Weekly work load

Submittal date: 10/7/2022


Name : Philippe Alexandre Bérubé
Week starting: 10/11/2022

Status CLIENT VTEK PM PROJECT # PROJECT NAME Hours Project remaining


hours
Proposal FSM S. M. Krid 22091 R&I and AMP Initiatives 12 130
PO Irving J. Lefrançois 22096 Laser Scan and ISO's 1 2
PO Irving J. Lefrançois 22118 2023 Turnaround Piping Scan Support 2 701
90% Irving J. Attia 22127 T252 Change of Service 2 119
90% Irving J. Attia 22128 T181 Roof Insulation 2 33
90% Les Pipe-Lines Montréal S. M. Krid 22104 Modification Pipeline 24 po 3 24
PO Shell D. Haddouche 22057 LOT Support - Operations 2022 2 2
Proposal Shell J. Lefrançois 22110 Deadleg Inspection Database Upgrade 0 105
PO Suncor S. M. Krid 22012 Saskatoon Tank 99 Repair 1 1
OH VTEK S. M. Krid 9904 Overhead Mechanical 0 0
OH VTEK M. Trudelle 9914 Overhead Marketing 6 6
OH VTEK S. M. Krid 9900 Overhead Training 0 0
OH VTEK B. Lagacé 9918 Overhead HSSE 1 1
OH VTEK S. M. Krid - Vacation/ Holiday/ Off Work 8 8

Total = 40 1132