Assignment 2 DCS-I
Assignment 2 DCS-I
ASSIGNMENT No: 2
Assignment Outcomes: Marks
(I)Able to understand the WSM and LSM method.
(II) Able to understand prestressed concrete
SECTION A 4*1 = 4
1. Thickened part of a flat slab over its supporting column, is technically known as
i. drop panel
ii. capital
iii. column head
iv. none of these
a) . A flat slab is supported
i. on columns
ii. on beam
iii. on columns monolithicaily built with slab
iv. all the above
b) . The minimum thickness of a flat slab is taken
i. L/32 for end panels without drops
ii. L/36 for end panels without drops
iii. L/36 for interior panels without drop
iv. All the above
c) . Enlarged head of a supporting column of a flat slabs is technically .known as
i. top of the column
ii. capital
iii. drop panel
iv. none of these
SECTON B 3*2 = 6
2. Discuss the concept of prestressed concrete?
3. What is Flat slab? Discuss the difference between conventional and flat slab.
4. Explain the procedure for concrete mix design.
SECTION C 2*7 =14
5. Discuss the specification regarding spacing of reinforcement in slab, cover to reinforcement in slab,
beam column &footing.
6.Discuss the Merits and demerit of Working Stress Method.
1|P age
Note for students: Students are required to submit handwritten solutions of given assignment / tutorial sheet on or before La
of submission otherwise penalty in terms of deduction
in marks will be made as per following rule:
If submitted on or before last date then Deduction of marks = 0
If submission delayed by (1-7) days then Deduction of marks = 20%
If submission delayed by (8-14) days then Deduction of marks = 40%
If submission delayed by more than 15 days then Deduction of marks = 60%
2|P age