housing Type S2 S2.03 C - Defect in the HPL surface P2 OPEN DO BJS WME/BJP
207 Housing Type S2 S2.03 C - P2 door is not smooth when opeed/closed OPEN DO BJS WME/BJP
208 Housing Type S2 S2.03 C - There are 19 of unfilled ceramics and plint OPEN CR BJS WME/BJP
209 Housing Type S2 S2.03 C - Gap on power outlet receptacle OPEN EL2 BJS WME/BJP
210 Housing Type S2 S2.03 C - Gap on switch lamp OPEN EL2 BJS WME/BJP
211 Housing Type S2 S2.03 C - Wall surface is uneven OPEN WA BJS WME/BJP
212 Housing Type S2 S2.03 C - Wall painting is uneven OPEN WA BJS WME/BJP
213 Housing Type S2 S2.03 C - Shadow line painting is untidy OPEN CI BJS WME/BJP
214 Housing Type S2 S2.03 C - Ceiling surface is uneven OPEN CI BJS WME/BJP
215 Housing Type S2 S2.03 C - Scratch on the ceiling surface OPEN CI BJS WME/BJP
216 Housing Type S2 S2.03 C - Manhole area painting is untidy OPEN CI BJS WME/BJP
218 Housing Type S2 S2.03 C - Porous on the wall OPEN WA BJS WME/BJP
Terrace -
219 Housing Type S2 S2.03 C Master - Defect on the planter box surface OPEN WA BJS WME/BJP
Bedroom
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
220 Housing Type S2 S2.03 C - Crack on the plante box surface OPEN WA BJS WME/BJP
221 Housing Type S2 S2.03 C - Planter box unfinished OPEN WA BJS WME/BJP
222 Housing Type S2 S2.03 C - Uneven wall surface OPEN WA BJS WME/BJP
223 Housing Type S2 S2.03 C - Crack on wall surface OPEN WA BJS WME/BJP
224 Housing Type S2 S2.03 C - Uneven wall painting OPEN WA BJS WME/BJP
225 Housing Type S2 S2.03 C - Gap between frames J1 OPEN DO BJS WME/BJP
230 Housing Type S2 S2.03 C - Deffect on top canopy surface OPEN RO BJS WME/BJP
231 Housing Type S2 S2.03 C - Uneven painting on roof dike OPEN RO BJS WME/BJP
232 Housing Type S2 S2.03 C - Crack on top roof dike OPEN RO BJS WME/BJP
233 Housing Type S2 S2.03 C - Deffect on top roof dike OPEN RO BJS WME/BJP
234 Housing Type S2 S2.03 C - Scratch on frame PG1 OPEN DO BJS WME/BJP
235 Housing Type S2 S2.03 C - Gap between frames PG1 OPEN DO BJS WME/BJP
236 Housing Type S2 S2.03 C - Deffect on the PG1 frame OPEN DO BJS WME/BJP
237 Housing Type S2 S2.03 C - Sealant PG1 is untidy OPEN DO BJS WME/BJP
238 Housing Type S2 S2.03 C - Uneven opening surface PG1 OPEN WA BJS WME/BJP
239 Housing Type S2 S2.03 C - Untidy shadow line paint OPEN CI BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
240 Housing Type S2 S2.03 C - Uneven surface & painting of ceiling OPEN CI BJS WME/BJP
241 Housing Type S2 S2.03 C - Uneven wall surface OPEN WA BJS WME/BJP
243 Housing Type S2 S2.03 C - Grout ceramics floor and grout is untidy OPEN CR BJS WME/BJP
244 Housing Type S2 S2.03 C - Uneven surface & painting of canopy OPEN WA BJS WME/BJP
245 Housing Type S2 S2.03 C - Crack on canopy surface OPEN RO BJS WME/BJP
246 Housing Type S2 S2.03 C - Crack on top roof dike OPEN RO BJS WME/BJP
247 Housing Type S2 S2.03 C - Uneven surface & painting of top roof dike OPEN RO BJS WME/BJP
Facade -
248 Housing Type S2 S2.03 C - Finishing bottom embossed walk OPEN WA BJS WME/BJP
Left Side
249 Housing Type S2 S2.03 C - Deffect on bottom embossed wall surface OPEN WA BJS WME/BJP
250 Housing Type S2 S2.03 C - Crack on bottom embossed wall surface OPEN WA BJS WME/BJP
251 Housing Type S2 S2.03 C - Uneven surface & painting of wall OPEN WA BJS WME/BJP
252 Housing Type S2 S2.03 C - Crack & uneven painting of roof deck OPEN RO BJS WME/BJP
255 Housing Type S2 S2.03 C - Finishing bottom embossed wall OPEN WA BJS WME/BJP
256 Housing Type S2 S2.03 C - Crack on planter box surface OPEN WA BJS WME/BJP
257 Housing Type S2 S2.03 C - Uneven planter box surface OPEN WA BJS WME/BJP
258 Housing Type S2 S2.03 C - Deffect on the planter box surface OPEN WA BJS WME/BJP
259 Housing Type S2 S2.03 C - Uneven planter box painting OPEN WA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
260 Housing Type S2 S2.03 C - Uneven opening surface J2 OPEN WA BJS WME/BJP
262 Housing Type S2 S2.03 C - Gap between frames J2 OPEN DO BJS WME/BJP
263 Housing Type S2 S2.03 C - Sealant in the J2 is untidy OPEN DO BJS WME/BJP
264 Housing Type S2 S2.03 C - Scratch in the frame J2 OPEN DO BJS WME/BJP
265 Housing Type S2 S2.03 C - Check verticality corner in the J2 OPEN DO BJS WME/BJP
266 Housing Type S2 S2.03 C - Uneven surface & painting of canopy OPEN RO BJS WME/BJP
267 Housing Type S2 S2.03 C - Defect on the top canopy surface OPEN RO BJS WME/BJP
268 Housing Type S2 S2.03 C - Defect on the top deck surface OPEN RO BJS WME/BJP
269 Housing Type S2 S2.03 C - Uneven surface & painting on top roof dike OPEN RO BJS WME/BJP
270 Housing Type S2 S2.03 C - Frame of J2 is not installed yet OPEN DO BJS WME/BJP
Terrace -
271 Housing Type S2 S2.03 C Living - Uneven opening PJ2 surface OPEN WA BJS WME/BJP
Room
272 Housing Type S2 S2.03 C - Sealant PJ2 is untidy OPEN DO BJS WME/BJP
273 Housing Type S2 S2.03 C - Gap between frames PJ2 OPEN DO BJS WME/BJP
274 Housing Type S2 S2.03 C - Scratch on the frame PJ2 OPEN DO BJS WME/BJP
275 Housing Type S2 S2.03 C - Rubber window PJ2 less in length OPEN DO BJS WME/BJP
276 Housing Type S2 S2.03 C - Installation of door handle is not proper OPEN DO BJS WME/BJP
277 Housing Type S2 S2.03 C - Door accessories surface have been corrosion OPEN DO BJS WME/BJP
278 Housing Type S2 S2.03 C - Sealant PJ2 not finished OPEN DO BJS WME/BJP
279 Housing Type S2 S2.03 C - Uneven surface & painting on wall OPEN WA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
280 Housing Type S2 S2.03 C - Untidy finishing on the shadow line OPEN CI BJS WME/BJP
281 Housing Type S2 S2.03 C - Uneven ceiling surface OPEN CI BJS WME/BJP
282 Housing Type S2 S2.03 C - Uneven surface & painting on ceiling exposed OPEN CI BJS WME/BJP
283 Housing Type S2 S2.03 C - Cleaning outbow lamp OPEN EL2 BJS WME/BJP
284 Housing Type S2 S2.03 C - Defect on the ceiling exposed surface OPEN CI BJS WME/BJP
285 Housing Type S2 S2.03 C - Untidy painting & uneven surface on column OPEN WA BJS WME/BJP
286 Housing Type S2 S2.03 C - Gap on pillar lamp OPEN WA BJS WME/BJP
287 Housing Type S2 S2.03 C - Cleaning pillar lamp OPEN WA BJS WME/BJP
288 Housing Type S2 S2.03 C - Gap on power outlet OPEN EL2 BJS WME/BJP
289 Housing Type S2 S2.03 C - Uneven surface & painting on top floor dike OPEN WA BJS WME/BJP
290 Housing Type S2 S2.03 C - Finishing verticality of Paras Jogja OPEN PJ BJS WME/BJP
291 Housing Type S2 S2.03 C - Porous 63 floor tiles & plint OPEN CR BJS WME/BJP
292 Housing Type S2 S2.03 C - Finishing bottom concrete floor dike OPEN WA BJS WME/BJP
293 Housing Type S2 S2.03 C - Crack on bottom floor dike OPEN CR BJS WME/BJP
294 Housing Type S2 S2.03 C - Floor tiles & grout plint is untidy OPEN CR BJS WME/BJP
Terrace -
295 Housing Type S2 S2.03 C - Uneven surface & painting on PG2 opening OPEN WA BJS WME/BJP
Bedroom II
296 Housing Type S2 S2.03 C - Sealant on frame PG2 is untidy OPEN DO BJS WME/BJP
297 Housing Type S2 S2.03 C - Gap between frames PG2 OPEN DO BJS WME/BJP
298 Housing Type S2 S2.03 C - Gap between frame PG2 and floor OPEN DO BJS WME/BJP
299 Housing Type S2 S2.03 C - Scratch on PG2 frame OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
300 Housing Type S2 S2.03 C - Crack on wall surface around PG2 OPEN WA BJS WME/BJP
301 Housing Type S2 S2.03 C - Uneven surface & painting on the wall OPEN WA BJS WME/BJP
302 Housing Type S2 S2.03 C - Shadow line painting is untidy OPEN CI BJS WME/BJP
303 Housing Type S2 S2.03 C - Uneven surface & painting in the ceiling OPEN CI BJS WME/BJP
304 Housing Type S2 S2.03 C - Crack on canopy surface OPEN RO BJS WME/BJP
305 Housing Type S2 S2.03 C - Uneven surface & painting on the canopy OPEN RO BJS WME/BJP
306 Housing Type S2 S2.03 C - Defect on top canopy surface OPEN RO BJS WME/BJP
307 Housing Type S2 S2.03 C - Uneven surface & painting on top roof dike OPEN RO BJS WME/BJP
308 Housing Type S2 S2.03 C - Crack on top & bottom roof dike OPEN RO BJS WME/BJP
309 Housing Type S2 S2.03 C - Bottom roof dike unfinished OPEN WA BJS WME/BJP
310 Housing Type S2 S2.03 C - Crack on planter box OPEN WA BJS WME/BJP
311 Housing Type S2 S2.03 C - Finishing planter box is untidy OPEN WA BJS WME/BJP
312 Housing Type S2 S2.03 C - Porous 25 floor tiles & plint OPEN CR BJS WME/BJP
313 Housing Type S2 S2.03 C - Grout and plint on the floor is untidy OPEN CR BJS WME/BJP
314 Housing Type S2 S2.03 C - Clean water faucet not installed OPEN PP BJS WME/BJP
Facade -
315 Housing Type S2 S2.03 C - Bottom embossed wall unfinished OPEN WA BJS WME/BJP
Right side
317 Housing Type S2 S2.03 C - Uneven surface & painting in the wall OPEN WA BJS WME/BJP
318 Housing Type S2 S2.03 C - Crack on the wall surface OPEN WA BJS WME/BJP
319 Housing Type S2 S2.03 C - Uneven top roof dike surface OPEN RO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
356
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
320 Housing Type S2 S2.03 C - Uneven opening bouvenlight OPEN WA BJS WME/BJP
323 Housing Type S2 S2.03 C - Sealant in the bouvenlight is untidy OPEN DO BJS WME/BJP
324 Housing Type S2 S2.03 C - Uneven surface & painting on canopy surface OPEN RO BJS WME/BJP
325 Housing Type S2 S2.03 C - Defect on the canopy surface OPEN RO BJS WME/BJP
326 Housing Type S2 S2.03 C - Defect on the top deck surface OPEN RO BJS WME/BJP
327 Housing Type S2 S2.03 C - Uneven wall surface in the exhaust area OPEN WA BJS WME/BJP
Master
328 Housing Type S2 S2.03 C - Gap between P2 frame and floor OPEN DO BJS WME/BJP
Bathroom
329 Housing Type S2 S2.03 C - Sealant P2 is untidy & dirty OPEN DO BJS WME/BJP
331 Housing Type S2 S2.03 C - Scratch on door leaves P2 (HPL surface) OPEN DO BJS WME/BJP
333 Housing Type S2 S2.03 C - Installation the door P2 is not proper OPEN DO BJS WME/BJP
334 Housing Type S2 S2.03 C - Opening lattice of door is untidy & rugged OPEN WA BJS WME/BJP
340 Housing Type S2 S2.03 C - Scratch on bathtub surface OPEN SA BJS WME/BJP
341 Housing Type S2 S2.03 C - Sealant in the J2 is untidy OPEN DO BJS WME/BJP
342 Housing Type S2 S2.03 C - Gap between J2 frame OPEN DO BJS WME/BJP
343 Housing Type S2 S2.03 C - Scratch on J2 frame & rambuncis OPEN DO BJS WME/BJP
345 Housing Type S2 S2.03 C - Defect on HPL drawer surface OPEN FU BJS WME/BJP
347 Housing Type S2 S2.03 C - Gap on lavatory accessories OPEN FU BJS WME/BJP
348 Housing Type S2 S2.03 C - CWP & WWP is not connected OPEN PP BJS WME/BJP
349 Housing Type S2 S2.03 C - Gap between lavatory and floor OPEN SA BJS WME/BJP
350 Housing Type S2 S2.03 C - Double roob hook not installed yet OPEN FU BJS WME/BJP
351 Housing Type S2 S2.03 C - Shadow line painting is untidy OPEN CI BJS WME/BJP
352 Housing Type S2 S2.03 C - Uneven surface & painting in the ceiling OPEN CI BJS WME/BJP
353 Housing Type S2 S2.03 C - Gap on exhaust fan to ceiling OPEN EC1 BJS WME/BJP
354 Housing Type S2 S2.03 C - Porous 94 floor tiles & grout untidy OPEN CR BJS WME/BJP
355 Housing Type S2 S2.03 C - Porous 220 wall tiles & grout untidy OPEN CR BJS WME/BJP
356 Housing Type S2 S2.03 C - Defect on the wall tiles OPEN CR BJS WME/BJP
20-Dec TOTAL PROGRESS REMARKS
0 0%
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
1 Housing Type S2 S2.04 C Bedroom - (P1) Sealant application is untidy B OPEN DO BJS WME/BJP
3 Housing Type S2 S2.04 C - (P1) Opening painting is untidy B OPEN DO BJS WME/BJP
4 Housing Type S2 S2.04 C - (P1) Remove seal frame C OPEN DO BJS WME/BJP
5 Housing Type S2 S2.04 C - (P1) Dirty on door leaves C OPEN DO BJS WME/BJP
8 Housing Type S2 S2.04 C - (P1) There is no sealant on bottom frame B OPEN DO BJS WME/BJP
12 Housing Type S2 S2.04 C - Switch lamp installation is inclined C OPEN WA BJS WME/BJP
13 Housing Type S2 S2.04 C - Finishing around power outlet is untidy B OPEN WA BJS WME/BJP
14 Housing Type S2 S2.04 C - (PG2) Gap between frame and wall B OPEN WA BJS WME/BJP
15 Housing Type S2 S2.04 C - (PG2) Gap on jointing frame B OPEN DO BJS WME/BJP
20 Housing Type S2 S2.04 C - (PG2) Remove seal on rail C OPEN DO BJS WME/BJP
22 Housing Type S2 S2.04 C - (PG2) Door can't close B OPEN DO BJS WME/BJP
25 Housing Type S2 S2.04 C - Curtain not install yet B OPEN FU BJS WME/BJP
27 Housing Type S2 S2.04 C - Gap between AC indoor unit on wall B OPEN EC1 BJS WME/BJP
Walk In
29 Housing Type S2 S2.04 C - Gap between wardrobe and wall B OPEN FU BJS WME/BJP
Closet
32 Housing Type S2 S2.04 C - Ceiling surface finishing is untidy B OPEN CI BJS WME/BJP
34 Housing Type S2 S2.04 C Bathroom - (P2) Opening surface finishing is untidy B OPEN WA BJS WME/BJP
35 Housing Type S2 S2.04 C - (P2) Sealant application is untidy B OPEN DO BJS WME/BJP
37 Housing Type S2 S2.04 C - (P2) Gap between frame and wall B OPEN WA BJS WME/BJP
38 Housing Type S2 S2.04 C - (P2) Adhesive marks on door leaves C OPEN DO BJS WME/BJP
Master
41 Housing Type S2 S2.04 C - (P2) Opening surface is uneven B OPEN WA BJS WME/BJP
Bathroom
42 Housing Type S2 S2.04 C - (P2) Gap between frame and floor B OPEN DO BJS WME/BJP
43 Housing Type S2 S2.04 C - (P2) Sealant application is untidy B OPEN DO BJS WME/BJP
45 Housing Type S2 S2.04 C - (P2) Opening lattice is untidy B OPEN DO BJS WME/BJP
46 Housing Type S2 S2.04 C - (P2) Lattice finishing is untidy B OPEN DO BJS WME/BJP
47 Housing Type S2 S2.04 C - (P2) Lattice surface is rugged B OPEN DO BJS WME/BJP
48 Housing Type S2 S2.04 C - (P2) Scratch on door leaves B OPEN DO BJS WME/BJP
49 Housing Type S2 S2.04 C - (P2) The door is not tight when closed B OPEN DO BJS WME/BJP
50 Housing Type S2 S2.04 C - Towel bar installation is not proper B OPEN FU BJS WME/BJP
53 Housing Type S2 S2.04 C - Adhesive mark on glass cubicle C OPEN SA BJS WME/BJP
54 Housing Type S2 S2.04 C - (BV1) Opening surface is uneven B OPEN WA BJS WME/BJP
55 Housing Type S2 S2.04 C - (BV1) Sealant application is untidy B OPEN DO BJS WME/BJP
56 Housing Type S2 S2.04 C - (BV1) Gap between jointing frame B OPEN DO BJS WME/BJP
57 Housing Type S2 S2.04 C - (BV1) Scratch on the frame B OPEN DO BJS WME/BJP
58 Housing Type S2 S2.04 C - Gap on shower faucet and soap holder B OPEN SA BJS WME/BJP
61 Housing Type S2 S2.04 C - Sealant application for mirror is untidy B OPEN SA BJS WME/BJP
62 Housing Type S2 S2.04 C - Gap between granite table and wall tile B OPEN FU BJS WME/BJP
64 Housing Type S2 S2.04 C - Gap between wastafel table and wall tile B OPEN FU BJS WME/BJP
65 Housing Type S2 S2.04 C - Tumbler holder installation is inclined B OPEN FU BJS WME/BJP
70 Housing Type S2 S2.04 C - Shadow line painting is untidy B OPEN CI BJS WME/BJP
72 Housing Type S2 S2.04 C Hall Way - Uneven opening P1 B OPEN WA BJS WME/BJP
73 Housing Type S2 S2.04 C - (P1) There is no sealant on bottom frame B OPEN DO BJS WME/BJP
74 Housing Type S2 S2.04 C - (P1) Gap between jointing frame B OPEN DO BJS WME/BJP
75 Housing Type S2 S2.04 C - (P1) Scratch on the frame B OPEN DO BJS WME/BJP
76 Housing Type S2 S2.04 C - (P1) Sealant application is untidy B OPEN DO BJS WME/BJP
77 Housing Type S2 S2.04 C - (P1) scratched on HPL surface B OPEN DO BJS WME/BJP
79 Housing Type S2 S2.04 C - (P1) Gap on cylinder cover B OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
80 Housing Type S2 S2.04 C - (P1) The door is not tight when closed B OPEN DO BJS WME/BJP
82 Housing Type S2 S2.04 C - Shadow line painting is untidy B OPEN CI BJS WME/BJP
87 Housing Type S2 S2.04 C - Gap betwenen jointing panel on TV Cabinet B OPEN FU BJS WME/BJP
88 Housing Type S2 S2.04 C - Wall shelves installation is inclined B OPEN FU BJS WME/BJP
91 Housing Type S2 S2.04 C - (Shelf) Wall painting finishing is untidy B OPEN FU BJS WME/BJP
92 Housing Type S2 S2.04 C - (Shelf) Crack on the wall B OPEN FU BJS WME/BJP
93 Housing Type S2 S2.04 C - (Shelf) Sealant application is untidy B OPEN FU BJS WME/BJP
94 Housing Type S2 S2.04 C - Shelves is not sealing yet B OPEN FU BJS WME/BJP
97 Housing Type S2 S2.04 C - (PJ1) Sealant application is untidy B OPEN DO BJS WME/BJP
98 Housing Type S2 S2.04 C - (PJ1) Remove seal frame C OPEN DO BJS WME/BJP
99 Housing Type S2 S2.04 C - (PJ1) Gap between jointing frame B OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
100 Housing Type S2 S2.04 C - (PJ1) Dirty on frame C OPEN DO BJS WME/BJP
101 Housing Type S2 S2.04 C - (PJ1) The frame is not sealing yet B OPEN DO BJS WME/BJP
102 Housing Type S2 S2.04 C - (PJ1) Scratch on the frame B OPEN DO BJS WME/BJP
103 Housing Type S2 S2.04 C - (PJ1) Rambuncis function is not proper B OPEN DO BJS WME/BJP
104 Housing Type S2 S2.04 C - (PJ2) Opening painting is untidy B OPEN WA BJS WME/BJP
105 Housing Type S2 S2.04 C - (PJ2) Sealant application is untidy B OPEN DO BJS WME/BJP
106 Housing Type S2 S2.04 C - (PJ2) Scratch and defect on frame B OPEN DO BJS WME/BJP
107 Housing Type S2 S2.04 C - (PJ2) Rambuncis function is not proper B OPEN DO BJS WME/BJP
108 Housing Type S2 S2.04 C - (PJ2) Dirty on the frame C OPEN DO BJS WME/BJP
109 Housing Type S2 S2.04 C - (PJ2) Crack on the opening B OPEN WA BJS WME/BJP
111 Housing Type S2 S2.04 C - (PJ2) The door can't be closed B OPEN DO BJS WME/BJP
113 Housing Type S2 S2.04 C - (PJ2) Jointing frame is inclined B OPEN DO BJS WME/BJP
115 Housing Type S2 S2.04 C - Nail pierces to the surface of HPL B OPEN FU BJS WME/BJP
117 Housing Type S2 S2.04 C - Gap between granite table and kitchen set B OPEN FU BJS WME/BJP
Front
- Wall surface finishing is untidy (crack &
118 Housing Type S2 S2.04 C Side B OPEN WA WA WME/BJP
chipped out) & painting is uneven
Facade
- (J1) Opening painting around sealant is
119 Housing Type S2 S2.04 C B OPEN WA RO WME/BJP
untidy
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
120 Housing Type S2 S2.04 C - (J1) Opening surface finishing is untidy B OPEN WA RO WME/BJP
121 Housing Type S2 S2.04 C - (J1) Sealant application is untidy B OPEN DO WA WME/BJP
122 Housing Type S2 S2.04 C - (J1) Frame jointing is not align B OPEN DO WA WME/BJP
123 Housing Type S2 S2.04 C - (J1) Gap on jointing frame B OPEN DO WA WME/BJP
124 Housing Type S2 S2.04 C - (J1) Dirty on frame of swing window C OPEN DO FU WME/BJP
130 Housing Type S2 S2.04 C - (PJ1) Remove seal frame C OPEN DO WA WME/BJP
132 Housing Type S2 S2.04 C - (PJ1) The glass of window is not sealing y B OPEN DO DO WME/BJP
133 Housing Type S2 S2.04 C - (PJ1) Sealant application is untidy B OPEN DO CR WME/BJP
Service
137 Housing Type S2 S2.04 C - (P2) Opening surface finishing is untidy B OPEN WA DO WME/BJP
Room
138 Housing Type S2 S2.04 C - (P2) Sealant application Untidy sealant an B OPEN DO DO WME/BJP
139 Housing Type S2 S2.04 C - (P2) Adhesive marks on door leaves C OPEN DO CI WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
140 Housing Type S2 S2.04 C - (P2) Remove seal frame C OPEN DO FU WME/BJP
141 Housing Type S2 S2.04 C - Ceiling surface finishing is untidy B OPEN CI CI WME/BJP
142 Housing Type S2 S2.04 C - Wall surface finishing is untidy B OPEN WA DO WME/BJP
143 Housing Type S2 S2.04 C - Ceramic floor tiles that porous A OPEN CR CR WME/BJP
Right
144 Housing Type S2 S2.04 C Side - (BV1) Sealant application is untidy B OPEN DO WA WME/BJP
Facade
- (BV1) Wall painting around bouvenlight is
145 Housing Type S2 S2.04 C B OPEN WA WA WME/BJP
untidy
152 Housing Type S2 S2.04 C - Ceiling finishing surface is untidy B OPEN CI CI WME/BJP
155 Housing Type S2 S2.04 C - (PG1) Dirty on glass of window C OPEN DO PJ WME/BJP
156 Housing Type S2 S2.04 C - (PG1) Opening finishing surface is untidy B OPEN WA WA WME/BJP
157 Housing Type S2 S2.04 C - (PG1) Sealant application is untidy B OPEN DO WA WME/BJP
158 Housing Type S2 S2.04 C - (PG1) Painting on sealant is untidy B OPEN DO WA WME/BJP
159 Housing Type S2 S2.04 C - (PG1) Jointing frame is not align B OPEN DO WA WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
161 Housing Type S2 S2.04 C - (PG1) Remove seal frame C OPEN DO WA WME/BJP
166 Housing Type S2 S2.04 C - Whole column finishing surface is untidy B OPEN WA BJS WME/BJP
167 Housing Type S2 S2.04 C - Dirt on column lamp fixtures C OPEN EL2 BJS WME/BJP
170 Housing Type S2 S2.04 C - (PJ2) Opening finishing surface is untidy B OPEN WA BJS WME/BJP
171 Housing Type S2 S2.04 C - (PJ2) Sealant application is untidy B OPEN DO BJS WME/BJP
172 Housing Type S2 S2.04 C - (PJ2) Untidy painting on sealant B OPEN DO BJS WME/BJP
173 Housing Type S2 S2.04 C - (PJ2) Remove seal frame C OPEN DO BJS WME/BJP
174 Housing Type S2 S2.04 C - (PJ2) Adhesive marks on frame C OPEN DO BJS WME/BJP
175 Housing Type S2 S2.04 C - (PJ2) Jointing frame is not align B OPEN DO BJS WME/BJP
176 Housing Type S2 S2.04 C - (PJ2) Gap on jointing frame B OPEN DO BJS WME/BJP
178 Housing Type S2 S2.04 C - Ceramic floor tiles that porous A OPEN CR BJS WME/BJP
179 Housing Type S2 S2.04 C - Lattice is not install yet B OPEN DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
180 Housing Type S2 S2.04 C - (J2) Scratch on frame B OPEN DO BJS WME/BJP
181 Housing Type S2 S2.04 C - (J2) Gap on jointing frame B OPEN DO BJS WME/BJP
182 Housing Type S2 S2.04 C - (J2) Opening finishing surface is untidy B OPEN WA BJS WME/BJP
183 Housing Type S2 S2.04 C - (PG2) Opening finishing frame is untidy B OPEN WA BJS WME/BJP
184 Housing Type S2 S2.04 C - (PG2) Sealant application is untidy B OPEN DO BJS WME/BJP
185 Housing Type S2 S2.04 C - (PG2) Untidy painting on sealant B OPEN DO BJS WME/BJP
186 Housing Type S2 S2.04 C - (PG2) Dirt on frame C OPEN DO BJS WME/BJP
187 Housing Type S2 S2.04 C - (PG2) Scratch on frame B OPEN DO BJS WME/BJP
188 Housing Type S2 S2.04 C - (PG2) Jointing frame is not align B OPEN DO BJS WME/BJP
Left
- Wall painting surface is untidy and
189 Housing Type S2 S2.04 C Side B OPEN WA BJS WME/BJP
uneven painting
Facade
- Embossed wall finishing surface is untidy
190 Housing Type S2 S2.04 C B OPEN WA BJS WME/BJP
and uneven painting
196 Housing Type S2 S2.04 C - Bottom of Paras Jogja installation is unti B OPEN PJ BJS WME/BJP
199 Housing Type S2 S2.04 C - Dirt on roof deck surface C OPEN RO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
201 Housing Type S2 S2.04 C - Roof tile arrangement is not align B OPEN RO BJS WME/BJP
202 Housing Type S2 S2.04 C - Roof tile is not painting yet B OPEN RO BJS WME/BJP
Roof Top
204 Housing Type S2 S2.04 C - Right - Roof tile is not painting yet B OPEN RO BJS WME/BJP
Side
- Wall finishing surface is untidy and
205 Housing Type S2 S2.04 C B OPEN RO BJS WME/BJP
uneven painting
207 Housing Type S2 S2.04 C - AC drain pipe should be piped to the botto B OPEN RO BJS WME/BJP
208 Housing Type S2 S2.04 C - Wall not painting yet B OPEN RO BJS WME/BJP
210 Housing Type S2 S2.04 C - Crack on the ridge A OPEN RO BJS WME/BJP
218 Housing Type S2 S2.04 C - Dirt on roof tile C OPEN RO BJS WME/BJP
219 Housing Type S2 S2.04 C - Roof tile arrangement is not align B OPEN RO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
233
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
225 Housing Type S2 S2.04 C - Outer ceiling finishing surface is untidy B OPEN RO BJS WME/BJP
227 Housing Type S2 S2.04 C - Parapet wall surface is not align B OPEN RO BJS WME/BJP
228 Housing Type S2 S2.04 C - Crack on the ridge A OPEN RO BJS WME/BJP
229 Housing Type S2 S2.04 C - Roof tile not painting yet B OPEN RO BJS WME/BJP
230 Housing Type S2 S2.04 C - Hole on the wall B OPEN RO BJS WME/BJP
231 Housing Type S2 S2.04 C - Untidy flexible on wall B OPEN RO BJS WME/BJP
0 0%
0 Proses
0 Proses
0 Proses
0 Proses
0 Proses
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Proses
0 Not Actifity
0 Proses
0 Proses
0 Proses
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Proses
0 Proses
0 Proses
0 Proses
0 Proses
0 Proses
0 Proses
0 Proses
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 0
80
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
Master
1 Housing Type S2 S2.05 C - Ceramic floor tiles that porous A KEY/Subcon OPEN CR BJS WME/BJP
Bedroom
2 Housing Type S2 S2.05 C - Wall painting is untidy B KEY/Subcon OPEN WA BJS WME/BJP
3 Housing Type S2 S2.05 C - (PG1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
5 Housing Type S2 S2.05 C - (PG1) Gap between frame & wall B KEY/Subcon OPEN DO BJS WME/BJP
6 Housing Type S2 S2.05 C - (PG1) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP
7 Housing Type S2 S2.05 C - (PG1) Curtain is not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
8 Housing Type S2 S2.05 C - (PG1) Dirty on the frame C KEY/Subcon OPEN DO BJS WME/BJP
9 Housing Type S2 S2.05 C - Shadow line surface is untidy B KEY/Subcon OPEN CI BJS WME/BJP
10 Housing Type S2 S2.05 C - Hole in the wall around bottom AC B KEY/Subcon OPEN WA BJS WME/BJP
11 Housing Type S2 S2.05 C - Crack on the wall B KEY/Subcon OPEN WA BJS WME/BJP
12 Housing Type S2 S2.05 C - Adhesive mark on the glass C KEY/Subcon OPEN SA BJS WME/BJP
Terrace
14 Housing Type S2 S2.05 C - Wall surface is uneven B KEY/Subcon OPEN WA BJS WME/BJP
Bedroom
15 Housing Type S2 S2.05 C - Ceramic floor tiles that porous A KEY/Subcon OPEN CR BJS WME/BJP
20 Housing Type S2 S2.05 C - (PG2) Crack on bottom of opening B KEY/Subcon OPEN WA BJS WME/BJP
24 Housing Type S2 S2.05 C - Column surface is uneven and dirty B KEY/Subcon OPEN WA BJS WME/BJP
Master
25 Housing Type S2 S2.05 C - Gap between bathtub and granite slab B KEY/Subcon OPEN SA BJS WME/BJP
Bathroom
26 Housing Type S2 S2.05 C - Lavatory table is not sealing yet B KEY/Subcon OPEN FU BJS WME/BJP
29 Housing Type S2 S2.05 C - Scratch on downlight lamp fixtures B KEY/Subcon OPEN EL1 BJS WME/BJP
30 Housing Type S2 S2.05 C - Ceiling painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP
31 Housing Type S2 S2.05 C - Dirty on power outlet and switch C KEY/Subcon OPEN EL2 BJS WME/BJP
32 Housing Type S2 S2.05 C - The bottom of mirror is not sealing yet B KEY/Subcon OPEN SA BJS WME/BJP
33 Housing Type S2 S2.05 C - Chipped on ceramic wall tiles B KEY/Subcon OPEN CR BJS WME/BJP
35 Housing Type S2 S2.05 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
36 Housing Type S2 S2.05 C - Gap between wardrobe and wall B KEY/Subcon OPEN FU BJS WME/BJP
37 Housing Type S2 S2.05 C - Crack on wall (above of wardrobe) B KEY/Subcon OPEN FU BJS WME/BJP
42 Housing Type S2 S2.05 C - Paras jogja installation that porous A KEY/Subcon OPEN PJ BJS WME/BJP
43 Housing Type S2 S2.05 C - Ceiling painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP
44 Housing Type S2 S2.05 C - Column surface painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
45 Housing Type S2 S2.05 C - (PJ1) The bottom of opening is untidy B KEY/Subcon OPEN WA BJS WME/BJP
48 Housing Type S2 S2.05 C - (P2) Dirty on the door leaves C KEY/Subcon OPEN DO BJS WME/BJP
49 Housing Type S2 S2.05 C - Wall surface is uneven B KEY/Subcon OPEN WA BJS WME/BJP
Living
50 Housing Type S2 S2.05 C - (PJ1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
Room
51 Housing Type S2 S2.05 C - (PJ1) The bottom of opening is untidy B KEY/Subcon OPEN DO BJS WME/BJP
52 Housing Type S2 S2.05 C - Wall surface is untidy B KEY/Subcon OPEN WA BJS WME/BJP
56 Housing Type S2 S2.05 C - Shadow line painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP
57 Housing Type S2 S2.05 C - Curtain not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
59 Housing Type S2 S2.05 C - (PJ1) Chipped on wall B KEY/Subcon OPEN DO BJS WME/BJP
60 Housing Type S2 S2.05 C - Gap between shoe rack and wall B KEY/Subcon OPEN FU BJS WME/BJP
61 Housing Type S2 S2.05 C - Curtain is not installed yet B KEY/Subcon OPEN RO BJS WME/BJP
63 Housing Type S2 S2.05 C - (PJ1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
64 Housing Type S2 S2.05 C - (PJ2) Cleaning the door C KEY/Subcon OPEN DO BJS WME/BJP
68 Housing Type S2 S2.05 C - Soap holder is not sealing yet B KEY/Subcon OPEN SA BJS WME/BJP
69 Housing Type S2 S2.05 C - Glass clamp is not installed yet B KEY/Subcon OPEN SA BJS WME/BJP
70 Housing Type S2 S2.05 C Bedroom - Wall surface is untidy and crack B KEY/Subcon OPEN WA BJS WME/BJP
72 Housing Type S2 S2.05 C - Wardrobe is not sealing yet B KEY/Subcon OPEN FU BJS WME/BJP
73 Housing Type S2 S2.05 C - (PG1) Floor tile level is uneven B KEY/Subcon OPEN CR BJS WME/BJP
74 Housing Type S2 S2.05 C - Curtain is not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
75 Housing Type S2 S2.05 C - Hole on the ceiling B KEY/Subcon OPEN CI BJS WME/BJP
77 Housing Type S2 S2.05 C - Door accessories is not installed yet B KEY/Subcon OPEN DO BJS WME/BJP
79 Housing Type S2 S2.05 C - Wall surface is uneven B KEY/Subcon OPEN WA BJS WME/BJP
80 Housing Type S2 S2.05 C - (PG1) Chipped on opening surface B KEY/Subcon OPEN WA BJS WME/BJP
20-Dec TOTAL PROGRESS REMARKS
0 0%
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 13
80 D E S E M
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
Master
1 Housing Type S2 S2.05 C - Ceramic floor tiles that porous A KEY/Subcon OPEN CR BJS WME/BJP
Bedroom
2 Housing Type S2 S2.05 C - Wall painting is untidy B KEY/Subcon OPEN WA BJS WME/BJP
3 Housing Type S2 S2.05 C - (PG1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
5 Housing Type S2 S2.05 C - (PG1) Gap between frame & wall B KEY/Subcon OPEN DO BJS WME/BJP
6 Housing Type S2 S2.05 C - (PG1) Scratch on the frame B KEY/Subcon OPEN DO BJS WME/BJP
7 Housing Type S2 S2.05 C - (PG1) Curtain is not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
8 Housing Type S2 S2.05 C - PJ1 frame opening is untidy C KEY/Subcon OPEN DO BJS WME/BJP
9 Housing Type S2 S2.05 C - Shadow line surface is untidy B KEY/Subcon OPEN CI BJS WME/BJP
10 Housing Type S2 S2.05 C - Hole in the wall around bottom AC B KEY/Subcon OPEN WA BJS WME/BJP
11 Housing Type S2 S2.05 C - Crack on the wall B KEY/Subcon CLOSE WA BJS WME/BJP
12 Housing Type S2 S2.05 C - Adhesive mark on the glass C KEY/Subcon CLOSE SA BJS WME/BJP
Terrace
14 Housing Type S2 S2.05 C - Wall surface is uneven B KEY/Subcon OPEN WA BJS WME/BJP
Bedroom
15 Housing Type S2 S2.05 C - Ceramic floor tiles that porous A KEY/Subcon OPEN CR BJS WME/BJP
20 Housing Type S2 S2.05 C - (PG2) Crack on bottom of opening B KEY/Subcon CLOSE WA BJS WME/BJP
24 Housing Type S2 S2.05 C - Column surface is uneven and dirty B KEY/Subcon OPEN WA BJS WME/BJP
Master
25 Housing Type S2 S2.05 C - Gap between bathtub and granite slab B KEY/Subcon OPEN SA BJS WME/BJP
Bathroom
26 Housing Type S2 S2.05 C - Lavatory table is not sealing yet B KEY/Subcon OPEN FU BJS WME/BJP
29 Housing Type S2 S2.05 C - Scratch on downlight lamp fixtures B KEY/Subcon OPEN WA BJS WME/BJP
30 Housing Type S2 S2.05 C - Ceiling painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP
31 Housing Type S2 S2.05 C - Dirty on power outlet and switch C KEY/Subcon OPEN WA BJS WME/BJP
32 Housing Type S2 S2.05 C - The bottom of mirror is not sealing yet B KEY/Subcon OPEN SA BJS WME/BJP
33 Housing Type S2 S2.05 C - Chipped on ceramic wall tiles B KEY/Subcon OPEN CR BJS WME/BJP
35 Housing Type S2 S2.05 C - Wall painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
36 Housing Type S2 S2.05 C - Gap between wardrobe and wall B KEY/Subcon OPEN FU BJS WME/BJP
37 Housing Type S2 S2.05 C - Crack on wall (above of wardrobe) B KEY/Subcon CLOSE FU BJS WME/BJP
42 Housing Type S2 S2.05 C - Paras jogja installation that porous A KEY/Subcon OPEN PJ BJS WME/BJP
43 Housing Type S2 S2.05 C - Ceiling painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP
44 Housing Type S2 S2.05 C - Column surface painting is uneven B KEY/Subcon OPEN WA BJS WME/BJP
45 Housing Type S2 S2.05 C - (PJ1) The bottom of opening is untidy B KEY/Subcon OPEN WA BJS WME/BJP
48 Housing Type S2 S2.05 C - (P2) Dirty on the door leaves C KEY/Subcon OPEN DO BJS WME/BJP
49 Housing Type S2 S2.05 C - Wall surface is uneven B KEY/Subcon CLOSE WA BJS WME/BJP
Living
50 Housing Type S2 S2.05 C - (PJ1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
Room
51 Housing Type S2 S2.05 C - (PJ1) The bottom of opening is untidy B KEY/Subcon OPEN DO BJS WME/BJP
52 Housing Type S2 S2.05 C - Wall surface is untidy B KEY/Subcon OPEN WA BJS WME/BJP
56 Housing Type S2 S2.05 C - Shadow line painting is uneven B KEY/Subcon OPEN CI BJS WME/BJP
57 Housing Type S2 S2.05 C - Curtain not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
59 Housing Type S2 S2.05 C - (PJ1) Chipped on wall B KEY/Subcon CLOSE DO BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 13
80 D E S E M
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
60 Housing Type S2 S2.05 C - Gap between shoe rack and wall B KEY/Subcon OPEN FU BJS WME/BJP
61 Housing Type S2 S2.05 C - Curtain is not installed yet B KEY/Subcon OPEN RO BJS WME/BJP
63 Housing Type S2 S2.05 C - (PJ1) Sealant application is untidy B KEY/Subcon OPEN DO BJS WME/BJP
64 Housing Type S2 S2.05 C - (PJ2) Cleaning the door C KEY/Subcon OPEN DO BJS WME/BJP
68 Housing Type S2 S2.05 C - Soap holder is not sealing yet B KEY/Subcon OPEN SA BJS WME/BJP
69 Housing Type S2 S2.05 C - Glass clamp is not installed yet B KEY/Subcon OPEN SA BJS WME/BJP
70 Housing Type S2 S2.05 C Bedroom - Wall surface is untidy and crack B KEY/Subcon CLOSE WA BJS WME/BJP
72 Housing Type S2 S2.05 C - Wardrobe is not sealing yet B KEY/Subcon OPEN FU BJS WME/BJP
73 Housing Type S2 S2.05 C - (PG1) Floor tile level is uneven B KEY/Subcon OPEN CR BJS WME/BJP
74 Housing Type S2 S2.05 C - Curtain is not installed yet B KEY/Subcon OPEN FU BJS WME/BJP
75 Housing Type S2 S2.05 C - Hole on the ceiling B KEY/Subcon CLOSE CI BJS WME/BJP
77 Housing Type S2 S2.05 C - Door accessories is not installed yet B KEY/Subcon CLOSE DO BJS WME/BJP
79 Housing Type S2 S2.05 C - Wall surface is uneven B KEY/Subcon OPEN WA BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 13
80 D E S E M
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
80 Housing Type S2 S2.05 C - (PG1) Chipped on opening surface B KEY/Subcon CLOSE WA BJS WME/BJP
E S E M B E R 2 0 2 0 J A N U A R I 2 0
20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan
0.4
0.4
0.4
E S E M B E R 2 0 2 0 J A N U A R I 2 0
20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan
0.1
0.1
0.1
1
E S E M B E R 2 0 2 0 J A N U A R I 2 0
20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan
0.1
0.1
0.1
0.1
0.1
1
E S E M B E R 2 0 2 0 J A N U A R I 2 0
20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan
0.1
0.1
0.1
E S E M B E R 2 0 2 0 J A N U A R I 2 0
20-Dec 21-Dec 22-Dec 23-Dec 24-Dec 25-Dec 26-Dec 27-Dec 28-Dec 29-Dec 30-Dec 31-Dec 1-Jan 2-Jan 3-Jan 4-Jan 5-Jan 6-Jan 7-Jan 8-Jan 9-Jan 10-Jan 11-Jan 12-Jan 13-Jan 14-Jan 15-Jan 16-Jan
1
A R I 2 0 2 1 F E B R
17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb
A R I 2 0 2 1 F E B R
17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb
0.3
A R I 2 0 2 1 F E B R
17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb
0.3
0.4
0.3
0.4
A R I 2 0 2 1 F E B R
17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb
0.9
0.9
A R I 2 0 2 1 F E B R
17-Jan 18-Jan 19-Jan 20-Jan 21-Jan 22-Jan 23-Jan 24-Jan 25-Jan 26-Jan 27-Jan 28-Jan 29-Jan 30-Jan 31-Jan 1-Feb 2-Feb 3-Feb 4-Feb 5-Feb 6-Feb 7-Feb 8-Feb 9-Feb 10-Feb 11-Feb 12-Feb 13-Feb
F E B R U A R I 2 0 2 1
14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb TOTAL PROGRESS REMARKS
0 23%
0.9
0 Not Actifity
1 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
1 Not Actifity
1 Not Actifity
0 Not Actifity
0.6
0 Not Actifity
0
F E B R U A R I 2 0 2 1
14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb TOTAL PROGRESS REMARKS
0.1
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0.4
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
1 Not Actifity
0 Not Actifity
0 Not Actifity
F E B R U A R I 2 0 2 1
14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0.1
0 Not Actifity
0 Not Actifity
1 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
1 Not Actifity
F E B R U A R I 2 0 2 1
14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
1 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
1 Not Actifity
1 Not Actifity
1 Not Actifity
0 Not Actifity
14-Feb 15-Feb 16-Feb 17-Feb 18-Feb 19-Feb 20-Feb 21-Feb 22-Feb 23-Feb 24-Feb 25-Feb 26-Feb 27-Feb 28-Feb TOTAL PROGRESS REMARKS
1 Not Actifity
18.7
BJP HOUSING KILLING PUNCH LIST 0
51
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
1 Housing Type S2 S2.01 ME All Area - Some power outlets are not protection type A KEY/Subcon OPEN EL2 BJS WME/BJP
2 Housing Type S2 S2.01 ME Living Room - The power outlet installed not close to the wall/ there is gap ( panrty room) B KEY/Subcon OPEN EL2 BJS WME/BJP
3 Housing Type S2 S2.01 ME - The hose not connected yet to the clean water & waste water line A KEY/Subcon OPEN PP BJS WME/BJP
4 Housing Type S2 S2.01 ME - The power outlet installed not close to the wall/ there is gap B KEY/Subcon OPEN EL2 BJS WME/BJP
6 Housing Type S2 S2.01 ME - The lamps is not installed yet A KEY/Subcon OPEN EL1 BJS WME/BJP
7 Housing Type S2 S2.01 ME -There is a gap between the AC cassete and ceiling B KEY/Subcon OPEN EC3 BJS WME/BJP
8 Housing Type S2 S2.01 ME Minipragma - No tagging / no information label on the minipraghm A KEY/Subcon OPEN EL2 BJS WME/BJP
9 Housing Type S2 S2.01 ME - Input and output MCB cable shall be connected using sleve A KEY/Subcon OPEN EL3 BJS WME/BJP
- The color of the cable (from 3 phase to 1 phase) does not match the PUIL 2011 &
10 Housing Type S2 S2.01 ME replace to 4mm cable A KEY/Subcon OPEN EL3 BJS WME/BJP
11 Housing Type S2 S2.01 ME - MCB spare shall be 3 pcs. Only 2 pcs are available A KEY/Subcon OPEN EL2 BJS WME/BJP
12 Housing Type S2 S2.01 ME - The MCB tagging/no is not in correct sequent A KEY/Subcon OPEN EL2 BJS WME/BJP
13 Housing Type S2 S2.01 ME - No tagging / no information label on the MCB A KEY/Subcon OPEN EL2 BJS WME/BJP
14 Housing Type S2 S2.01 ME - Connecting cable on the terminal is untidy A KEY/Subcon OPEN EL3 BJS WME/BJP
15 Housing Type S2 S2.01 ME Bathroom - The ceramic tile shall be replaced since the power outlet not installed very badly B KEY/Subcon OPEN EL2 BJS WME/BJP
16 Housing Type S2 S2.01 ME - The switch is damage, need to replace with the good one A KEY/Subcon OPEN EL2 BJS WME/BJP
17 Housing Type S2 S2.01 ME - The hose of closet outlet is too short A KEY/Subcon OPEN PP BJS WME/BJP
18 Housing Type S2 S2.01 ME - There is a gap between the exhaust fan grill and ceiling. B KEY/Subcon OPEN EC3 BJS WME/BJP
19 Housing Type S2 S2.01 ME - The ceramic tile shall be replaced since the power outlet not installed very badly B KEY/Subcon OPEN EL2 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
51
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
20 Housing Type S2 S2.01 ME - The switch is damage, need to replace with the good one A KEY/Subcon OPEN EL2 BJS WME/BJP
21 Housing Type S2 S2.01 ME Bedroom - There is a gap in the AC split B KEY/Subcon OPEN EC3 BJS WME/BJP
22 Housing Type S2 S2.01 ME Master - There is gap between connection pipe and the wall B KEY/Subcon OPEN PP BJS WME/BJP
Bathroom
23 Housing Type S2 S2.01 ME Walk in Closet - The switch is damage, need to replace with the good one A KEY/Subcon OPEN EL2 BJS WME/BJP
24 Housing Type S2 S2.01 ME Master Bedroom - The cover of AC indoor unit is missing (not available) A KEY/Subcon OPEN EC3 BJS WME/BJP
25 Housing Type S2 S2.01 ME Entrance - There is a gap in the pillar lamp and check corraction leveling on verticaly with B KEY/Subcon OPEN EL2 BJS WME/BJP
water pass
26 Housing Type S2 S2.01 ME Grounding - The grounding rood clamp shall be 2 pcs. Only 1pc is installed. A KEY/Subcon OPEN EL4 BJS WME/BJP
27 Housing Type S2 S2.01 ME - The bottom of grounding pit not finish with concrete (not done) A KEY/Subcon OPEN EL4 BJS WME/BJP
28 Housing Type S2 S2.01 ME - There is no cover on the grounding pit A KEY/Subcon OPEN EL4 BJS WME/BJP
29 Housing Type S2 S2.01 ME Entrance - Check elevation grounding rod refer to design drawing A KEY/Subcon OPEN EL4 BJS WME/BJP
- The junction box cover has not been installed yet, and after the junction box is
30 Housing Type S2 S2.01 ME closed by cover then close it with a paras jogja A KEY/Subcon OPEN EL3 BJS WME/BJP
31 Housing Type S2 S2.01 ME - Faucet not installed yet A KEY/Subcon OPEN PP BJS WME/BJP
32 Housing Type S2 S2.01 ME - Grease trap pipe has not been installed A KEY/Subcon OPEN PP BJS WME/BJP
33 Housing Type S2 S2.01 ME - Replace the grease trap hose with the pipe according to the drawing A KEY/Subcon OPEN PP BJS WME/BJP
34 Housing Type S2 S2.01 ME - The power outlet in paras jogja not installed properly B KEY/Subcon OPEN EL2 BJS WME/BJP
35 Housing Type S2 S2.01 ME - Faucet has not been installed yet A KEY/Subcon OPEN PP BJS WME/BJP
36 Housing Type S2 S2.01 ME - The juntion box cover has not been installed A KEY/Subcon OPEN EL3 BJS WME/BJP
37 Housing Type S2 S2.01 ME - The rain pipe not connected yet to main line A KEY/Subcon OPEN PP BJS WME/BJP
- The waste water pipe (floor drain) not connected yet to the mainline, make it fix
38 Housing Type S2 S2.01 ME A KEY/Subcon OPEN PP BJS WME/BJP
the waste water and put base concrete to support pipe
39 Housing Type S2 S2.01 ME Terrace - The AC drain pipe not connected yet, and refregerant pipe untidy A KEY/Subcon OPEN PP BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
51
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
40 Housing Type S2 S2.01 ME Roof Entrance - There is no grill cover on roof drain A KEY/Subcon OPEN PP BJS WME/BJP
- The AC bracket has not installed yet, AC ouotdoor shall be install foundation and
41 Housing Type S2 S2.01 ME A KEY/Subcon OPEN EC3 BJS WME/BJP
the anchor
42 Housing Type S2 S2.01 ME - The AC drain pipe has not connected yet A KEY/Subcon OPEN PP BJS WME/BJP
43 Housing Type S2 S2.01 ME Electrical - Replace double switch to single switch (The living room) A KEY/Subcon OPEN EL2 BJS WME/BJP
Installation
44 Housing Type S2 S2.01 ME - The exhaust fan not connected to it's own line ( wrong line plan) A KEY/Subcon OPEN EC3 BJS WME/BJP
45 Housing Type S2 S2.01 ME - Exhaust fan are connected in the wrong line A KEY/Subcon OPEN EC3 BJS WME/BJP
46 Housing Type S2 S2.01 ME - All AC are installed but not energized yet A KEY/Subcon OPEN EC3 BJS WME/BJP
47 Housing Type S2 S2.01 ME AC - The drain AC pipe has not been connected A KEY/Subcon OPEN PP BJS WME/BJP
48 Housing Type S2 S2.01 ME On Ceiling - Some cable are installed without conduit pipe. A KEY/Subcon OPEN PP BJS WME/BJP
49 Housing Type S2 S2.01 ME - Pipe Installation on ceiling untidy A KEY/Subcon OPEN PP BJS WME/BJP
- Manhole is not strong, there is no additional support for people to climb into the
50 Housing Type S2 S2.01 ME manhole A KEY/Subcon OPEN CI BJS WME/BJP
51 Housing Type S2 S2.01 ME - The junction box have no cover (cable connection) A KEY/Subcon OPEN EL3 BJS WME/BJP
20-Dec TOTAL PROGRESS REMARKS
0 0%
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Proses
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 0
50
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
1 Housing Type S2 S2.02 ME Minipraghm Installation - Input and output MCB cable shall be connected using terminal A KEY/Subcon OPEN EL2 BJS WME/BJP
- The color of the cable (from 3 phase to 1 phase) does not match the PUIL 2011 &
2 Housing Type S2 S2.02 ME A KEY/Subcon OPEN EL3 BJS WME/BJP
replace to 4mm cable
3 Housing Type S2 S2.02 ME - The MCB spare shall be 3 pcs. Only 2 pcs are available A KEY/Subcon OPEN EL2 BJS WME/BJP
4 Housing Type S2 S2.02 ME - The MCB tagging is not in correct sequent A KEY/Subcon OPEN EL2 BJS WME/BJP
5 Housing Type S2 S2.02 ME - Tagging is wrong for power outlet 3 of MCB A KEY/Subcon OPEN EL2 BJS WME/BJP
6 Housing Type S2 S2.02 ME - No information label/tagging on the minipragma A KEY/Subcon OPEN EL2 BJS WME/BJP
7 Housing Type S2 S2.02 ME - Connecting cable on the terminal is untidy A KEY/Subcon OPEN EL3 BJS WME/BJP
8 Housing Type S2 S2.02 ME Entrance - This pilar lamp does not work ( 1 only ) A KEY/Subcon OPEN EL1 BJS WME/BJP
9 Housing Type S2 S2.02 ME Living Room - Sink hose it not connected yet to the clean water and waste water line A KEY/Subcon OPEN PP BJS WME/BJP
10 Housing Type S2 S2.02 ME All area - Some power outlets are not protection type, shall be replaced A KEY/Subcon OPEN EL2 BJS WME/BJP
11 Housing Type S2 S2.02 ME Living Room - The switch is damage, need to replace with the good one A KEY/Subcon OPEN EL2 BJS WME/BJP
12 Housing Type S2 S2.02 ME - There is a gap in the switches B KEY/Subcon OPEN EL2 BJS WME/BJP
13 Housing Type S2 S2.02 ME Master Bathroom - The ceramic tile shall be replaced since the switches not installed very badly B KEY/Subcon OPEN EL2 BJS WME/BJP
14 Housing Type S2 S2.02 ME - There is gap in the power outlet B KEY/Subcon OPEN EL2 BJS WME/BJP
15 Housing Type S2 S2.02 ME - The hose closet is too short A KEY/Subcon OPEN PP BJS WME/BJP
16 Housing Type S2 S2.02 ME - Toilet connection pipe untidy and there is gap on pipe A KEY/Subcon OPEN PP BJS WME/BJP
17 Housing Type S2 S2.02 ME - There is a gap between the exhaust fan grill and ceiling. B KEY/Subcon OPEN EC3 BJS WME/BJP
18 Housing Type S2 S2.02 ME - Plywood is untidy installed (on washtafel) B KEY/Subcon OPEN FU BJS WME/BJP
19 Housing Type S2 S2.02 ME - Pipe hole is untidy installed (on washtafel) B KEY/Subcon OPEN PP BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
50
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
20 Housing Type S2 S2.02 ME Master Bedroom - TV/internet outlet and power outlet is not installed yet A KEY/Subcon OPEN EL2 BJS WME/BJP
- The ceramic tile shall be replaced since the switches not installed very badly,
21 Housing Type S2 S2.02 ME Bathroom B KEY/Subcon OPEN EL2 BJS WME/BJP
chnge ceramic
22 Housing Type S2 S2.02 ME - The clean water pipe not connected yet A KEY/Subcon OPEN PP BJS WME/BJP
23 Housing Type S2 S2.02 ME - Washtafel pipe connetion untidy, and plywood untidy A KEY/Subcon OPEN PP BJS WME/BJP
24 Housing Type S2 S2.02 ME Bathroom (Toilet) - The clean water closet pipe connected yet A KEY/Subcon OPEN PP BJS WME/BJP
25 Housing Type S2 S2.02 ME - There is gap between connection pipe and the wall B KEY/Subcon OPEN PP BJS WME/BJP
26 Housing Type S2 S2.02 ME Above Ceiling - Some cable are installed without conduit pipe. A KEY/Subcon OPEN PP BJS WME/BJP
27 Housing Type S2 S2.02 ME - Some TV, internet cable are install without conduit pipe A KEY/Subcon OPEN PP BJS WME/BJP
28 Housing Type S2 S2.02 ME - Manhole is not strong, there is no additional support for people to climb into the A KEY/Subcon OPEN CI BJS WME/BJP
manhole
29 Housing Type S2 S2.02 ME - Pipe Installation on ceiling untidy A KEY/Subcon OPEN PP BJS WME/BJP
30 Housing Type S2 S2.02 ME - The junction box have no cover (cable connection) and untidy A KEY/Subcon OPEN EL3 BJS WME/BJP
31 Housing Type S2 S2.02 ME Roof Deck - Roof drain over the bathroom has no rainwater path holes 1 unit A KEY/Subcon OPEN PP BJS WME/BJP
32 Housing Type S2 S2.02 ME - Roof drain of rain water on the terrace has no rain water path holes i unit A KEY/Subcon OPEN PP BJS WME/BJP
33 Housing Type S2 S2.02 ME Pipe Installation - All rain water pipe not connected yet to the mainline A KEY/Subcon OPEN PP BJS WME/BJP
34 Housing Type S2 S2.02 ME - The floor drain of waste water pipe not connected yet to the mainline sum pit A KEY/Subcon OPEN PP BJS WME/BJP
- All AC are installed but not energized yet and all of support not installed yet
35 Housing Type S2 S2.02 ME Air Conditioner A KEY/Subcon OPEN EC3 BJS WME/BJP
foundation
36 Housing Type S2 S2.02 ME - Drain pipe AC not installed yet A KEY/Subcon OPEN EC3 BJS WME/BJP
37 Housing Type S2 S2.02 ME - Above the bedrom there is no AC drain A KEY/Subcon OPEN PP BJS WME/BJP
38 Housing Type S2 S2.02 ME Grounding - The grounding rood clamp shall be 2 pcs. Only 1pc is installed. A KEY/Subcon OPEN EL4 BJS WME/BJP
39 Housing Type S2 S2.02 ME - The bottom grounding is not yet in concrete A KEY/Subcon OPEN EL4 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
50
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
40 Housing Type S2 S2.02 ME - There is no cover on the grounding pit A KEY/Subcon OPEN EL4 BJS WME/BJP
41 Housing Type S2 S2.02 ME - Untidy of conduit cable grounding A KEY/Subcon OPEN PP BJS WME/BJP
42 Housing Type S2 S2.02 ME - Check elevation grounding rod refer to design drawing A KEY/Subcon OPEN EL4 BJS WME/BJP
43 Housing Type S2 S2.02 ME Electric Water Heater (EWH) - The hose / pipe of the water heater in the jogja parasas hole ar untidy A KEY/Subcon OPEN PP BJS WME/BJP
- Move the electric water heater (EWH) position above the deck then give
44 Housing Type S2 S2.02 ME support/bracket, and close the ceiling A KEY/Subcon OPEN EC3 BJS WME/BJP
45 Housing Type S2 S2.02 ME - The conduit cable of water heater is untidy A KEY/Subcon OPEN PP BJS WME/BJP
46 Housing Type S2 S2.02 ME Terrace - There is a gap in the pillar lamp and pillar lamp area unclean B KEY/Subcon OPEN EL1 BJS WME/BJP
47 Housing Type S2 S2.02 ME - Faucet has not been installed yet A KEY/Subcon OPEN PP BJS WME/BJP
48 Housing Type S2 S2.02 ME Terrace (garden) - Unclean and check correction leveling on verticality with water pass of garden C KEY/Subcon OPEN EL1 BJS WME/BJP
lamp
49 Housing Type S2 S2.02 ME Terrace - Faucet has not been installed yet A KEY/Subcon OPEN PP BJS WME/BJP
50 Housing Type S2 S2.02 ME Terrace (garden) - Check correction leveling on verticality with water pass of garden lamp C KEY/Subcon OPEN EL1 BJS WME/BJP
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 0% Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 0
75
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
Minipraghm
1 Housing Type S2 S2.03 ME Installation - 1 pcs bolt is missing on the minipraghm B OPEN EL2 BJS WME/BJP
2 Housing Type S2 S2.03 ME - No tagging / no information label on the minipraghm A OPEN EL2 BJS WME/BJP
3 Housing Type S2 S2.03 ME - There is gap a in the minipraghm box A OPEN EL2 BJS WME/BJP
4 Housing Type S2 S2.03 ME - MCB tagging/information label on label on cable are not in correct sequent A OPEN EL2 BJS WME/BJP
5 Housing Type S2 S2.03 ME - The MCB spare shall be 3 unit A OPEN EL2 BJS WME/BJP
6 Housing Type S2 S2.03 ME - The cable colour is wrong (from MAC 3 phase to input MCB phase 1) A OPEN EL3 BJS WME/BJP
7 Housing Type S2 S2.03 ME - Connection cable on the terminal is untidy (grounding & netral) A OPEN EL3 BJS WME/BJP
- The color of the cable (from 3 phase to 1 phase) does not match the PUIL 2011 &
8 Housing Type S2 S2.03 ME A OPEN EL3 BJS WME/BJP
replace to 4mm cable
9 Housing Type S2 S2.03 ME - 1 Side bracket is missing on minipragma casing A OPEN EL2 BJS WME/BJP
10 Housing Type S2 S2.03 ME - The MCB for ONT shall be moved to spare position A OPEN EL2 BJS WME/BJP
11 Housing Type S2 S2.03 ME - Input and output MCB cable shall be connected using sleve (skun) A OPEN EL3 BJS WME/BJP
- Tagging of MCB for EWH and AC-3 are connected is wrong line, need to be
12 Housing Type S2 S2.03 ME corrected A OPEN EL2 BJS WME/BJP
13 Housing Type S2 S2.03 ME Living Room - The position of the switch cover up behind the curtain, need to rlocate (garden) B OPEN EL2 BJS WME/BJP
14 Housing Type S2 S2.03 ME - There is a gap in the switches B OPEN EL2 BJS WME/BJP
15 Housing Type S2 S2.03 ME - Some power outle protection type, shall be replaced A OPEN EL2 BJS WME/BJP
16 Housing Type S2 S2.03 ME - Switch has not been installed yet (2 unit beside the door) A OPEN EL2 BJS WME/BJP
17 Housing Type S2 S2.03 ME Pantry/Kitchen - There is a gap on power outlet cooker hood and seal the gap B OPEN EL2 BJS WME/BJP
18 Housing Type S2 S2.03 ME - Hose of sink is not connected yet to clean water and waste water line A OPEN PP BJS WME/BJP
19 Housing Type S2 S2.03 ME Living Room - The AC cassete unit is not energized yet A OPEN EL3 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
75
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
20 Housing Type S2 S2.03 ME - There is a gap between the AC cassete and ceiling B OPEN EC3 BJS WME/BJP
Living Room, Master ,- The ONT line (Optical Network Termination), TV, telephone, internet are not
21 Housing Type S2 S2.03 ME A OPEN EC2 BJS WME/BJP
bedroom, bedroom installed yet
22 Housing Type S2 S2.03 ME Bathroom - The switch is damage, need to replace with the good one, and there is a gap on B OPEN EL2 BJS WME/BJP
switch
23 Housing Type S2 S2.03 ME - Here is a gap in the power outlet, replace the ceramic B OPEN EL2 BJS WME/BJP
24 Housing Type S2 S2.03 ME - The hose of closet outlet is too short A OPEN PP BJS WME/BJP
25 Housing Type S2 S2.03 ME - Cleaning and press gap exhaust B OPEN EC3 BJS WME/BJP
26 Housing Type S2 S2.03 ME - The pipe hole is untidy installed (On Washtafel),and sealant gap between pipe B OPEN PP BJS WME/BJP
hole and wall
27 Housing Type S2 S2.03 ME - Plywood is untidy installed (on wastafel) C OPEN FU BJS WME/BJP
28 Housing Type S2 S2.03 ME Bedroom - 3 pcs lamps are not available A OPEN EL1 BJS WME/BJP
29 Housing Type S2 S2.03 ME - The AC unit is not energized yet and cover on AC is not installed yet A OPEN EC3 BJS WME/BJP
30 Housing Type S2 S2.03 ME - The cover of switches is missing (not available) A OPEN EL2 BJS WME/BJP
31 Housing Type S2 S2.03 ME Walk in Closet - The power outlet is not in straight position B OPEN EL2 BJS WME/BJP
32 Housing Type S2 S2.03 ME Master Bathroom - The switch is damage, need to replace with the good one, and press gap on switch A OPEN EL2 BJS WME/BJP
34 Housing Type S2 S2.03 ME - Sink pipe of hole is untidy installed (on wastafel), and sealant gap between pipe A OPEN PP BJS WME/BJP
and wall
35 Housing Type S2 S2.03 ME - The toilet hose of clean water is not connected yet A OPEN PP BJS WME/BJP
37 Housing Type S2 S2.03 ME - There is a gap in the shower hose B OPEN PP BJS WME/BJP
38 Housing Type S2 S2.03 ME Master Bedroom - The cover of switches is missing (not available) A OPEN EL2 BJS WME/BJP
39 Housing Type S2 S2.03 ME - The AC unit is not energized yet and cover on AC is not installed yet A OPEN EC3 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
75
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
40 Housing Type S2 S2.03 ME - There is on gap power outlets B OPEN EL2 BJS WME/BJP
41 Housing Type S2 S2.03 ME Terrace - The power outlet installed on paras jogja stone shall be finishing properly B OPEN EL2 BJS WME/BJP
42 Housing Type S2 S2.03 ME Terrace (garden) - Unclean and check correction leveling on verticality with water pass of garden C OPEN EL2 BJS WME/BJP
lamp
43 Housing Type S2 S2.03 ME Terrace - Armature downlight outbow need to be clean, and check leveling with water pass B OPEN EL1 BJS WME/BJP
44 Housing Type S2 S2.03 ME - Wall lamp need to be clean, and check verticality leveling with water pass B OPEN EL1 BJS WME/BJP
45 Housing Type S2 S2.03 ME - Faucet not installed yet A OPEN PP BJS WME/BJP
46 Housing Type S2 S2.03 ME Entrance - Faucet not installed yet A OPEN PP BJS WME/BJP
47 Housing Type S2 S2.03 ME - Wall lamp need to be clean, and check verticality leveling with water pass B OPEN EL1 BJS WME/BJP
48 Housing Type S2 S2.03 ME Service Area - The switch is damage, need to replace with the good one A OPEN EL2 BJS WME/BJP
49 Housing Type S2 S2.03 ME - There is a gap in the power outlet B OPEN EL2 BJS WME/BJP
50 Housing Type S2 S2.03 ME - The gas line need to cover up and seal finishing C OPEN PP BJS WME/BJP
51 Housing Type S2 S2.03 ME - The lamps is not installed yet A OPEN EL1 BJS WME/BJP
52 Housing Type S2 S2.03 ME Grounding - Cleaning the grounding area C OPEN EL4 BJS WME/BJP
- The grounding rood clamp shall be 2 pcs. Only 1pc is installed. And check
53 Housing Type S2 S2.03 ME elevation grounding refer to design drawing A OPEN EL4 BJS WME/BJP
54 Housing Type S2 S2.03 ME - Base concrete is not installed A OPEN EL4 BJS WME/BJP
55 Housing Type S2 S2.03 ME - There is no cover concrete in the grounding box A OPEN EL4 BJS WME/BJP
56 Housing Type S2 S2.03 ME Grease Trap - The grease trap pipe has not been installed A OPEN PP BJS WME/BJP
57 Housing Type S2 S2.03 ME - Replace the grease trap hose with the pipe according to the drawing A OPEN PP BJS WME/BJP
58 Housing Type S2 S2.03 ME Pipe Installation - The rain pipe not connected yet to main line A OPEN PP BJS WME/BJP
- The waste water closet and floor drain pipe not connected yet to the mainline
59 Housing Type S2 S2.03 ME STP A OPEN PP BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
75
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
60 Housing Type S2 S2.03 ME Roof Deck - The power outlet, need to be clean, the inbow type shouldn't be outside (EWT) A OPEN EL2 BJS WME/BJP
61 Housing Type S2 S2.03 ME - The grill cover must be detachable B OPEN PP BJS WME/BJP
62 Housing Type S2 S2.03 ME - All grill cover on roof drain rusty and need to cleaning then repainting B OPEN PP BJS WME/BJP
63 Housing Type S2 S2.03 ME - All AC bracket/foundation has not installed yet A OPEN EC3 BJS WME/BJP
64 Housing Type S2 S2.03 ME - Drain AC has not been installed yet A OPEN PP BJS WME/BJP
65 Housing Type S2 S2.03 ME - The refregerant pipe installed untidy, then install camp refregerant to wall, and A OPEN PP BJS WME/BJP
seal on refregerant pipe between refregerant and wall
66 Housing Type S2 S2.03 ME - The grill cover on roof drain broken, need to replace, west position above the A OPEN PP BJS WME/BJP
bedroom deck
67 Housing Type S2 S2.03 ME - The roof drain burried up by screeding mortar (should be 2 holes available) A OPEN PP BJS WME/BJP
68 Housing Type S2 S2.03 ME Electric Water Heater - The hose / pipe of the water heater in the jogja parasas hole are untidy A OPEN PP BJS WME/BJP
(EWH)
69 Housing Type S2 S2.03 ME - Move the electric water heater (EWH) position above the deck then give A OPEN EC3 BJS WME/BJP
support/bracket, and close the ceiling
70 Housing Type S2 S2.03 ME - The conduit cable of water heater is untidy A OPEN PP BJS WME/BJP
71 Housing Type S2 S2.03 ME On Ceiling - The junction box is not installed yet (cable connection) A OPEN EL3 BJS WME/BJP
72 Housing Type S2 S2.03 ME - Some cable are installed without conduit pipe. A OPEN PP BJS WME/BJP
73 Housing Type S2 S2.03 ME - Some tv, internet cable are install without conduit pipe A OPEN PP BJS WME/BJP
74 Housing Type S2 S2.03 ME - Manhole is not strong, there is no additional support for people to climb into the A OPEN CI BJS WME/BJP
manhole
75 Housing Type S2 S2.03 ME - Pipe Installation on ceiling untidy A OPEN PP BJS WME/BJP
20-Dec TOTAL PROGRESS REMARKS
0 0%
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 0
65
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
1 Housing Type S2 S2.04 ME Minipragma Installation - No information label on the minipragma cover A OPEN EL2 BJS WME/BJP
2 Housing Type S2 S2.04 ME - MCB (ampere) sequence doesn't match the drawing A OPEN EL2 BJS WME/BJP
3 Housing Type S2 S2.04 ME - The MCB spare shall be 3 pcs A OPEN EL2 BJS WME/BJP
- Color of the cable (from 3 phase to 1 phase) does not match with the PUIL 2011
4 Housing Type S2 S2.04 ME & replace to 4mm cable A OPEN EL3 BJS WME/BJP
5 Housing Type S2 S2.04 ME - Input and output MCB cable shall be connected using sleve (skun) A OPEN EL3 BJS WME/BJP
6 Housing Type S2 S2.04 ME - Cable on terminal undity A OPEN EL3 BJS WME/BJP
7 Housing Type S2 S2.04 ME - MCB tagging is not in correct sequent A OPEN EL2 BJS WME/BJP
Living Room, Master - The ONT line ( Optical Network Termination), TV, telephone, internet are not
8 Housing Type S2 S2.04 ME A OPEN EC2 BJS WME/BJP
Bedroom, Bedroom installed yet
9 Housing Type S2 S2.04 ME Living Room - Telephone power outlet tilted, must be level A OPEN EL2 BJS WME/BJP
10 Housing Type S2 S2.04 ME - There is a gap in the switches B OPEN EL2 BJS WME/BJP
11 Housing Type S2 S2.04 ME - The switch is damage, need to replace with the good one B OPEN EL2 BJS WME/BJP
- There is a gap in the power outlet in pantry, press gap and sealant power outlet
12 Housing Type S2 S2.04 ME Living Room (Pantry) for gap to ceramic B OPEN EL2 BJS WME/BJP
13 Housing Type S2 S2.04 ME Living Room - All lamp are not installed yet (12 unit) A OPEN EL1 BJS WME/BJP
14 Housing Type S2 S2.04 ME Living Room (Pantry) - The cooker hood when turned on is loud, and cable untidy B OPEN EL1 BJS WME/BJP
15 Housing Type S2 S2.04 ME - Sink hose is not connected to the clean water and waste water line A OPEN PP BJS WME/BJP
16 Housing Type S2 S2.04 ME All Area - Some power outlets are not protection type, shall be replace A OPEN EL2 BJS WME/BJP
17 Housing Type S2 S2.04 ME Bathroom - The switch is damage (anjlok), need to replace with the good one B OPEN EL2 BJS WME/BJP
18 Housing Type S2 S2.04 ME - The Closet pipe untidy B OPEN PP BJS WME/BJP
19 Housing Type S2 S2.04 ME - There is a gap between the exhaust fan grill and ceiling. B OPEN EC3 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
65
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
21 Housing Type S2 S2.04 ME - Washtafel pipe line untidy, and sealant between pipe and wall B OPEN PP BJS WME/BJP
22 Housing Type S2 S2.04 ME Bedroom - The switch doesn't connect to the lamp, it should be if the switch is on 1, then the A OPEN EL3 BJS WME/BJP
light must be on 1
23 Housing Type S2 S2.04 ME - There is a gap in the power outlet B OPEN EL2 BJS WME/BJP
24 Housing Type S2 S2.04 ME - The lamp, 2 pcs not available A OPEN EL1 BJS WME/BJP
25 Housing Type S2 S2.04 ME - AC is not energized yet, check either power or AC broken, and press gap between A A OPEN EC3 BJS WME/BJP
26 Housing Type S2 S2.04 ME - The cover of switch is missing (not available) A OPEN EL2 BJS WME/BJP
27 Housing Type S2 S2.04 ME Master Bathroom - Cleaning the switch and power outlet (all) B OPEN EL2 BJS WME/BJP
28 Housing Type S2 S2.04 ME - The switch is damage (seret), need to replace with the good one B OPEN EL2 BJS WME/BJP
29 Housing Type S2 S2.04 ME - There is a gap in the switch B OPEN EL2 BJS WME/BJP
30 Housing Type S2 S2.04 ME - Gap closet hose untidy B OPEN PP BJS WME/BJP
32 Housing Type S2 S2.04 ME - There is gap between washtafel pipe and wall, then sealant B OPEN PP BJS WME/BJP
33 Housing Type S2 S2.04 ME Master Bedroom - All lights not installed yet A OPEN EL1 BJS WME/BJP
34 Housing Type S2 S2.04 ME Master Bedroom (AC) - AC is not energized yet, check either power or AC broken, and press gap between A OPEN EC3 BJS WME/BJP
AC and wall
35 Housing Type S2 S2.04 ME Master Bedroom - There is a gap in the power outlet B OPEN EL2 BJS WME/BJP
36 Housing Type S2 S2.04 ME Terrace - The power outlet in paras jogja not installed properly B OPEN EL2 BJS WME/BJP
37 Housing Type S2 S2.04 ME - The faucet has not been installed yet A OPEN PP BJS WME/BJP
38 Housing Type S2 S2.04 ME - The correction leveling on verticality of garden lamp C OPEN EL2 BJS WME/BJP
39 Housing Type S2 S2.04 ME - Cleaning Downlight outbow, and check leveling with water pass B OPEN EL1 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
65
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
40 Housing Type S2 S2.04 ME - There is a gap in the pillar lamp, and unclean B OPEN EL1 BJS WME/BJP
41 Housing Type S2 S2.04 ME Service Room - The lamp not installed yet A OPEN EL1 BJS WME/BJP
42 Housing Type S2 S2.04 ME - Lamp armature untidy, the cleaning A OPEN EL1 BJS WME/BJP
43 Housing Type S2 S2.04 ME Entrance - Cleaning Downlight outbow, and check leveling with water pass B OPEN EL1 BJS WME/BJP
44 Housing Type S2 S2.04 ME - There is a gap in the pillar lamp, and unclean B OPEN EL1 BJS WME/BJP
45 Housing Type S2 S2.04 ME - The correction leveling on verticality of garden lamp C OPEN EL1 BJS WME/BJP
46 Housing Type S2 S2.04 ME - The faucet has not been installed yet A OPEN PP BJS WME/BJP
47 Housing Type S2 S2.04 ME Grounding - Cleaning the grounding area C OPEN EL4 BJS WME/BJP
48 Housing Type S2 S2.04 ME - Base concrete is not installed yet, clamp rod ground shall be 2 pcs, and check A OPEN EL4 BJS WME/BJP
elevation grounding refer to design drawing
49 Housing Type S2 S2.04 ME - The is no cover concrete in the grounding box A OPEN EL4 BJS WME/BJP
50 Housing Type S2 S2.04 ME Pipe Installation - The grease trap pipe has not been installed to mainline STP A OPEN PP BJS WME/BJP
51 Housing Type S2 S2.04 ME - Replace the grease trap hose with the pipe according to the drawing A OPEN PP BJS WME/BJP
52 Housing Type S2 S2.04 ME - The rain pipe not connected yet to main line A OPEN PP BJS WME/BJP
- Waste water of floor drain pipe and waste water closet are not connected to
53 Housing Type S2 S2.04 ME main line, and give support (concrete) under the pipe A OPEN PP BJS WME/BJP
54 Housing Type S2 S2.04 ME Roof Deck - Rusty filter roof drain, shall be painting and the grill cover shall be detachable B OPEN PP BJS WME/BJP
55 Housing Type S2 S2.04 ME - Installation of roof drain accessories undity and loose A OPEN PP BJS WME/BJP
- Rain water of roof drain path above the terrace less then 1 hole, and 1 pcs cover
56 Housing Type S2 S2.04 ME is missing A OPEN PP BJS WME/BJP
57 Housing Type S2 S2.04 ME - There is no all AC outdoor support and anchor A OPEN EC3 BJS WME/BJP
- Move the electric water heater (EWH) position above the deck then give
59 Housing Type S2 S2.04 ME support/bracket, and close the ceiling A OPEN EC3 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
65
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of SUBCON Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec 19-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
60 Housing Type S2 S2.04 ME - The conduit cable of water heater is untidy B OPEN PP BJS WME/BJP
61 Housing Type S2 S2.04 ME Roof Deck (EWH) - The inbow type shouldn't be outside (EWT) B OPEN EC3 BJS WME/BJP
62 Housing Type S2 S2.04 ME Roof Deck - AC Drain pipe not connected A OPEN PP BJS WME/BJP
63 Housing Type S2 S2.04 ME On Ceiling - Some cable are installed without conduit pipe. A OPEN PP BJS WME/BJP
64 Housing Type S2 S2.04 ME - Pipe Installation on ceiling untidy A OPEN PP BJS WME/BJP
65 Housing Type S2 S2.04 ME - The junction box have no cover (cable connection) A OPEN EL3 BJS WME/BJP
20-Dec TOTAL PROGRESS REMARKS
0 0%
0 Proses
0 Proses
0 Proses
0 Proses
0 Proses
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Proses
0 Not Actifity
0 Proses
0 Proses
20-Dec TOTAL PROGRESS REMARKS
0 Proses
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
BJP HOUSING KILLING PUNCH LIST 0
63
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
1 Housing Type S2 S2.05 ME Minipraghm - No information label on the minipragma cover A KEY/Subcon OPEN EL2 BJS WME/BJP
Installation
2 Housing Type S2 S2.05 ME - The Incoming main cable is too short, move the 3 phase MCB to an area A KEY/Subcon OPEN EL3 BJS WME/BJP
closer to the cable
3 Housing Type S2 S2.05 ME - wire at the terminal are untidy (Neutral & grounding) A KEY/Subcon OPEN EL3 BJS WME/BJP
4 Housing Type S2 S2.05 ME - MCB tagging is not in correct sequent and tagging on MCB is loose, A KEY/Subcon OPEN EL2 BJS WME/BJP
need be tighten
5 Housing Type S2 S2.05 ME - Color of the cable (from 3 phase to 1 phase) does not match with the A KEY/Subcon OPEN EL3 BJS WME/BJP
PUIL 2011 & replace to 4mm cable
6 Housing Type S2 S2.05 ME - Input and output MCB cable shall be connected using sleve (skun) A KEY/Subcon OPEN EL3 BJS WME/BJP
7 Housing Type S2 S2.05 ME - ONT (Optical Network Termination) MCB move to spare MCB A KEY/Subcon OPEN EL2 BJS WME/BJP
8 Housing Type S2 S2.05 ME - MCB spare nare not installed on minipragma, MCB spar shall be 3 pcs A KEY/Subcon OPEN EL2 BJS WME/BJP
9 Housing Type S2 S2.05 ME Living Room - Reserve installation switch and change coarse switch (for terrace and A KEY/Subcon OPEN EL2 BJS WME/BJP
garden)
10 Housing Type S2 S2.05 ME - There is a gap on switch, and ceiling all switch B KEY/Subcon OPEN EL2 BJS WME/BJP
11 Housing Type S2 S2.05 ME All Area - All power outlets shall be install protection A KEY/Subcon OPEN EL2 BJS WME/BJP
12 Housing Type S2 S2.05 ME Living Room - Hose is not connected to the clean water and waste water line A KEY/Subcon OPEN PP BJS WME/BJP
13 Housing Type S2 S2.05 ME - Ac ceiling cassete can not turn on, check either power or AC cassete A KEY/Subcon OPEN EC3 BJS WME/BJP
broken
14 Housing Type S2 S2.05 ME - There is a gap between the lamp and ceiling. And cleaning armature B KEY/Subcon OPEN EL1 BJS WME/BJP
lamp
15 Housing Type S2 S2.05 ME Living Room, Master - The ONT line (Optical Network Termination), TV, telephone, internet are A KEY/Subcon OPEN EC2 BJS WME/BJP
Bedroom, Bedroom not installed yet
16 Housing Type S2 S2.05 ME Living Room (Pantry) - Filter cooker hood broken A KEY/Subcon OPEN EC3 BJS WME/BJP
17 Housing Type S2 S2.05 ME Bathroom - Washtafel pipe line untidy, and sealant between pipe and wall B KEY/Subcon OPEN PP BJS WME/BJP
19 Housing Type S2 S2.05 ME - There is gap a in the power outlet, change ceramic A KEY/Subcon OPEN EL2 BJS WME/BJP
BJP HOUSING KILLING PUNCH LIST 0
63
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
20 Housing Type S2 S2.05 ME Bedroom - AC split can not turn on, check either power or AC broken A KEY/Subcon OPEN EC3 BJS WME/BJP
21 Housing Type S2 S2.05 ME - There is a gap between the lamp and ceiling. Please prss the armature B KEY/Subcon OPEN EL1 BJS WME/BJP
22 Housing Type S2 S2.05 ME Master Bathroom - Reverse switch and the light off A KEY/Subcon OPEN EL2 BJS WME/BJP
23 Housing Type S2 S2.05 ME - 5 pcs lamp are not energized yet A KEY/Subcon OPEN EL1 BJS WME/BJP
- Exhaust fan is energized yet, Note: all connection cables at the exhaust
24 Housing Type S2 S2.05 ME must be at the terminals A KEY/Subcon OPEN EC3 BJS WME/BJP
26 Housing Type S2 S2.05 ME - The Washtafel pipe line, then sealant between pipe and wall B KEY/Subcon OPEN PP BJS WME/BJP
27 Housing Type S2 S2.05 ME - Hose of closet outlet is too short, change hose A KEY/Subcon OPEN PP BJS WME/BJP
28 Housing Type S2 S2.05 ME - The flush closet broken (anjlok) A KEY/Subcon OPEN PP BJS WME/BJP
29 Housing Type S2 S2.05 ME On Ceiling - Some cable are installed without conduit pipe. All cable shall be instal A KEY/Subcon OPEN EL3 BJS WME/BJP
use conduit
30 Housing Type S2 S2.05 ME - Pipe Installation on ceiling untidy A KEY/Subcon OPEN PP BJS WME/BJP
31 Housing Type S2 S2.05 ME - Manhole is not strong, there is no additional support for people to climb A KEY/Subcon OPEN CI BJS WME/BJP
into the manhole
32 Housing Type S2 S2.05 ME - The junction box have no cover (cable connection) A KEY/Subcon OPEN EL3 BJS WME/BJP
33 Housing Type S2 S2.05 ME Master Bedroom - The switch is damage, need to replace with the good one (seret) A KEY/Subcon OPEN EL2 BJS WME/BJP
34 Housing Type S2 S2.05 ME - The cover of switches are missing (not available) A KEY/Subcon OPEN EL2 BJS WME/BJP
35 Housing Type S2 S2.05 ME - AC split can not turn on, check either power or AC broken, and cover of A KEY/Subcon OPEN EC3 BJS WME/BJP
AC not installed yet
36 Housing Type S2 S2.05 ME - The cover of TV and internet outlet are missing (not available) A KEY/Subcon OPEN EL2 BJS WME/BJP
37 Housing Type S2 S2.05 ME Terrace - There are no lights on the wall lights yet, and there is gap on wall lamp A KEY/Subcon OPEN EL1 BJS WME/BJP
38 Housing Type S2 S2.05 ME - The faucet not installed yet A KEY/Subcon OPEN PP BJS WME/BJP
39 Housing Type S2 S2.05 ME - Cleaning downlight outbow, and check level downlight outbow with B KEY/Subcon OPEN EL1 BJS WME/BJP
water pass
BJP HOUSING KILLING PUNCH LIST 0
63
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
40 Housing Type S2 S2.05 ME - Check leveling on verticality with water pass of garden lamp C KEY/Subcon OPEN EL1 BJS WME/BJP
41 Housing Type S2 S2.05 ME Entrance - Downlight Outbow lamp are not installed A KEY/Subcon OPEN EL1 BJS WME/BJP
42 Housing Type S2 S2.05 ME - Check leveling on verticality with water pass of garden lamp (2 pcs) C KEY/Subcon OPEN EL2 BJS WME/BJP
43 Housing Type S2 S2.05 ME - Cleaning downlight outbow armature, and check leveling verticality with B KEY/Subcon OPEN EL1 BJS WME/BJP
water pass
44 Housing Type S2 S2.05 ME - Cleaning the pillar lamp C KEY/Subcon OPEN EL1 BJS WME/BJP
45 Housing Type S2 S2.05 ME - The cover of T-dus missing (not available) A KEY/Subcon OPEN EL3 BJS WME/BJP
46 Housing Type S2 S2.05 ME - Faucet not installed yet A KEY/Subcon OPEN PP BJS WME/BJP
47 Housing Type S2 S2.05 ME Grounding - The grounding rod clamp shall be 2 pcs. A KEY/Subcon OPEN EL4 BJS WME/BJP
48 Housing Type S2 S2.05 ME - Conduit of grounding untidy A KEY/Subcon OPEN EL4 BJS WME/BJP
49 Housing Type S2 S2.05 ME - Cover and base concrete are not installed yet A KEY/Subcon OPEN EL4 BJS WME/BJP
50 Housing Type S2 S2.05 ME Grease Trap - Grease trap pipe is incorrectly connected, it should be to the main pipe A KEY/Subcon OPEN PP BJS WME/BJP
STP
51 Housing Type S2 S2.05 ME - Replace the grease trap hose with the pipe according to the drawing A KEY/Subcon OPEN PP BJS WME/BJP
52 Housing Type S2 S2.05 ME Pipe Installation - Rain pipe not connected to main line, Note: all pipe must be tighten and A KEY/Subcon OPEN PP BJS WME/BJP
lock with land concrete as per 2 meter
53 Housing Type S2 S2.05 ME - The floor drain of waste water pipe not connected yet to the mainline A KEY/Subcon OPEN PP BJS WME/BJP
sum pit
54 Housing Type S2 S2.05 ME Service Room - Cleaning the switch C KEY/Subcon OPEN EL2 BJS WME/BJP
55 Housing Type S2 S2.05 ME - Lamp is not installed yet A KEY/Subcon OPEN EL2 BJS WME/BJP
56 Housing Type S2 S2.05 ME Roof Deck (Electric - The hose / pipe of the water heater in the jogja parasas hole are untidy A KEY/Subcon OPEN PP BJS WME/BJP
Water Heater)
57 Housing Type S2 S2.05 ME - Move the Electric Water Heater (EWH) position above the deck then A KEY/Subcon OPEN EC3 BJS WME/BJP
give support/bracket, and giver cover for EWH then close the ceiling
58 Housing Type S2 S2.05 ME - Inbow type box be replace with outbow (EWH), cable untidy A KEY/Subcon OPEN EL3 BJS WME/BJP
59 Housing Type S2 S2.05 ME Roof Deck - All AC outdoor bracket are not install foundation and sealant the hole A KEY/Subcon OPEN EC3 BJS WME/BJP
where the refregerant pipe place
BJP HOUSING KILLING PUNCH LIST 0
63
Punch
Item Building Unit Civil / ME Section Description .Cat. Responsible Status Item of Implementer Closed By 9-Dec 10-Dec 11-Dec 12-Dec 13-Dec 14-Dec 15-Dec 16-Dec 17-Dec 18-Dec
Control
No. (Incomplete/ Unsatisfactory Works) A/B/C Party Work
No.
60 Housing Type S2 S2.05 ME - Rusty filter roof drain, shall be painting and the grill cover shall be B KEY/Subcon OPEN PP BJS WME/BJP
detachable
61 Housing Type S2 S2.05 ME - Roof drain over the bathroom deck there is no filter/grill over A KEY/Subcon OPEN PP BJS WME/BJP
62 Housing Type S2 S2.05 ME - AC of drain pipe is not connected A KEY/Subcon OPEN PP BJS WME/BJP
63 Housing Type S2 S2.05 ME - Roof drain in terrace deck less 1 unit, in the drawing there are 2, check A KEY/Subcon OPEN PP BJS WME/BJP
all roof drain.
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 0%
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity
19-Dec 20-Dec TOTAL PROGRESS REMARKS
0 Not Actifity
0 Not Actifity
0 Not Actifity
0 Not Actifity